Sunshine Act Meetings, 28682-28683 [06-4637]

Download as PDF 28682 Federal Register / Vol. 71, No. 95 / Wednesday, May 17, 2006 / Notices Milestone Target Date Tendering Notice .......................................................................................................................................................................... Additional Study Requests & Interventions ................................................................................................................................. Additional Information Requests (if necessary) ........................................................................................................................... Issue Acceptance Letter .............................................................................................................................................................. Issue Scoping Document 1 for Comments .................................................................................................................................. Hold Scoping Meetings ................................................................................................................................................................ Request Additional Information (if necessary) ............................................................................................................................. Issue Scoping Document 2 .......................................................................................................................................................... Notice of Ready for Environmental Analysis ............................................................................................................................... Filing of recommendations, preliminary terms and conditions, and fishway prescriptions ......................................................... Commission issues Draft EA or EIS ............................................................................................................................................ Comments on Draft EA or EIS & Modified Terms and Conditions ............................................................................................. Commission Issues Final EA or EIS ............................................................................................................................................ Ready for Commission Decision on the Application ................................................................................................................... Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Magalie R. Salas, Secretary. [FR Doc. E6–7491 Filed 5–16–06; 8:45 am] STATUS: DEPARTMENT OF ENERGY Open. Agenda; *Note—Items listed on the agenda may be deleted without further notice. MATTERS TO BE CONSIDERED: Federal Energy Regulatory Commission CONTACT PERSON FOR MORE INFORMATION: Sunshine Act Meetings May 11, 2006. The following notice of meeting is published pursuant to section 3(a) of the Government in the Sunshine Act (Pub. L. 94–409), 5 U.S.C. 552b: AGENCY HOLDING MEETING: Federal Energy Regulatory Commission. DATE AND TIME: May 18, 2006; 10 a.m. PLACE: Room 2C, 888 First Street NE., Washington, DC 20426. BILLING CODE 6717–01–P May 10, 2006. June 26, 2006. July 2006. October 2006. November 2006. January 2006. February 2007. March 2007. March 2007. May 2007. September 2007. November 2007. March 2008. April 2008. Magalie R. Salas, Secretary, Telephone (202) 502–8400. For a recorded listing item stricken from or added to the meeting, call (202) 502–8627. This is a list of matters to be considered by the Commission. It does not include a listing of all papers relevant to the items on the agenda; however, all public documents may be examined in the Public Reference Room. 905th—Meeting REGULAR MEETING [May 18, 2006; 10 a.m.] Item No. Docket No. Company Administrative Agenda A–1 ......................... A–2 ......................... A–3 ......................... AD02–1–000 ............................. AD02–7–000 ............................. AD06–3–000 ............................. Agency Administrative Matters. Customer Matters, Reliability, Security and Market Operations. Energy Market Update. Electric E–1 ......................... E–5 ......................... E–6 ......................... RM05–25–000 .......................... RM05–17–000 .......................... RM04–7–000 ............................ Omitted. ER99–3491–005 ....................... ER99–3491–006 ER99–3491–007 ER99–3491–008 ER00–2184–003 ....................... ER00–2184–004 ER00–2184–005 ER00–2184–006 ER00–2185–003 ER00–2185–004 ER00–2185–005 ER00–2185–006 ....................... EL05–124–000 ......................... EL05–124–001 EL05–124–002 EL05–124–003 ER06–780–000 ......................... ER06–800–000 ......................... E–7 ......................... ER06–801–000 ......................... mstockstill on PROD1PC61 with NOTICES E–2 ......................... E–3 ......................... E–4 ......................... VerDate Aug<31>2005 16:39 May 16, 2006 Jkt 208001 PO 00000 Preventing Undue Discrimination and Preference in Transmission Service. Information Requirements for Available Transfer Capability. Market-Based Rates for Wholesale Sales of Electricity by Public Utilities. PP&L Montana, LLC. PPL Colstrip II, LLC. PPL Colstrip I, LLC. PPL Montana, LLC, PPL Colstrip II, LLC and PPL Colstrip I, LLC. American Electric Power Service Corporation. Midwest Independent Transmission System Operator, Inc. and American Transmission Systems, Inc. Allegheny Energy Supply Company, LLC. Frm 00028 Fmt 4703 Sfmt 4703 E:\FR\FM\17MYN1.SGM 17MYN1 Federal Register / Vol. 71, No. 95 / Wednesday, May 17, 2006 / Notices 28683 REGULAR MEETING—Continued [May 18, 2006; 10 a.m.] Item No. Docket No. E–8 ......................... E–9 ......................... E–10 ....................... E–11 ....................... E–12 ....................... E–13 ....................... E–14 ....................... Omitted. ER06–777–000 ......................... ER06–839–000 ......................... Omitted. ER06–840–000 ......................... Omitted. ER01–3001–013 ....................... ER01–3001–014 ER05–1475–004 ....................... Omitted. Omitted. EC06–48–000 ........................... RM06–14–000 .......................... E–15 E–16 E–17 E–18 E–19 ....................... ....................... ....................... ....................... ....................... E–20 ....................... E–21 E–22 E–23 E–24 E–25 ....................... ....................... ....................... ....................... ....................... Company ER05–130–001 ......................... ER05–130–003 ER05–150–000 Omitted. RM06–2–001 ............................ RM05–36–001 .......................... Omitted. RM01–10–005 .......................... Conectiv Energy Supply, Inc. Conectiv Energy Supply, Inc. Conectiv Energy Supply, Inc. New York Independent System Operator, Inc. Midwest Independent Transmission System Operator, Inc. Westar Energy, Inc., ONEOK Energy Services Company, L.P. Revisions to Record Retention Requirements for Unbundled Sales Service, Persons Holding Blanket Marketing Certificates, and Public Utility Market-Based Rate Authorization Holders. Pacific Gas and Electric Company. Procedures for Disposition of Contested Audit Matters. Revised Regulations Governing Small Power Production and Cogeneration Facilities. Order on Request for Additional Clarification of Interpretive Order Relating to the Standards of Conduct. Hydro H–1 ......................... H–2 H–3 H–4 H–5 ......................... ......................... ......................... ......................... H–6 ......................... P–12657–000 ........................... P–12657–001 P–2342–018 ............................. P–10395–033 ........................... P–2659–023 ............................. P–5633–008 ............................. P–6058–014 P–6059–015 P–12498–002 ........................... P–12500–002 P–12497–002 P–12499–002 P–12502–002 P–12503–002 P–12504–002 Electric Plant Board of the City of Augusta, Kentucky. PacifiCorp. Electric Plant Board of the City of Augusta, Kentucky. PacifiCorp. Hydro Development Group, Inc. Red Circle Systems Corporation. Certificates C–1 ......................... C–2 ......................... Omitted. RM06–1–000 ............................ C–3 ......................... C–4 ......................... C–5 CP06–34–000 ........................... Omitted. CP04–68–000 ........................... CP04–69–000 mstockstill on PROD1PC61 with NOTICES Magalie R. Salas, Secretary. A free Web cast of this event is available through https://www.ferc.gov. Anyone with Internet access who desires to view this event can do so by navigating to www.ferc.gov’s Calendar of Events and locating this event in the Calendar. The event will contain a link to its Webcast. The Capitol Connection provides technical support for the free Web casts. It also offers access to this event via television in the DC area and VerDate Aug<31>2005 15:08 May 16, 2006 Jkt 208001 Regulations Implementing the Energy Policy Act of 2005: Coordinating the Processing of Federal Authorizations for Applications under Sections 3 and 7 of the Natural Gas Act and Maintaining a Complete Consolidated Record. Transcontinental Gas Pipe Line Corporation. Freeport-McMoRan Energy LLC. via phone bridge for a fee. If you have any questions, visit https:// www.CapitolConnection.org or contact Danelle Perkowski or David Reininger at 703–993–3100. Immediately following the conclusion of the Commission Meeting, a press briefing will be held in Hearing Room 2. Members of the public may view this briefing in the Commission Meeting overflow room. This statement is intended to notify the public that the press briefings that follow Commission PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service. [FR Doc. 06–4637 Filed 5–12–06; 4:42 pm] BILLING CODE 6717–01–P E:\FR\FM\17MYN1.SGM 17MYN1

