Green Point Hydro, LLC; Hugo Hydro, LLC; Meyers Hydro, LLC; Heflin Hydro, LLC; Ohio River L&D 52 Hydro, LLC; MSR 5 Hydro, LLC; Easton Diversion Dam Hydro, LLC; Notice of Surrender of Preliminary Permits, 24667 [E6-6238]

Download as PDF 24667 Federal Register / Vol. 71, No. 80 / Wednesday, April 26, 2006 / Notices Copies of the full text of the Director’s Order are available from the Commission’s Public Reference Room, 888 First Street, NE., Washington, DC 20426. The Order may also be viewed on the Commission’s Web site at https:// www.ferc.gov, using the eLibrary link. Enter the docket number excluding the last three digits in the docket number filed to access the document. Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Magalie R. Salas, Secretary. [FR Doc. E6–6236 Filed 4–25–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12198–001, Project No. 12213– 001, Project No. 12274–001, Project No. 12297–001, Project No. 12309–001, Project No. 12369–001, Project No. 12535–001] Green Point Hydro, LLC; Hugo Hydro, LLC; Meyers Hydro, LLC; Heflin Hydro, LLC; Ohio River L&D 52 Hydro, LLC; MSR 5 Hydro, LLC; Easton Diversion Dam Hydro, LLC; Notice of Surrender of Preliminary Permits April 19, 2006. Take notice that the permittees for the subject projects have requested voluntary surrender of their preliminary permits. Project No. 12198–001 12213–001 12274–001 12297–001 12309–001 12369–001 12535–001 ................... ................... ................... ................... ................... ................... ................... Project name Stream State Expiration date Green Point Upper Dam ................................ Hugo Dam Hydroelectric ................................ John T. Meyers L&D ...................................... Heflin L&D ...................................................... Ohio River L&D #52 ....................................... Mississippi River L&D #5 ............................... Easton Diversion Dam ................................... Green Point Creek ......................................... Kiamichi River ................................................ Ohio River ...................................................... Tombigbee River ............................................ Ohio River ...................................................... Mississippi River ............................................ Yakima River .................................................. OR .... OK .... IN ...... AL ..... KY ..... WI ..... WA .... 11–30–2007 10–31–2006 11–30–2007 11–30–2007 11–30–2007 11–30–2007 2–29–2008 The permits shall remain in effect through the thirtieth day after issuance of this notice unless that day is Saturday, Sunday, or a holiday as described in 18 CFR 385.2007, in which case each permit shall remain in effect through the first business day following that day. New applications involving these project sites, to the extent provided for under 18 CFR part 4, may be filed on the next business day. Magalie R. Salas, Secretary. [FR Doc. E6–6238 Filed 4–25–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP06–124–000] Gulf South Pipeline Company; Notice of Request Under Blanket Authorization wwhite on PROD1PC61 with NOTICES April 19, 2006. Take notice that on April 7, 2006, Gulf South Pipeline Company, LP (Gulf South), 20 East Greenway, Houston, Texas 77046, filed in Docket No. CP06– 124–000, a request pursuant to sections 157.205 and 157. 208 of the Commission’s regulations under the Natural Gas Act (18 CFR 157.205 and VerDate Aug<31>2005 16:58 Apr 25, 2006 Jkt 208001 157.208 (2005)) for authorization to reduce the maximum allowable operating pressure (MAOP) of its 8-inch Jackson to Hattiesburg Lateral located in Rankin, Simpson, Covington, Forrest, and Jones Counties, Mississippi, under Gulf South’s blanket certificate issued in Docket No CP82–430–000 pursuant to section 7(c) of the Natural Gas Act, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the Web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@gerc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Gulf South proposes to reduce the MAOP of Index 387, between milepost 0.00 and milepost 80, from 419 psig to 165 psig. Gulf South confirms that recent operating history of this Lateral shows that customers consistently have requested and used substantially lower volumes of gas. Gulf South states that the current firm transportation obligations on Index 387 are approximately 12.0 MMcf per day, and that the proposed reduction of the MAOP will not affect their ability to meet its contractual firm obligations, since the demand for natural gas PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 deliveries from the Lateral has been minimal. Also, Gulf South neither foresees a material increase in demand nor any market requirement for Gulf South to maintain a higher MAOP on this Lateral. Furthermore, Gulf South explains that over the years there has been a significant encroachment of the pipeline in this area due to an increase in population density. As a result, Gulf South believes that it is acting in the public interest in lowering the MAOP of the line due to this encroachment. Also, Gulf South states that their proposal to lower the MAOP of Index 387 will permit them to continue to operate the Lateral well within safe limits given the age of the line and the increase in population density without adversely affecting the reliability of the line. Finally, Gulf South states that no construction activities will be required to facilitate the MAOP reduction. Any person or the Commission’s Staff may, within 45 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and, pursuant to section 157.205 of the Commission’s Regulations under the Natural Gas Act (NGA) (18 CFR 157.205) a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be E:\FR\FM\26APN1.SGM 26APN1

Agencies

[Federal Register Volume 71, Number 80 (Wednesday, April 26, 2006)]
[Notices]
[Page 24667]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-6238]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12198-001, Project No. 12213-001, Project No. 12274-001, 
Project No. 12297-001, Project No. 12309-001, Project No. 12369-001, 
Project No. 12535-001]


Green Point Hydro, LLC; Hugo Hydro, LLC; Meyers Hydro, LLC; 
Heflin Hydro, LLC; Ohio River L&D 52 Hydro, LLC; MSR 5 Hydro, LLC; 
Easton Diversion Dam Hydro, LLC; Notice of Surrender of Preliminary 
Permits

April 19, 2006.
    Take notice that the permittees for the subject projects have 
requested voluntary surrender of their preliminary permits.

----------------------------------------------------------------------------------------------------------------
                                                                                                    Expiration
           Project No.                  Project name                 Stream             State          date
----------------------------------------------------------------------------------------------------------------
12198-001.......................  Green Point Upper Dam...  Green Point Creek......  OR.........      11-30-2007
12213-001.......................  Hugo Dam Hydroelectric..  Kiamichi River.........  OK.........      10-31-2006
12274-001.......................  John T. Meyers L&D......  Ohio River.............  IN.........      11-30-2007
12297-001.......................  Heflin L&D..............  Tombigbee River........  AL.........      11-30-2007
12309-001.......................  Ohio River L&D 52.
12369-001.......................  Mississippi River L&D     Mississippi River......  WI.........      11-30-2007
                                   5.
12535-001.......................  Easton Diversion Dam....  Yakima River...........  WA.........       2-29-2008
----------------------------------------------------------------------------------------------------------------

    The permits shall remain in effect through the thirtieth day after 
issuance of this notice unless that day is Saturday, Sunday, or a 
holiday as described in 18 CFR 385.2007, in which case each permit 
shall remain in effect through the first business day following that 
day. New applications involving these project sites, to the extent 
provided for under 18 CFR part 4, may be filed on the next business 
day.

Magalie R. Salas,
Secretary.
[FR Doc. E6-6238 Filed 4-25-06; 8:45 am]
BILLING CODE 6717-01-P