Environmental Impacts Statements; Notice of Availability, 30399-30400 [E6-8146]
Download as PDF
Federal Register / Vol. 71, No. 102 / Friday, May 26, 2006 / Notices
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6675–6]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7167.
An explanation of the ratings assigned
to draft environmental impact
statements (EISs) was published in the
Federal Register dated April 7, 2006 (71
FR 17845).
jlentini on PROD1PC65 with NOTICES
Draft EISs
EIS No. 20060042, ERP No. D–NPS–
E65079–TN, Great Smoky Mountains
National Park General Management
Plan Amendment, Implementation,
Elkmont Historic District, Sevier
County, TN.
Summary: EPA does not object to the
proposed action.
Rating LO.
EIS No. 20060090, ERP No. D–AFS–
F65061–WI, Fishbone Project Area,
Vegetation and Road Management,
Implementation, Washburn Ranger
District, Chequamegon-Nicolet
National Forest, Bayfield County, WI.
Summary: EPA supports the preferred
alternative, but recommends that the
Final EIS include additional
information on cumulative impacts to
sensitive species.
Rating EC2.
EIS No. 20060110, ERP No. D–AFS–
J65459–MT, Whitetail-Pipestone
Travel Management, Develop SiteSpecific Travel Management Plan,
Jefferson and Butte Ranger Districts,
Beaverhead-Deerlodge National
Forest, Jefferson and Silver Bow
Counties, MT.
Summary: EPA expressed
environmental concerns about adverse
impacts from roads and motorized use
to water quality, aquatic habitat and
wildlife. The final EIS should consider
modifying the preferred alternative to
further reduce sedimentation from road
erosion by decreasing road densities and
stream crossings and improving road
conditions.
Rating EC2.
Final EISs
EIS No. 20050495, ERP No. F–SFW–
E65074–NC, Roanake River National
VerDate Aug<31>2005
16:12 May 25, 2006
Jkt 208001
Wildlife Refuge, Comprehensive
Conservation Plan, To Determine and
Evaluate a Range of Reasonable
Management Alternative, Bertie
County, NC.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20060102, ERP No. F–NOA–
D81036–WV, Canaan Valley Institute
Office Complex, Proposes to
Construct: Offices, Classrooms,
Laboratories, 250-Seat Auditorium,
Parking Facilities, Outdoor
Classrooms and Interpretive Areas,
U.S. Army COE Section 404 Permit,
Southeast of the Towns of Davis and
Thomas, Tucker County, WV.
Summary: EPA does not object to the
proposed action.
Dated: May 23, 2006.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E6–8147 Filed 5–25–06; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6675–5]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed May 15, 2006 through May 19,
2006
Pursuant to 40 CFR 1506.9.
EIS No. 20060197, Final EIS, FHW, CO,
US Highway 160, Transportation
Improvements from Junction US 160/
550 Durango—East to Bayfield, U.S.
Army COE Section 404 Permit, La
Plata County, CO, Wait Period Ends:
June 26, 2006, Contact: Joseph R.
Duran 720–963–3006.
EIS No. 20060198, Final EIS, AFS, MT,
Helena National Forest Noxious Weed
Treatment Project, Implementation,
Lewis and Clark, Broadwater, Powell,
Jefferson and Meagher Counties, MT,
Wait Period Ends: June 26, 2006,
Contact: Dennis Heffner 406–495–
3727.
EIS No. 20060199, Final EIS, AFS, MI,
Huron-Manistee National Forests,
Land and Resource Management Plan,
Implementation, Several Counties,
MI, Wait Period Ends: June 26, 2006,
Contact: Jeffery G. Pullen 231–775–
3183.
EIS No. 20060200, Draft EIS, COE, 00,
Programmatic—Ohio River Mainstem
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
30399
System Study, System Investment
Plan (SIP) for Maintaining Safe,
Environmentally Sustainable and
Reliable Navigation on the Ohio
River, IL, IN, OH, KY, PA and WV,
Comment Period Ends: July 18, 2006,
Contact: Veronica Rife 502–315–6785.
EIS No. 20060201, Final EIS, NRS, AR,
Little Red River Irrigation Project,
Develop a Water Management Plan for
Irrigation Purposes in Seary, U.S.
Army COE Section 404 Permit, Raft
Creek, White County, AR, Wait Period
Ends: June 26, 2006, Contact: Belinda
Bell 501–301–3149.
