Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests, 33743 [E6-9089]
Download as PDF
Federal Register / Vol. 71, No. 112 / Monday, June 12, 2006 / Notices
site at https://www.ferc.gov under the ‘‘eFiling’’ link.
Magalie R. Salas,
Secretary.
[FR Doc. E6–9088 Filed 6–9–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application for Amendment
of License and Soliciting Comments,
Motions To Intervene, and Protests
dsatterwhite on PROD1PC76 with NOTICES
June 2, 2006.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Amendment of
License to Increase the Authorized
Generating Capacity.
b. Project No: 5–080.
c. Date Filed: May 2, 2006.
d. Applicant: PPL Montana, LLC/
Confederated Salish and Kootenai
Tribes of the Flathead Nation.
e. Name of Project: Kerr Hydroelectric
Project.
f. Location: The project is located on
the Flathead River in Flathead and Lake
Counties, Montana.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a—825r.
h. Applicant Contact: David R. Poe/
Robert M. Lamkin, LeBoeuf, Lamb,
Greene and MacRae, L.L.P., 1875
Connecticut Avenue, NW., Suite 1200,
Washington, DC 20009–5728, Tel.: 202–
986–8000, Fax: 202–986–8102, e-mail:
dpoe@llgm.com.
i. FERC Contact: Any questions on
this notice should be addressed to Mr.
Hong Tung at (202) 502–8757, or e-mail
address: hong.tung@ferc.gov.
j. Deadline for filing comments and or
motions: June 30, 2006.
k. Description of Request: The
licensees propose to replace the Unit
No. 3 turbine with a new more efficient
stainless steel turbine. The replacement
of the turbine would increase the
project’s total generating capacity by
approximately 13.875 MW to 188.25
MW, or 8%; and the project’s total
turbine hydraulic capacity by 610 cfs to
12,880 cfs, or 5%.
l. Locations of Applications: A copy of
the application is available for
inspection and reproduction at the
Commission in the Public Reference
Room, located at 888 First Street, NE.,
Room 2A, Washington, DC 20426, or by
calling (202) 502–8371. This filing may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
VerDate Aug<31>2005
19:52 Jun 09, 2006
Jkt 208001
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, call toll-free 1–866–208–
3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, 385.211,
385.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filings must bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers. All documents (original
and eight copies) should be filed with:
Magalie R. Salas, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
A copy of any motion to intervene must
also be served upon each representative
of the Applicant specified in the
particular application.
p. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
q. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
33743
site at https://www.ferc.gov under the ‘‘eFiling’’ link.
Magalie R. Salas,
Secretary.
[FR Doc. E6–9089 Filed 6–9–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application Accepted for
Filing and Soliciting Motions To
Intervene, Protests, and Comments
June 6, 2006.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: 12673–000.
c. Date filed: May 16, 2006.
d. Applicant: NT Hydro.
e. Name of Project: Sworinger
Reservoir Pumped Storage Project.
f. Location: The project would be
located on the Sworinger Reservoir and
Lower Reservoir, in Modoc and Lassen
Counties, California and Washoe
County, Nevada. The penstock and
transmission line will occupy federal
lands managed by the Bureau of Land
Management.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)—825(r).
h. Applicant Contact: Mr. Nicholas E.
Josten, NT Hydro, 2742 Saint Charles
Ave, Idaho Falls, ID 83404, Phone (208)
528–6152.
i. FERC Contact: Robert Bell, (202)
502–6062.
j. Deadline for filing comments,
protests, and motions to intervene: 60
days from the issuance date of this
notice.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. Description of Project: The
proposed project would consist of: (1)
The existing 900-foot-long, 30-foot-high
rock filled Sworinger Dam, (2) the
existing Sworinger reservoir to be used
as the project’s upper reservoir having a
surface area of 2,000 acres with a storage
capacity of 27,000 acre-feet and a
E:\FR\FM\12JNN1.SGM
12JNN1
Agencies
[Federal Register Volume 71, Number 112 (Monday, June 12, 2006)]
[Notices]
[Page 33743]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-9089]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application for Amendment of License and Soliciting
Comments, Motions To Intervene, and Protests
June 2, 2006.
Take notice that the following application has been filed with the
Commission and is available for public inspection:
a. Application Type: Amendment of License to Increase the
Authorized Generating Capacity.
b. Project No: 5-080.
c. Date Filed: May 2, 2006.
d. Applicant: PPL Montana, LLC/Confederated Salish and Kootenai
Tribes of the Flathead Nation.
e. Name of Project: Kerr Hydroelectric Project.
f. Location: The project is located on the Flathead River in
Flathead and Lake Counties, Montana.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a--825r.
h. Applicant Contact: David R. Poe/Robert M. Lamkin, LeBoeuf, Lamb,
Greene and MacRae, L.L.P., 1875 Connecticut Avenue, NW., Suite 1200,
Washington, DC 20009-5728, Tel.: 202-986-8000, Fax: 202-986-8102, e-
mail: dpoe@llgm.com.
i. FERC Contact: Any questions on this notice should be addressed
to Mr. Hong Tung at (202) 502-8757, or e-mail address:
hong.tung@ferc.gov.
j. Deadline for filing comments and or motions: June 30, 2006.
k. Description of Request: The licensees propose to replace the
Unit No. 3 turbine with a new more efficient stainless steel turbine.
The replacement of the turbine would increase the project's total
generating capacity by approximately 13.875 MW to 188.25 MW, or 8%; and
the project's total turbine hydraulic capacity by 610 cfs to 12,880
cfs, or 5%.
l. Locations of Applications: A copy of the application is
available for inspection and reproduction at the Commission in the
Public Reference Room, located at 888 First Street, NE., Room 2A,
Washington, DC 20426, or by calling (202) 502-8371. This filing may
also be viewed on the Commission's Web site at https://www.ferc.gov
using the ``eLibrary'' link. Enter the docket number excluding the last
three digits in the docket number field to access the document. You may
also register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
call toll-free 1-866-208-3676 or e-mail FERCOnlineSupport@ferc.gov. For
TTY, call (202) 502-8659. A copy is also available for inspection and
reproduction at the address in item (h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210,
385.211, 385.214. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filings must
bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS
FOR TERMS AND CONDITIONS'', ``PROTEST'', or ``MOTION TO INTERVENE'', as
applicable, and the Project Number of the particular application to
which the filing refers. All documents (original and eight copies)
should be filed with: Magalie R. Salas, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. A
copy of any motion to intervene must also be served upon each
representative of the Applicant specified in the particular
application.
p. Agency Comments: Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
q. Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site at https://www.ferc.gov
under the ``e-Filing'' link.
Magalie R. Salas,
Secretary.
[FR Doc. E6-9089 Filed 6-9-06; 8:45 am]
BILLING CODE 6717-01-P