Environmental Impacts Statements; Notice of Availability, 29148-29149 [E6-7663]
Download as PDF
29148
Federal Register / Vol. 71, No. 97 / Friday, May 19, 2006 / Notices
Management Plans, Implementation,
San Bernardino, Riverside, and San
Diego Counties, CA.
Summary: No comment letter was
sent to the preparing agency.
EIS No. 20060076, ERP No. F–CGD–
G39043–00, Main Pass Energy Hub
Deepwater Port License Application,
Proposes to Construct a Deepwater
Port and Associated Anchorages, U.S.
Army COE Section 10 and 404
Permits, Gulf of Mexico (GOM),
southeast of the coast of Louisiana in
Main Pass Lease Block (MP) 2999 and
from the Mississippi coast in MP 164.
Summary: EPA appreciates the
improvements that have been
incorporated into the proposed LNG
project; therefore, concludes that the
ORV technology would result in minor
adverse impacts to water quality and
biological resources. EPA recommends
that USCG and the Maritime
Administration consider operational
modifications to further reduce impacts.
EIS No. 20060111, ERP No. FC–COE–
H36012–MO, St. Johns Bayou and
New Madrid Floodway Project,
Channel Enlargement and
Improvement, Revised Information to
Clarify and Address Issues of
Concern, Flood Control National
Economic Development (NED), New
Madrid, Mississippi and Scott
Counties, MO.
Summary: EPA does not object to
proposed project.
Dated: May 16, 2006.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E6–7661 Filed 5–18–06; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6675–3]
wwhite on PROD1PC61 with NOTICES
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed May 8, 2006 Through May 12,
2006.
Pursuant to 40 CFR 1506.9.
EIS No. 20060178, Draft EIS, WPA, 00,
Big Stone II Power Plant and
Transmission Project, Propose Power
Plant, Transmission Alternatives, and
Substation Modification, (DOE/EIS–
0377), U.S. Army COE Section 10 and
VerDate Aug<31>2005
17:37 May 18, 2006
Jkt 208001
404 Permits, Big Stone City, Grant
County, SD and MN, Comment Period
Ends: July 3, 2006, Contact: Nancy
Werdel 720–962–7251.
EIS No. 20060179, Final EIS, AFS, WY,
Moose-Gypsum Project, Proposes to
Authorize Vegetation Treatments,
Watershed Improvements, and Travel
Plan and Recreation Updates,
Pinedale Ranger District, BridgerTeton National Forest, Sublette
County, WY, Wait Period Ends: June
19, 2006, Contact: Craig Trulock 307–
367–4326.
EIS No. 20060180, Final EIS, AFS, IN,
Tell City Windthrow 2004 Project,
Salvage Harvest and Prescribed
Burning of Windthrow Timber,
Implementation, Hoosier National
Forest, Perry, Crawford and Dubois
Counties, IN, Wait Period Ends: June
19, 2006, Contact: Ron Ellis 812–275–
5987.
EIS No. 20060181, Draft EIS, BLM, 00,
Devers-Palo Verde No. 2 Transmission
Line Project, Construction and
Operation a New 230-mile 500 kV
Electric Transmission Line between
Devers Substation in California and
Harquahala Generating Substation in
Arizona, Comment Period Ends: July
5, 2006, Contact: Greg Hill 760–251–
4840.
EIS No. 20060182, Draft EIS, COE, CA,
San Clemente Dam Seismic Safety
Project, Increase Dam Safety to Meet
Current Design Standards, Monterey
County, CA, Comment Period Ends:
July 3, 2006, Contact: Robert Smith
415–977–8450.
EIS No. 20060183, Final EIS, FAA, UT,
St. George Municipal Airport
Replacement, Funding, City of St.
George, Washington County, UT, Wait
Period Ends: June 19, 2006, Contact:
T.J. Stetz 425–227–2611.
EIS No. 20060184, Draft EIS, COE, MD,
Masonville Dredge Material
Containment Facility (DMCF),
Construction from Baltimore Harbor
Channel north of Point-Rock Point
Line, U.S. Army COE Section 10 and
404 Permits, Baltimore, MD,
Comment Period Ends: July 7, 2006,
Contact: Jon Romeo 410–962–6079.
EIS No. 20060185, Final EIS, AFS, MI,
Hiawatha National Forest, Proposed
Land and Resource Management Plan,
Forest Plan Revision, Implementation,
Alger, Cheboygan, Chippewa, Delta,
Luce, Mackinac, Marquette and
Schoolcraft Counties, MI, Wait Period
Ends: June 19, 2006, Contact: Dave
Maercklein 906–789–3301.