EIS No. 20060202, Final EIS, NOA, 00,
Snapper Grouper Fishery,
Amendment 13C to the Fishery
Management Plan, Phase Out
Overfishing of Snowy Grouper,
Golden Tilefish, Vermilion Snapper
and Sea Bass, Implementation, South
Atlantic Region , Wait Period Ends:
June 26, 2006, Contact: Dr. Roy E.
Crabtree 727–824–5301.
EIS No. 20060203, Draft EIS, BLM, WY,
Maysdorf Coal Lease by Application
(LBA) Tract, (Federal Coal
Application WYW154432),
Implementation, Campbell Counties,
WY, Comment Period Ends: July 25,
2006, Contact: Nancy Doelger 307–
261–7627.
EIS No. 20060204, Draft EIS, AFS, OR,
Mt. Hood National Forest and
Columbia River Gorge National Scenic
Area, Site-Specific Invasive Plant
Treatments, Forest Plan Amendments
#16, Mt. Hood National Forest and
Columbia River Gorge National Scenic
Area, Clackamas, Hood River,
Multnomah and Wasco Counties, OR,
Comment Period Ends: July 13, 2006,
Contact: Jennie O’Connor 503–668–
1645.
EIS No. 20060205, Draft EIS, AFS, PA,
Allegheny National Forest, Proposed
Revised Land and Resource
Management Plan, Implementation,
Elk, Forest, McKean and Warren
Counties, PA, Comment Period Ends:
August 28, 2006, Contact: William
Connelly 814–723–5150.
EIS No. 20060206, Draft EIS, FRC, MS,
Clean Energy Liquefied Natural Gas
(LNG) Import Terminal and Natural
Gas Pipeline Facilities, Construction
and Operation, US Army COE Section
10 and 404 Permits, (FERC/EIS–
0192D), Port of Pascagoula, Jackson
County, MS, Comment Period Ends:
July 10, 2006, Contact: Todd Sedmak
1–866–208–3372.
EIS No. 20060207, Draft EIS, FRC, MS,
Casotte Landing Liquefied Natural
Gas (LNG) Import and Interstate
Natural Gas Transmission Facilities,
Construction and Operation, U.S.
Army COE Section 404 Permit,
E:\FR\FM\26MYN1.SGM
26MYN1
jlentini on PROD1PC65 with NOTICES
30400
Federal Register / Vol. 71, No. 102 / Friday, May 26, 2006 / Notices
(FERC/EIS–0193D), near the City of
Pascagoula, Jackson County, MS,
Comment Period Ends: July 10, 2006,
Contact: Todd Sedmak 1–866–208–
3372.
EIS No. 20060208, Draft EIS, AFS, 00,
Heavenly Mountain Resort Master
Plan Amendment 2005 (MPA 05),
Improve and Enhance the Resorts
Over Winter and Summer Recreation
Opportunities, Special-Use-Permit,
Lake Tahoe Basin, El Dorado County,
CA and Douglas County, NV,
Comment Period Ends: July 17, 2006,
Contact: Matt Dickinson 530–543–
2769.
EIS No. 20060209, Draft EIS, NPS, PA,
Flight 93 National Memorial,
Designation of Crash Site to
Commemorate the Passengers and
Crew of Flight 93, Implementation,
Stonycreek Township, Somerset
County, PA, Comment Period Ends:
July 17, 2006, Contact: Jeff Reinbold
814–443–4557.
EIS No. 20060210, Final EIS, UAF, AZ,
Barry M. Goldwater Range (BMGR),
Integrated Natural Resources
Management Plan (INRMP),
Implementation, Yuma, Pima, and
Maricopa Counties, AZ, Wait Period
Ends: June 26, 2006, Contact: Carol
Heathington 623–856–8492.
EIS No. 20060211, Draft EIS, DOE, 00,
Strategic Petroleum Reserve
Expansion, Site Selection of Five New
Sites: Chacahoula and Clovelly, in
Lafourche Parish, LA; Burinsburg,
Claiborne County, MS; Richton, Perry
County, MS; and Stratton Ridge,
Brazoria County, TX and Existing Site
Bayou Choctaw, Iberville Parish, LA,
West Hackberry, Cameron and
Calcasieu Parishes, LA; and Big Hill,
Jefferson County, TX, Comment
Period Ends: July 10, 2006, Contact:
Donald Silawsky 202–586–1892.
EIS No. 20060212, Draft EIS, AFS, CA,
Freeman Project, Reduce Hazardous
Fuel and Improving Forest Health,
Implementation, Lake Recreation
Area, Beckworth Ranger District,
Plumas National Forest, Plumas
County, CA, Comment Period Ends:
July 10, 2006, Contact: Sabrina Stadler
530–836–7141.
