Flambeau Hydro, LLC; Notice of Availability of Environmental Assessment, 27493 [E6-7191]
Download as PDF
Federal Register / Vol. 71, No. 91 / Thursday, May 11, 2006 / Notices
to the documents. Go to https://
www.ferc.gov/esubscribenow.htm.
information, contact Patrick Murphy at
(202) 502–8755.
Magalie R. Salas,
Secretary.
[FR Doc. E6–7199 Filed 5–10–06; 8:45 am]
Magalie R. Salas,
Secretary.
[FR Doc. E6–7191 Filed 5–10–06; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. CP05–396–000]
[Project No. 9185–009-WI]
Sabine Pass LNG, LP; Notice of
Availability of the Environmental
Assessment for the Proposed Sabine
Pass LNG Terminal Phase II Project
May 5, 2006.
cchase on PROD1PC60 with NOTICES
Flambeau Hydro, LLC; Notice of
Availability of Environmental
Assessment
May 5, 2006.
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s regulations, 18 CFR part
380 (Order No. 486, 52 FR 47879), the
Office of Energy Projects has reviewed
the application for a subsequent license
for the Clam River Hydroelectric Project,
located on the Clam River, 9.5 miles
northwest of Webster, Wisconsin in
Burnett County, and has prepared an
Environmental Assessment (EA). In the
EA, Commission staff analyze the
potential environmental effects of
relicensing the project and conclude
that issuing a subsequent license for the
project, with appropriate environmental
measures, would not constitute a major
Federal action significantly affecting the
quality of the human environment.
A copy of the EA is on file with the
Commission and is available for public
inspection. The EA may also be viewed
on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659.
Any comments should be filed within
30 days from the issuance date of this
notice, and should be addressed to the
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Room 1–A, Washington, DC 20426.
Please affix ‘‘Clam River Project No.
9185–009’’ to all comments. Comments
may be filed electronically via Internet
in lieu of paper. The Commission
strongly encourages electronic filings.
See 18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘eFiling’’ link. For further
The staff of the Federal Energy
Regulatory Commission (Commission or
FERC) has prepared an environmental
assessment (EA) on the liquefied natural
gas (LNG) facilities proposed by Sabine
Pass LNG, L.P. (SPLNG) in the abovereferenced docket. The Sabine Pass LNG
Terminal Phase II Project (Project)
would be located in Cameron Parish,
Louisiana.
The EA was prepared to satisfy the
requirements of the National
Environmental Policy Act. The staff
concludes that approval of the proposed
Project, with appropriate mitigating
measures, would not constitute a major
Federal action significantly affecting the
quality of the human environment. This
EA evaluates alternatives to the
proposal, including system alternatives
and site layout alternatives for the LNG
import terminal, impact of Ambient Air
Vaporizers, and air emissions.
The U.S. Army Corps of Engineers
(COE), U.S. Coast Guard (Coast Guard),
and U.S. Fish and Wildlife Service
(FWS) have all participated as
cooperating agencies in the preparation
of the EA.
The EA assesses the potential
environmental effects of the
construction and operation of the
following facilities:
• Sixteen (16) ambient air
vaporization trains (AAV Trains), one of
which would be installed significantly
before the others as a pilot AAV Train
for testing purposes;
• Eight (8) SCV Trains;
• One (1) pilot AAV Train;
• Three (3) LNG storage tanks;
• Two (2) LNG transfer lines;
• Two (2) BOG compressors;
• Two (2) BOG condensing systems;
• Four (4) shell and tube heat
exchangers;
• Two (2) vapor return blowers;
• One (1) simple cycle gas turbine
generator; and
VerDate Aug<31>2005
16:29 May 10, 2006
Jkt 208001
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
27493
• Two (2) 30-inch natural gas
pipelines from the Project process area
to new main meters.
The EA has been placed in the public
files of the FERC and is available for
public inspection at: Federal Energy
Regulatory Commission, Public
Reference Room, 888 First Street, NE.,
Room 2A, Washington, DC 20426, (202)
502–8371.
A limited number of copies are
available from the FERC’s Public
Reference Room identified above. In
addition, copies of the EA have been
mailed to Federal, state, and local
government agencies; elected officials;
Native American tribes; local libraries
and newspapers; intervenors in the
FERC’s proceeding; individuals who
provided scoping comments; and
affected landowners and individuals.
Any person wishing to comment on
the EA may do so. To ensure
consideration prior to a Commission
decision on the proposal, it is important
that we receive your comments before
the date specified below. Please
carefully follow these instructions to
ensure that your comments are received
in time and properly recorded:
• Send an original and two copies of
your comments to: Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Room 1A, Washington,
DC 20426;
• Label one copy of the comments for
the attention of the Gas Branch 2,
PJ11.2;
• Reference Docket No. CP05–396–
000; and
• Mail your comments so that they
will be received in Washington, DC on
or before June 5, 2006.
The Commission strongly encourages
electronic filing of any comments or
interventions or protests to this
proceeding. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site at https://
www.ferc.gov under the ‘‘e-Filing’’ link
and the link to the User’s Guide. Before
you can file comments, you will need to
create a free account, which can be
created by clicking on ‘‘Sign-up.’’
Additional information about the
Project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC (3372) or on the
FERC Internet Web site using the
eLibrary link. Click on the eLibrary link,
click on ‘‘General Search’’ and enter the
docket number excluding the last three
digits in the Docket Number field. Be
sure you have selected an appropriate
date range. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
contact (202) 502–8659. The eLibrary
E:\FR\FM\11MYN1.SGM
11MYN1
Agencies
[Federal Register Volume 71, Number 91 (Thursday, May 11, 2006)]
[Notices]
[Page 27493]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-7191]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 9185-009-WI]
Flambeau Hydro, LLC; Notice of Availability of Environmental
Assessment
May 5, 2006.
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's regulations, 18 CFR part
380 (Order No. 486, 52 FR 47879), the Office of Energy Projects has
reviewed the application for a subsequent license for the Clam River
Hydroelectric Project, located on the Clam River, 9.5 miles northwest
of Webster, Wisconsin in Burnett County, and has prepared an
Environmental Assessment (EA). In the EA, Commission staff analyze the
potential environmental effects of relicensing the project and conclude
that issuing a subsequent license for the project, with appropriate
environmental measures, would not constitute a major Federal action
significantly affecting the quality of the human environment.
A copy of the EA is on file with the Commission and is available
for public inspection. The EA may also be viewed on the Commission's
Web site at https://www.ferc.gov using the ``eLibrary'' link. Enter the
docket number excluding the last three digits in the docket number
field to access the document. For assistance, contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676,
or for TTY, (202) 502-8659.
Any comments should be filed within 30 days from the issuance date
of this notice, and should be addressed to the Secretary, Federal
Energy Regulatory Commission, 888 First Street, NE., Room 1-A,
Washington, DC 20426. Please affix ``Clam River Project No. 9185-009''
to all comments. Comments may be filed electronically via Internet in
lieu of paper. The Commission strongly encourages electronic filings.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site under the ``eFiling'' link. For further information, contact
Patrick Murphy at (202) 502-8755.
Magalie R. Salas,
Secretary.
[FR Doc. E6-7191 Filed 5-10-06; 8:45 am]
BILLING CODE 6717-01-P