Federal Acquisition Regulation; FAR Case 2004-031, Fast Payment Procedures, 20308-20309 [06-3686]
Download as PDF
20308
Federal Register / Vol. 71, No. 75 / Wednesday, April 19, 2006 / Rules and Regulations
BUY AMERICAN ACT—CONSTRUCTION
MATERIALS UNDER TRADE AGREEMENTS
‘‘(APR 2006)’’
*
*
*
*
(c) * * *
(3) * * * List in paragraph (b)(3) of
the clause all foreign construction
material excepted from the requirements
of the Buy American Act, unless the
excepted foreign construction material
is from a designated country other than
Mexico.
*
*
*
*
*
PART 52—SOLICITATION PROVISIONS
AND CONTRACT CLAUSES
Alternate I ‘‘(APR 2006)’’. * * *
Australian, Chilean, or Moroccan
construction material means a construction
material that—
(1) Is wholly the growth, product, or
manufacture of Australia, Chile, or Morocco;
or
(2) In the case of a construction material
that consists in whole or in part of materials
from another country, has been substantially
transformed in Australia, Chile, or Morocco
into a new and different construction
material distinct from the materials from
which it was transformed.
the current practice. Instead, they will
be paid using either fast payment or
normal payment procedures. In
addition, the revision deletes the
requirement for marking invoices ‘‘No
Receiving Report Prepared.’’
DATES: Effective Date: May 19, 2006.
FOR FURTHER INFORMATION CONTACT: For
clarification of content, contact Mr.
Jeremy Olson, Procurement Analyst, at
(202) 501–3221. Please cite FAC 2005–
09, FAR case 2004–031. For information
pertaining to status or publication
schedules, contact the FAR Secretariat
at (202) 501–4755.
SUPPLEMENTARY INFORMATION:
*
A. Background
6. Amend section 25.1102 by revising
the second sentence of paragraph (c)(3)
to read as follows:
I
25.1102
*
Acquisition of construction.
*
52.212–5
7. Amend section 52.212–5 by
revising the date of the clause to read
‘‘(APR 2006)’’; and by removing from
paragraphs (b)(24)(i) and (b)(25) ‘‘(JAN
2006)’’ and adding ‘‘(APR 2006)’’ in its
place.
[Amended]
8. Amend section 52.225–3 by
revising the date of the clause to read
‘‘(APR 2006)’’; and in paragraph (c) by
adding to the first sentence ‘‘(except the
Morocco FTA)’’ after ‘‘FTAs’’.
I
52.225–5
[Amended]
9. Amend section 52.225–5 by
revising the date of the clause to read
‘‘(APR 2006)’’; and in paragraph (a), in
the definition ‘‘Designated country’’ by
adding to paragraph (2) ‘‘Morocco,’’
after ‘‘Mexico,’’.
I
52.225–11
[Amended]
10. Amend section 52.225–11 by—
a. Revising the date of the clause;
b. Adding to paragraph (a), in the
definition ‘‘Designated country’’ in
paragraph (2) ‘‘Morocco,’’ after
‘‘Mexico,’’;
I c. Removing from paragraph (b)(2)
‘‘domestic,’’ and adding ‘‘domestic or’’
in its place.
I d. Amending Alternate I by—
I 1. Revising the date of Alternate I;
I 2. Removing from the introductory
paragraph ‘‘Australian or Chilean’’ and
adding ‘‘Australian, Chilean, or
Moroccan’’ in its place;
I 3. Revising the definition ‘‘Australian
or Chilean construction material’’; and
I 4. Removing from paragraphs (b)(1)
and (b)(2) ‘‘Australian or Chilean’’ and
adding ‘‘Australian, Chilean, or
Moroccan’’ in its place.
I The revised text reads as follows:
wwhite on PROD1PC65 with RULES3
I
I
I
52.225–11 Buy American Act—
Construction Materials under Trade
Agreements.
*
*
*
VerDate Aug<31>2005
*
*
52.225–12
[Amended]
I
52.225–3
*
*
18:56 Apr 18, 2006
Jkt 208001
*
*
*
*
*
*
[Amended]
11. Amend section 52.225–12 by
revising the date of Alternate II to read
‘‘(APR 2006)’’; and by removing from
paragraphs (a), (d)(1) twice, and (d)(3)
twice ‘‘Australian or Chilean’’ and
adding ‘‘Australian, Chilean, or
Moroccan’’ in its place.
I
[FR Doc. 06–3685 Filed 4–18–06; 8:45 am]
BILLING CODE 6820–EP–S
DEPARTMENT OF DEFENSE
GENERAL SERVICES
ADMINISTRATION
NATIONAL AERONAUTICS AND
SPACE ADMINISTRATION
48 CFR Part 52
[FAC 2005–09; FAR Case 2004–031; Item
IX; Docket FAR–2006–0020]
RIN 9000–AK24
Federal Acquisition Regulation; FAR
Case 2004–031, Fast Payment
Procedures
AGENCIES: Department of Defense (DoD),
General Services Administration (GSA),
and National Aeronautics and Space
Administration (NASA).