EIS No. 20060186, Final Supplement,
TPT, CA, Presidio Trust Public Health
Service Hospital (PUSH or Building
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
1801) at the Presidio of San Francisco
(Area B) of Presidio Trust
Management Plan, Rehabilitation and
Reuse of Buildings, Gold Gate
National Recreation Area, San
Francisco Bay, Marin County, CA,
Wait Period Ends: June 19, 2006,
Contact: John G. Pelka 415–561–5300.
EIS No. 20060187, Draft EIS, AFS, WI,
Long Rail Vegetation and
Transportation Management Project,
Implementation, Eagle River-Florence
Ranger District, Chequamegon-Nicolet
National Forest, Florence and Forest
Counties, WI, Comment Period Ends:
July 3, 2006, Contact: Christine
Brunner 715–479–2827.
EIS No. 20060188, Draft EIS, NOA, CA,
Channel Islands National Marine
Sanctuary Management Plan Review,
Implementation, Santa Barbara and
Ventura Counties, CA, Comment
Period Ends: July 21, 2006, Contact:
Chris Mobley 805–966–7107 x465.
EIS No. 20060189, Final EIS, NRC, OH,
American Centrifuge Plant, Gas
Centrifuge Uranium Enrichment
Facility, Construction, Operation, and
Decommission, License Issuance,
Piketon, OH, Wait Period Ends: June
19, 2006, Contact: Matthew Blevins
301–415–7684.
EIS No. 20060190, Final EIS, AFS, MI,
Ottawa National Forest, Proposed
Land and Resource Management Plan,
Forest Plan Revision, Implementation,
Baraga, Gogebic, Houghton, Iron,
Marquette and Ontonagan Counties,
MI, Wait Period Ends: June 19, 2006,
Contact: Robert Brenner 906–931–
1330 x317.
EIS No. 20060191, Final EIS, FAA, FL,
Panama City-Bay County International
Airport (PFN), Proposed Relocation to
a New Site, NPDES Permit and U.S.
Army COE Section 404 Permit, Bay
County, FL, Wait Period Ends: June
19, 2006, Contact: Virginia Lane 407–
872–6331 Ext. 129.
EIS No. 20060192, Draft EIS, AFS, ID,
Myrtle Creek Healthy Forest
Restoration Act Project, Proposes
Aquatic and Vegetation Improvement
Treatments, Panhandle National
Forests, Bonners Ferry Ranger
District, City of Bonners Ferry,
Boundary County, ID, Comment
Period Ends: July 3, 2006, Contact:
Doug Nishek 208–267–5561.
EIS No. 20060193, Final EIS, AFS, UT,
Ogden Ranger District Travel Plan, To
Update the Travel Management Plan,
Wasatch-Cache National Plan, Ogden
Ranger District, Box Elder, Cache,
Morgan, Weber and Rich Counties,
UT, Wait Period Ends: June 19, 2006,
Contact: Rick Vallejos 801–625–5112.
E:\FR\FM\19MYN1.SGM
19MYN1
Federal Register / Vol. 71, No. 97 / Friday, May 19, 2006 / Notices
EIS No. 20060194, Draft EIS, AFS, 00,
Kootenai National Forest Invasive
Plant Management, Proposes to
Manage Noxious Weed and Invasive
Plant Species, Lincoln Sanders,
Flathead Counties, MT and Bonner
and Boundary Counties, ID, Comment
Period Ends: July 3, 2006, Contact:
Ellen Sullivan 406–296–7114.
EIS No. 20060195, Draft EIS, CGD, MA,
Northeast Gateway Deepwater Port
License Application, Construct, Own
and Operate a Deepwater Port to
Import Liquefied Natural Gas (LNG)
in Massachusetts Bay, City of
Gloucester, MA, Comment Period
Ends: July 3, 2006, Contact: Mark
Prescott 202–267–0225.
EIS No. 20060196, Final EIS, COE, FL,
South Florida Water Management
District, (SFWMD), Proposes
Construction and Operation
Everglades Agricultural Area
Reservoir A–1 Project, Lake
Okeechobee, Palm Beach County, FL,
Wait Period Ends: June 19, 2006,
Contact: Tori White 561–742–8888.
