Federal Register / Vol. 71, No. 83 / Monday, May 1, 2006 / Notices
using a maximum Libby Dam release
rate at some level up to 10 kcfs above
the approximately 25 kcfs powerhouse
capacity. As with Alternative LS2,
Alternative LV2 does not identify a
specific mechanism to achieve the 10
kcfs of additional flow and the
corresponding analysis presumes that
the full 10 kcfs of flow above
powerhouse capacity would be
provided for all sturgeon flow
augmentation events except when
limited to avoid exceeding flood stage of
1,764 feet at Bonners Ferry, Idaho. As
with LS2, it portrays the maximum
extent of impacts associated with these
flows.
• Alternative LSB: Libby Dam
operations using Standard FC with
sturgeon, bull trout, and salmon flow
augmentation. Sturgeon flow
augmentation would provide tiered
sturgeon volumes consistent with the
2006 FWS BiOp. Annual operations
would be based on a scientific approach
for testing different releases from Libby
Dam and determining the effectiveness
for achieving the habitat attributes and
meeting the conservation needs
established for sturgeon as described in
the 2006 BiOp. Specific details are being
developed in a Flow Plan
Implementation Protocol in
collaboration with the states of Montana
and Idaho, interested tribes and other
Federal agencies. Maximum peak
augmentation flows would be provided
for up to 14 days, when water supply
conditions are conducive, during the
peak of the spawning period. After the
peak augmentation flows, remaining
water in the sturgeon tier would be
provided to maximize flows for up to 21
days with a gradually receding
hydrograph. Under LSB, Libby Dam
would provide sturgeon flow
augmentation either with dam releases
up to existing powerhouse capacity, or
with dam releases to powerhouse
capacity plus up to 10 kcfs via the Libby
Dam spillway. Under Standard FC,
simulations indicate that the
appropriate reservoir and water supply
conditions to allow for releases of
sturgeon flows via the Libby Dam
spillway would occur for some period of
time in approximately 25% of years.
Actual duration and quantity of spill
operations would vary in any given year
when spill is provided based on actual
water supply.
• Alternative LVB (Preferred
Alternative): Libby Dam operations
similar to Alternative LSB, but with
VARQ FC rather than Standard FC.
Under VARQ FC, simulations indicate
that the appropriate reservoir and water
supply conditions to allow for releases
of sturgeon flows from the Libby Dam
VerDate Aug<31>2005
17:38 Apr 28, 2006
Jkt 208001
spillway for some period of time would
occur in approximately 50% of years.
Actual duration and quantity of spill
operations would vary in any given year
when spill is provided based on actual
water supply.
Alternatives LSB and LVB represent
new alternatives that were added to the
FEIS in response to the U.S. Fish and
Wildlife Service’s issuance of a new
BiOp on Libby Dam operations on Feb.
18, 2006. The 2006 BiOp recommends
the implementation of actions by the
Corps, including increased releases by
Libby Dam in accordance with the
Endangered Species Act (ESA).
Alternatives LSB and LVB would
provide flexibility to operate Libby Dam
with a range of releases to achieve
habitat attributes for sturgeon using the
2006 FWS BiOp’s performance-based
approach, with the spillway as the only
currently available mechanism for
achieving flows up to 10,000 cfs above
current powerhouse capacity.
In order to ensure that the Corps’
actions are consistent with the terms of
the 2006 USFWS BiOp, and due to
Reclamation’s ongoing consultation
under Section 106 of the National
Historic Preservation Act (NHPA),
Reclamation decided to step down from
co-lead status on the FEIS and move to
cooperating agency status under NEPA
regulations. Each agency will prepare its
own Record of Decision (ROD) for its
respective dams to implement the FEIS
for future operations. The Corps plans to
issue a ROD for Libby Dam during the
spring of 2006. As a cooperating agency,
Reclamation may choose to adopt and/
or expand upon portions of the FEIS
that apply to Reclamation’s actions at
Hungry Horse Dam. Reclamation plans
to issue a ROD on the proposed
implementation of the FEIS at Hungry
Horse dam following the Reclamation’s
completion of NHPA Section 106
consultation and NEPA analysis and
documentation. In the interim,
Reclamation will continue to implement
such operations as described in its
March 2002 voluntary Environmental
Assessment.
The Corps will accept comments on
the FEIS until May 30, 2006. Comments
on the FEIS will be addressed in the
appropriate agency’s ROD.
