Consolidated Water Power Company; Notice of Availability of Draft Environmental Assessment, 29329 [E6-7695]
Download as PDF
Federal Register / Vol. 71, No. 98 / Monday, May 22, 2006 / Notices
Power Corporation in its complaint
filing of September 30, 2005.
Comment Date: 5 p.m. Eastern Time
on May 26, 2006.
2. Midland Cogeneration Venture
Limited Partnership
[Docket No. ER06–733–001]
Take notice that May 10, 2006,
Midland Cogeneration Venture Limited
Partnership filed revised tariff sheets,
Sub. Original Sheet Nos. 2 through 4
and Original Sheet No. 5, to its marketbased tariff, Original Volume No 1,
pursuant to the Commission’s May 8,
2006 request.
Comment Date: 5 p.m. Eastern Time
on May 22, 2006.
3. Arcadia Power Partners, LLC; Cleco
Power LLC
[Docket Nos. ER06–964–000; ER06–965–000]
Take notice that on May 5, 2006,
Arcadia Power Partners, LLC filed its
proposed revised market-based rate
tariff, Original Volume No. 1, Original
Sheet No. 3, to permit it to make sales
of energy indirectly through a nonaffiliated marketer to its affiliate, Cleco
Power LLC.
Comment Date: 5 p.m. Eastern Time
on May 19, 2006.
4. Colstrip Energy Limited Partnership
[Docket No. QF84–377–011]
Take notice that on May 3, 2006,
Colstrip Energy Limited Partnership
filed an application for recertification as
a qualifying small power production
facility, pursuant to part 292, subpart B
of the Commission’s regulations, 18 CFR
292.207(b).
Comment Date: 5 p.m. Eastern Time
on June 2, 2006.
cchase on PROD1PC60 with NOTICES
Standard Paragraph
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
VerDate Aug<31>2005
20:16 May 19, 2006
Jkt 208001
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–7755 Filed 5–19–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2192–022—WI]
Consolidated Water Power Company;
Notice of Availability of Draft
Environmental Assessment
May 12, 2006.
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380 (Order No.
486, 52 FR 47897), the Office of Energy
Projects has reviewed an application for
the conveyance and acquisition of
project lands at the Biron Project (FERC
No. 2192), and has prepared a draft
environmental assessment (DEA) for the
proposal. The proposed project land
exchange would occur on the Biron
reservoir in Wood County, Wisconsin.
In the application, Consolidated
Water Power (licensee) requests
Commission authorization to exchange
approximately 3.14 acres of licenseeowned lands with 3,000 linear feet of
shoreline along the Biron flowage, for
three different parcels of land totaling
approximately 205.213 total acres. The
first parcel has 830 linear feet of river
shoreline and consists of 47.546 acres.
The second parcel has 126 linear feet of
river shoreline and consists of 2.960
acres, abutting an existing licenseeowned boat launch. The third parcel
consists of islands in the river,
peninsulas, and a roadside access
totaling 154.84 acres (48.82 acres above
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
29329
water). These island perimeters,
peninsulas, and the roadside access
total 33,749 linear feet of waterfront. All
lands are currently within the project
boundary, and the licensee intends to
retain flowage rights over any conveyed
lands, and to retain all lands within the
project boundary. The DEA contains the
Commission staff’s analysis of the
probable environmental impacts of the
licensee’s land-exchange proposal.
The DEA is available for review and
reproduction at the Commission’s
Public Reference Room, located at 888
First Street, NE., Room 2A, Washington,
DC 20426. The DEA may also be viewed
on the Commission’s Web site at https://
www.ferc.gov using the ‘‘elibrary’’ link.
Enter the docket number (P–2192–022)
excluding the last three digits, in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY,
contact (202) 502–8659.
Comments on the DEA should be filed
within 30 days of the date of this notice
and should be addressed to Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Please reference ‘‘Biron Project, FERC
Project No. 2192–022’’ on all comments.
Comments may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link.
Magalie R. Salas,
Secretary.
[FR Doc. E6–7695 Filed 5–19–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application Accepting for
Filing and Soliciting Motions To
Intervene, Protests and Comments
May 12, 2006.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: 12637–000.
c. Date filed: January 9, 2006.
d. Applicant: Elias A. Felluss.
e. Name of Project: Columbia Hydro
Power Alpha Station.
f. Location: On Claverack Creek, in
Stottville, Columbia County, New York.
E:\FR\FM\22MYN1.SGM
22MYN1
Agencies
[Federal Register Volume 71, Number 98 (Monday, May 22, 2006)]
[Notices]
[Page 29329]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-7695]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2192-022--WI]
Consolidated Water Power Company; Notice of Availability of Draft
Environmental Assessment
May 12, 2006.
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's (Commission)
regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office
of Energy Projects has reviewed an application for the conveyance and
acquisition of project lands at the Biron Project (FERC No. 2192), and
has prepared a draft environmental assessment (DEA) for the proposal.
The proposed project land exchange would occur on the Biron reservoir
in Wood County, Wisconsin.
In the application, Consolidated Water Power (licensee) requests
Commission authorization to exchange approximately 3.14 acres of
licensee-owned lands with 3,000 linear feet of shoreline along the
Biron flowage, for three different parcels of land totaling
approximately 205.213 total acres. The first parcel has 830 linear feet
of river shoreline and consists of 47.546 acres. The second parcel has
126 linear feet of river shoreline and consists of 2.960 acres,
abutting an existing licensee-owned boat launch. The third parcel
consists of islands in the river, peninsulas, and a roadside access
totaling 154.84 acres (48.82 acres above water). These island
perimeters, peninsulas, and the roadside access total 33,749 linear
feet of waterfront. All lands are currently within the project
boundary, and the licensee intends to retain flowage rights over any
conveyed lands, and to retain all lands within the project boundary.
The DEA contains the Commission staff's analysis of the probable
environmental impacts of the licensee's land-exchange proposal.
The DEA is available for review and reproduction at the
Commission's Public Reference Room, located at 888 First Street, NE.,
Room 2A, Washington, DC 20426. The DEA may also be viewed on the
Commission's Web site at https://www.ferc.gov using the ``elibrary''
link. Enter the docket number (P-2192-022) excluding the last three
digits, in the docket number field to access the document. For
assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov
or toll-free at (866) 208-3676, or for TTY, contact (202) 502-8659.
Comments on the DEA should be filed within 30 days of the date of
this notice and should be addressed to Magalie R. Salas, Secretary,
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426. Please reference ``Biron Project, FERC Project
No. 2192-022'' on all comments. Comments may be filed electronically
via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site under the ``e-Filing''
link.
Magalie R. Salas,
Secretary.
[FR Doc. E6-7695 Filed 5-19-06; 8:45 am]
BILLING CODE 6717-01-P