EIS No. 20060213, Draft EIS, CGD, MA,
Northeast Gateway Deepwater Port
License Application to Import
Liquefied Natural Gas (LNG) (USCG–
2005–22219), Massachusetts Bay, City
of Gloucester, MA, Comment Period
Ends: July 10, 2006, Contact: Mark
Prescott 202–267–0225.
EIS No. 20060214, Final EIS, NRC, NY,
Generic—License Renewal of Nuclear
Plants for Nine Mile Point Nuclear
Station, Units 1 and 2, Supplement 24
to NUREG 1437, Implementation,
VerDate Aug<31>2005
16:12 May 25, 2006
Jkt 208001
Lake Ontario, Oswego County, NY,
Wait Period Ends: June 26, 2006,
Contact: Samuel Hernandez 301–415–
4049.
EIS No. 20060215, Final EIS, AFS, AK,
Whistle Stop Project, Provide Access
to Backcountry Recreation Area on
National Forest, System (NFS) Lands,
on the Kenai Peninsula between
Portage and Moose Pass, Chugach
National Forest, Kenai Peninsula
Borough, AK , Wait Period Ends: June
26, 2006, Contact: Adam McClory
907–754–2352.
EIS No. 20060216, Final EIS, IBR, 00,
Programmatic—Platte River Recovery
Implementation Program, Assessing
Alternatives for the Implementation of
a Basinwide, Cooperative, Endangered
Species Recovery Program, Four
Target Species: Whooping Crane,
Interior Least Tern, Pipping Plover
and Pallid Sturgeon, NE, WY, and CO,
Wait Period Ends: June 26, 2006,
Contact: Curt Brown 303–445–2096.
Amended Notices
EIS No. 20060191, Final EIS, FAA, FL,
Panama City-Bay County International
Airport (PFN), Proposed Relocation to
a New Site, NPDES Permit and U.S.
Army COE Section 404 Permit, Bay
County, FL, Wait Period Ends: July 5,
2006, Contact: Virginia Lane 407–
872–6331 Ext. 129. Revision to FR
Notice Published May 19, 2006:
Comment Period Extended from June
19, 2006 to July 5, 2006.
Dated: May 23, 2006.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E6–8146 Filed 5–25–06; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2006–0299; FRL–8066–7]
Notice of Filing of a Pesticide Petition
for the Establishment of a Temporary
Exemption from the Requirement of a
Tolerance for the Residues of the
Plant-Incorporated Protectants
Bacillus Thuringiensis Cry2Ab2
Protein and the Genetic Material for Its
Production in Corn in or on All Corn
Commodities
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
SUMMARY: This notice announces the
initial filing of a pesticide petition
proposing the establishment of a
temporary exemption from the
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
requirement of a tolerance for the
residues of the plant-incorporated
protectants Bacillus thuringiensis
Cry2Ab2 and the genetic material
necessary for its production in corn in
or on all corn commodities.
DATES: Comments must be received on
or before June 26, 2006.
ADDRESSES: Submit your comments,
identified by docket identification (ID)
number EPA–HQ–OPP–2006–0299, and
pesticide petition number (PP) 5G7005
by one of the following methods:
• Federal eRulemaking Portal: https://
www.regulations.gov. Follow the on-line
instructions for submitting comments.
• Mail: Office of Pesticide Programs
(OPP) Regulatory Public Docket (7502P),
Environmental Protection Agency, 1200
Pennsylvania Ave., NW., Washington,
DC 20460-0001.
• Delivery: OPP Regulatory Public
Docket (7502P), Environmental
Protection Agency, Rm. S-4400, One
Potomac Yard (South Building), 2777 S.
Crystal Drive, Arlington, VA. Deliveries
are only accepted during the Docket’s
normal hours of operation (8:30 a.m. to
4 p.m., Monday through Friday,
excluding legal holidays). Special
arrangements should be made for
deliveries of boxed information. The
Docket telephone number is (703) 3055805.
Instructions: Direct your comments to
docket ID number EPA–HQ–OPP–2006–
0299. EPA’s policy is that all comments
received will be included in the docket
without change and may be made
available on-line at https://
www.regulations.gov, including any
personal information provided, unless
the comment includes information
claimed to be Confidential Business
Information (CBI) or other information
whose disclosure is restricted by statute.
