Carolina Power and Light Company; Errata Notice and Revised Schedule, 34903-34904 [E6-9393]
Download as PDF
34903
Federal Register / Vol. 71, No. 116 / Friday, June 16, 2006 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP06–358–000]
ANR Pipeline Company; Notice of
Application
June 9, 2006.
Take notice that on May 30, 2006,
ANR Pipeline Company (ANR), 1001
Louisiana, Houston, Texas 77002, filed
in Docket No. CP06–358–000, an
application pursuant to section 7 of the
Natural Gas Act (NGA) for authorization
to abandon certain facilities and for a
certificate of public convenience and
necessity to perform certain
enhancements to its storage system in
order to optimize its operations by
matching inventory and deliverability to
market demands at its Lincoln-Freeman,
Winfield, Goodwell, and Reed storage
fields in Clare, Montcalm, Newaygo,
Osceola and Lake Counties, Michigan,
all as more fully set forth in the
application which is on file with the
Commission and open to public
inspection. This filing may be also
viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, call (866) 208–3676 or TTY,
(202) 502–8659.
Any questions concerning this
application may be directed to Dawn
McGuire, Counsel, ANR Pipeline
Company, 1001 Louisiana, Houston,
Texas 77002 at (713) 420–5503.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, before the comment date of this
notice, file with the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426, a
motion to intervene in accordance with
the requirements of the Commission’s
Rules of Practice and Procedure (18 CFR
385.214 or 385.211) and the Regulations
under the NGA (18 CFR 157.10). A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies of all documents
filed by the applicant and by all other
parties. A party must submit 14 copies
of filings made with the Commission
and must mail a copy to the applicant
and to every other party in the
proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link.
Comment Date: June 30, 2006.
Magalie R. Salas,
Secretary.
[FR Doc. E6–9386 Filed 6–15–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. P–2206–030]
Carolina Power and Light Company;
Errata Notice and Revised Schedule
June 9, 2006.
On May 10, 2006 the Commission
issued a ‘‘Notice of Application
Tendered for Filing’’ regarding the
above-referenced proceeding. This
Errata makes the following correction to
the notice:
(1) Under letter n., paragraph 4, the
last sentence should be replaced by the
following sentence: ‘‘During the 2002
drought, Progress Energy and APGI
agreed, in a regional Emergency Drought
Management Protocol (now expired), to
operate the projects so as to achieve a
daily average flow of 900 cfs at the
Rockingham, North Carolina U.S.
Geological Survey gage.’’
(2) Under letter q. Procedural
Schedule: The table is revised as
follows:
Milestone
Target date
wwhite on PROD1PC61 with NOTICES
Tendering Notice ..........................................................................................................................................................................
File Additional Study Requests ....................................................................................................................................................
Additional Information Requests (if necessary) ...........................................................................................................................
Issue Acceptance Letter and Solicit Interventions .......................................................................................................................
Issue Scoping Document 1 for Comments ..................................................................................................................................
Hold Scoping Meetings ................................................................................................................................................................
Request Additional Information (if necessary) .............................................................................................................................
Issue Scoping Document 2 (if necessary) ...................................................................................................................................
Notice of Application Ready for Environmental Analysis ............................................................................................................
Filing of Recommendations, Preliminary Terms and Conditions, and Fishway Prescriptions ....................................................
Notice of Availability of Draft EA or EIS ......................................................................................................................................
Comments on Draft EA or EIS and Modified Terms and Conditions ..........................................................................................
Notice of Availability of Final EA or EIS ......................................................................................................................................
Ready for Commission Decision on the Application ...................................................................................................................
VerDate Aug<31>2005
18:25 Jun 15, 2006
Jkt 208001
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
E:\FR\FM\16JNN1.SGM
16JNN1
May 10, 2006.
June 26, 2006.
July 2006.
October 2006.
November 2006.
January 2006.
March 2007.
March 2007.
April 2007.
June 2007.
September 2007.
November 2007.
March 2008.
April 2008.
34904
Federal Register / Vol. 71, No. 116 / Friday, June 16, 2006 / Notices
Magalie R. Salas,
Secretary.
[FR Doc. E6–9393 Filed 6–15–06; 8:45 am]
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP00–500–006]
Magalie R. Salas,
Secretary.
[FR Doc. E6–9382 Filed 6–15–06; 8:45 am]
Chandeleur Pipe Line Company;
Notice of Negotiated Rate
BILLING CODE 6717–01–P
wwhite on PROD1PC61 with NOTICES
June 8, 2006.
Take notice that on May 31, 2006,
Chandeleur Pipe Line Company
(Chandeleur) tendered for filing as part
of its FERC Gas Tariff, Second Revised
Volume No. 1, Fifth Revised Sheet No.
