Sunshine Act Meetings, 28682-28683 [06-4637]
Download as PDF
28682
Federal Register / Vol. 71, No. 95 / Wednesday, May 17, 2006 / Notices
Milestone
Target Date
Tendering Notice ..........................................................................................................................................................................
Additional Study Requests & Interventions .................................................................................................................................
Additional Information Requests (if necessary) ...........................................................................................................................
Issue Acceptance Letter ..............................................................................................................................................................
Issue Scoping Document 1 for Comments ..................................................................................................................................
Hold Scoping Meetings ................................................................................................................................................................
Request Additional Information (if necessary) .............................................................................................................................
Issue Scoping Document 2 ..........................................................................................................................................................
Notice of Ready for Environmental Analysis ...............................................................................................................................
Filing of recommendations, preliminary terms and conditions, and fishway prescriptions .........................................................
Commission issues Draft EA or EIS ............................................................................................................................................
Comments on Draft EA or EIS & Modified Terms and Conditions .............................................................................................
Commission Issues Final EA or EIS ............................................................................................................................................
Ready for Commission Decision on the Application ...................................................................................................................
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Magalie R. Salas,
Secretary.
[FR Doc. E6–7491 Filed 5–16–06; 8:45 am]
STATUS:
DEPARTMENT OF ENERGY
Open.
Agenda;
*Note—Items listed on the agenda may
be deleted without further notice.
MATTERS TO BE CONSIDERED:
Federal Energy Regulatory
Commission
CONTACT PERSON FOR MORE INFORMATION:
Sunshine Act Meetings
May 11, 2006.
The following notice of meeting is
published pursuant to section 3(a) of the
Government in the Sunshine Act (Pub.
L. 94–409), 5 U.S.C. 552b:
AGENCY HOLDING MEETING: Federal
Energy Regulatory Commission.
DATE AND TIME: May 18, 2006; 10 a.m.
PLACE: Room 2C, 888 First Street NE.,
Washington, DC 20426.
BILLING CODE 6717–01–P
May 10, 2006.
June 26, 2006.
July 2006.
October 2006.
November 2006.
January 2006.
February 2007.
March 2007.
March 2007.
May 2007.
September 2007.
November 2007.
March 2008.
April 2008.
Magalie R. Salas, Secretary, Telephone
(202) 502–8400. For a recorded listing
item stricken from or added to the
meeting, call (202) 502–8627.
This is a list of matters to be
considered by the Commission. It does
not include a listing of all papers
relevant to the items on the agenda;
however, all public documents may be
examined in the Public Reference Room.
905th—Meeting
REGULAR MEETING
[May 18, 2006; 10 a.m.]
Item No.
Docket No.
Company
Administrative Agenda
A–1 .........................
A–2 .........................
A–3 .........................
AD02–1–000 .............................
AD02–7–000 .............................
AD06–3–000 .............................
Agency Administrative Matters.
Customer Matters, Reliability, Security and Market Operations.
Energy Market Update.
Electric
E–1 .........................
E–5 .........................
E–6 .........................
RM05–25–000 ..........................
RM05–17–000 ..........................
RM04–7–000 ............................
Omitted.
ER99–3491–005 .......................
ER99–3491–006
ER99–3491–007
ER99–3491–008
ER00–2184–003 .......................
ER00–2184–004
ER00–2184–005
ER00–2184–006
ER00–2185–003
ER00–2185–004
ER00–2185–005
ER00–2185–006 .......................
EL05–124–000 .........................
EL05–124–001
EL05–124–002
EL05–124–003
ER06–780–000 .........................
ER06–800–000 .........................
E–7 .........................
ER06–801–000 .........................
mstockstill on PROD1PC61 with NOTICES
E–2 .........................
E–3 .........................
E–4 .........................
VerDate Aug<31>2005
16:39 May 16, 2006
Jkt 208001
PO 00000
Preventing Undue Discrimination and Preference in Transmission Service.