Copies of the FEIS are available for
public review at libraries throughout the
potentially affected portions of the
Kootenai, Flathead, Clark Fork, Pend
Oreille, and upper Columbia basins in
the U.S. and Canada. See ADDRESSES for
instructions for requesting a copy of the
FEIS.
The FEIS has been prepared in
accordance with (1) The National
Environmental Policy Act (NEPA) of
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
25573
1969, as amended (42 U.S.C. 4321 et
seq.), (2) regulations of the Council on
Environmental Quality for
implementing the procedural provisions
of NEPA (40 CFR parts 1500–1508), and
(3) Corps regulations implementing
NEPA (ER–200–2–2).
Dated: April 20, 2006.
Debra M. Lewis,
Colonel, District Commander, Seattle District,
U.S. Army Corps of Engineers.
[FR Doc. E6–6532 Filed 4–28–06; 8:45 am]
BILLING CODE 3710–92–P
DEPARTMENT OF DEFENSE
Department of the Army; Corps of
Engineers
Intent To Prepare an Environmental
Impact Statement for Pine Mountain
Dam & Lake Project, AR
Department of the Army, U.S.
Army Corps of Engineers, DoD.
ACTION: Notice of intent.
AGENCY:
SUMMARY: Pursuant to the National
Environmental Policy Act (NEPA), the
U.S. Army Corps of Engineers (USACE),
Little Rock District will prepare an
Environmental Impact Statement (EIS)
for the proposed Pine Mountain Dam
and Lake Project, AR.
The purpose of the EIS will be to
present alternatives and assess the
impacts to the human environment
associated with providing flood control,
recreation and water supply for the
surrounding areas in Arkansas and
Oklahoma from the proposed project.
The study area includes the entire Lee
Creek watershed together with the lower
Lee Creek reservoir near Van Buren, AR.
The proposed project could affect
agriculture, recreation, flood control,
water supply and natural resources
within the study area.
The EIS will evaluate potential
impacts (positive and negative) to the
natural, physical, and human
environment as a result of implementing
any of the proposed project alternatives
that may be developed during the EIS
process.
Questions or comments
concerning the proposed action should
be addressed to: Mr. Ron Carman,
USACE, Little Rock District, Planning
and Environmental Office, PO Box 867,
Little Rock, AR 72203–0867, e-mail:
ron.r.carman@usace.army.mil.
ADDRESSES:
Mr.
Ron Carman, (501) 324–5601.
SUPPLEMENTARY INFORMATION:
1. Study History: The Pine Mountain
Dam project was authorized for
FOR FURTHER INFORMATION CONTACT:
E:\FR\FM\01MYN1.SGM
01MYN1
cchase on PROD1PC60 with NOTICES
25574
Federal Register / Vol. 71, No. 83 / Monday, May 1, 2006 / Notices
construction by Congress in 1965.
Additional studies and a preliminary
draft EIS were prepared in the 1970s. In
1980, prior to public review of the EIS,
the local sponsor decided not to
continue sponsoring the project. In
2000, the River Valley Regional Water
District identified themselves as a
willing sponsor and requested that the
Corps of Engineers reevaluate the
project. The proposed Pine Mountain
Dam Project is being undertaken by
USACE, Little Rock District under the
direction of the U.S. Congress. A study
will be conducted consisting of major
hydraulics and hydrologic
investigations, economic analyses,
alternative development and related
analyses in conjunction with the EIS.
2. Comments/Scoping Meeting:
Interested parties are requested to
express their views concerning the
proposed activity. The public is
encouraged to provide written
comments in addition to or in lieu of
oral comments at scoping meetings. To
be most helpful, scoping comments
should clearly describe specific
environmental topics or issues, which
the commentator believes the document
should address. Oral and written
comments receive equal consideration.
Scoping meetings will be held with
government agencies and the public in
the spring/summer of 2006 in Crawford
County, AR. The location, time, and
date will be published at least 14 days
prior to each scoping meeting.
Comments received as a result of this
notice and the news releases will be
used to assist the District in identifying
potential impacts to the quality of the
human or natural environment. Affected
local, state, or Federal agencies, affected
Indian Tribes, and other interested
private organizations and parties may
participate in the scoping process by
forwarding written comments to (see
ADDRESSES). Interested parties may also
request to be included on the mailing
list for public distribution of meeting
announcements and documents.