73 to become effective July 1, 2006.
Chandeleur states that the proposed
change would update its tariff to
accurately state the current negotiated
rate transaction information as required
by section 24.3 of Chandeleur’s tariff.
Chandeleur states that the proposed
change is necessary to delete the
information for a contract reflecting a
termination date of June 30, 2006.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
VerDate Aug<31>2005
18:25 Jun 15, 2006
Jkt 208001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP06–385–000]
Distrigas of Massachusetts LLC;
Notice of Proposed Changes in FERC
Gas Tariff
June 8, 2006.
Take notice that on June 5, 2006,
Distrigas of Massachusetts LLC
(DOMAC) tendered for filing as part of
its FERC Gas Tariff, First Revised
Volume No. 1, the following revised
Tariff sheets proposed to be effective
July 6, 2006:
Sixth Revised Sheet No. 29
Fifth Revised Sheet No. 38
Fifth Revised Sheet No. 39
Fifth Revised Sheet No. 40
Fifth Revised Sheet No. 41
First Revised Sheet No. 48A
First Revised Sheet No. 48B
First Revised Sheet No. 48C
First Revised Sheet No. 48D
First Revised Sheet No. 48E
First Revised Sheet No. 48F
First Revised Sheet No. 48G
First Revised Sheet No. 48H
First Revised Sheet No. 48I
Frm 00035
Fmt 4703
Sfmt 4703
Magalie R. Salas,
Secretary.
[FR Doc. E6–9372 Filed 6–15–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP06–373–000]
El Paso Natural Gas Company; Notice
of Application
June 9, 2006.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
PO 00000
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Take notice that on June 5, 2006, El
Paso Natural Gas Company (EPNG), P.O.
Box 1087, Colorado Springs, Colorado,
80944, filed in Docket No. CP06–373–
000 an application pursuant to section
7(b) of the Commission’s regulations
under the Natural Gas Act (NGA) for
authorization to abandon, by sale, to
West Texas Gas, Inc. (WTG) its Snyder
and Sonora Pipeline Systems, with
appurtenances, located in Scurry,
Borden, Howard, Martin, Andrews,
Ector, Sutton, Schleicher, Crockett,
Irion, Reagan and Upton Counties,
Texas. Additionally, WTG requests that
the Commission make a determination
that, upon transfer of the Snyder and
Sonora Pipelines, the operation and
service rendered through these facilities
will be exempt from the Commission’s
jurisdiction under section 1(b) of the
Natural gas Act. This filing is available
for review at the Commission in the
Public Reference Room or may be
viewed on the Web at https://
E:\FR\FM\16JNN1.SGM
16JNN1
Agencies
[Federal Register Volume 71, Number 116 (Friday, June 16, 2006)]
[Notices]
[Pages 34903-34904]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-9393]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. P-2206-030]
Carolina Power and Light Company; Errata Notice and Revised
Schedule
June 9, 2006.
On May 10, 2006 the Commission issued a ``Notice of Application
Tendered for Filing'' regarding the above-referenced proceeding. This
Errata makes the following correction to the notice:
(1) Under letter n., paragraph 4, the last sentence should be
replaced by the following sentence: ``During the 2002 drought, Progress
Energy and APGI agreed, in a regional Emergency Drought Management
Protocol (now expired), to operate the projects so as to achieve a
daily average flow of 900 cfs at the Rockingham, North Carolina U.S.
Geological Survey gage.''
(2) Under letter q. Procedural Schedule: The table is revised as
follows:
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Tendering Notice...................... May 10, 2006.
File Additional Study Requests........ June 26, 2006.
Additional Information Requests (if July 2006.
necessary).
Issue Acceptance Letter and Solicit October 2006.
Interventions.
Issue Scoping Document 1 for Comments. November 2006.
Hold Scoping Meetings................. January 2006.
Request Additional Information (if March 2007.
necessary).
Issue Scoping Document 2 (if March 2007.
necessary).
Notice of Application Ready for April 2007.
Environmental Analysis.
Filing of Recommendations, Preliminary June 2007.
Terms and Conditions, and Fishway
Prescriptions.
Notice of Availability of Draft EA or September 2007.
EIS.
Comments on Draft EA or EIS and November 2007.
Modified Terms and Conditions.
Notice of Availability of Final EA or March 2008.
EIS.
Ready for Commission Decision on the April 2008.
Application.
------------------------------------------------------------------------
[[Page 34904]]
Magalie R. Salas,
Secretary.
[FR Doc. E6-9393 Filed 6-15-06; 8:45 am]
BILLING CODE 6717-01-P