Information Requirements for Available Transfer Capability.
Market-Based Rates for Wholesale Sales of Electricity by Public Utilities.
PP&L Montana, LLC.
PPL Colstrip II, LLC.
PPL Colstrip I, LLC.
PPL Montana, LLC, PPL Colstrip II, LLC and PPL Colstrip I, LLC.
American Electric Power Service Corporation.
Midwest Independent Transmission System Operator, Inc. and American Transmission
Systems, Inc.
Allegheny Energy Supply Company, LLC.
Frm 00028
Fmt 4703
Sfmt 4703
E:\FR\FM\17MYN1.SGM
17MYN1
Federal Register / Vol. 71, No. 95 / Wednesday, May 17, 2006 / Notices
28683
REGULAR MEETING—Continued
[May 18, 2006; 10 a.m.]
Item No.
Docket No.
E–8 .........................
E–9 .........................
E–10 .......................
E–11 .......................
E–12 .......................
E–13 .......................
E–14 .......................
Omitted.
ER06–777–000 .........................
ER06–839–000 .........................
Omitted.
ER06–840–000 .........................
Omitted.
ER01–3001–013 .......................
ER01–3001–014
ER05–1475–004 .......................
Omitted.
Omitted.
EC06–48–000 ...........................
RM06–14–000 ..........................
E–15
E–16
E–17
E–18
E–19
.......................
.......................
.......................
.......................
.......................
E–20 .......................
E–21
E–22
E–23
E–24
E–25
.......................
.......................
.......................
.......................
.......................
Company
ER05–130–001 .........................
ER05–130–003
ER05–150–000
Omitted.
RM06–2–001 ............................
RM05–36–001 ..........................
Omitted.
RM01–10–005 ..........................
Conectiv Energy Supply, Inc.
Conectiv Energy Supply, Inc.
Conectiv Energy Supply, Inc.
New York Independent System Operator, Inc.
Midwest Independent Transmission System Operator, Inc.
Westar Energy, Inc., ONEOK Energy Services Company, L.P.
Revisions to Record Retention Requirements for Unbundled Sales Service, Persons
Holding Blanket Marketing Certificates, and Public Utility Market-Based Rate Authorization Holders.
Pacific Gas and Electric Company.
Procedures for Disposition of Contested Audit Matters.
Revised Regulations Governing Small Power Production and Cogeneration Facilities.
Order on Request for Additional Clarification of Interpretive Order Relating to the Standards of Conduct.
Hydro
H–1 .........................
H–2
H–3
H–4
H–5
.........................
.........................
.........................
.........................
H–6 .........................
P–12657–000 ...........................
P–12657–001
P–2342–018 .............................
P–10395–033 ...........................
P–2659–023 .............................
P–5633–008 .............................
P–6058–014
P–6059–015
P–12498–002 ...........................
P–12500–002
P–12497–002
P–12499–002
P–12502–002
P–12503–002
P–12504–002
Electric Plant Board of the City of Augusta, Kentucky.
PacifiCorp.
Electric Plant Board of the City of Augusta, Kentucky.
PacifiCorp.
Hydro Development Group, Inc.
Red Circle Systems Corporation.
Certificates
C–1 .........................
C–2 .........................
Omitted.
RM06–1–000 ............................
C–3 .........................
C–4 .........................
C–5
CP06–34–000 ...........................
Omitted.
CP04–68–000 ...........................
CP04–69–000
mstockstill on PROD1PC61 with NOTICES
Magalie R. Salas,
Secretary.
A free Web cast of this event is
available through https://www.ferc.gov.
Anyone with Internet access who
desires to view this event can do so by
navigating to www.ferc.gov’s Calendar of
Events and locating this event in the
Calendar. The event will contain a link
to its Webcast. The Capitol Connection
provides technical support for the free
Web casts. It also offers access to this
event via television in the DC area and
VerDate Aug<31>2005
15:08 May 16, 2006
Jkt 208001
Regulations Implementing the Energy Policy Act of 2005: Coordinating the Processing
of Federal Authorizations for Applications under Sections 3 and 7 of the Natural Gas
Act and Maintaining a Complete Consolidated Record.