Do not submit information that you
consider to be CBI or otherwise
protected through regulations.gov or email. The Federal regulations.gov Web
site is an ‘‘anonymous access’’ system,
which means EPA will not know your
identity or contact information unless
you provide it in the body of your
comment. If you send an e-mail
comment directly to EPA without going
through regulations.gov, your e-mail
address will be automatically captured
and included as part of the comment
that is placed in the docket and made
available on the Internet. If you submit
an electronic comment, EPA
recommends that you include your
name and other contact information in
the body of your comment and with any
disk or CD-ROM you submit. If EPA
cannot read your comment due to
technical difficulties and cannot contact
E:\FR\FM\26MYN1.SGM
26MYN1
Agencies
[Federal Register Volume 71, Number 102 (Friday, May 26, 2006)]
[Notices]
[Pages 30399-30400]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-8146]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6675-5]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed May 15, 2006 through May 19, 2006
Pursuant to 40 CFR 1506.9.
EIS No. 20060197, Final EIS, FHW, CO, US Highway 160, Transportation
Improvements from Junction US 160/550 Durango--East to Bayfield, U.S.
Army COE Section 404 Permit, La Plata County, CO, Wait Period Ends:
June 26, 2006, Contact: Joseph R. Duran 720-963-3006.
EIS No. 20060198, Final EIS, AFS, MT, Helena National Forest Noxious
Weed Treatment Project, Implementation, Lewis and Clark, Broadwater,
Powell, Jefferson and Meagher Counties, MT, Wait Period Ends: June 26,
2006, Contact: Dennis Heffner 406-495-3727.
EIS No. 20060199, Final EIS, AFS, MI, Huron-Manistee National Forests,
Land and Resource Management Plan, Implementation, Several Counties,
MI, Wait Period Ends: June 26, 2006, Contact: Jeffery G. Pullen 231-
775-3183.
EIS No. 20060200, Draft EIS, COE, 00, Programmatic--Ohio River Mainstem
System Study, System Investment Plan (SIP) for Maintaining Safe,
Environmentally Sustainable and Reliable Navigation on the Ohio River,
IL, IN, OH, KY, PA and WV, Comment Period Ends: July 18, 2006, Contact:
Veronica Rife 502-315-6785.
EIS No. 20060201, Final EIS, NRS, AR, Little Red River Irrigation
Project, Develop a Water Management Plan for Irrigation Purposes in
Seary, U.S. Army COE Section 404 Permit, Raft Creek, White County, AR,
Wait Period Ends: June 26, 2006, Contact: Belinda Bell 501-301-3149.
EIS No. 20060202, Final EIS, NOA, 00, Snapper Grouper Fishery,
Amendment 13C to the Fishery Management Plan, Phase Out Overfishing of
Snowy Grouper, Golden Tilefish, Vermilion Snapper and Sea Bass,
Implementation, South Atlantic Region , Wait Period Ends: June 26,
2006, Contact: Dr. Roy E. Crabtree 727-824-5301.
EIS No. 20060203, Draft EIS, BLM, WY, Maysdorf Coal Lease by
Application (LBA) Tract, (Federal Coal Application WYW154432),
Implementation, Campbell Counties, WY, Comment Period Ends: July 25,
2006, Contact: Nancy Doelger 307-261-7627.
EIS No. 20060204, Draft EIS, AFS, OR, Mt. Hood National Forest and
Columbia River Gorge National Scenic Area, Site-Specific Invasive Plant
Treatments, Forest Plan Amendments 16, Mt. Hood National
Forest and Columbia River Gorge National Scenic Area, Clackamas, Hood
River, Multnomah and Wasco Counties, OR, Comment Period Ends: July 13,
2006, Contact: Jennie O'Connor 503-668-1645.
EIS No. 20060205, Draft EIS, AFS, PA, Allegheny National Forest,
Proposed Revised Land and Resource Management Plan, Implementation,
Elk, Forest, McKean and Warren Counties, PA, Comment Period Ends:
August 28, 2006, Contact: William Connelly 814-723-5150.
EIS No. 20060206, Draft EIS, FRC, MS, Clean Energy Liquefied Natural
Gas (LNG) Import Terminal and Natural Gas Pipeline Facilities,
Construction and Operation, US Army COE Section 10 and 404 Permits,
(FERC/EIS-0192D), Port of Pascagoula, Jackson County, MS, Comment
Period Ends: July 10, 2006, Contact: Todd Sedmak 1-866-208-3372.
