Green Point Hydro, LLC; Hugo Hydro, LLC; Meyers Hydro, LLC; Heflin Hydro, LLC; Ohio River L&D 52 Hydro, LLC; MSR 5 Hydro, LLC; Easton Diversion Dam Hydro, LLC; Notice of Surrender of Preliminary Permits, 24667 [E6-6238]
Download as PDF
24667
Federal Register / Vol. 71, No. 80 / Wednesday, April 26, 2006 / Notices
Copies of the full text of the Director’s
Order are available from the
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at https://
www.ferc.gov, using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E6–6236 Filed 4–25–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12198–001, Project No. 12213–
001, Project No. 12274–001, Project No.
12297–001, Project No. 12309–001, Project
No. 12369–001, Project No. 12535–001]
Green Point Hydro, LLC; Hugo Hydro,
LLC; Meyers Hydro, LLC; Heflin Hydro,
LLC; Ohio River L&D 52 Hydro, LLC;
MSR 5 Hydro, LLC; Easton Diversion
Dam Hydro, LLC; Notice of Surrender
of Preliminary Permits
April 19, 2006.
Take notice that the permittees for the
subject projects have requested
voluntary surrender of their preliminary
permits.
Project No.
12198–001
12213–001
12274–001
12297–001
12309–001
12369–001
12535–001
...................
...................
...................
...................
...................
...................
...................
Project name
Stream
State
Expiration date
Green Point Upper Dam ................................
Hugo Dam Hydroelectric ................................
John T. Meyers L&D ......................................
Heflin L&D ......................................................
Ohio River L&D #52 .......................................
Mississippi River L&D #5 ...............................
Easton Diversion Dam ...................................
Green Point Creek .........................................
Kiamichi River ................................................
Ohio River ......................................................
Tombigbee River ............................................
Ohio River ......................................................
Mississippi River ............................................
Yakima River ..................................................
OR ....
OK ....
IN ......
AL .....
KY .....
WI .....
WA ....
11–30–2007
10–31–2006
11–30–2007
11–30–2007
11–30–2007
11–30–2007
2–29–2008
The permits shall remain in effect
through the thirtieth day after issuance
of this notice unless that day is
Saturday, Sunday, or a holiday as
described in 18 CFR 385.2007, in which
case each permit shall remain in effect
through the first business day following
that day. New applications involving
these project sites, to the extent
provided for under 18 CFR part 4, may
be filed on the next business day.
Magalie R. Salas,
Secretary.
[FR Doc. E6–6238 Filed 4–25–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP06–124–000]
Gulf South Pipeline Company; Notice
of Request Under Blanket
Authorization
wwhite on PROD1PC61 with NOTICES
April 19, 2006.
Take notice that on April 7, 2006,
Gulf South Pipeline Company, LP (Gulf
South), 20 East Greenway, Houston,
Texas 77046, filed in Docket No. CP06–
124–000, a request pursuant to sections
157.205 and 157. 208 of the
Commission’s regulations under the
Natural Gas Act (18 CFR 157.205 and
VerDate Aug<31>2005
16:58 Apr 25, 2006
Jkt 208001
157.208 (2005)) for authorization to
reduce the maximum allowable
operating pressure (MAOP) of its 8-inch
Jackson to Hattiesburg Lateral located in
Rankin, Simpson, Covington, Forrest,
and Jones Counties, Mississippi, under
Gulf South’s blanket certificate issued in
Docket No CP82–430–000 pursuant to
section 7(c) of the Natural Gas Act, all
as more fully set forth in the application
which is on file with the Commission
and open to public inspection. The
filing may also be viewed on the Web
at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@gerc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Gulf South proposes to reduce the
MAOP of Index 387, between milepost
0.00 and milepost 80, from 419 psig to
165 psig. Gulf South confirms that
recent operating history of this Lateral
shows that customers consistently have
requested and used substantially lower
volumes of gas. Gulf South states that
the current firm transportation
obligations on Index 387 are
approximately 12.0 MMcf per day, and
that the proposed reduction of the
MAOP will not affect their ability to
meet its contractual firm obligations,
since the demand for natural gas
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
deliveries from the Lateral has been
minimal. Also, Gulf South neither
foresees a material increase in demand
nor any market requirement for Gulf
South to maintain a higher MAOP on
this Lateral. Furthermore, Gulf South
explains that over the years there has
been a significant encroachment of the
pipeline in this area due to an increase
in population density. As a result, Gulf
South believes that it is acting in the
public interest in lowering the MAOP of
the line due to this encroachment. Also,
Gulf South states that their proposal to
lower the MAOP of Index 387 will
permit them to continue to operate the
Lateral well within safe limits given the
age of the line and the increase in
population density without adversely
affecting the reliability of the line.
Finally, Gulf South states that no
construction activities will be required
to facilitate the MAOP reduction.
Any person or the Commission’s Staff
may, within 45 days after the issuance
of the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and, pursuant to section
157.205 of the Commission’s
Regulations under the Natural Gas Act
(NGA) (18 CFR 157.205) a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
E:\FR\FM\26APN1.SGM
26APN1
Agencies
[Federal Register Volume 71, Number 80 (Wednesday, April 26, 2006)]
[Notices]
[Page 24667]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-6238]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12198-001, Project No. 12213-001, Project No. 12274-001,
Project No. 12297-001, Project No. 12309-001, Project No. 12369-001,
Project No. 12535-001]
Green Point Hydro, LLC; Hugo Hydro, LLC; Meyers Hydro, LLC;
Heflin Hydro, LLC; Ohio River L&D 52 Hydro, LLC; MSR 5 Hydro, LLC;
Easton Diversion Dam Hydro, LLC; Notice of Surrender of Preliminary
Permits
April 19, 2006.
Take notice that the permittees for the subject projects have
requested voluntary surrender of their preliminary permits.
----------------------------------------------------------------------------------------------------------------
Expiration
Project No. Project name Stream State date
----------------------------------------------------------------------------------------------------------------
12198-001....................... Green Point Upper Dam... Green Point Creek...... OR......... 11-30-2007
12213-001....................... Hugo Dam Hydroelectric.. Kiamichi River......... OK......... 10-31-2006
12274-001....................... John T. Meyers L&D...... Ohio River............. IN......... 11-30-2007
12297-001....................... Heflin L&D.............. Tombigbee River........ AL......... 11-30-2007
12309-001....................... Ohio River L&D 52.
12369-001....................... Mississippi River L&D Mississippi River...... WI......... 11-30-2007
5.
12535-001....................... Easton Diversion Dam.... Yakima River........... WA......... 2-29-2008
----------------------------------------------------------------------------------------------------------------
The permits shall remain in effect through the thirtieth day after
issuance of this notice unless that day is Saturday, Sunday, or a
holiday as described in 18 CFR 385.2007, in which case each permit
shall remain in effect through the first business day following that
day. New applications involving these project sites, to the extent
provided for under 18 CFR part 4, may be filed on the next business
day.
Magalie R. Salas,
Secretary.
[FR Doc. E6-6238 Filed 4-25-06; 8:45 am]