Carolina Power and Light Company; Errata Notice and Revised Schedule, 34903-34904 [E6-9393]

Download as PDF 34903 Federal Register / Vol. 71, No. 116 / Friday, June 16, 2006 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP06–358–000] ANR Pipeline Company; Notice of Application June 9, 2006. Take notice that on May 30, 2006, ANR Pipeline Company (ANR), 1001 Louisiana, Houston, Texas 77002, filed in Docket No. CP06–358–000, an application pursuant to section 7 of the Natural Gas Act (NGA) for authorization to abandon certain facilities and for a certificate of public convenience and necessity to perform certain enhancements to its storage system in order to optimize its operations by matching inventory and deliverability to market demands at its Lincoln-Freeman, Winfield, Goodwell, and Reed storage fields in Clare, Montcalm, Newaygo, Osceola and Lake Counties, Michigan, all as more fully set forth in the application which is on file with the Commission and open to public inspection. This filing may be also viewed on the Web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call (866) 208–3676 or TTY, (202) 502–8659. Any questions concerning this application may be directed to Dawn McGuire, Counsel, ANR Pipeline Company, 1001 Louisiana, Houston, Texas 77002 at (713) 420–5503. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, before the comment date of this notice, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. Comment Date: June 30, 2006. Magalie R. Salas, Secretary. [FR Doc. E6–9386 Filed 6–15–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. P–2206–030] Carolina Power and Light Company; Errata Notice and Revised Schedule June 9, 2006. On May 10, 2006 the Commission issued a ‘‘Notice of Application Tendered for Filing’’ regarding the above-referenced proceeding. This Errata makes the following correction to the notice: (1) Under letter n., paragraph 4, the last sentence should be replaced by the following sentence: ‘‘During the 2002 drought, Progress Energy and APGI agreed, in a regional Emergency Drought Management Protocol (now expired), to operate the projects so as to achieve a daily average flow of 900 cfs at the Rockingham, North Carolina U.S. Geological Survey gage.’’ (2) Under letter q. Procedural Schedule: The table is revised as follows: Milestone Target date wwhite on PROD1PC61 with NOTICES Tendering Notice .......................................................................................................................................................................... File Additional Study Requests .................................................................................................................................................... Additional Information Requests (if necessary) ........................................................................................................................... Issue Acceptance Letter and Solicit Interventions ....................................................................................................................... Issue Scoping Document 1 for Comments .................................................................................................................................. Hold Scoping Meetings ................................................................................................................................................................ Request Additional Information (if necessary) ............................................................................................................................. Issue Scoping Document 2 (if necessary) ................................................................................................................................... Notice of Application Ready for Environmental Analysis ............................................................................................................ Filing of Recommendations, Preliminary Terms and Conditions, and Fishway Prescriptions .................................................... Notice of Availability of Draft EA or EIS ...................................................................................................................................... Comments on Draft EA or EIS and Modified Terms and Conditions .......................................................................................... Notice of Availability of Final EA or EIS ...................................................................................................................................... Ready for Commission Decision on the Application ................................................................................................................... VerDate Aug<31>2005 18:25 Jun 15, 2006 Jkt 208001 PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 E:\FR\FM\16JNN1.SGM 16JNN1 May 10, 2006. June 26, 2006. July 2006. October 2006. November 2006. January 2006. March 2007. March 2007. April 2007. June 2007. September 2007. November 2007. March 2008. April 2008. 34904 Federal Register / Vol. 71, No. 116 / Friday, June 16, 2006 / Notices Magalie R. Salas, Secretary. [FR Doc. E6–9393 Filed 6–15–06; 8:45 am] Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP00–500–006] Magalie R. Salas, Secretary. [FR Doc. E6–9382 Filed 6–15–06; 8:45 am] Chandeleur Pipe Line Company; Notice of Negotiated Rate BILLING CODE 6717–01–P wwhite on PROD1PC61 with NOTICES June 8, 2006. Take notice that on May 31, 2006, Chandeleur Pipe Line Company (Chandeleur) tendered for filing as part of its FERC Gas Tariff, Second Revised Volume No. 1, Fifth Revised Sheet No. 73 to become effective July 1, 2006. Chandeleur states that the proposed change would update its tariff to accurately state the current negotiated rate transaction information as required by section 24.3 of Chandeleur’s tariff. Chandeleur states that the proposed change is necessary to delete the information for a contract reflecting a termination date of June 30, 2006. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public VerDate Aug<31>2005 18:25 Jun 15, 2006 Jkt 208001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP06–385–000] Distrigas of Massachusetts LLC; Notice of Proposed Changes in FERC Gas Tariff June 8, 2006. Take notice that on June 5, 2006, Distrigas of Massachusetts LLC (DOMAC) tendered for filing as part of its FERC Gas Tariff, First Revised Volume No. 1, the following revised Tariff sheets proposed to be effective July 6, 2006: Sixth Revised Sheet No. 29 Fifth Revised Sheet No. 38 Fifth Revised Sheet No. 39 Fifth Revised Sheet No. 40 Fifth Revised Sheet No. 41 First Revised Sheet No. 48A First Revised Sheet No. 48B First Revised Sheet No. 48C First Revised Sheet No. 48D First Revised Sheet No. 48E First Revised Sheet No. 48F First Revised Sheet No. 48G First Revised Sheet No. 48H First Revised Sheet No. 48I Frm 00035 Fmt 4703 Sfmt 4703 Magalie R. Salas, Secretary. [FR Doc. E6–9372 Filed 6–15–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP06–373–000] El Paso Natural Gas Company; Notice of Application June 9, 2006. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date PO 00000 need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Take notice that on June 5, 2006, El Paso Natural Gas Company (EPNG), P.O. Box 1087, Colorado Springs, Colorado, 80944, filed in Docket No. CP06–373– 000 an application pursuant to section 7(b) of the Commission’s regulations under the Natural Gas Act (NGA) for authorization to abandon, by sale, to West Texas Gas, Inc. (WTG) its Snyder and Sonora Pipeline Systems, with appurtenances, located in Scurry, Borden, Howard, Martin, Andrews, Ector, Sutton, Schleicher, Crockett, Irion, Reagan and Upton Counties, Texas. Additionally, WTG requests that the Commission make a determination that, upon transfer of the Snyder and Sonora Pipelines, the operation and service rendered through these facilities will be exempt from the Commission’s jurisdiction under section 1(b) of the Natural gas Act. This filing is available for review at the Commission in the Public Reference Room or may be viewed on the Web at https:// E:\FR\FM\16JNN1.SGM 16JNN1

