Download as PDF Federal Register / Vol. 71, No. 84 / Tuesday, May 2, 2006 / Notices be effective August 7, 2005, to correspond with the effective date that the Commission required for the Sales Tariff in its March 17, 2006 order. Comment Date: 5 p.m. Eastern Time on May 8, 2006. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EC06–111–000, et al.] ESI Energy, LLC, et al.; Electric Rate and Corporate Filings 5. Cabrillo Power I LLC; Cabrillo Power II LLC; El Segundo Power, LLC; Long Beach Generation, LLC April 26, 2005. The following filings have been made with the Commission. The filings are listed in ascending order within each docket classification. 1. ESI Energy, LLC; Bison Wind GP, LLC; Heartland LP, LLC; Bison Wind Holdings, LLC; Bison Wind, LLC; FPL Energy Burleigh County Wind, LLC; FPL Wind Cowboy Wind, LLC [Docket No. EC06–111–000] Take notice that on April 14, 2006 ESI Energy, LLC; Bison Wind GP, LLC; Heartland LP, LLC; Bison Wind Holdings, LLC; Bison Wind, LLC; FPL Energy Burleigh County Wind, LLC; and FPL Wind Cowboy Wind, LLC filed an application for approval of a corporate organization and request for expedited approval pursuant to section 203 of the Federal Power Act. Comment Date: 5 p.m. eastern time on May 5, 2006. 2. DeSoto County Generating Company, LLC; Progress Genco Ventures, LLC; Southern Power Company [Docket No. EC06–112–000] Take notice that on April 14, 2006 DeSoto County Generating Company, LLC, Progress Genco Ventures, LLC, and Southern Power Company filed an application for approval of a disposition of jurisdictional facilities pursuant to section 203 of the Federal Power Act. Comment Date: 5 p.m. eastern time on May 5, 2006. 3. Entergy Services, Inc. [Docket No. EL01–88–004] Take notice that on April 10, 2006 Entergy Services, Inc. as agent and on behalf of the Entergy Operating Companies filed amendments to its Entergy System Agreement in compliance with the Commission’s June 1, 2005 and December 19, 2005 orders. Comment Date: 5 p.m. eastern time on May 31, 2006. 4. MidAmerican Energy Company rmajette on PROD1PC67 with NOTICES [Docket No. ER96–719–012] Take notice that on April 3, 2006 MidAmerican Energy Company filed proposed changes to its FERC Electric Tariff, Original Volume No. 11 (Sales Tariff) for sales of capacity and energy within the MidAmerican control area, to VerDate Aug<31>2005 15:18 May 01, 2006 Jkt 208001 [Docket Nos. ER99–1115–009; ER99–1116– 009; ER06–820–001; ER98–1127–009; ER98– 1796–008] Take notice that on April 17, 2006 Cabrillo Power I LLC, Cabrillo Power II LLC, El Segundo, LLC and Long Beach Generation, LLC filed amendments to their market-based rate tariffs to conform with the other market-based rate tariffs held by subsidiaries of NRG Energy, Inc that have been approved by the Commission in recent proceedings. Comment Date: 5 p.m. eastern time on May 8, 2006. 25835 Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E6–6582 Filed 5–1–06; 8:45 am] 6. Governors of the States of Arizona, California; Colorado, Montana, Nevada, New Mexico; Oregon, Utah, Washington and Wyoming BILLING CODE 6717–01–P [Docket No. RR06–2–000] Federal Energy Regulatory Commission On April 20, 2006, the Governors of the States of Arizona, California, Colorado, Montana, Nevada, New Mexico, Oregon, Utah, Washington and Wyoming filed a petition, pursuant to section 215 of the Federal Power Act, to create a Regulatory Advisory Body for the Western Interconnection. The petitioners propose to organize the Western Interconnection Regional Advisory Body pursuant to a Policy Resolution of the Western Governors’ Association. Comment Date: 5 p.m. eastern time on May 26, 2006. Standard Paragraph Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Notice of Application Accepted for Filing and Soliciting Motions To Intervene, Protests, and Comments April 26, 2006. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Preliminary Permit. b. Project No.: 12652–000. c. Date filed: February 28, 2006. d. Applicant: Gerald M. Lutticken. e. Name of Project: Helltown Ravine Hydroelectric Project. f. Location: On Helltown Ravine, a tributary to Butte Creek, Butte County, California. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Mr. Gerald M. Lutticken, P.E., 730 Bluegrass Drive, Petaluma, California, (707) 206–2099. The proposed Helltown Ravine Hydroelectric Project would occupy lands within the Bureau of Land Management and private lands. i. FERC Contact: Patricia W. Gillis at (202) 502–8735. j. Deadline for filing comments, protests, and motions to intervene: 60 days from the issuance date of this notice. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on E:\FR\FM\02MYN1.SGM 02MYN1

Agencies

[Federal Register Volume 71, Number 84 (Tuesday, May 2, 2006)]
[Notices]
[Page 25835]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-6582]



[[Page 25835]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. EC06-111-000, et al.]