Agencies

[Federal Register Volume 71, Number 95 (Wednesday, May 17, 2006)]
[Notices]
[Pages 28682-28683]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 06-4637]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Sunshine Act Meetings

May 11, 2006.
    The following notice of meeting is published pursuant to section 
3(a) of the Government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C. 
552b:

AGENCY HOLDING MEETING: Federal Energy Regulatory Commission.

DATE AND TIME: May 18, 2006; 10 a.m.

PLACE: Room 2C, 888 First Street NE., Washington, DC 20426.

Status: Open.

Matters To Be Considered: Agenda; *Note--Items listed on the agenda may 
be deleted without further notice.

Contact Person for More Information: Magalie R. Salas, Secretary, 
Telephone (202) 502-8400. For a recorded listing item stricken from or 
added to the meeting, call (202) 502-8627.
    This is a list of matters to be considered by the Commission. It 
does not include a listing of all papers relevant to the items on the 
agenda; however, all public documents may be examined in the Public 
Reference Room.

905th--Meeting

                                                 Regular Meeting
                                             [May 18, 2006; 10 a.m.]
----------------------------------------------------------------------------------------------------------------
               Item No.                       Docket No.                             Company
----------------------------------------------------------------------------------------------------------------
                                              Administrative Agenda
----------------------------------------------------------------------------------------------------------------
A-1..................................  AD02-1-000.............  Agency Administrative Matters.
A-2..................................  AD02-7-000.............  Customer Matters, Reliability, Security and
                                                                 Market Operations.
A-3..................................  AD06-3-000.............  Energy Market Update.
----------------------------------------------------------------------------------------------------------------
                                                    Electric
----------------------------------------------------------------------------------------------------------------
E-1..................................  RM05-25-000............  Preventing Undue Discrimination and Preference
                                                                 in Transmission Service.
                                       RM05-17-000............  Information Requirements for Available Transfer
                                                                 Capability.
E-2..................................  RM04-7-000.............  Market-Based Rates for Wholesale Sales of
                                                                 Electricity by Public Utilities.
E-3..................................  Omitted................
E-4..................................  ER99-3491-005..........  PP&L Montana, LLC.
                                       ER99-3491-006..........
                                       ER99-3491-007..........
                                       ER99-3491-008..........
                                       ER00-2184-003..........  PPL Colstrip II, LLC.
                                       ER00-2184-004..........
                                       ER00-2184-005..........
                                       ER00-2184-006..........
                                       ER00-2185-003
                                       ER00-2185-004..........
                                       ER00-2185-005..........
                                       ER00-2185-006..........  PPL Colstrip I, LLC.
                                       EL05-124-000...........  PPL Montana, LLC, PPL Colstrip II, LLC and PPL
                                       EL05-124-001...........   Colstrip I, LLC.
                                       EL05-124-002...........
                                       EL05-124-003...........
E-5..................................  ER06-780-000...........  American Electric Power Service Corporation.
E-6..................................  ER06-800-000...........  Midwest Independent Transmission System
                                                                 Operator, Inc. and American Transmission
                                                                 Systems, Inc.
E-7..................................  ER06-801-000...........  Allegheny Energy Supply Company, LLC.