Amended Notices
EIS No. 20060136, Draft EIS, AFS, AK,
Kenai Winter Access Project, Develop
a Winter Access Management Plan for
2006/2007 Winter Season,
Implementation, Seward Ranger
District, Chugach National Forest,
Located on the Kenai Peninsula in
Southcentral, AK, Comment Period
Ends: June 12, 2006, Contact: Sharon
Randall 907–743–9497.
Revision to FR Notice Published April
21, 2006: Comment Period Extended
from June 5, 2006 to June 12, 2006.
EIS No. 20060162, Draft EIS, FHW, 00,
TIER 1—DEIS Trans-Texas Corridor—
35 (TTC–35) System, Improvement to
International, Interstate and Intrastate
Movement of Goods and People,
Oklahoma-Mexico/Gulf Coast
Element, Comment Period Ends:
August 21, 2006, Contact: Salvador
Decampo 512–536–5950.
wwhite on PROD1PC61 with NOTICES
Revision to FR Notice Published May
5, 2006: Comment Period Extended from
June 19, 2006 to August 21, 2006.
Dated: May 16, 2006.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E6–7663 Filed 5–18–06; 8:45 am]
BILLING CODE 6560–50–P
VerDate Aug<31>2005
17:37 May 18, 2006
Jkt 208001
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–8172–5; Docket ID No. EPA–HQ–ORD–
2003–0016]
Integrated Risk Information System
(IRIS); Announcement of 2006 Program
Environmental Protection
Agency.
ACTION: Notice; correction.
AGENCY:
SUMMARY: The U.S. Environmental
Protection Agency (EPA) published a
document in the Federal Register of
February 23, 2006 (71 FR 9333),
announcing the IRIS 2006 program
agenda. EPA is correcting errors in the
list of substances.
The Integrated Risk Information
System (IRIS) is an EPA database that
contains the Agency’s scientific
positions on human health effects that
may result from exposure to chemical
substances in the environment. On
March 4, 2005, EPA announced the
2005 IRIS agenda (70 FR 10616), with
solicitation of scientific information
from the public for consideration in
assessing health effects from specific
chemical substances. All assessments
currently in progress are listed in this
notice. EPA is not initiating new
assessments in 2006 in order to focus on
completion of existing assessments.
This notice also provides an update on
EPA’ efforts to improve the IRIS health
assessment development and review
processes.
While EPA is not expressly
soliciting comments on this notice, the
Agency will accept information related
to the substances included herein.
Please submit any information in
accordance with the instructions
provided at the end of this notice.
ADDRESSES: Please submit relevant
scientific information identified by
docket ID number EPA–HQ–ORD–2003–
0016, online at https://
www.regulations.gov (EPA’ preferred
method); by e-mail to
ord.docket@epa.gov; mailed to EPA
Docket Center, Environmental
Protection Agency, Mail Code: 2822T,
1200 Pennsylvania Ave., NW.,
Washington, DC 20460–0001; or by
hand delivery or courier to EPA Docket
Center, EPA West, Room B102, 1301
Constitution Ave., NW., Washington,
DC, between 8:30 a.m. and 4:30 p.m.
Monday through Friday, excluding legal
holidays. Comments on a disk or CD–
ROM should be formatted in Word or as
an ASCII file, avoiding the use of special
characters and any form of encryption,
and may be mailed to the mailing
address above.
DATES:
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
29149
For
information on the IRIS program,
contact Dr. Abdel-Razak Kadry, IRIS
Program Director, National Center for
Environmental Assessment, (mail code:
8601D), Office of Research and
Development, U.S. Environmental
Protection Agency, Washington, DC
20460; telephone: (202) 564–1645,
facsimile: (202) 565–0075; or e-mail:
kadry.abdel@epa.gov.
For general questions about access to
IRIS, or the content of IRIS, please call
the IRIS Hotline at (202) 566–1676 or
send electronic mail inquiries to
hotline.iris@epa.gov.
FOR FURTHER INFORMATION CONTACT:
SUPPLEMENTARY INFORMATION:
Background
IRIS is an EPA database containing
Agency scientific positions on potential
adverse human health effects that may
result from exposure to chemical
substances found in the environment.
(EPA notes that information in the IRIS
database has no preclusive effect and
does not predetermine the outcome of
any rulemaking. When EPA uses such
information to support a rulemaking,
the scientific basis for, and the
application of, that information are
subject to comment.) IRIS currently
provides information on health effects
associated with more than 500 chemical
substances.
The database includes chemicalspecific summaries of qualitative and
quantitative health information in
support of the first two steps of the risk
assessment process, i.e., hazard
identification and dose-response
evaluation. Combined with specific
situational exposure assessment
information, the information in IRIS is
an important source in evaluating
potential public health risks from
environmental contaminants.