ESI Energy, LLC, et al.; Electric Rate and Corporate Filings

April 26, 2005.
    The following filings have been made with the Commission. The 
filings are listed in ascending order within each docket 
classification.

1. ESI Energy, LLC; Bison Wind GP, LLC; Heartland LP, LLC; Bison Wind 
Holdings, LLC; Bison Wind, LLC; FPL Energy Burleigh County Wind, LLC; 
FPL Wind Cowboy Wind, LLC

[Docket No. EC06-111-000]

    Take notice that on April 14, 2006 ESI Energy, LLC; Bison Wind GP, 
LLC; Heartland LP, LLC; Bison Wind Holdings, LLC; Bison Wind, LLC; FPL 
Energy Burleigh County Wind, LLC; and FPL Wind Cowboy Wind, LLC filed 
an application for approval of a corporate organization and request for 
expedited approval pursuant to section 203 of the Federal Power Act.
    Comment Date: 5 p.m. eastern time on May 5, 2006.

2. DeSoto County Generating Company, LLC; Progress Genco Ventures, LLC; 
Southern Power Company

[Docket No. EC06-112-000]

    Take notice that on April 14, 2006 DeSoto County Generating 
Company, LLC, Progress Genco Ventures, LLC, and Southern Power Company 
filed an application for approval of a disposition of jurisdictional 
facilities pursuant to section 203 of the Federal Power Act.
    Comment Date: 5 p.m. eastern time on May 5, 2006.

3. Entergy Services, Inc.

[Docket No. EL01-88-004]

    Take notice that on April 10, 2006 Entergy Services, Inc. as agent 
and on behalf of the Entergy Operating Companies filed amendments to 
its Entergy System Agreement in compliance with the Commission's June 
1, 2005 and December 19, 2005 orders.
    Comment Date: 5 p.m. eastern time on May 31, 2006.

4. MidAmerican Energy Company

[Docket No. ER96-719-012]

    Take notice that on April 3, 2006 MidAmerican Energy Company filed 
proposed changes to its FERC Electric Tariff, Original Volume No. 11 
(Sales Tariff) for sales of capacity and energy within the MidAmerican 
control area, to be effective August 7, 2005, to correspond with the 
effective date that the Commission required for the Sales Tariff in its 
March 17, 2006 order.
    Comment Date: 5 p.m. Eastern Time on May 8, 2006.

5. Cabrillo Power I LLC; Cabrillo Power II LLC; El Segundo Power, LLC; 
Long Beach Generation, LLC

[Docket Nos. ER99-1115-009; ER99-1116-009; ER06-820-001; ER98-1127-009; 
ER98-1796-008]

    Take notice that on April 17, 2006 Cabrillo Power I LLC, Cabrillo 
Power II LLC, El Segundo, LLC and Long Beach Generation, LLC filed 
amendments to their market-based rate tariffs to conform with the other 
market-based rate tariffs held by subsidiaries of NRG Energy, Inc that 
have been approved by the Commission in recent proceedings.
    Comment Date: 5 p.m. eastern time on May 8, 2006.

6. Governors of the States of Arizona, California; Colorado, Montana, 
Nevada, New Mexico; Oregon, Utah, Washington and Wyoming

[Docket No. RR06-2-000]

    On April 20, 2006, the Governors of the States of Arizona, 
California, Colorado, Montana, Nevada, New Mexico, Oregon, Utah, 
Washington and Wyoming filed a petition, pursuant to section 215 of the 
Federal Power Act, to create a Regulatory Advisory Body for the Western 
Interconnection. The petitioners propose to organize the Western 
Interconnection Regional Advisory Body pursuant to a Policy Resolution 
of the Western Governors' Association.
    Comment Date: 5 p.m. eastern time on May 26, 2006.

Standard Paragraph

    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. On or 
before the comment date, it is not necessary to serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Magalie R. Salas,
 Secretary.