EIS No. 20060207, Draft EIS, FRC, MS, Casotte Landing Liquefied Natural
Gas (LNG) Import and Interstate Natural Gas Transmission Facilities,
Construction and Operation, U.S. Army COE Section 404 Permit,
[[Page 30400]]
(FERC/EIS-0193D), near the City of Pascagoula, Jackson County, MS,
Comment Period Ends: July 10, 2006, Contact: Todd Sedmak 1-866-208-
3372.
EIS No. 20060208, Draft EIS, AFS, 00, Heavenly Mountain Resort Master
Plan Amendment 2005 (MPA 05), Improve and Enhance the Resorts Over
Winter and Summer Recreation Opportunities, Special-Use-Permit, Lake
Tahoe Basin, El Dorado County, CA and Douglas County, NV, Comment
Period Ends: July 17, 2006, Contact: Matt Dickinson 530-543-2769.
EIS No. 20060209, Draft EIS, NPS, PA, Flight 93 National Memorial,
Designation of Crash Site to Commemorate the Passengers and Crew of
Flight 93, Implementation, Stonycreek Township, Somerset County, PA,
Comment Period Ends: July 17, 2006, Contact: Jeff Reinbold 814-443-
4557.
EIS No. 20060210, Final EIS, UAF, AZ, Barry M. Goldwater Range (BMGR),
Integrated Natural Resources Management Plan (INRMP), Implementation,
Yuma, Pima, and Maricopa Counties, AZ, Wait Period Ends: June 26, 2006,
Contact: Carol Heathington 623-856-8492.
EIS No. 20060211, Draft EIS, DOE, 00, Strategic Petroleum Reserve
Expansion, Site Selection of Five New Sites: Chacahoula and Clovelly,
in Lafourche Parish, LA; Burinsburg, Claiborne County, MS; Richton,
Perry County, MS; and Stratton Ridge, Brazoria County, TX and Existing
Site Bayou Choctaw, Iberville Parish, LA, West Hackberry, Cameron and
Calcasieu Parishes, LA; and Big Hill, Jefferson County, TX, Comment
Period Ends: July 10, 2006, Contact: Donald Silawsky 202-586-1892.
EIS No. 20060212, Draft EIS, AFS, CA, Freeman Project, Reduce Hazardous
Fuel and Improving Forest Health, Implementation, Lake Recreation Area,
Beckworth Ranger District, Plumas National Forest, Plumas County, CA,
Comment Period Ends: July 10, 2006, Contact: Sabrina Stadler 530-836-
7141.
EIS No. 20060213, Draft EIS, CGD, MA, Northeast Gateway Deepwater Port
License Application to Import Liquefied Natural Gas (LNG) (USCG-2005-
22219), Massachusetts Bay, City of Gloucester, MA, Comment Period Ends:
July 10, 2006, Contact: Mark Prescott 202-267-0225.
EIS No. 20060214, Final EIS, NRC, NY, Generic--License Renewal of
Nuclear Plants for Nine Mile Point Nuclear Station, Units 1 and 2,
Supplement 24 to NUREG 1437, Implementation, Lake Ontario, Oswego
County, NY, Wait Period Ends: June 26, 2006, Contact: Samuel Hernandez
301-415-4049.
EIS No. 20060215, Final EIS, AFS, AK, Whistle Stop Project, Provide
Access to Backcountry Recreation Area on National Forest, System (NFS)
Lands, on the Kenai Peninsula between Portage and Moose Pass, Chugach
National Forest, Kenai Peninsula Borough, AK , Wait Period Ends: June
26, 2006, Contact: Adam McClory 907-754-2352.
EIS No. 20060216, Final EIS, IBR, 00, Programmatic--Platte River
Recovery Implementation Program, Assessing Alternatives for the
Implementation of a Basinwide, Cooperative, Endangered Species Recovery
Program, Four Target Species: Whooping Crane, Interior Least Tern,
Pipping Plover and Pallid Sturgeon, NE, WY, and CO, Wait Period Ends:
June 26, 2006, Contact: Curt Brown 303-445-2096.
Amended Notices
EIS No. 20060191, Final EIS, FAA, FL, Panama City-Bay County
International Airport (PFN), Proposed Relocation to a New Site, NPDES
Permit and U.S. Army COE Section 404 Permit, Bay County, FL, Wait
Period Ends: July 5, 2006, Contact: Virginia Lane 407-872-6331 Ext.
129. Revision to FR Notice Published May 19, 2006: Comment Period
Extended from June 19, 2006 to July 5, 2006.
Dated: May 23, 2006.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E6-8146 Filed 5-25-06; 8:45 am]
BILLING CODE 6560-50-P