EPA’s overall process for developing
IRIS assessments consists of: (1) An
annual Federal Register announcement
of EPA’s IRIS agenda and call for
scientific information from the public
on selected chemical substances; (2) a
search of the scientific literature; (3)
development of IRIS Summaries and
support documents; (4) EPA-wide
review; (5) external peer review; (6)
management review and approval; and
(7) entry of IRIS Summaries and support
documents into the IRIS database
(https://www.epa.gov/iris).
The IRIS Annual Agenda
Each year, EPA develops an annual
agenda for the IRIS program and
announces new assessments under
review. A focus of the IRIS Program for
2006 is to move forward the 75
E:\FR\FM\19MYN1.SGM
19MYN1
Agencies
[Federal Register Volume 71, Number 97 (Friday, May 19, 2006)]
[Notices]
[Pages 29148-29149]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-7663]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6675-3]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed May 8, 2006 Through May 12, 2006.
Pursuant to 40 CFR 1506.9.
EIS No. 20060178, Draft EIS, WPA, 00, Big Stone II Power Plant and
Transmission Project, Propose Power Plant, Transmission Alternatives,
and Substation Modification, (DOE/EIS-0377), U.S. Army COE Section 10
and 404 Permits, Big Stone City, Grant County, SD and MN, Comment
Period Ends: July 3, 2006, Contact: Nancy Werdel 720-962-7251.
EIS No. 20060179, Final EIS, AFS, WY, Moose-Gypsum Project, Proposes to
Authorize Vegetation Treatments, Watershed Improvements, and Travel
Plan and Recreation Updates, Pinedale Ranger District, Bridger-Teton
National Forest, Sublette County, WY, Wait Period Ends: June 19, 2006,
Contact: Craig Trulock 307-367-4326.
EIS No. 20060180, Final EIS, AFS, IN, Tell City Windthrow 2004 Project,
Salvage Harvest and Prescribed Burning of Windthrow Timber,
Implementation, Hoosier National Forest, Perry, Crawford and Dubois
Counties, IN, Wait Period Ends: June 19, 2006, Contact: Ron Ellis 812-
275-5987.
EIS No. 20060181, Draft EIS, BLM, 00, Devers-Palo Verde No. 2
Transmission Line Project, Construction and Operation a New 230-mile
500 kV Electric Transmission Line between Devers Substation in
California and Harquahala Generating Substation in Arizona, Comment
Period Ends: July 5, 2006, Contact: Greg Hill 760-251-4840.
EIS No. 20060182, Draft EIS, COE, CA, San Clemente Dam Seismic Safety
Project, Increase Dam Safety to Meet Current Design Standards, Monterey
County, CA, Comment Period Ends: July 3, 2006, Contact: Robert Smith
415-977-8450.
EIS No. 20060183, Final EIS, FAA, UT, St. George Municipal Airport
Replacement, Funding, City of St. George, Washington County, UT, Wait
Period Ends: June 19, 2006, Contact: T.J. Stetz 425-227-2611.
EIS No. 20060184, Draft EIS, COE, MD, Masonville Dredge Material
Containment Facility (DMCF), Construction from Baltimore Harbor Channel
north of Point-Rock Point Line, U.S. Army COE Section 10 and 404
Permits, Baltimore, MD, Comment Period Ends: July 7, 2006, Contact: Jon
Romeo 410-962-6079.
EIS No. 20060185, Final EIS, AFS, MI, Hiawatha National Forest,
Proposed Land and Resource Management Plan, Forest Plan Revision,
Implementation, Alger, Cheboygan, Chippewa, Delta, Luce, Mackinac,
Marquette and Schoolcraft Counties, MI, Wait Period Ends: June 19,
2006, Contact: Dave Maercklein 906-789-3301.
EIS No. 20060186, Final Supplement, TPT, CA, Presidio Trust Public
Health Service Hospital (PUSH or Building 1801) at the Presidio of San
Francisco (Area B) of Presidio Trust Management Plan, Rehabilitation
and Reuse of Buildings, Gold Gate National Recreation Area, San
Francisco Bay, Marin County, CA, Wait Period Ends: June 19, 2006,
Contact: John G. Pelka 415-561-5300.