[[Page 28683]]

 
E-8..................................  Omitted................
E-9..................................  ER06-777-000...........  Conectiv Energy Supply, Inc.
E-10.................................  ER06-839-000...........  Conectiv Energy Supply, Inc.
E-11.................................  Omitted................
E-12.................................  ER06-840-000...........  Conectiv Energy Supply, Inc.
E-13.................................  Omitted................
E-14.................................  ER01-3001-013..........  New York Independent System Operator, Inc.
                                       ER01-3001-014..........
E-15.................................  ER05-1475-004..........  Midwest Independent Transmission System
                                                                 Operator, Inc.
E-16.................................  Omitted................
E-17.................................  Omitted................
E-18.................................  EC06-48-000............  Westar Energy, Inc., ONEOK Energy Services
                                                                 Company, L.P.
E-19.................................  RM06-14-000............  Revisions to Record Retention Requirements for
                                                                 Unbundled Sales Service, Persons Holding
                                                                 Blanket Marketing Certificates, and Public
                                                                 Utility Market-Based Rate Authorization
                                                                 Holders.
E-20.................................  ER05-130-001...........  Pacific Gas and Electric Company.
                                       ER05-130-003...........
                                       ER05-150-000...........
E-21.................................  Omitted................
E-22.................................  RM06-2-001.............  Procedures for Disposition of Contested Audit
                                                                 Matters.
E-23.................................  RM05-36-001............  Revised Regulations Governing Small Power
                                                                 Production and Cogeneration Facilities.
E-24.................................  Omitted................
E-25.................................  RM01-10-005............  Order on Request for Additional Clarification of
                                                                 Interpretive Order Relating to the Standards of
                                                                 Conduct.
----------------------------------------------------------------------------------------------------------------
                                                      Hydro
----------------------------------------------------------------------------------------------------------------
H-1..................................  P-12657-000............  Electric Plant Board of the City of Augusta,
                                       P-12657-001............   Kentucky.
H-2..................................  P-2342-018.............  PacifiCorp.
H-3..................................  P-10395-033............  Electric Plant Board of the City of Augusta,
                                                                 Kentucky.
H-4..................................  P-2659-023.............  PacifiCorp.
H-5..................................  P-5633-008.............  Hydro Development Group, Inc.
                                       P-6058-014.............
                                       P-6059-015.............
H-6..................................  P-12498-002............  Red Circle Systems Corporation.
                                       P-12500-002............
                                       P-12497-002............
                                       P-12499-002............
                                       P-12502-002............
                                       P-12503-002............
                                       P-12504-002............
----------------------------------------------------------------------------------------------------------------
                                                  Certificates
----------------------------------------------------------------------------------------------------------------
C-1..................................  Omitted................
C-2..................................  RM06-1-000.............  Regulations Implementing the Energy Policy Act
                                                                 of 2005: Coordinating the Processing of Federal
                                                                 Authorizations for Applications under Sections
                                                                 3 and 7 of the Natural Gas Act and Maintaining
                                                                 a Complete Consolidated Record.
C-3..................................  CP06-34-000............  Transcontinental Gas Pipe Line Corporation.
C-4..................................  Omitted................
C-5                                    CP04-68-000............  Freeport-McMoRan Energy LLC.
                                       CP04-69-000............
----------------------------------------------------------------------------------------------------------------


Magalie R. Salas,
Secretary.
    A free Web cast of this event is available through https://
www.ferc.gov. Anyone with Internet access who desires to view this 
event can do so by navigating to www.ferc.gov's Calendar of Events and 
locating this event in the Calendar. The event will contain a link to 
its Webcast. The Capitol Connection provides technical support for the 
free Web casts. It also offers access to this event via television in 
the DC area and via phone bridge for a fee. If you have any questions, 
visit https://www.CapitolConnection.org or contact Danelle Perkowski or 
David Reininger at 703-993-3100.
    Immediately following the conclusion of the Commission Meeting, a 
press briefing will be held in Hearing Room 2. Members of the public 
may view this briefing in the Commission Meeting overflow room. This 
statement is intended to notify the public that the press briefings 
that follow Commission meetings may now be viewed remotely at 
Commission headquarters, but will not be telecast through the Capitol 
Connection service.
[FR Doc. 06-4637 Filed 5-12-06; 4:42 pm]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.