Drawbridge Operation Regulations; Upper Mississippi River, Iowa and Illinois, 26832 [06-4323]
Download as PDF
26832
Federal Register / Vol. 71, No. 89 / Tuesday, May 9, 2006 / Rules and Regulations
until 11 a.m. on June 3, 2006. There are
no alternate routes for vessels transiting
this section of the Upper Mississippi
River.
The Rock Island Railroad and
Highway Drawbridge, in the closed-tonavigation position, provides a vertical
clearance of 23.8 feet above normal
pool. Navigation on the waterway
consists primarily of commercial tows
and recreational watercraft. This
deviation has been coordinated with
waterway users. No objections were
received.
In accordance with 33 CFR 117.35(c),
this work will be performed with all due
speed in order to return the bridge to
normal operation as soon as possible.
This deviation from the operating
regulations is authorized under 33 CFR
117.35.
Dated: April 28, 2006.
Roger K. Wiebusch,
Bridge Administrator.
[FR Doc. 06–4324 Filed 5–8–06; 8:45 am]
BILLING CODE 4910–15–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[CGD08–06–018]
RIN 1625–AA09
Drawbridge Operation Regulations;
Upper Mississippi River, Iowa and
Illinois
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
mstockstill on PROD1PC68 with RULES
ACTION:
SUMMARY: The Commander, Eighth
Coast Guard District has issued a
temporary deviation from the regulation
governing the operations of the Rock
Island Railroad and Highway
Drawbridge, Mile 482.9, Rock Island,
Illinois across the Upper Mississippi
River. This deviation allows the bridge
to remain closed to navigation from 8
a.m. until 11 a.m. on September 24,
2006. The deviation is necessary to
allow time for repairs to mechanical
components essential to the continued
safe operation of the drawbridge.
DATES: This temporary deviation is
effective from 8 a.m. until 11 a.m. on
September 24, 2006.
ADDRESSES: Materials referred to in this
document are available for inspection or
copying at Room 2.107F in the Robert A.
Young Federal Building, 1222 Spruce
Street, St. Louis, MO 63103–2832,
VerDate Aug<31>2005
15:32 May 08, 2006
Jkt 208001
between 8 a.m. and 4 p.m., Monday
through Friday, except Federal holidays.
The Eighth Coast Guard District Bridge
Administration Branch maintains the
public docket for this temporary
deviation.
DEPARTMENT OF HOMELAND
SECURITY
Roger
K. Wiebusch, Bridge Administrator,
(314) 539–3900, extension 2378.
[CGD13–06–014]
FOR FUTHER INFORMATION CONTACT:
The Rock
Island Arsenal requested a temporary
deviation to allow time to conduct
repairs to the Rock Island Railroad and
Highway Drawbridge, mile 482.9, at
Rock Island, Illinois across the Upper
Mississippi River. The Rock Island
Railroad and Highway Drawbridge
currently operates in accordance with
33 CFR 117.5 which requires the
drawbridge to open promptly and fully
for passage of vessels when a request to
open is given in accordance with 33
CFR part 117, subpart A. In order to
facilitate required bridge maintenance,
the bridge must be kept in the closedto-navigation position. This deviation
allows the drawbridge to remain closed
to navigation for three hours from 8 a.m.
until 11 a.m. on September 24, 2006.
There are no alternate routes for vessels
transiting this section of the Upper
Mississippi River.
The Rock Island Railroad and
Highway Drawbridge, in the closed-tonavigation position, provides a vertical
clearance of 23.8 feet above normal
pool. Navigation on the waterway
consists primarily of commercial tows
and recreational watercraft. This
deviation has been coordinated with
waterway users. No objections were
received.
In accordance with 33 CFR 117.35(c),
this work will be performed with all due
speed in order to return the bridge to
normal operation as soon as possible.
This deviation from the operating
regulations is authorized under 33 CFR
117.35.
SUPPLEMENTARY INFORMATION:
Dated: April 28, 2006.
Roger K. Wiebusch,
Bridge Administrator.
[FR Doc. 06–4323 Filed 5–8–06; 8:45 am]
BILLING CODE 4910–15–P
PO 00000
Frm 00016
Fmt 4700
Sfmt 4700
Coast Guard
33 CFR Part 117
RIN 1625–AA09
Drawbridge Operation Regulations;
Lake Washington Ship Canal, WA
Coast Guard, DHS.
Temporary final rule.