4. Alternatives/Issues: The EIS will
evaluate the effects of the Pine
Mountain Dam and Lake, other practical
alternatives, and other identified
concerns. Anticipated significant issues
to be addressed in the EIS include
impacts on: (1) Flooding, (2) water
supply, (3) recreation and recreation
facilities, (4) stream hydraulics, (5) fish
and wildlife resources and habitats, and
(6) other impacts identified by the
Public, agencies or USACE studies.
5. Availability of the Draft EIS: The
Draft EIS is anticipated to be available
for public review in early 2009 subject
to the receipt of federal funding.
VerDate Aug<31>2005
17:38 Apr 28, 2006
Jkt 208001
6. Authority: Pine Mountain Dam and
Lake was authorized for construction by
the Flood Control Act of 1965 (Title II,
Pub. L. 89–298) substantially in
accordance with the recommendations
of the Chief of Engineers in House
Document No. 270, 89th Congress.
Wally Z. Walters,
Colonel, Corps of Engineers, District
Commander.
[FR Doc. 06–4061 Filed 4–28–06; 8:45 am]
BILLING CODE 3710–57–M
DEPARTMENT OF EDUCATION
Notice of Proposed Information
Collection Requests
AGENCY: Department of Education.
SUMMARY: The IC Clearance Official,
Regulatory Information Management
Services, Office of Management, invites
comments on the proposed information
collection requests as required by the
Paperwork Reduction Act of 1995.
DATES: Interested persons are invited to
submit comments on or before June 30,
2006.
SUPPLEMENTARY INFORMATION: Section
3506 of the Paperwork Reduction Act of
1995 (44 U.S.C. Chapter 35) requires
that the Office of Management and
Budget (OMB) provide interested
Federal agencies and the public an early
opportunity to comment on information
collection requests. OMB may amend or
waive the requirement for public
consultation to the extent that public
participation in the approval process
would defeat the purpose of the
information collection, violate State or
Federal law, or substantially interfere
with any agency’s ability to perform its
statutory obligations. The IC Clearance
Official, Regulatory Information
Management Services, Office of
Management, publishes that notice
containing proposed information
collection requests prior to submission
of these requests to OMB. Each
proposed information collection,
grouped by office, contains the
following: (1) Type of review requested,
e.g. new, revision, extension, existing or
reinstatement; (2) Title; (3) Summary of
the collection; (4) Description of the
need for, and proposed use of, the
information; (5) Respondents and
frequent of collection; and (6) Reporting
and/or Recordkeeping burden. OMB
invites public comment.
The Department of Education is
especially interested in public comment
addressing the following issues: (1) Is
this collection necessary to the proper
functions of the Department; (2) will
this information be processed and used
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
in a timely manner; (3) is the estimate
of burden accurate; (4) how might the
Department enhance the quality, utility,
and clarity of the information to be
collected; and (5) how might the
Department minimize the burden of this
collection on the respondents, including
through the use of information
technology.
Dated: April 24, 2006.
Angela C. Arrington,
IC Clearance Official, Regulatory Information
Management Services, Office of Management.
Office of Postsecondary Education
Type of Review: Reinstatement.
Title: Teacher Quality Enhancement
Grants Program (TQE) Scholarship and
Teaching Verification Forms on
Scholarship Recipients.
Frequency: On occasion; semiannually; annually.
Affected Public: Individuals or
household; not-for-profit institutions;
State, local, or tribal gov’t, SEAs or
LEAs.
Reporting and Recordkeeping Hour
Burden:
Responses: 2,850.
Burden Hours: 3,090.
Abstract: Students receiving
scholarships under section 204(3) of the
Higher Education Act incur a service
obligation to teach in a high-need school
in a high-need LEA. This information
collection consists of a contract to be
executed when funds are awarded and
a separate teaching verification form to
be used by students to document their
compliance with the contract’s
conditions.
Requests for copies of the proposed
information collection request may be
accessed from https://edicsweb.ed.gov,
by selecting the ‘‘Browse Pending
Collections’’ link and by clicking on
link number 3069. When you access the
information collection, click on
‘‘Download Attachments’’ to view.
Written requests for information should
be addressed to U.S. Department of
Education, 400 Maryland Avenue, SW.,
Potomac Center, 9th Floor, Washington,
DC 20202–4700. Requests may also be
electronically mailed to IC
DocketMgr@ed.gov or faxed to 202–245–
6623. Please specify the complete title
of the information collection when
making your request.
Comments regarding burden and/or
the collection activity requirements
should be electronically mailed to IC
DocketMgr@ed.gov. Individuals who use
a telecommunications device for the
deaf (TDD) may call the Federal
Information Relay Service (FIRS) at 1–
800–877–8339.
