Southern California Edison Company; San Diego Gas and Electric Company; the Cities of Riverside and Anaheim, CA; San Onofre Nuclear Generating Station, Units 2 and 3; Notice of Consideration of Approval of Transfer Facility Operating Licenses and Conforming Amendments and Opportunity for a Hearing, 33321-33322 [E6-8922]
Download as PDF
Federal Register / Vol. 71, No. 110 / Thursday, June 8, 2006 / Notices
A copy of the supporting statement
may be viewed free of charge at the NRC
Public Document Room, One White
Flint North, 11555 Rockville Pike, Room
O–1 F21, Rockville, MD 20852. OMB
clearance packages are available at the
NRC World Wide Web site: https://
www.nrc.gov/public-involve/doccomment/omb/. The
document will be available on the NRC
home page site for 60 days after the
signature date of this notice.
Comments and questions should be
directed to the OMB reviewer by August
7, 2006: John A. Asalone, Office of
Information and Regulatory Affairs
(3150–0014, 3150–0001, and 3150–
xxxx), NEOB–10202, Office of
Management and Budget, Washington,
DC 20503.
Comments can also be e-mailed to
John_A._Asalone@omb.eop.gov or
submitted by telephone at (202) 395–
4650.
The NRC Clearance Officer is Brenda
Jo. Shelton, 301–415–7233.
Dated at Rockville, Maryland, this 1st day
of June 2006.
For the Nuclear Regulatory Commission.
Brenda Jo. Shelton,
NRC Clearance Officer, Office of Information
Services.
[FR Doc. E6–8921 Filed 6–7–06; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 50–361 and 50–362]
cprice-sewell on PROD1PC66 with NOTICES
Southern California Edison Company;
San Diego Gas and Electric Company;
the Cities of Riverside and Anaheim,
CA; San Onofre Nuclear Generating
Station, Units 2 and 3; Notice of
Consideration of Approval of Transfer
Facility Operating Licenses and
Conforming Amendments and
Opportunity for a Hearing
The U.S. Nuclear Regulatory
Commission (the Commission) is
considering the issuance of an order
under 10 CFR 50.80 approving the
direct transfer of the Facility Operating
Licenses, which are numbered NPF–10
and NPF–15, for the San Onofre Nuclear
Generating Station, Units 2 and 3
(SONGS 2 and 3), currently held by
Southern California Edison Company
(SCE), San Diego Gas and Electric
Company, the City of Riverside,
California, and the City of Anaheim,
California (Anaheim), as owners; and
Southern California Edison Company as
licensed operator of SONGS 2 and 3.
The request is to transfer Anaheim’s
3.16 percent undivided ownership
VerDate Aug<31>2005
15:37 Jun 07, 2006
Jkt 208001
interest in SONGS 2 and 3 to SCE,
excluding Anaheim’s interest in its
spent fuel and in the SONGS 2 and 3
independent spent fuel storage
installation (ISFSI). The Commission is
also considering amending the license
for administrative purposes to reflect
the proposed transfer.
According to the application for
approval filed by SCE, acting on behalf
of itself and Anaheim, SCE would
acquire Anaheim’s 3.16 percent
ownership interest in the facility,
excluding Anaheim’s interest in its
spent fuel and in the SONGS 2 and 3
ISFSI located on the SONGS site,
following approval of the proposed
license transfer. SCE would retain
exclusive responsibility for the
operation and maintenance of SONGS 2
and 3.
No physical changes to the SONGS 2
and 3 facility or operational changes are
being proposed in the application.
The proposed amendments would
state that the City of Anaheim has
transferred its ownership interests in the
facility, and entitlement to generating
output, to Southern California Edison
Company, except that it retains its
ownership interests in its spent nuclear
fuel and the facility’s ISFSI located on
the facility’s site. In addition, the
proposed amendments would state that
the City of Anaheim retains financial
responsibility for its spent fuel and for
a portion of the facility’s
decommissioning costs, and it remains
a licensee for the purposes of its
retained interests and liabilities.
