PacifiCorp; Notice of Availability of Environment Assessment, 30913 [E6-8328]
Download as PDF
Federal Register / Vol. 71, No. 104 / Wednesday, May 31, 2006 / Notices
free at (866) 208–3676, or for TTY,
contact (202) 502–8659.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Magalie R. Salas,
Secretary.
[FR Doc. E6–8329 Filed 5–30–06; 8:45 am]
[Project No. 2232–480–NC]
BILLING CODE 6717–01–P
Duke Power; A Division of Duke
Energy Corporation; Notice of
Availability of Environmental
Assessment
Federal Energy Regulatory
Commission
jlentini on PROD1PC65 with NOTICES
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380 (Order No.
486, 52 FR 47897), the Office of Energy
Projects has reviewed an application for
non-project use of project lands and
waters at the Catawba-Wateree Project
(FERC No. 2232), and has prepared an
environmental assessment (EA) for the
proposed non-project use. The project is
located on Lake Wylie in Mecklenburg
County, North Carolina.
In the application, Duke Power
(licensee) requests Commission
authorization to lease to The Sanctuary
at Lake Wylie, LLC and The Sanctuary
Property Owners Association (The
Sanctuary) 0.461 acre of project land for
a commercial residential marina. The
Sanctuary proposes to construct one
cluster dock with ten boat slips and a
covered fishing pier located adjacent to
the cluster dock, an irrigation intake
structure, and install 20,000 feet of
shoreline stabilization. The EA contains
Commission staff’s analysis of the
probable environmental impacts of the
proposal and concludes that approving
the licensee’s application, with staff’s
recommended environmental measures,
would not constitute a major Federal
action significantly affecting the quality
of the human environment.
A copy of the EA is attached to a
Commission order titled ‘‘Order
Modifying and Approving Non-Project
Use of Project Lands and Waters’’,
issued May 23, 2006. The EA is
available for review and reproduction at
the Commission’s Public Reference
Room, located at 888 First Street, NE.,
Room 2A, Washington, DC 20426. The
EA may also be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘elibrary’’ link.
Enter the dock number (prefaced by P–
2232) and excluding the last three
digits, in the docket number field to
access the document. For assistance,
contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll-
VerDate Aug<31>2005
17:52 May 30, 2006
Jkt 208001
PacifiCorp; Notice of Availability of
Environment Assessment
May 23, 2006.
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s regulations, the Office of
Energy Projects has reviewed the
application requesting the
Commission’s authorization to remove
its Cove development and reduce the
minimum flow required in the bypassed
reach of the Grace development. The
project is located on the Bear River in
Caribou and Franklin Counties, Idaho.
An environmental assessment (EA) has
been prepared.
In the EA, the Commission’s staff
concludes that approval of the licensee’s
application, with adoption of staff’s
recommendations, would not constitute
a major Federal action significantly
affecting the quality of the human
environment.
A copy of the EA is attached to a
Commission order titled ‘‘Order
Amending License and Revising Annual
Charges’’, issued May 23, 2006, and is
available at the Commission’s Public
Reference Room. A copy of the EA may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘elibrary’’ link. Enter the docket
number (P–20) in the docket field to
access the document. For assistance,
call (202) 502–8222 or (202) 502–8659
(for TTY).
Magalie R. Salas,
Secretary.
[FR Doc. E6–8328 Filed 5–30–06; 8:45 am]
PO 00000
Frm 00057
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
[Docket No. CP06–018–000]
May 24, 2006.
[Project Nos. 20–065]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Tennessee Gas Pipeline Company;
Notice of Availability of the
Environmental Assessment for the
Proposed Essex-Middlesex Project
DEPARTMENT OF ENERGY
May 23, 2006.
30913
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared an
environmental assessment (EA) on the
natural gas pipeline facilities proposed
to be constructed by Tennessee Gas
Pipeline Company (Tennessee Gas) in
the above-referenced docket.
The EA was prepared to satisfy the
requirements of the National
Environmental Policy Act. The staff
concludes that approval of the proposed
project, with appropriate mitigating
measures, would not constitute a major
Federal action significantly affecting the
quality of the human environment.
The EA assesses the potential
environmental effects of:
• 7.8 miles of 24-inch-diameter
pipeline in Essex and Middlesex
Counties, Massachusetts;
• One tie-in facility at the northern
terminus, milepost 7.83;
• One new pig receiver at the north
end, milepost 7.62; and
• One tie-in facility at the southern
terminus, milepost 0.0.
The purpose of the proposed project
is to increase its ability to receive and
transport gas into the Northeast natural
gas pipeline network by constructing its
facilities in Essex and Middlesex
Counties, Massachusetts, to provide up
to 82,300 decatherms per day of
incremental firm transportation
capacity.
The EA has been placed in the public
files of the FERC. A limited number of
copies of the EA are available for
distribution and public inspection at:
Federal Energy Regulatory Commission,
Public Reference and Files Maintenance
Branch, 888 First Street, NE., Room 2A,
Washington, DC 20426. (202) 502–8371.
Copies of the EA have been mailed to
Federal, state and local agencies, public
interest groups, interested individuals,
newspapers, and parties to this
proceeding.
Any person wishing to comment on
the EA may do so. To ensure
consideration prior to a Commission
decision on the proposal, it is important
that we receive your comments before
the date specified below. Please
carefully follow these instructions to
E:\FR\FM\31MYN1.SGM
31MYN1
Agencies
[Federal Register Volume 71, Number 104 (Wednesday, May 31, 2006)]
[Notices]
[Page 30913]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-8328]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project Nos. 20-065]
PacifiCorp; Notice of Availability of Environment Assessment
May 23, 2006.
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's regulations, the Office
of Energy Projects has reviewed the application requesting the
Commission's authorization to remove its Cove development and reduce
the minimum flow required in the bypassed reach of the Grace
development. The project is located on the Bear River in Caribou and
Franklin Counties, Idaho. An environmental assessment (EA) has been
prepared.
In the EA, the Commission's staff concludes that approval of the
licensee's application, with adoption of staff's recommendations, would
not constitute a major Federal action significantly affecting the
quality of the human environment.
A copy of the EA is attached to a Commission order titled ``Order
Amending License and Revising Annual Charges'', issued May 23, 2006,
and is available at the Commission's Public Reference Room. A copy of
the EA may also be viewed on the Commission's Web site at https://
www.ferc.gov using the ``elibrary'' link. Enter the docket number (P-
20) in the docket field to access the document. For assistance, call
(202) 502-8222 or (202) 502-8659 (for TTY).
Magalie R. Salas,
Secretary.
[FR Doc. E6-8328 Filed 5-30-06; 8:45 am]