Independent Energy Producers Association, et al., 24668-24669 [E6-6233]
Download as PDF
24668
Federal Register / Vol. 71, No. 80 / Wednesday, April 26, 2006 / Notices
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to Section 7 of
the NGA.
Any questions regarding this
application should be directed to J. Kyle
Stephens, Director of Certificates, Gulf
South Pipeline Company, LP, 20 East
Greenway Plaza, Houston, Texas 77046,
or call (713) 544–7309 or fax (713) 544–
3540 or by e-mail
kyle.stephens@gulfsouthpl.com.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the Internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
Magalie R. Salas,
Secretary.
[FR Doc. E6–6239 Filed 4–25–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. eastern time
April 28, 2006.
Federal Energy Regulatory
Commission
Magalie R. Salas,
Secretary.
[FR Doc. E6–6235 Filed 4–25–06; 8:45 am]
[Docket No. PR06–15–000]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
wwhite on PROD1PC61 with NOTICES
April 19, 2006.
Take notice that on March 31, 2006,
Overland Trail Transmission, LLC
(OTTCO) filed a petition for rate
approval for NGPA section 311
maximum transportation rates, pursuant
to section 284.123(b)(2) of the
Commission’s regulations. OTTCO
request an effective date for its new
section 311 as of April 1, 2006.
Any person desiring to participate in
this rate proceeding must file a motion
to intervene or to protest this filing must
file in accordance with Rules 211 and
214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214). Protests will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Any person wishing to become a party
must file a notice of intervention or
motion to intervene, as appropriate.
Such notices, motions, or protests must
be filed on or before the date as
indicated below. Anyone filing an
intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
16:58 Apr 25, 2006
Jkt 208001
Magalie R. Salas,
Secretary.
[FR Doc. E6–6237 Filed 4–25–06; 8:45 am]
BILLING CODE 6717–01–P
Overland Trail Transmission, LLC;
Notice of Petition for Rate Approval
VerDate Aug<31>2005
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. eastern time on
May 3, 2006.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. ID–4852–000]
Harry J. Pearce; Notice of Filing
[Docket Nos. EL05–146–000, et al.]
April 19, 2006.
Take notice that on April 12, 2006,
Harry J. Pearce filed an application
requesting authority to hold interlocking
positions, pursuant to section 305(a) of
the Federal Power Act and part 45 of the
Commission’s Regulations, as a director
of MDU Resources Group, Inc., Nortel
Networks Corporation and Nortel
Networks Limited.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
Independent Energy Producers
Association, et al.; Electric Rate and
Corporate Filings
April 14, 2006.
The following filings have been made
with the Commission. The filings are
listed in ascending order within each
docket classification.
1. Independent Energy Producers
Association, Complainant v. California
Independent System Operator
Corporation, Respondent
[Docket No. EL05–146–000]
Take notice that on March 31, 2006,
the California Independent System
Operator Corporation filed an agreement
to settle a pending complaint with the
Settling Parties.
Comment Date: 5 p.m. eastern time on
April 20, 2006.
E:\FR\FM\26APN1.SGM
26APN1
Federal Register / Vol. 71, No. 80 / Wednesday, April 26, 2006 / Notices
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
[Docket Nos. ER94–1188–040, ER98–4540–
009, ER99–1623–009, ER98–1279–011, EL05– https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
99–004]
review in the Commission’s Public
Take notice that on April 13, 2006,
Reference Room in Washington, DC.
LG&E Energy Marketing Inc., Louisville
There is an ‘‘eSubscription’’ link on the
Gas & Electric Company, Kentucky
Web site that enables subscribers to
Utilities Company and Western
receive.
Kentucky Energy Corporation
(collectively, LG&E Parties) submit a
Magalie R. Salas,
supplemental refund report in
Secretary.
compliance with the Commission’s
[FR Doc. E6–6233 Filed 4–25–06; 8:45 am]
February 15, 2006 letter order.
BILLING CODE 6717–01–P
Comment Date: 5 p.m. eastern time on
April 21, 2006.
DEPARTMENT OF ENERGY
3. Midwest Independent Transmission
System Operator, Inc.
Federal Energy Regulatory
[Docket No. ER04–691–070]
Commission
Take notice that on April 3, 2006
Combined Notice of Filings # 1
Midwest Independent Transmission
System Operator, Inc., filed proposed
April 19, 2006.
revisions to its Open Access
Take notice that the Commission
Transmission and Energy Markets
received the following electric securities
Tariff, Third Revised Volume No. 1, in
filings.
compliance with the Commission’s 3/3/
Docket Numbers: ES06–32–000.
06 Order.
Applicants: Cambridge Electric Light
Comment Date: 5 p.m. eastern time on
Company.
April 24, 2006.
Description: Cambridge Electric Light
4. Auburndale Power Partners, L.P.
Co. submits its section 204 application
for authority to issue short-term debt
[Docket No. ER06–735–000]
securities from time to time, in amounts
Take notice that on March 29, 2006
Auburndale Power Partners, L.P. filed a such that the aggregate principal
amount of securities outstanding at one
withdrawal of its Petition for Order
time, shall not exceed $80,000,000.