Pursuant to 10 CFR 50.80, no license,
or any right thereunder, shall be
transferred, directly or indirectly,
through transfer of control of the
licenses, unless the Commission shall
give its consent in writing. The
Commission will approve an
application for the direct transfer of the
licenses, if the Commission determines
that the proposed transferee is qualified
to hold the licenses, and that the
transfer is otherwise consistent with
applicable provisions of law,
regulations, and orders issued by the
Commission pursuant thereto.
Before issuance of the proposed
conforming license amendments, the
Commission will have made findings
required by the Atomic Energy Act of
1954, as amended (the Act), and the
Commission’s regulations.
As provided in 10 CFR 2.1315, unless
otherwise determined by the
Commission with regard to a specific
application, the Commission has
determined that any amendment to the
license of a utilization facility which
does no more than conform the license
to reflect the transfer action involves no
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
33321
significant hazards consideration and no
genuine issue as to whether the health
and safety of the public will be
significantly affected. No contrary
determination has been made with
respect to this specific license
amendment application. In light of the
generic determination reflected in 10
CFR 2.1315, no public comments with
respect to significant hazards
considerations are being solicited,
notwithstanding the general comment
procedures contained in 10 CFR 50.91.
The filing of requests for hearing and
petitions for leave to intervene, and
written comments with regard to the
license transfer application, are
discussed below.
Within 20 days from the date of
publication of this notice, any person
whose interest may be affected by the
Commission’s action on the application
may request a hearing and, if not the
applicant, may petition for leave to
intervene in a hearing proceeding on the
Commission’s action. Requests for a
hearing and petitions for leave to
intervene should be filed in accordance
with the Commission’s rules of practice
set forth in Subpart C ‘‘Rules of General
Applicability: Hearing Requests,
Petitions to Intervene, Availability of
Documents, Selection of Specific
Hearing Procedures, Presiding Officer
Powers, and General Hearing
Management for NRC Adjudicatory
Hearings,’’ of 10 CFR part 2. In
particular, such requests and petitions
must comply with the requirements set
forth in 10 CFR 2.309. Untimely
requests and petitions may be denied, as
provided in 10 CFR 2.309(c)(1), unless
good cause for failure to file on time is
established. In addition, an untimely
request or petition should address the
factors that the Commission will also
consider, in reviewing untimely
requests or petitions, set forth in 10 CFR
2.309(c)(1)(i)–(viii).
Requests for a hearing and petitions
for leave to intervene should be served
upon Douglas K. Porter, 2244 Walnut
Grove Avenue, Rosemead, CA 91770,
telephone number: 626–302–3964; the
General Counsel, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001 (e-mail address
OGCLT@NRC.gov); and the Secretary of
the Commission, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001, Attention: Rulemakings
and Adjudications Staff, in accordance
with 10 CFR 2.302 and 2.305.
The Commission will issue a notice or
order granting or denying a hearing
request or intervention petition,
designating the issues for any hearing
that will be held and designating the
Presiding Officer. A notice granting a
E:\FR\FM\08JNN1.SGM
08JNN1
33322
Federal Register / Vol. 71, No. 110 / Thursday, June 8, 2006 / Notices
hearing will be published in the Federal
Register and served on the parties to the
hearing.
As an alternative to requests for
hearing and petitions to intervene,
within 30 days from the date of
publication of this notice, persons may
submit written comments regarding the
license transfer application, as provided
for in 10 CFR 2.1305. The Commission
will consider and, if appropriate,
respond to these comments, but such
comments will not otherwise constitute
part of the decisional record. Comments
should be submitted to the Secretary,
U.S. Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemakings and Adjudications Staff,
and should cite the publication date and
page number of this Federal Register
notice.
For further details with respect to this
action, see the application dated March
10, 2006, as supplemented by the
electronic mail from the licensee dated
May 16, 2006, available for public
inspection at the Commission’s Public
Document Room (PDR), located at One
White Flint North, Public File Area O1
F21, 11555 Rockville Pike (first floor),
Rockville, Maryland. Publicly available
records will be accessible electronically
from the Agencywide Documents
Access and Management System’s
(ADAMS) Public Electronic Reading
Room on the Internet at the NRC Web
site, https://www.nrc.gov/reading-rm/
adams.html. Persons who do not have
access to ADAMS or who encounter
problems in accessing the documents
located in ADAMS should contact the
NRC PDR Reference staff by telephone
at 1–800–397–4209, or 301–415–4737 or
by e-mail to pdr@nrc.gov.