Transcontinental Gas Pipe Line Corporation.
Freeport-McMoRan Energy LLC.
via phone bridge for a fee. If you have
any questions, visit https://
www.CapitolConnection.org or contact
Danelle Perkowski or David Reininger at
703–993–3100.
Immediately following the conclusion
of the Commission Meeting, a press
briefing will be held in Hearing Room
2. Members of the public may view this
briefing in the Commission Meeting
overflow room. This statement is
intended to notify the public that the
press briefings that follow Commission
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
meetings may now be viewed remotely
at Commission headquarters, but will
not be telecast through the Capitol
Connection service.
[FR Doc. 06–4637 Filed 5–12–06; 4:42 pm]
BILLING CODE 6717–01–P
E:\FR\FM\17MYN1.SGM
17MYN1
Agencies
[Federal Register Volume 71, Number 95 (Wednesday, May 17, 2006)]
[Notices]
[Pages 28682-28683]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 06-4637]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Sunshine Act Meetings
May 11, 2006.
The following notice of meeting is published pursuant to section
3(a) of the Government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C.
552b:
AGENCY HOLDING MEETING: Federal Energy Regulatory Commission.
DATE AND TIME: May 18, 2006; 10 a.m.
PLACE: Room 2C, 888 First Street NE., Washington, DC 20426.
Status: Open.
Matters To Be Considered: Agenda; *Note--Items listed on the agenda may
be deleted without further notice.
Contact Person for More Information: Magalie R. Salas, Secretary,
Telephone (202) 502-8400. For a recorded listing item stricken from or
added to the meeting, call (202) 502-8627.
This is a list of matters to be considered by the Commission. It
does not include a listing of all papers relevant to the items on the
agenda; however, all public documents may be examined in the Public
Reference Room.
905th--Meeting
Regular Meeting
[May 18, 2006; 10 a.m.]
----------------------------------------------------------------------------------------------------------------
Item No. Docket No. Company
----------------------------------------------------------------------------------------------------------------
Administrative Agenda
----------------------------------------------------------------------------------------------------------------
A-1.................................. AD02-1-000............. Agency Administrative Matters.
A-2.................................. AD02-7-000............. Customer Matters, Reliability, Security and
Market Operations.
A-3.................................. AD06-3-000............. Energy Market Update.
----------------------------------------------------------------------------------------------------------------
Electric
----------------------------------------------------------------------------------------------------------------
E-1.................................. RM05-25-000............ Preventing Undue Discrimination and Preference
in Transmission Service.
RM05-17-000............ Information Requirements for Available Transfer
Capability.
E-2.................................. RM04-7-000............. Market-Based Rates for Wholesale Sales of
Electricity by Public Utilities.
E-3.................................. Omitted................
E-4.................................. ER99-3491-005.......... PP&L Montana, LLC.
ER99-3491-006..........
ER99-3491-007..........
ER99-3491-008..........
ER00-2184-003.......... PPL Colstrip II, LLC.
ER00-2184-004..........
ER00-2184-005..........
ER00-2184-006..........
ER00-2185-003
ER00-2185-004..........
ER00-2185-005..........
ER00-2185-006.......... PPL Colstrip I, LLC.
EL05-124-000........... PPL Montana, LLC, PPL Colstrip II, LLC and PPL
EL05-124-001........... Colstrip I, LLC.
EL05-124-002...........
EL05-124-003...........
E-5.................................. ER06-780-000........... American Electric Power Service Corporation.
E-6.................................. ER06-800-000........... Midwest Independent Transmission System
Operator, Inc. and American Transmission
Systems, Inc.
E-7.................................. ER06-801-000........... Allegheny Energy Supply Company, LLC.
