Notice of Application Accepted for Filing and Soliciting Comments, Protests, and Motions to Intervene, 30917-30918 [E6-8336]
Download as PDF
Federal Register / Vol. 71, No. 104 / Wednesday, May 31, 2006 / Notices
Kyle (Gulf South)
kyle.stephens@gulfsouthpl.com.
Magalie R. Salas,
Secretary.
[FR Doc. E6–8330 Filed 5–30–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application Accepted for
Filing and Soliciting Comments,
Protests, and Motions to Intervene
jlentini on PROD1PC65 with NOTICES
May 24, 2006.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: 12634–000.
c. Date Filed: January 3, 2006.
d. Applicant: Alaska Power &
Telephone Company.
e. Name and Location of Project: The
proposed Connelly Lake Hydroelectric
Project would be located at the existing
Connelly Lake on an unnamed tributary
of the Chilkoot River in Haines Borough,
Alaska, partially on Federal lands
administered by the Bureau of Land
Management.
f. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
g. Applicant contact: Robert S.
Grimm, President, Alaska Power &
Telephone Co., P.O. Box 3222, Port
Townsend, WA 98368, (360) 385–1733
x120.
h. FERC Contact: Tom Papsidero,
(202) 502–6002.
i. Deadline for filing comments,
protests, and motions to intervene: 60
days from the issuance date of this
notice.
All documents (original and eight
copies) should be filed with Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper; see 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Please include the project number (P–
12634–000) on any comments or
motions filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
VerDate Aug<31>2005
17:52 May 30, 2006
Jkt 208001
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
j. Description of Proposed Project: The
proposed project would operate as a
storage project and would consist of the
following new facilities: (1) A proposed
48-foot-high, 575-foot-long rockfill dam
at the Lake outlet, (2) Connelly Lake,
which would have a minimum water
surface elevation of 2,280 feet above
mean sea level (msl), its current level,
and a maximum water surface elevation
of 2,312 feet msl, (3) a screened intake
structure at elevation 2,270 feet msl, (4)
a 6,188-foot-long, 48-inch-diameter
penstock, which connects to a valve
house with an auxiliary release adjacent
to the dam, then decreases to a 30-inchdiameter penstock, (5) a powerhouse
containing one generating unit with an
installed capacity of 6.2 megawatts, (6)
a 14-mile-long, 34.5-kilovolt
underground transmission line
connecting to an existing power line;
and (7) appurtenant facilities. The
project would have an annual
generation of 23 GWh.
k. Location of Applications: A copy of
the application is available for
inspection and reproduction at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item g
above.
l. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
m. Competing Preliminary Permit:
Anyone desiring to file a competing
application for preliminary permit for a
proposed project must submit the
competing application itself, or a notice
of intent to file such an application, to
the Commission on or before the
specified comment date for the
particular application (see 18 CFR 4.36).
Submission of a timely notice of intent
allows an interested person to file the
competing preliminary permit
application no later than 30 days after
the specified comment date for the
particular application. A competing
PO 00000
Frm 00061
Fmt 4703
Sfmt 4703
30917
preliminary permit application must
conform with 18 CFR 4.30(b) and 4.36.
n. Competing Development
Application: Any qualified development
applicant desiring to file a competing
development application must submit to
the Commission, on or before a
specified comment date for the
particular application, either a
competing development application or a
notice of intent to file such an
application. Submission of a timely
notice of intent to file a development
application allows an interested person
to file the competing application no
later than 120 days after the specified
comment date for the particular
application. A competing license
application must conform with 18 CFR
4.30(b) and 4.36.
o. Notice of Intent: A notice of intent
must specify the exact name, business
address, and telephone number of the
prospective applicant, and must include
an unequivocal statement of intent to
submit, if such an application may be
filed, either a preliminary permit
application or a development
application (specify which type of
application). A notice of intent must be
served on the applicant(s) named in this
public notice.
p. Proposed Scope of Studies under
Permit: A preliminary permit, if issued,
does not authorize construction. The
term of the proposed preliminary permit
would be 36 months. The work
proposed under the preliminary permit
would include economic analysis,
preparation of preliminary engineering
plans, and a study of environmental
impacts. Based on the results of these
studies, the Applicant would decide
whether to proceed with the preparation
of a development application to
construct and operate the project.
q. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper; See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under ‘‘e-
E:\FR\FM\31MYN1.SGM
31MYN1
30918
Federal Register / Vol. 71, No. 104 / Wednesday, May 31, 2006 / Notices
filing’’ link. The Commission strongly
encourages electronic filing.
r. Filing and Service of Responsive
Documents: Any filings must bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘NOTICE OF INTENT TO FILE
COMPETING APPLICATION’’,
‘‘COMPETING APPLICATION’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
Any of the above-named documents
must be filed by providing the original
and the number of copies provided by
the Commission’s regulations to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. An additional
copy must be sent to Director, Division
of Hydropower Administration and
Compliance, Federal Energy Regulatory
Commission, at the above-mentioned
address. A copy of any notice of intent,
competing application or motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
s. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E6–8336 Filed 5–30–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM98–1–000]
Records Governing Off-the-Record
Communications; Public Notice
May 22, 2006.