Dated at Rockville, Maryland, this 30th day
of May 2006.
For the Nuclear Regulatory Commission.
N. Kalyanam,
Project Manager, Plant Licensing Branch IV,
Division of Operating Reactor Licensing,
Office of Nuclear Reactor Regulation.
[FR Doc. E6–8922 Filed 6–7–06; 8:45 am]
cprice-sewell on PROD1PC66 with NOTICES
BILLING CODE 7590–01–P
SECURITIES AND EXCHANGE
COMMISSION
[Release No. 34–53930; File No. SR–CBOE–
2006–56]
Self-Regulatory Organizations;
Chicago Board Options Exchange,
Incorporated; Notice of Filing and
Immediate Effectiveness of Proposed
Rule Change Relating to the Extension
of the Pilot Period Applicable to
CBOE’s Listing and Trading of Options
on the iShares MSCI Emerging Markets
Index Fund
June 1, 2006.
Pursuant to Section 19(b)(1) of the
Securities Exchange Act of 1934 (the
‘‘Act’’),1 and Rule 19b–4 thereunder,2
notice is hereby given that on May 31,
2006, the Chicago Board Options
Exchange, Incorporated (‘‘Exchange’’ or
‘‘CBOE’’) filed with the Securities and
Exchange Commission (the
‘‘Commission’’) the proposed rule
change as described in Items I and II
below, which Items have been prepared
by the Exchange. The Exchange filed
this proposal as a ‘‘non-controversial’’
proposed rule change pursuant to
Section 19(b)(3)(A)(iii) of the Act 3 and
Rule 19b–4(f)(6) thereunder,4 which
renders the proposed rule change
effective upon filing with the
commission.5 The Commission is
publishing this notice to solicit
comments on the proposed rule change
from interested persons.
I. Self-Regulatory Organization’s
Statement of the Terms of Substance of
the Proposed Rule Change
The Chicago Board Options Exchange,
Incorporated (‘‘CBOE’’ or ‘‘Exchange’’)
proposes to extend the pilot period
applicable to CBOE’s listing and trading
of options on the iShares MSCI
Emerging Markets Index Fund (‘‘Fund
Options’’). CBOE is not proposing any
textual changes to the rules of CBOE.
The text of the proposed rule change is
available on the Exchange’s Web site
(https://www.cboe.com), the Office of the
Secretary, CBOE, and at the
Commission’s Public Reference Room.
1 15
U.S.C. 78s(b)(1).
2 17 CFR 240.19b–4.
3 15 U.S.C. 78s(b)(3)(A)(iii).
4 17 CFR 240.19b–4(f)(6).
5 The Exchange requested the Commission to
waive the five-day pre-filing notice requirement and
the 30-day operative delay, as specified in Rule
19b–4(f)(6)(iii). 17 CFR 240.19b–4(f)(6)(iii).
VerDate Aug<31>2005
15:37 Jun 07, 2006
Jkt 208001
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
II. Self-Regulatory Organization’s
Statement of the Purpose of, and
Statutory Basis for, the Proposed Rule
Change
In its filing with the Commission,
CBOE included statements concerning
the purpose of and basis for the
proposed rule change and discussed any
comments it received on the proposed
rule change. The text of those
statements may be examined at the
places specified in Item IV below. The
CBOE has prepared summaries, set forth
in sections A, B, and C below, of the
most significant parts of such
statements.
