Notice of Application To Amend License and Soliciting Comments, Motions To Intervene, and Protests, 34924 [E6-9381]
Download as PDF
34924
Federal Register / Vol. 71, No. 116 / Friday, June 16, 2006 / Notices
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicants’ representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E6–9380 Filed 6–15–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application To Amend
License and Soliciting Comments,
Motions To Intervene, and Protests
wwhite on PROD1PC61 with NOTICES
June 8, 2006.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Non-project use
of project lands and waters.
b. Project No.: 271–095.
c. Date Filed: May 23, 2006.
d. Applicant: Entergy Arkansas, Inc.
(Entergy).
e. Name of Project: Carpenter-Remmel
Project.
f. Location: The project is located on
the Quachita River in Hot Springs and
Garland Counties, Arkansas on
Hamilton Lake. The project does not
occupy any Federal or tribal lands.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Blake Hogue,
Hydro Operations, Entergy Arkansas,
Inc., 141 West County Line Road,
Malvern, AR 72104. Phone: (501) 844–
2197.
i. FERC Contact: Gina Krump,
gina.krump@ferc.gov, 202–502–6704.
j. Deadline for filing comments and or
motions: July 7, 2006.
All documents (original and eight
copies) should be filed with Ms. Magalie
R. Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. Please reference
‘‘Carpenter-Remmel Project, FERC
Project No. 271–095’’ on any comments
or motions filed.
k. Description of the Application:
Entergy requests Commission approval
to permit John Carter to construct three
docks with a total of 13 slips, one fuel
dock with 6 double-wide slips, and a
600-foot-long boardwalk along the
VerDate Aug<31>2005
18:25 Jun 15, 2006
Jkt 208001
perimeter of the island for use as a
commercial marina. Fueling facilities
will contain both above and belowground fuel tanks with a total of six fuel
dispensers. All facilities will be
handicap accessible.
l. Locations of the Application: This
filing is available for review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘E-library’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY,
contact (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filings must bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS’’, ‘‘PROTEST’’, OR
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers. Any of the above-named
documents must be filed by providing
the original and the number of copies
provided by the Commission’s
regulations to: The Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
A copy of any motion to intervene must
also be served upon each representative
of the Applicant specified in the
particular application.
p. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
PO 00000
Frm 00055
Fmt 4703
Sfmt 4703
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E6–9381 Filed 6–15–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP05–422–000]
El Paso Natural Gas Company; Notice
of Revised Date and Time of
Settlement Conference
June 9, 2006.
On June 7, 2006, the Commission
issued a ‘‘Notice of Informal Settlement
Conference’’ in the above-referenced
docket for the purpose of exploring a
possible settlement. A new date and
time has been established for the
informal settlement conference as
follows:
Date: June 14, 2006.
Time: 9 a.m. (EST).
The settlement conference will be
held in Hearing Room 1, at the
Commission’s offices, 888 First Street,
NE., Washington, DC 20426.
Magalie R. Salas,
Secretary.
[FR Doc. E6–9396 Filed 6–15–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER96–1551–013; ER96–1551–
014; ER96–1551–015; ER01–615–009; ER01–
615–010; ER01–615–011; EL05–2–000]
Public Service Company of New
Mexico; Notice of Technical
Conference and Denial of Motion for
Extension of Time
June 9, 2006.
On June 6, 2006, Public Service
Company of New Mexico (PNM) filed a
motion requesting that the Commission
convene a technical conference to
discuss issues related to the possible
mitigation of PNM’s market-based rates
in the El Paso Electric Company (El
Paso) control area as provided for in an
order issued on April 21, 2006, in these
proceedings.1 PNM also asks the
1 Public Service Company of New Mexico, 115
FERC ¶ 61,090 (2006) (April 21 Order).
E:\FR\FM\16JNN1.SGM
16JNN1
Agencies
[Federal Register Volume 71, Number 116 (Friday, June 16, 2006)]
[Notices]
[Page 34924]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-9381]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application To Amend License and Soliciting Comments,
Motions To Intervene, and Protests
June 8, 2006.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Non-project use of project lands and waters.
b. Project No.: 271-095.
c. Date Filed: May 23, 2006.
d. Applicant: Entergy Arkansas, Inc. (Entergy).
e. Name of Project: Carpenter-Remmel Project.
f. Location: The project is located on the Quachita River in Hot
Springs and Garland Counties, Arkansas on Hamilton Lake. The project
does not occupy any Federal or tribal lands.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Blake Hogue, Hydro Operations, Entergy
Arkansas, Inc., 141 West County Line Road, Malvern, AR 72104. Phone:
(501) 844-2197.
i. FERC Contact: Gina Krump, gina.krump@ferc.gov, 202-502-6704.
j. Deadline for filing comments and or motions: July 7, 2006.
All documents (original and eight copies) should be filed with Ms.
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426. Comments, protests, and
interventions may be filed electronically via the Internet in lieu of
paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the
Commission's Web site under the ``e-Filing'' link. Please reference
``Carpenter-Remmel Project, FERC Project No. 271-095'' on any comments
or motions filed.
k. Description of the Application: Entergy requests Commission
approval to permit John Carter to construct three docks with a total of
13 slips, one fuel dock with 6 double-wide slips, and a 600-foot-long
boardwalk along the perimeter of the island for use as a commercial
marina. Fueling facilities will contain both above and below-ground
fuel tanks with a total of six fuel dispensers. All facilities will be
handicap accessible.
l. Locations of the Application: This filing is available for
review at the Commission in the Public Reference Room or may be viewed
on the Commission's Web site at https://www.ferc.gov using the ``E-
library'' link. Enter the docket number excluding the last three digits
in the docket number field to access the document. For assistance,
please contact FERC Online Support at FERCOnlineSupport@ferc.gov or
toll-free at (866) 208-3676, or for TTY, contact (202) 502-8659. A copy
is also available for inspection and reproduction at the address in
item (h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filings must
bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS
FOR TERMS AND CONDITIONS'', ``PROTEST'', OR ``MOTION TO INTERVENE'', as
applicable, and the Project Number of the particular application to
which the filing refers. Any of the above-named documents must be filed
by providing the original and the number of copies provided by the
Commission's regulations to: The Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE., Washington, DC 20426. A copy of any
motion to intervene must also be served upon each representative of the
Applicant specified in the particular application.
p. Agency Comments: Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E6-9381 Filed 6-15-06; 8:45 am]
BILLING CODE 6717-01-P