ESI Energy, LLC, et al.; Electric Rate and Corporate Filings, 25835 [E6-6582]
Download as PDF
Federal Register / Vol. 71, No. 84 / Tuesday, May 2, 2006 / Notices
be effective August 7, 2005, to
correspond with the effective date that
the Commission required for the Sales
Tariff in its March 17, 2006 order.
Comment Date: 5 p.m. Eastern Time
on May 8, 2006.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. EC06–111–000, et al.]
ESI Energy, LLC, et al.; Electric Rate
and Corporate Filings
5. Cabrillo Power I LLC; Cabrillo Power
II LLC; El Segundo Power, LLC; Long
Beach Generation, LLC
April 26, 2005.
The following filings have been made
with the Commission. The filings are
listed in ascending order within each
docket classification.
1. ESI Energy, LLC; Bison Wind GP,
LLC; Heartland LP, LLC; Bison Wind
Holdings, LLC; Bison Wind, LLC; FPL
Energy Burleigh County Wind, LLC;
FPL Wind Cowboy Wind, LLC
[Docket No. EC06–111–000]
Take notice that on April 14, 2006 ESI
Energy, LLC; Bison Wind GP, LLC;
Heartland LP, LLC; Bison Wind
Holdings, LLC; Bison Wind, LLC; FPL
Energy Burleigh County Wind, LLC; and
FPL Wind Cowboy Wind, LLC filed an
application for approval of a corporate
organization and request for expedited
approval pursuant to section 203 of the
Federal Power Act.
Comment Date: 5 p.m. eastern time on
May 5, 2006.
2. DeSoto County Generating Company,
LLC; Progress Genco Ventures, LLC;
Southern Power Company
[Docket No. EC06–112–000]
Take notice that on April 14, 2006
DeSoto County Generating Company,
LLC, Progress Genco Ventures, LLC, and
Southern Power Company filed an
application for approval of a disposition
of jurisdictional facilities pursuant to
section 203 of the Federal Power Act.
Comment Date: 5 p.m. eastern time on
May 5, 2006.
3. Entergy Services, Inc.
[Docket No. EL01–88–004]
Take notice that on April 10, 2006
Entergy Services, Inc. as agent and on
behalf of the Entergy Operating
Companies filed amendments to its
Entergy System Agreement in
compliance with the Commission’s June
1, 2005 and December 19, 2005 orders.
Comment Date: 5 p.m. eastern time on
May 31, 2006.
4. MidAmerican Energy Company
rmajette on PROD1PC67 with NOTICES
[Docket No. ER96–719–012]
Take notice that on April 3, 2006
MidAmerican Energy Company filed
proposed changes to its FERC Electric
Tariff, Original Volume No. 11 (Sales
Tariff) for sales of capacity and energy
within the MidAmerican control area, to
VerDate Aug<31>2005
15:18 May 01, 2006
Jkt 208001
[Docket Nos. ER99–1115–009; ER99–1116–
009; ER06–820–001; ER98–1127–009; ER98–
1796–008]
Take notice that on April 17, 2006
Cabrillo Power I LLC, Cabrillo Power II
LLC, El Segundo, LLC and Long Beach
Generation, LLC filed amendments to
their market-based rate tariffs to
conform with the other market-based
rate tariffs held by subsidiaries of NRG
Energy, Inc that have been approved by
the Commission in recent proceedings.
Comment Date: 5 p.m. eastern time on
May 8, 2006.
25835
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–6582 Filed 5–1–06; 8:45 am]
6. Governors of the States of Arizona,
California; Colorado, Montana, Nevada,
New Mexico; Oregon, Utah, Washington
and Wyoming
BILLING CODE 6717–01–P
[Docket No. RR06–2–000]
Federal Energy Regulatory
Commission
On April 20, 2006, the Governors of
the States of Arizona, California,
Colorado, Montana, Nevada, New
Mexico, Oregon, Utah, Washington and
Wyoming filed a petition, pursuant to
section 215 of the Federal Power Act, to
create a Regulatory Advisory Body for
the Western Interconnection. The
petitioners propose to organize the
Western Interconnection Regional
Advisory Body pursuant to a Policy
Resolution of the Western Governors’
Association.
Comment Date: 5 p.m. eastern time on
May 26, 2006.
Standard Paragraph
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Notice of Application Accepted for
Filing and Soliciting Motions To
Intervene, Protests, and Comments
April 26, 2006.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: 12652–000.
c. Date filed: February 28, 2006.
d. Applicant: Gerald M. Lutticken.
e. Name of Project: Helltown Ravine
Hydroelectric Project.
f. Location: On Helltown Ravine, a
tributary to Butte Creek, Butte County,
California.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Gerald M.