A. Self-Regulatory Organization’s
Statement of the Purpose of, and the
Statutory Basis for, the Proposed Rule
Change
1. Purpose
On April 10, 2006, the Securities and
Exchange Commission (‘‘Commission’’)
approved a CBOE proposal (SR–CBOE–
2006–32) to list and trade Fund
Options.6 SR–CBOE–2006–32 was
approved for a sixty-day pilot period
that is due to expire on June 9, 2006
(‘‘Pilot’’). The Fund Options will
continue to meet substantially all of the
listing and maintenance standards in
CBOE Rules 5.3.06 and 5.4.08,
respectively. For the requirements that
are not met, the Exchange continues to
represent that sufficient mechanisms
exist that would provide the Exchange
with adequate surveillance and
regulatory information with respect to
the Fund. Continuation of the Pilot
would permit the Exchange to continue
to work with the Bolsa Mexicana de
Valores (‘‘Bolsa’’) to develop a
surveillance sharing agreement.7
Accordingly, the Exchange proposes
to extend the Pilot for an additional
ninety-days, until September 7, 2006.
2. Statutory Basis
The Exchange believes the proposed
rule change is consistent with the Act
and the rules and regulations
thereunder applicable to a national
securities exchange and, in particular,
the requirements of Section 6(b) of the
Act.8 Specifically, the Exchange
believes the proposed rule change is
consistent with the Section 6(b)(5) Act 9
requirements that the rules of an
6 See Securities Exchange Act Release No. 53621
(April 10, 2006), 71 FR 19568 (April 14, 2006) (SR–
CBOE–2006–32).
7 Telephone conference between Patrick Sexton,
Associate General Counsel, Exchange, Bill Speth,
Director of Research, Exchange, and Geoffrey
Pemble, Special Counsel, Division, Commission, on
June 1, 2006.
8 15 U.S.C. 78f(b).
9 15 U.S.C. 78f(b)(5).
E:\FR\FM\08JNN1.SGM
08JNN1
Agencies
[Federal Register Volume 71, Number 110 (Thursday, June 8, 2006)]
[Notices]
[Pages 33321-33322]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-8922]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-361 and 50-362]
Southern California Edison Company; San Diego Gas and Electric
Company; the Cities of Riverside and Anaheim, CA; San Onofre Nuclear
Generating Station, Units 2 and 3; Notice of Consideration of Approval
of Transfer Facility Operating Licenses and Conforming Amendments and
Opportunity for a Hearing
The U.S. Nuclear Regulatory Commission (the Commission) is
considering the issuance of an order under 10 CFR 50.80 approving the
direct transfer of the Facility Operating Licenses, which are numbered
NPF-10 and NPF-15, for the San Onofre Nuclear Generating Station, Units
2 and 3 (SONGS 2 and 3), currently held by Southern California Edison
Company (SCE), San Diego Gas and Electric Company, the City of
Riverside, California, and the City of Anaheim, California (Anaheim),
as owners; and Southern California Edison Company as licensed operator
of SONGS 2 and 3. The request is to transfer Anaheim's 3.16 percent
undivided ownership interest in SONGS 2 and 3 to SCE, excluding
Anaheim's interest in its spent fuel and in the SONGS 2 and 3
independent spent fuel storage installation (ISFSI). The Commission is
also considering amending the license for administrative purposes to
reflect the proposed transfer.
According to the application for approval filed by SCE, acting on
behalf of itself and Anaheim, SCE would acquire Anaheim's 3.16 percent
ownership interest in the facility, excluding Anaheim's interest in its
spent fuel and in the SONGS 2 and 3 ISFSI located on the SONGS site,
following approval of the proposed license transfer. SCE would retain
exclusive responsibility for the operation and maintenance of SONGS 2
and 3.
No physical changes to the SONGS 2 and 3 facility or operational
changes are being proposed in the application.
The proposed amendments would state that the City of Anaheim has
transferred its ownership interests in the facility, and entitlement to
generating output, to Southern California Edison Company, except that
it retains its ownership interests in its spent nuclear fuel and the
facility's ISFSI located on the facility's site. In addition, the
proposed amendments would state that the City of Anaheim retains
financial responsibility for its spent fuel and for a portion of the
facility's decommissioning costs, and it remains a licensee for the
purposes of its retained interests and liabilities.
Pursuant to 10 CFR 50.80, no license, or any right thereunder,
shall be transferred, directly or indirectly, through transfer of
control of the licenses, unless the Commission shall give its consent
in writing. The Commission will approve an application for the direct
transfer of the licenses, if the Commission determines that the
proposed transferee is qualified to hold the licenses, and that the
transfer is otherwise consistent with applicable provisions of law,
regulations, and orders issued by the Commission pursuant thereto.
