Flambeau Hydro, LLC; Notice of Availability of Environmental Assessment, 27493 [E6-7191]

Download as PDF Federal Register / Vol. 71, No. 91 / Thursday, May 11, 2006 / Notices to the documents. Go to https:// www.ferc.gov/esubscribenow.htm. information, contact Patrick Murphy at (202) 502–8755. Magalie R. Salas, Secretary. [FR Doc. E6–7199 Filed 5–10–06; 8:45 am] Magalie R. Salas, Secretary. [FR Doc. E6–7191 Filed 5–10–06; 8:45 am] BILLING CODE 6717–01–P BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Docket No. CP05–396–000] [Project No. 9185–009-WI] Sabine Pass LNG, LP; Notice of Availability of the Environmental Assessment for the Proposed Sabine Pass LNG Terminal Phase II Project May 5, 2006. cchase on PROD1PC60 with NOTICES Flambeau Hydro, LLC; Notice of Availability of Environmental Assessment May 5, 2006. In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s regulations, 18 CFR part 380 (Order No. 486, 52 FR 47879), the Office of Energy Projects has reviewed the application for a subsequent license for the Clam River Hydroelectric Project, located on the Clam River, 9.5 miles northwest of Webster, Wisconsin in Burnett County, and has prepared an Environmental Assessment (EA). In the EA, Commission staff analyze the potential environmental effects of relicensing the project and conclude that issuing a subsequent license for the project, with appropriate environmental measures, would not constitute a major Federal action significantly affecting the quality of the human environment. A copy of the EA is on file with the Commission and is available for public inspection. The EA may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. Any comments should be filed within 30 days from the issuance date of this notice, and should be addressed to the Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Room 1–A, Washington, DC 20426. Please affix ‘‘Clam River Project No. 9185–009’’ to all comments. Comments may be filed electronically via Internet in lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘eFiling’’ link. For further The staff of the Federal Energy Regulatory Commission (Commission or FERC) has prepared an environmental assessment (EA) on the liquefied natural gas (LNG) facilities proposed by Sabine Pass LNG, L.P. (SPLNG) in the abovereferenced docket. The Sabine Pass LNG Terminal Phase II Project (Project) would be located in Cameron Parish, Louisiana. The EA was prepared to satisfy the requirements of the National Environmental Policy Act. The staff concludes that approval of the proposed Project, with appropriate mitigating measures, would not constitute a major Federal action significantly affecting the quality of the human environment. This EA evaluates alternatives to the proposal, including system alternatives and site layout alternatives for the LNG import terminal, impact of Ambient Air Vaporizers, and air emissions. The U.S. Army Corps of Engineers (COE), U.S. Coast Guard (Coast Guard), and U.S. Fish and Wildlife Service (FWS) have all participated as cooperating agencies in the preparation of the EA. The EA assesses the potential environmental effects of the construction and operation of the following facilities: • Sixteen (16) ambient air vaporization trains (AAV Trains), one of which would be installed significantly before the others as a pilot AAV Train for testing purposes; • Eight (8) SCV Trains; • One (1) pilot AAV Train; • Three (3) LNG storage tanks; • Two (2) LNG transfer lines; • Two (2) BOG compressors; • Two (2) BOG condensing systems; • Four (4) shell and tube heat exchangers; • Two (2) vapor return blowers; • One (1) simple cycle gas turbine generator; and VerDate Aug<31>2005 16:29 May 10, 2006 Jkt 208001 PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 27493 • Two (2) 30-inch natural gas pipelines from the Project process area to new main meters. The EA has been placed in the public files of the FERC and is available for public inspection at: Federal Energy Regulatory Commission, Public Reference Room, 888 First Street, NE., Room 2A, Washington, DC 20426, (202) 502–8371. A limited number of copies are available from the FERC’s Public Reference Room identified above. In addition, copies of the EA have been mailed to Federal, state, and local government agencies; elected officials; Native American tribes; local libraries and newspapers; intervenors in the FERC’s proceeding; individuals who provided scoping comments; and affected landowners and individuals. Any person wishing to comment on the EA may do so. To ensure consideration prior to a Commission decision on the proposal, it is important that we receive your comments before the date specified below. Please carefully follow these instructions to ensure that your comments are received in time and properly recorded: • Send an original and two copies of your comments to: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Room 1A, Washington, DC 20426; • Label one copy of the comments for the attention of the Gas Branch 2, PJ11.2; • Reference Docket No. CP05–396– 000; and • Mail your comments so that they will be received in Washington, DC on or before June 5, 2006. The Commission strongly encourages electronic filing of any comments or interventions or protests to this proceeding. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https:// www.ferc.gov under the ‘‘e-Filing’’ link and the link to the User’s Guide. Before you can file comments, you will need to create a free account, which can be created by clicking on ‘‘Sign-up.’’ Additional information about the Project is available from the Commission’s Office of External Affairs, at 1–866–208–FERC (3372) or on the FERC Internet Web site using the eLibrary link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number excluding the last three digits in the Docket Number field. Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, contact (202) 502–8659. The eLibrary E:\FR\FM\11MYN1.SGM 11MYN1

Agencies

[Federal Register Volume 71, Number 91 (Thursday, May 11, 2006)]
[Notices]
[Page 27493]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-7191]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 9185-009-WI]


Flambeau Hydro, LLC; Notice of Availability of Environmental 
Assessment

May 5, 2006.
    In accordance with the National Environmental Policy Act of 1969 
and the Federal Energy Regulatory Commission's regulations, 18 CFR part 
380 (Order No. 486, 52 FR 47879), the Office of Energy Projects has 
reviewed the application for a subsequent license for the Clam River 
Hydroelectric Project, located on the Clam River, 9.5 miles northwest 
of Webster, Wisconsin in Burnett County, and has prepared an 
Environmental Assessment (EA). In the EA, Commission staff analyze the 
potential environmental effects of relicensing the project and conclude 
that issuing a subsequent license for the project, with appropriate 
environmental measures, would not constitute a major Federal action 
significantly affecting the quality of the human environment.
    A copy of the EA is on file with the Commission and is available 
for public inspection. The EA may also be viewed on the Commission's 
Web site at https://www.ferc.gov using the ``eLibrary'' link. Enter the 
docket number excluding the last three digits in the docket number 
field to access the document. For assistance, contact FERC Online 
Support at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, 
or for TTY, (202) 502-8659.
    Any comments should be filed within 30 days from the issuance date 
of this notice, and should be addressed to the Secretary, Federal 
Energy Regulatory Commission, 888 First Street, NE., Room 1-A, 
Washington, DC 20426. Please affix ``Clam River Project No. 9185-009'' 
to all comments. Comments may be filed electronically via Internet in 
lieu of paper. The Commission strongly encourages electronic filings. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site under the ``eFiling'' link. For further information, contact 
Patrick Murphy at (202) 502-8755.

Magalie R. Salas,
Secretary.
[FR Doc. E6-7191 Filed 5-10-06; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.