Lutticken, P.E., 730 Bluegrass Drive,
Petaluma, California, (707) 206–2099.
The proposed Helltown Ravine
Hydroelectric Project would occupy
lands within the Bureau of Land
Management and private lands.
i. FERC Contact: Patricia W. Gillis at
(202) 502–8735.
j. Deadline for filing comments,
protests, and motions to intervene: 60
days from the issuance date of this
notice.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
E:\FR\FM\02MYN1.SGM
02MYN1
Agencies
[Federal Register Volume 71, Number 84 (Tuesday, May 2, 2006)]
[Notices]
[Page 25835]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-6582]
[[Page 25835]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. EC06-111-000, et al.]
ESI Energy, LLC, et al.; Electric Rate and Corporate Filings
April 26, 2005.
The following filings have been made with the Commission. The
filings are listed in ascending order within each docket
classification.
1. ESI Energy, LLC; Bison Wind GP, LLC; Heartland LP, LLC; Bison Wind
Holdings, LLC; Bison Wind, LLC; FPL Energy Burleigh County Wind, LLC;
FPL Wind Cowboy Wind, LLC
[Docket No. EC06-111-000]
Take notice that on April 14, 2006 ESI Energy, LLC; Bison Wind GP,
LLC; Heartland LP, LLC; Bison Wind Holdings, LLC; Bison Wind, LLC; FPL
Energy Burleigh County Wind, LLC; and FPL Wind Cowboy Wind, LLC filed
an application for approval of a corporate organization and request for
expedited approval pursuant to section 203 of the Federal Power Act.
Comment Date: 5 p.m. eastern time on May 5, 2006.
2. DeSoto County Generating Company, LLC; Progress Genco Ventures, LLC;
Southern Power Company
[Docket No. EC06-112-000]
Take notice that on April 14, 2006 DeSoto County Generating
Company, LLC, Progress Genco Ventures, LLC, and Southern Power Company
filed an application for approval of a disposition of jurisdictional
facilities pursuant to section 203 of the Federal Power Act.
Comment Date: 5 p.m. eastern time on May 5, 2006.
3. Entergy Services, Inc.
[Docket No. EL01-88-004]
Take notice that on April 10, 2006 Entergy Services, Inc. as agent
and on behalf of the Entergy Operating Companies filed amendments to
its Entergy System Agreement in compliance with the Commission's June
1, 2005 and December 19, 2005 orders.
Comment Date: 5 p.m. eastern time on May 31, 2006.
4. MidAmerican Energy Company
[Docket No. ER96-719-012]
Take notice that on April 3, 2006 MidAmerican Energy Company filed
proposed changes to its FERC Electric Tariff, Original Volume No. 11
(Sales Tariff) for sales of capacity and energy within the MidAmerican
control area, to be effective August 7, 2005, to correspond with the
effective date that the Commission required for the Sales Tariff in its
March 17, 2006 order.
Comment Date: 5 p.m. Eastern Time on May 8, 2006.
5. Cabrillo Power I LLC; Cabrillo Power II LLC; El Segundo Power, LLC;
Long Beach Generation, LLC
[Docket Nos. ER99-1115-009; ER99-1116-009; ER06-820-001; ER98-1127-009;
ER98-1796-008]
Take notice that on April 17, 2006 Cabrillo Power I LLC, Cabrillo
Power II LLC, El Segundo, LLC and Long Beach Generation, LLC filed
amendments to their market-based rate tariffs to conform with the other
market-based rate tariffs held by subsidiaries of NRG Energy, Inc that
have been approved by the Commission in recent proceedings.
Comment Date: 5 p.m. eastern time on May 8, 2006.
6. Governors of the States of Arizona, California; Colorado, Montana,
Nevada, New Mexico; Oregon, Utah, Washington and Wyoming
[Docket No. RR06-2-000]
On April 20, 2006, the Governors of the States of Arizona,
California, Colorado, Montana, Nevada, New Mexico, Oregon, Utah,
Washington and Wyoming filed a petition, pursuant to section 215 of the
Federal Power Act, to create a Regulatory Advisory Body for the Western
Interconnection. The petitioners propose to organize the Western
Interconnection Regional Advisory Body pursuant to a Policy Resolution
of the Western Governors' Association.
Comment Date: 5 p.m. eastern time on May 26, 2006.
Standard Paragraph
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date. On or
before the comment date, it is not necessary to serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6-6582 Filed 5-1-06; 8:45 am]
BILLING CODE 6717-01-P