[FR Doc. 06–4075 Filed 4–28–06; 8:45am]
BILLING CODE 4000–01–M
E:\FR\FM\01MYN1.SGM
01MYN1
Agencies
[Federal Register Volume 71, Number 83 (Monday, May 1, 2006)]
[Notices]
[Pages 25573-25574]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 06-4061]
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Department of the Army; Corps of Engineers
Intent To Prepare an Environmental Impact Statement for Pine
Mountain Dam & Lake Project, AR
AGENCY: Department of the Army, U.S. Army Corps of Engineers, DoD.
ACTION: Notice of intent.
-----------------------------------------------------------------------
SUMMARY: Pursuant to the National Environmental Policy Act (NEPA), the
U.S. Army Corps of Engineers (USACE), Little Rock District will prepare
an Environmental Impact Statement (EIS) for the proposed Pine Mountain
Dam and Lake Project, AR.
The purpose of the EIS will be to present alternatives and assess
the impacts to the human environment associated with providing flood
control, recreation and water supply for the surrounding areas in
Arkansas and Oklahoma from the proposed project. The study area
includes the entire Lee Creek watershed together with the lower Lee
Creek reservoir near Van Buren, AR. The proposed project could affect
agriculture, recreation, flood control, water supply and natural
resources within the study area.
The EIS will evaluate potential impacts (positive and negative) to
the natural, physical, and human environment as a result of
implementing any of the proposed project alternatives that may be
developed during the EIS process.
ADDRESSES: Questions or comments concerning the proposed action should
be addressed to: Mr. Ron Carman, USACE, Little Rock District, Planning
and Environmental Office, PO Box 867, Little Rock, AR 72203-0867, e-
mail: ron.r.carman@usace.army.mil.
FOR FURTHER INFORMATION CONTACT: Mr. Ron Carman, (501) 324-5601.
SUPPLEMENTARY INFORMATION:
1. Study History: The Pine Mountain Dam project was authorized for
[[Page 25574]]
construction by Congress in 1965. Additional studies and a preliminary
draft EIS were prepared in the 1970s. In 1980, prior to public review
of the EIS, the local sponsor decided not to continue sponsoring the
project. In 2000, the River Valley Regional Water District identified
themselves as a willing sponsor and requested that the Corps of
Engineers reevaluate the project. The proposed Pine Mountain Dam
Project is being undertaken by USACE, Little Rock District under the
direction of the U.S. Congress. A study will be conducted consisting of
major hydraulics and hydrologic investigations, economic analyses,
alternative development and related analyses in conjunction with the
EIS.
2. Comments/Scoping Meeting: Interested parties are requested to
express their views concerning the proposed activity. The public is
encouraged to provide written comments in addition to or in lieu of
oral comments at scoping meetings. To be most helpful, scoping comments
should clearly describe specific environmental topics or issues, which
the commentator believes the document should address. Oral and written
comments receive equal consideration.
Scoping meetings will be held with government agencies and the
public in the spring/summer of 2006 in Crawford County, AR. The
location, time, and date will be published at least 14 days prior to
each scoping meeting. Comments received as a result of this notice and
the news releases will be used to assist the District in identifying
potential impacts to the quality of the human or natural environment.
Affected local, state, or Federal agencies, affected Indian Tribes, and
other interested private organizations and parties may participate in
the scoping process by forwarding written comments to (see ADDRESSES).
Interested parties may also request to be included on the mailing list
for public distribution of meeting announcements and documents.
4. Alternatives/Issues: The EIS will evaluate the effects of the
Pine Mountain Dam and Lake, other practical alternatives, and other
identified concerns. Anticipated significant issues to be addressed in
the EIS include impacts on: (1) Flooding, (2) water supply, (3)
recreation and recreation facilities, (4) stream hydraulics, (5) fish
and wildlife resources and habitats, and (6) other impacts identified
by the Public, agencies or USACE studies.
5. Availability of the Draft EIS: The Draft EIS is anticipated to
be available for public review in early 2009 subject to the receipt of
federal funding.
6. Authority: Pine Mountain Dam and Lake was authorized for
construction by the Flood Control Act of 1965 (Title II, Pub. L. 89-
298) substantially in accordance with the recommendations of the Chief
of Engineers in House Document No. 270, 89th Congress.
Wally Z. Walters,
Colonel, Corps of Engineers, District Commander.