EIS No. 20060187, Draft EIS, AFS, WI, Long Rail Vegetation and
Transportation Management Project, Implementation, Eagle River-Florence
Ranger District, Chequamegon-Nicolet National Forest, Florence and
Forest Counties, WI, Comment Period Ends: July 3, 2006, Contact:
Christine Brunner 715-479-2827.
EIS No. 20060188, Draft EIS, NOA, CA, Channel Islands National Marine
Sanctuary Management Plan Review, Implementation, Santa Barbara and
Ventura Counties, CA, Comment Period Ends: July 21, 2006, Contact:
Chris Mobley 805-966-7107 x465.
EIS No. 20060189, Final EIS, NRC, OH, American Centrifuge Plant, Gas
Centrifuge Uranium Enrichment Facility, Construction, Operation, and
Decommission, License Issuance, Piketon, OH, Wait Period Ends: June 19,
2006, Contact: Matthew Blevins 301-415-7684.
EIS No. 20060190, Final EIS, AFS, MI, Ottawa National Forest, Proposed
Land and Resource Management Plan, Forest Plan Revision,
Implementation, Baraga, Gogebic, Houghton, Iron, Marquette and
Ontonagan Counties, MI, Wait Period Ends: June 19, 2006, Contact:
Robert Brenner 906-931-1330 x317.
EIS No. 20060191, Final EIS, FAA, FL, Panama City-Bay County
International Airport (PFN), Proposed Relocation to a New Site, NPDES
Permit and U.S. Army COE Section 404 Permit, Bay County, FL, Wait
Period Ends: June 19, 2006, Contact: Virginia Lane 407-872-6331 Ext.
129.
EIS No. 20060192, Draft EIS, AFS, ID, Myrtle Creek Healthy Forest
Restoration Act Project, Proposes Aquatic and Vegetation Improvement
Treatments, Panhandle National Forests, Bonners Ferry Ranger District,
City of Bonners Ferry, Boundary County, ID, Comment Period Ends: July
3, 2006, Contact: Doug Nishek 208-267-5561.
EIS No. 20060193, Final EIS, AFS, UT, Ogden Ranger District Travel
Plan, To Update the Travel Management Plan, Wasatch-Cache National
Plan, Ogden Ranger District, Box Elder, Cache, Morgan, Weber and Rich
Counties, UT, Wait Period Ends: June 19, 2006, Contact: Rick Vallejos
801-625-5112.
[[Page 29149]]
EIS No. 20060194, Draft EIS, AFS, 00, Kootenai National Forest Invasive
Plant Management, Proposes to Manage Noxious Weed and Invasive Plant
Species, Lincoln Sanders, Flathead Counties, MT and Bonner and Boundary
Counties, ID, Comment Period Ends: July 3, 2006, Contact: Ellen
Sullivan 406-296-7114.
EIS No. 20060195, Draft EIS, CGD, MA, Northeast Gateway Deepwater Port
License Application, Construct, Own and Operate a Deepwater Port to
Import Liquefied Natural Gas (LNG) in Massachusetts Bay, City of
Gloucester, MA, Comment Period Ends: July 3, 2006, Contact: Mark
Prescott 202-267-0225.
EIS No. 20060196, Final EIS, COE, FL, South Florida Water Management
District, (SFWMD), Proposes Construction and Operation Everglades
Agricultural Area Reservoir A-1 Project, Lake Okeechobee, Palm Beach
County, FL, Wait Period Ends: June 19, 2006, Contact: Tori White 561-
742-8888.
Amended Notices
EIS No. 20060136, Draft EIS, AFS, AK, Kenai Winter Access Project,
Develop a Winter Access Management Plan for 2006/2007 Winter Season,
Implementation, Seward Ranger District, Chugach National Forest,
Located on the Kenai Peninsula in Southcentral, AK, Comment Period
Ends: June 12, 2006, Contact: Sharon Randall 907-743-9497.
Revision to FR Notice Published April 21, 2006: Comment Period
Extended from June 5, 2006 to June 12, 2006.
EIS No. 20060162, Draft EIS, FHW, 00, TIER 1--DEIS Trans-Texas
Corridor--35 (TTC-35) System, Improvement to International, Interstate
and Intrastate Movement of Goods and People, Oklahoma-Mexico/Gulf Coast
Element, Comment Period Ends: August 21, 2006, Contact: Salvador
Decampo 512-536-5950.
Revision to FR Notice Published May 5, 2006: Comment Period
Extended from June 19, 2006 to August 21, 2006.
Dated: May 16, 2006.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E6-7663 Filed 5-18-06; 8:45 am]
BILLING CODE 6560-50-P