This constitutes notice, in accordance
with 18 CFR 385.2201(b), of the receipt
of prohibited and exempt off-the-record
communications.
Order No. 607 (64 FR 51222,
September 22, 1999) requires
Commission decisional employees, who
make or receive a prohibited or exempt
off-the-record communication relevant
to the merits of a contested proceeding,
to deliver to the Secretary of the
Commission, a copy of the
communication, if written, or a
summary of the substance of any oral
communication.
Prohibited communications are
included in a public, non-decisional file
associated with, but not a part of, the
decisional record of the proceeding.
Unless the Commission determines that
the prohibited communication and any
responses thereto should become a part
of the decisional record, the prohibited
off-the-record communication will not
be considered by the Commission in
Docket No.
reaching its decision. Parties to a
proceeding may seek the opportunity to
respond to any facts or contentions
made in a prohibited off-the-record
communication, and may request that
the Commission place the prohibited
communication and responses thereto
in the decisional record. The
Commission will grant such a request
only when it determines that fairness so
requires. Any person identified below as
having made a prohibited off-the-record
communication shall serve the
document on all parties listed on the
official service list for the applicable
proceeding in accordance with Rule
2010, 18 CFR 385.2010.
Exempt off-the-record
communications are included in the
decisional record of the proceeding,
unless the communication was with a
cooperating agency as described by 40
CFR 1501.6, made under 18 CFR
385.2201(e)(1)(v).
The following is a list of off-therecord communications recently
received by the Secretary of the
Commission. The communications
listed are grouped by docket numbers in
ascending order. These filings are
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the eLibrary
link. Enter the docket number,
excluding the last three digits, in the
docket number field to access the
document. For assistance, please contact
FERC, Online Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or for TTY,
contact (202) 502–8659.
Date received
Prohibited:
1. ER00–2268–011, EL05–10–003, ER99–4124–009, EL05–11–003, ER00–3312–010,
EL05–12–003, ER99–4122–012, EL05–13–003.
Exempt:
1. CP98–150–006/007 .................................................................................................................
2. CP06–12–000, et al. ...............................................................................................................
3. CP06–54–000, CP06–55–000 ................................................................................................
4. EL05–121–000 ........................................................................................................................
5.
6.
7.
8.
Project
Project
Project
Project
5–17–06
Kenneth R. Saline.1
5–17–06
5–17–06
5–17–06
5–17–06
Jennifer Kerrigan.
Daniel T. Gregg.
James Martin.
Hon. Jon W. McKinney.
Hon. Edward H. Staats.
Hon. R. Michael Shaw.
Chris Goodreau.
Arianne Poindexter.
W. Davis Smith.
Pat Weslowsk.
Jot Splenda.
Tolga Yetis.
2603–012 .............................................................................................................
2630–000 .............................................................................................................
11858–002 ...........................................................................................................
11858–002 ...........................................................................................................
5–17–06
5–17–06
5–17–06
5–17–06
9. Project No. 11858–002 ...........................................................................................................
5–19–06
jlentini on PROD1PC65 with NOTICES
1 One
No.
No.
No.
No.
of two e-mails sent on April 25, 2006, from Mr. Saline.
VerDate Aug<31>2005
17:52 May 30, 2006
Jkt 208001
PO 00000
Frm 00062
Fmt 4703
Sfmt 4703
E:\FR\FM\31MYN1.SGM
Presenter or requester
31MYN1
Agencies
[Federal Register Volume 71, Number 104 (Wednesday, May 31, 2006)]
[Notices]
[Pages 30917-30918]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-8336]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application Accepted for Filing and Soliciting
Comments, Protests, and Motions to Intervene
May 24, 2006.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Preliminary Permit.
b. Project No.: 12634-000.
c. Date Filed: January 3, 2006.
d. Applicant: Alaska Power & Telephone Company.
e. Name and Location of Project: The proposed Connelly Lake
Hydroelectric Project would be located at the existing Connelly Lake on
an unnamed tributary of the Chilkoot River in Haines Borough, Alaska,
partially on Federal lands administered by the Bureau of Land
Management.
f. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
g. Applicant contact: Robert S. Grimm, President, Alaska Power &
Telephone Co., P.O. Box 3222, Port Townsend, WA 98368, (360) 385-1733
x120.
h. FERC Contact: Tom Papsidero, (202) 502-6002.
i. Deadline for filing comments, protests, and motions to
intervene: 60 days from the issuance date of this notice.