AGENCY:
ACTION:
SUMMARY: The Coast Guard is
temporarily revising the drawbridge
operation regulations for the Ballard
Bridge, mile 1.1, and the Fremont
Bridge, mile 2.6, across the Lake
Washington Ship Canal at Seattle,
Washington. The temporary change will
increase the two daily closed draw
periods by one hour each from May 30,
2006 through March 30, 2007. This will
facilitate road traffic, which will be
severely limited by lane closures during
the rebuilding of the approaches to the
Fremont Bridge.
DATES: This temporary rule is effective
from May 30, 2006 to March 30, 2007.
ADDRESSES: Documents indicated in this
preamble as being available in the
docket are part of docket [CGD13–06–
014] and are available for inspection or
copying at the Waterways Management
Branch, 13th Coast Guard District, 915
Second Avenue, Seattle, WA 98174–
1067 between 7:30 a.m. and 4 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT:
Austin Pratt, Chief, Bridge Section,
(206) 220–7282.
SUPPLEMENTARY INFORMATION:
Regulatory Information
We did not publish a notice of
proposed rulemaking (NPRM) for this
regulation. Under 5 U.S.C. 553(b)(B), the
Coast Guard finds that good cause exists
for not publishing an NPRM. The City
of Seattle requested this temporary
change after first studying traffic signals,
lane closures and other aspects of the
project before concluding that this
change might significantly mitigate
traffic congestion on the affected
arterials with minimal impact to
navigation. The change would affect
only one or two draw openings per day
on average. The city, which owns the
bridges, has conducted public outreach
concerning the project and its request to
change the operating schedule of the
drawspans temporarily. This has
included several neighborhood meetings
in the project area. In addition, the
E:\FR\FM\09MYR1.SGM
09MYR1
Agencies
[Federal Register Volume 71, Number 89 (Tuesday, May 9, 2006)]
[Rules and Regulations]
[Page 26832]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 06-4323]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[CGD08-06-018]
RIN 1625-AA09
Drawbridge Operation Regulations; Upper Mississippi River, Iowa
and Illinois
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, Eighth Coast Guard District has issued a
temporary deviation from the regulation governing the operations of the
Rock Island Railroad and Highway Drawbridge, Mile 482.9, Rock Island,
Illinois across the Upper Mississippi River. This deviation allows the
bridge to remain closed to navigation from 8 a.m. until 11 a.m. on
September 24, 2006. The deviation is necessary to allow time for
repairs to mechanical components essential to the continued safe
operation of the drawbridge.
DATES: This temporary deviation is effective from 8 a.m. until 11 a.m.
on September 24, 2006.
ADDRESSES: Materials referred to in this document are available for
inspection or copying at Room 2.107F in the Robert A. Young Federal
Building, 1222 Spruce Street, St. Louis, MO 63103-2832, between 8 a.m.
and 4 p.m., Monday through Friday, except Federal holidays. The Eighth
Coast Guard District Bridge Administration Branch maintains the public
docket for this temporary deviation.
FOR FUTHER INFORMATION CONTACT: Roger K. Wiebusch, Bridge
Administrator, (314) 539-3900, extension 2378.
SUPPLEMENTARY INFORMATION: The Rock Island Arsenal requested a
temporary deviation to allow time to conduct repairs to the Rock Island
Railroad and Highway Drawbridge, mile 482.9, at Rock Island, Illinois
across the Upper Mississippi River. The Rock Island Railroad and
Highway Drawbridge currently operates in accordance with 33 CFR 117.5
which requires the drawbridge to open promptly and fully for passage of
vessels when a request to open is given in accordance with 33 CFR part
117, subpart A. In order to facilitate required bridge maintenance, the
bridge must be kept in the closed-to-navigation position. This
deviation allows the drawbridge to remain closed to navigation for
three hours from 8 a.m. until 11 a.m. on September 24, 2006. There are
no alternate routes for vessels transiting this section of the Upper
Mississippi River.
The Rock Island Railroad and Highway Drawbridge, in the closed-to-
navigation position, provides a vertical clearance of 23.8 feet above
normal pool. Navigation on the waterway consists primarily of
commercial tows and recreational watercraft. This deviation has been
coordinated with waterway users. No objections were received.
In accordance with 33 CFR 117.35(c), this work will be performed
with all due speed in order to return the bridge to normal operation as
soon as possible. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: April 28, 2006.
Roger K. Wiebusch,
Bridge Administrator.
[FR Doc. 06-4323 Filed 5-8-06; 8:45 am]
BILLING CODE 4910-15-P