Oil and Gas and Sulphur Operations in the Outer Continental Shelf (OCS)Minimum Blowout Prevention (BOP) System Requirements for Well- Workover Operations Performed Using Coiled Tubing With the Production Tree in Place, 29710 [C6-2101]

Download as PDF 29710 Corrections Federal Register Vol. 71, No. 99 Tuesday, May 23, 2006 This section of the FEDERAL REGISTER contains editorial corrections of previously published Presidential, Rule, Proposed Rule, and Notice documents. These corrections are prepared by the Office of the Federal Register. Agency prepared corrections are issued as signed documents and appear in the appropriate document categories elsewhere in the issue. document, ‘‘Dated: April 13, 2006’’ should read ‘‘Dated: April 3, 2006’’. March 7, 2006, make the following correction: [FR Doc. C6–4578 Filed 5–22–06; 8:45 am] §250.615 BILLING CODE 1505–01–D [Corrected] Minerals Management Service 30 CFR Part 250 Office for Civil Rights; The Patient Safety and Quality Improvement Act of 2005; Delegation of Authority rmajette on PROD1PC67 with MISCELLANEOUS Correction In notice document 06–4578 beginning on page 28701 in the issue of Wednesday, May 17, 2006 make the following correction: On page 28702, in the first column, in the sixth line from the end of the VerDate Aug<31>2005 15:15 May 22, 2006 Jkt 208001 [FR Doc. C6–2101 Filed 5–22–06; 8:45 am] RIN 1010-AC96 DEPARTMENT OF HEALTH AND HUMAN SERVICES On page 11313, in §250.615(e)(1), in the table, under the third column, between the current fifth and sixth entries, insert the following entry ‘‘Hydraulically-operated pipe rams.’’. BILLING CODE 1505–01–D DEPARTMENT OF THE INTERIOR Oil and Gas and Sulphur Operations in the Outer Continental Shelf (OCS)— Minimum Blowout Prevention (BOP) System Requirements for WellWorkover Operations Performed Using Coiled Tubing With the Production Tree in Place Correction In rule document 06–2101 beginning on page 11310 in the issue of Tuesday, PO 00000 Frm 00001 Fmt 4734 Sfmt 4734 E:\FR\FM\23MYCX.SGM 23MYCX

Agencies

[Federal Register Volume 71, Number 99 (Tuesday, May 23, 2006)]
[Corrections]
[Page 29710]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: C6-2101]


-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Minerals Management Service

30 CFR Part 250

RIN 1010-AC96


Oil and Gas and Sulphur Operations in the Outer Continental Shelf 
(OCS)--Minimum Blowout Prevention (BOP) System Requirements for Well-
Workover Operations Performed Using Coiled Tubing With the Production 
Tree in Place

Correction

    In rule document 06-2101 beginning on page 11310 in the issue of 
Tuesday, March 7, 2006, make the following correction:


Sec. 250.615  [Corrected]

    On page 11313, in Sec. 250.615(e)(1), in the table, under the third 
column, between the current fifth and sixth entries, insert the 
following entry ``Hydraulically-operated pipe rams.''.

[FR Doc. C6-2101 Filed 5-22-06; 8:45 am]
BILLING CODE 1505-01-D
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.