All documents (original and eight copies) should be filed with
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426. Comments, protests and
interventions may be filed electronically via the Internet in lieu of
paper; see 18 CFR 385.2001(a)(1)(iii) and the instructions on the
Commission's Web site under the ``e-Filing'' link. The Commission
strongly encourages electronic filings. Please include the project
number (P-12634-000) on any comments or motions filed.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person in the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
j. Description of Proposed Project: The proposed project would
operate as a storage project and would consist of the following new
facilities: (1) A proposed 48-foot-high, 575-foot-long rockfill dam at
the Lake outlet, (2) Connelly Lake, which would have a minimum water
surface elevation of 2,280 feet above mean sea level (msl), its current
level, and a maximum water surface elevation of 2,312 feet msl, (3) a
screened intake structure at elevation 2,270 feet msl, (4) a 6,188-
foot-long, 48-inch-diameter penstock, which connects to a valve house
with an auxiliary release adjacent to the dam, then decreases to a 30-
inch-diameter penstock, (5) a powerhouse containing one generating unit
with an installed capacity of 6.2 megawatts, (6) a 14-mile-long, 34.5-
kilovolt underground transmission line connecting to an existing power
line; and (7) appurtenant facilities. The project would have an annual
generation of 23 GWh.
k. Location of Applications: A copy of the application is available
for inspection and reproduction at the Commission in the Public
Reference Room or may be viewed on the Commission's Web site at https://
www.ferc.gov using the ``eLibrary'' link. Enter the docket number
excluding the last three digits in the docket number field to access
the document. For assistance, call toll-free 1-866-208-3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item g
above.
l. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
m. Competing Preliminary Permit: Anyone desiring to file a
competing application for preliminary permit for a proposed project
must submit the competing application itself, or a notice of intent to
file such an application, to the Commission on or before the specified
comment date for the particular application (see 18 CFR 4.36).
Submission of a timely notice of intent allows an interested person to
file the competing preliminary permit application no later than 30 days
after the specified comment date for the particular application. A
competing preliminary permit application must conform with 18 CFR
4.30(b) and 4.36.
n. Competing Development Application: Any qualified development
applicant desiring to file a competing development application must
submit to the Commission, on or before a specified comment date for the
particular application, either a competing development application or a
notice of intent to file such an application. Submission of a timely
notice of intent to file a development application allows an interested
person to file the competing application no later than 120 days after
the specified comment date for the particular application. A competing
license application must conform with 18 CFR 4.30(b) and 4.36.
o. Notice of Intent: A notice of intent must specify the exact
name, business address, and telephone number of the prospective
applicant, and must include an unequivocal statement of intent to
submit, if such an application may be filed, either a preliminary
permit application or a development application (specify which type of
application). A notice of intent must be served on the applicant(s)
named in this public notice.
p. Proposed Scope of Studies under Permit: A preliminary permit, if
issued, does not authorize construction. The term of the proposed
preliminary permit would be 36 months. The work proposed under the
preliminary permit would include economic analysis, preparation of
preliminary engineering plans, and a study of environmental impacts.
Based on the results of these studies, the Applicant would decide
whether to proceed with the preparation of a development application to
construct and operate the project.
q. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper; See 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site under ``e-
[[Page 30918]]
filing'' link. The Commission strongly encourages electronic filing.
r. Filing and Service of Responsive Documents: Any filings must
bear in all capital letters the title ``COMMENTS'', ``NOTICE OF INTENT
TO FILE COMPETING APPLICATION'', ``COMPETING APPLICATION'',
``PROTEST'', or ``MOTION TO INTERVENE'', as applicable, and the Project
Number of the particular application to which the filing refers. Any of
the above-named documents must be filed by providing the original and
the number of copies provided by the Commission's regulations to: The
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426. An additional copy must be sent to Director,
Division of Hydropower Administration and Compliance, Federal Energy
Regulatory Commission, at the above-mentioned address. A copy of any
notice of intent, competing application or motion to intervene must
also be served upon each representative of the Applicant specified in
the particular application.
s. Agency Comments: Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E6-8336 Filed 5-30-06; 8:45 am]
BILLING CODE 6717-01-P