[[Page 28683]]
E-8.................................. Omitted................
E-9.................................. ER06-777-000........... Conectiv Energy Supply, Inc.
E-10................................. ER06-839-000........... Conectiv Energy Supply, Inc.
E-11................................. Omitted................
E-12................................. ER06-840-000........... Conectiv Energy Supply, Inc.
E-13................................. Omitted................
E-14................................. ER01-3001-013.......... New York Independent System Operator, Inc.
ER01-3001-014..........
E-15................................. ER05-1475-004.......... Midwest Independent Transmission System
Operator, Inc.
E-16................................. Omitted................
E-17................................. Omitted................
E-18................................. EC06-48-000............ Westar Energy, Inc., ONEOK Energy Services
Company, L.P.
E-19................................. RM06-14-000............ Revisions to Record Retention Requirements for
Unbundled Sales Service, Persons Holding
Blanket Marketing Certificates, and Public
Utility Market-Based Rate Authorization
Holders.
E-20................................. ER05-130-001........... Pacific Gas and Electric Company.
ER05-130-003...........
ER05-150-000...........
E-21................................. Omitted................
E-22................................. RM06-2-001............. Procedures for Disposition of Contested Audit
Matters.
E-23................................. RM05-36-001............ Revised Regulations Governing Small Power
Production and Cogeneration Facilities.
E-24................................. Omitted................
E-25................................. RM01-10-005............ Order on Request for Additional Clarification of
Interpretive Order Relating to the Standards of
Conduct.
----------------------------------------------------------------------------------------------------------------
Hydro
----------------------------------------------------------------------------------------------------------------
H-1.................................. P-12657-000............ Electric Plant Board of the City of Augusta,
P-12657-001............ Kentucky.
H-2.................................. P-2342-018............. PacifiCorp.
H-3.................................. P-10395-033............ Electric Plant Board of the City of Augusta,
Kentucky.
H-4.................................. P-2659-023............. PacifiCorp.
H-5.................................. P-5633-008............. Hydro Development Group, Inc.
P-6058-014.............
P-6059-015.............
H-6.................................. P-12498-002............ Red Circle Systems Corporation.
P-12500-002............
P-12497-002............
P-12499-002............
P-12502-002............
P-12503-002............
P-12504-002............
----------------------------------------------------------------------------------------------------------------
Certificates
----------------------------------------------------------------------------------------------------------------
C-1.................................. Omitted................
C-2.................................. RM06-1-000............. Regulations Implementing the Energy Policy Act
of 2005: Coordinating the Processing of Federal
Authorizations for Applications under Sections
3 and 7 of the Natural Gas Act and Maintaining
a Complete Consolidated Record.
C-3.................................. CP06-34-000............ Transcontinental Gas Pipe Line Corporation.
C-4.................................. Omitted................
C-5 CP04-68-000............ Freeport-McMoRan Energy LLC.
CP04-69-000............
----------------------------------------------------------------------------------------------------------------
Magalie R. Salas,
Secretary.
A free Web cast of this event is available through https://
www.ferc.gov. Anyone with Internet access who desires to view this
event can do so by navigating to www.ferc.gov's Calendar of Events and
locating this event in the Calendar. The event will contain a link to
its Webcast. The Capitol Connection provides technical support for the
free Web casts. It also offers access to this event via television in
the DC area and via phone bridge for a fee. If you have any questions,
visit https://www.CapitolConnection.org or contact Danelle Perkowski or
David Reininger at 703-993-3100.
Immediately following the conclusion of the Commission Meeting, a
press briefing will be held in Hearing Room 2. Members of the public
may view this briefing in the Commission Meeting overflow room. This
statement is intended to notify the public that the press briefings
that follow Commission meetings may now be viewed remotely at
Commission headquarters, but will not be telecast through the Capitol
Connection service.
[FR Doc. 06-4637 Filed 5-12-06; 4:42 pm]
BILLING CODE 6717-01-P