Green Mountain Power Corporation; Notice of Availability of Environment Assessment, 35888 [E6-9807]
Download as PDF
35888
Federal Register / Vol. 71, No. 120 / Thursday, June 22, 2006 / Notices
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–9798 Filed 6–21–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER06–944–001, et al.]
M–S–R Public Power Agency, et al.;
Electric Rate and Corporate Filings
June 16, 2006.
The following filings have been made
with the Commission. The filings are
listed in ascending order within each
docket classification.
1. City of Anaheim, California
[Docket No. ER06–944–001]
Take notice that on May 18, 2006,
City of Anaheim, California tendered for
filing a Certificate of Concurrence
regarding the filing by Public Service
Company of New Mexico of the
Amended and Restated San Juan Project
Participation Agreement.
Comment Date: 5 p.m. Eastern Time
on June 26, 2006.
2. Los Alamos County, New Mexico
[Docket No. ER06–944–001]
wwhite on PROD1PC61 with NOTICES
Take notice that on May 23, 2006, Los
Alamos County, New Mexico tendered
for filing a Certificate of Concurrence
regarding the filing by Public Service
Company of New Mexico of the
Amended and Restated San Juan Project
Participation Agreement.
Comment Date: 5 p.m. Eastern Time
on June 26, 2006.
3. M–S–R Public Power Agency, et al.
[Docket No. ER06–944–001]
Take notice that on May 22, 2006, M–
S–R Public power Agency, tendered for
filing a Certificate of Concurrence
VerDate Aug<31>2005
19:08 Jun 21, 2006
Jkt 208001
regarding the filing by Public Service
Company of New Mexico of the
Amended and Restated San Juan Project
Participation Agreement.
Comment Date: 5 p.m. Eastern Time
on June 26, 2006.
4. Southern California Public Power
Authority
[Docket No. ER06–944–001]
Take notice that on June 1, 2006,
Southern California Public Power
Authority tendered for filing a
Certificate of Concurrence regarding the
filing by Public Service Company of
New Mexico of the Amended and
Restated San Juan Project Participation
Agreement.
Comment Date: 5 p.m. Eastern Time
on June 26, 2006.
Standard Paragraph
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2513–066]
Green Mountain Power Corporation;
Notice of Availability of Environment
Assessment
June 15, 2006.
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s regulations, the Office of
Energy Projects has reviewed the
application by the licensee to install a
fifth turbine in the project powerhouse,
rated at 850 kW, with a maximum
hydraulic capacity of 210 cfs. The
project is located on the Winooski River
in the townships of Essex Junction and
Williston, Vermont. An environmental
assessment (EA) has been prepared.
In the EA, the Commission’s staff
concludes that approval of the licensee’s
application would not produce any
significant adverse environmental
impacts, consequently the proposal
would not constitute a major Federal
action significantly affecting the quality
of the human environment.
A copy of the EA is attached to a
Commission order titled ‘‘Order
Amending License and Revising Annual
Charges,’’ issued June 15, 2006, and is
available at the Commission’s Public
Reference Room. A copy of the EA may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘elibrary’’ link. Enter the docket
numbers (P–2513) in the docket field to
access the document. For assistance,
call (202) 502–8222 or (202) 502–8659
(for TTY).
Magalie R. Salas,
Secretary.
[FR Doc. E6–9807 Filed 6–21–06; 8:45 am]
BILLING CODE 6717–01–P
Magalie R. Salas,
Secretary.
[FR Doc. E6–9889 Filed 6–21–06; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
E:\FR\FM\22JNN1.SGM
22JNN1
Agencies
[Federal Register Volume 71, Number 120 (Thursday, June 22, 2006)]
[Notices]
[Page 35888]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-9807]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2513-066]
Green Mountain Power Corporation; Notice of Availability of
Environment Assessment
June 15, 2006.
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's regulations, the Office
of Energy Projects has reviewed the application by the licensee to
install a fifth turbine in the project powerhouse, rated at 850 kW,
with a maximum hydraulic capacity of 210 cfs. The project is located on
the Winooski River in the townships of Essex Junction and Williston,
Vermont. An environmental assessment (EA) has been prepared.
In the EA, the Commission's staff concludes that approval of the
licensee's application would not produce any significant adverse
environmental impacts, consequently the proposal would not constitute a
major Federal action significantly affecting the quality of the human
environment.
A copy of the EA is attached to a Commission order titled ``Order
Amending License and Revising Annual Charges,'' issued June 15, 2006,
and is available at the Commission's Public Reference Room. A copy of
the EA may also be viewed on the Commission's Web site at https://
www.ferc.gov using the ``elibrary'' link. Enter the docket numbers (P-
2513) in the docket field to access the document. For assistance, call
(202) 502-8222 or (202) 502-8659 (for TTY).
Magalie R. Salas,
Secretary.
[FR Doc. E6-9807 Filed 6-21-06; 8:45 am]
BILLING CODE 6717-01-P