Accepting Market-Based Rate Schedule
Filed Date: 4/5/2006.
filed March 17, 2006.
Accession Number: 20060412–0109.
Comment Date: 5 p.m. eastern time on
Comment Date: 5 p.m. eastern time on
April 21, 2006.
Wednesday, April 26, 2006.
Standard Paragraph
Docket Numbers: ES06–33–000.
Applicants: Boston Edison Company.
Any person desiring to intervene or to
Description: Boston Edison Co.
protest this filing must file in
submits its section 204 application for
accordance with Rules 211 and 214 of
authority to issue short-term debt
the Commission’s Rules of Practice and
securities for time to time in amounts
Procedure (18 CFR 385.211, 385.214).
such that the aggregate principal
Protests will be considered by the
amount of short-term securities
Commission in determining the
outstanding at any one time, shall not
appropriate action to be taken, but will
exceed $450,000,000.
not serve to make protestants parties to
Filed Date: 4/5/2006.
the proceeding. Any person wishing to
Accession Number: 20060412–0072.
become a party must file a notice of
Comment Date: 5 p.m. eastern time on
intervention or motion to intervene, as
Wednesday, April 26, 2006.
appropriate. Such notices, motions, or
protests must be filed on or before the
Docket Numbers: ES06–34–000.
comment date. On or before the
Applicants: Commonwealth Electric
comment date, it is not necessary to
Company.
Description: Commonwealth Electric
serve motions to intervene or protests
Co. submits its section 204 application
on persons other than the Applicant.
The Commission encourages
for authority to issue short-term debt
electronic submission of protests and
securities from time to time, in amount
interventions in lieu of paper using the
not to exceed $125,000,000.
‘‘eFiling’’ link at https://www.ferc.gov.
Filed Date: 4/5/2006.
Persons unable to file electronically
Accession Number: 20060412–0073.
wwhite on PROD1PC61 with NOTICES
2. LG&E Energy Marketing Inc.,
Louisville Gas & Electric Company,
Kentucky Utilities Company, Western
Kentucky Energy Corporation, LG&E
Energy Marketing Inc., et al.
VerDate Aug<31>2005
16:58 Apr 25, 2006
Jkt 208001
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
24669
Comment Date: 5 p.m. eastern time on
Wednesday, April 26, 2006.
Docket Numbers: ES06–35–000;
EC06–110–000.
Applicants: Entergy Services Inc.
Description: Entergy Services Inc., on
behalf of its associate companies:
Entergy Nuclear Generation Co. et al.
submits a joint application pursuant to
sections 204(a) and 203(a) of the FPA.
Filed Date: 4/6/2006.
Accession Number: 20060417–0198.
Comment Date: 5 p.m. eastern time on
Thursday, April 27, 2006.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St. NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
E:\FR\FM\26APN1.SGM
26APN1
Agencies
[Federal Register Volume 71, Number 80 (Wednesday, April 26, 2006)]
[Notices]
[Pages 24668-24669]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-6233]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. EL05-146-000, et al.]
Independent Energy Producers Association, et al.; Electric Rate
and Corporate Filings
April 14, 2006.
The following filings have been made with the Commission. The
filings are listed in ascending order within each docket
classification.
1. Independent Energy Producers Association, Complainant v. California
Independent System Operator Corporation, Respondent
[Docket No. EL05-146-000]
Take notice that on March 31, 2006, the California Independent
System Operator Corporation filed an agreement to settle a pending
complaint with the Settling Parties.
Comment Date: 5 p.m. eastern time on April 20, 2006.
[[Page 24669]]
2. LG&E Energy Marketing Inc., Louisville Gas & Electric Company,
Kentucky Utilities Company, Western Kentucky Energy Corporation, LG&E
Energy Marketing Inc., et al.
[Docket Nos. ER94-1188-040, ER98-4540-009, ER99-1623-009, ER98-1279-
011, EL05-99-004]
Take notice that on April 13, 2006, LG&E Energy Marketing Inc.,
Louisville Gas & Electric Company, Kentucky Utilities Company and
Western Kentucky Energy Corporation (collectively, LG&E Parties) submit
a supplemental refund report in compliance with the Commission's
February 15, 2006 letter order.
Comment Date: 5 p.m. eastern time on April 21, 2006.
3. Midwest Independent Transmission System Operator, Inc.
[Docket No. ER04-691-070]
Take notice that on April 3, 2006 Midwest Independent Transmission
System Operator, Inc., filed proposed revisions to its Open Access
Transmission and Energy Markets Tariff, Third Revised Volume No. 1, in
compliance with the Commission's 3/3/06 Order.
Comment Date: 5 p.m. eastern time on April 24, 2006.
4. Auburndale Power Partners, L.P.
[Docket No. ER06-735-000]
Take notice that on March 29, 2006 Auburndale Power Partners, L.P.
filed a withdrawal of its Petition for Order Accepting Market-Based
Rate Schedule filed March 17, 2006.
Comment Date: 5 p.m. eastern time on April 21, 2006.
Standard Paragraph
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date. On or
before the comment date, it is not necessary to serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive.
Magalie R. Salas,
Secretary.
[FR Doc. E6-6233 Filed 4-25-06; 8:45 am]
BILLING CODE 6717-01-P