Agencies

[Federal Register Volume 71, Number 116 (Friday, June 16, 2006)]
[Notices]
[Pages 34903-34904]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-9393]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. P-2206-030]


Carolina Power and Light Company; Errata Notice and Revised 
Schedule

June 9, 2006.
    On May 10, 2006 the Commission issued a ``Notice of Application 
Tendered for Filing'' regarding the above-referenced proceeding. This 
Errata makes the following correction to the notice:
    (1) Under letter n., paragraph 4, the last sentence should be 
replaced by the following sentence: ``During the 2002 drought, Progress 
Energy and APGI agreed, in a regional Emergency Drought Management 
Protocol (now expired), to operate the projects so as to achieve a 
daily average flow of 900 cfs at the Rockingham, North Carolina U.S. 
Geological Survey gage.''
    (2) Under letter q. Procedural Schedule: The table is revised as 
follows:

------------------------------------------------------------------------
               Milestone                           Target date
------------------------------------------------------------------------
Tendering Notice......................  May 10, 2006.
File Additional Study Requests........  June 26, 2006.
Additional Information Requests (if     July 2006.
 necessary).
Issue Acceptance Letter and Solicit     October 2006.
 Interventions.
Issue Scoping Document 1 for Comments.  November 2006.
Hold Scoping Meetings.................  January 2006.
Request Additional Information (if      March 2007.
 necessary).
Issue Scoping Document 2 (if            March 2007.
 necessary).
Notice of Application Ready for         April 2007.
 Environmental Analysis.
Filing of Recommendations, Preliminary  June 2007.
 Terms and Conditions, and Fishway
 Prescriptions.
Notice of Availability of Draft EA or   September 2007.
 EIS.
Comments on Draft EA or EIS and         November 2007.
 Modified Terms and Conditions.
Notice of Availability of Final EA or   March 2008.
 EIS.
Ready for Commission Decision on the    April 2008.
 Application.
------------------------------------------------------------------------



[[Page 34904]]

Magalie R. Salas,
Secretary.
[FR Doc. E6-9393 Filed 6-15-06; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.