Before issuance of the proposed conforming license amendments, the
Commission will have made findings required by the Atomic Energy Act of
1954, as amended (the Act), and the Commission's regulations.
As provided in 10 CFR 2.1315, unless otherwise determined by the
Commission with regard to a specific application, the Commission has
determined that any amendment to the license of a utilization facility
which does no more than conform the license to reflect the transfer
action involves no significant hazards consideration and no genuine
issue as to whether the health and safety of the public will be
significantly affected. No contrary determination has been made with
respect to this specific license amendment application. In light of the
generic determination reflected in 10 CFR 2.1315, no public comments
with respect to significant hazards considerations are being solicited,
notwithstanding the general comment procedures contained in 10 CFR
50.91.
The filing of requests for hearing and petitions for leave to
intervene, and written comments with regard to the license transfer
application, are discussed below.
Within 20 days from the date of publication of this notice, any
person whose interest may be affected by the Commission's action on the
application may request a hearing and, if not the applicant, may
petition for leave to intervene in a hearing proceeding on the
Commission's action. Requests for a hearing and petitions for leave to
intervene should be filed in accordance with the Commission's rules of
practice set forth in Subpart C ``Rules of General Applicability:
Hearing Requests, Petitions to Intervene, Availability of Documents,
Selection of Specific Hearing Procedures, Presiding Officer Powers, and
General Hearing Management for NRC Adjudicatory Hearings,'' of 10 CFR
part 2. In particular, such requests and petitions must comply with the
requirements set forth in 10 CFR 2.309. Untimely requests and petitions
may be denied, as provided in 10 CFR 2.309(c)(1), unless good cause for
failure to file on time is established. In addition, an untimely
request or petition should address the factors that the Commission will
also consider, in reviewing untimely requests or petitions, set forth
in 10 CFR 2.309(c)(1)(i)-(viii).
Requests for a hearing and petitions for leave to intervene should
be served upon Douglas K. Porter, 2244 Walnut Grove Avenue, Rosemead,
CA 91770, telephone number: 626-302-3964; the General Counsel, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001 (e-mail
address OGCLT@NRC.gov); and the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemakings and Adjudications Staff, in accordance with 10 CFR 2.302
and 2.305.
The Commission will issue a notice or order granting or denying a
hearing request or intervention petition, designating the issues for
any hearing that will be held and designating the Presiding Officer. A
notice granting a
[[Page 33322]]
hearing will be published in the Federal Register and served on the
parties to the hearing.
As an alternative to requests for hearing and petitions to
intervene, within 30 days from the date of publication of this notice,
persons may submit written comments regarding the license transfer
application, as provided for in 10 CFR 2.1305. The Commission will
consider and, if appropriate, respond to these comments, but such
comments will not otherwise constitute part of the decisional record.
Comments should be submitted to the Secretary, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, Attention: Rulemakings and
Adjudications Staff, and should cite the publication date and page
number of this Federal Register notice.
For further details with respect to this action, see the
application dated March 10, 2006, as supplemented by the electronic
mail from the licensee dated May 16, 2006, available for public
inspection at the Commission's Public Document Room (PDR), located at
One White Flint North, Public File Area O1 F21, 11555 Rockville Pike
(first floor), Rockville, Maryland. Publicly available records will be
accessible electronically from the Agencywide Documents Access and
Management System's (ADAMS) Public Electronic Reading Room on the
Internet at the NRC Web site, https://www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to ADAMS or who encounter problems in
accessing the documents located in ADAMS should contact the NRC PDR
Reference staff by telephone at 1-800-397-4209, or 301-415-4737 or by
e-mail to pdr@nrc.gov.
Dated at Rockville, Maryland, this 30th day of May 2006.
For the Nuclear Regulatory Commission.
N. Kalyanam,
Project Manager, Plant Licensing Branch IV, Division of Operating
Reactor Licensing, Office of Nuclear Reactor Regulation.
[FR Doc. E6-8922 Filed 6-7-06; 8:45 am]
BILLING CODE 7590-01-P