ACTION: Final rule.
SUMMARY: The Civilian Agency
Acquisition Council and the Defense
Acquisition Regulations Council
(Councils) have agreed on a final rule
amending the Federal Acquisition
Regulation (FAR) by revising fast
payment procedures. The revision
permits, but does not require, fast
payment when invoices and/or outer
shipping containers are not marked
‘‘Fast Pay’’ provided the contract
includes the ‘‘Fast Payment Procedure’’
clause. As highlighted in the clause, if
the clause is in the contract, the
invoices will no longer be rejected, as is
PO 00000
Frm 00016
Fmt 4701
Sfmt 4700
DoD, GSA, and NASA published a
proposed rule, FAR case 2004–031, at
70 FR 40279 on July 13, 2005, to obtain
comments on a proposal to amend the
policies and contract clause regarding
Fast Pay procedures. No comments were
submitted and the rule was converted to
a final rule without change from the
proposed rule. FAR 52.213–1, Fast
Payment Procedure, is revised to permit
acceptance and payment under invoices
that are not prominently marked ‘‘FAST
PAY.’’
This change provides the payment
office flexibility to make fast payments
when invoices and/or outer shipping
containers are not marked ‘‘FAST PAY.’’
The change permits, but does not
require, fast payment when invoices
and/or outer shipping containers are not
marked ‘‘FAST PAY’’ provided the
contract includes the ‘‘Fast Payment
Procedure’’ clause. However, if the
payment office decides to not process
invoices as ‘‘FAST PAY’’ because the
proper markings are not present, the
payment date will be the payment date
that would have applied had the ‘‘Fast
Payment Procedure’’ clause not been in
the contract. In this manner, an
unmarked invoice will not be rejected.
This change does not eliminate the
requirement for the contractor to
annotate an invoice ‘‘FAST PAY;’’ the
contractor remains at risk that fast
payment procedures will not be applied
unless the invoice is annotated
accordingly.
If a receiving report is not prepared,
it is imperative that the invoice includes
sufficient information to facilitate
follow-up verification that the item was
received. The FAR revision does not
eliminate that requirement for such
information on the invoice. However,
the revision does not require the
statement ‘‘No Receiving Report
Prepared’’ on the invoice.
This is not a significant regulatory
action and, therefore, was not subject to
E:\FR\FM\19APR3.SGM
19APR3
Federal Register / Vol. 71, No. 75 / Wednesday, April 19, 2006 / Rules and Regulations
review under Section 6(b) of Executive
Order 12866, Regulatory Planning and
Review, dated September 30, 1993. This
rule is not a major rule under 5 U.S.C.
804.
payment office for fast payment. If the
payment office declines to make fast
payment, the Contractor shall be paid in
accordance with procedures applicable to
invoices to which the Fast Payment clause
does not apply.
B. Regulatory Flexibility Act
The Department of Defense, the
General Services Administration, and
the National Aeronautics and Space
Administration certify that this final
rule will not have a significant
economic impact on a substantial
number of small entities within the
meaning of the Regulatory Flexibility
Act, 5 U.S.C. 601, et seq., because it will
have a beneficial, but small, impact.
Under the prior policy and clause, small
businesses which failed to follow the
fast payment clause instructions to mark
the invoice ‘‘FAST PAY’’ had their
invoices rejected, which means they
would not be paid until they sent a
corrected invoice. The clause revisions
mean the invoices would not have to be
automatically rejected. No comments
were received from small entities or
other members of the public.
*
C. Paperwork Reduction Act
The Paperwork Reduction Act does
not apply because the changes to the
FAR do not impose information
collection requirements that require the
approval of the Office of Management
and Budget under 44 U.S.C. 3501, et
seq.
*
*
*
*
(3) If this contract, order, or blanket
purchase agreement requires the preparation
of a receiving report, the Contractor shall
either—
(i) Submit the receiving report on the
prescribed form with the invoice; or
(ii) Include the following information on
the invoice:
(A) Shipment number.
(B) Mode of shipment.
(C) At line item level—
(1) National stock number and/or
manufacturer’s part number;
(2) Unit of measure;
(3) Ship-To Point;
(4) Mark-For Point, if in the contract; and
(5) FEDSTRIP/MILSTRIP document
number, if in the contract.
*
*
*
*
*
(e) Fast pay container identification. The
Contractor shall mark all outer shipping
containers ‘‘FAST PAY.’’ When outer
shipping containers are not marked ‘‘FAST
PAY,’’ the payment office may make fast
payment. If the payment office declines to
make fast payment, the Contractor shall be
paid in accordance with procedures
applicable to invoices to which the Fast
Payment clause does not apply.
(End of clause)
[FR Doc. 06–3686 Filed 4–18–06; 8:45 am]
cite FAC 2005–09, Technical
Amendment.
List of Subjects in 48 CFR Part 19
Government procurement.
Dated: April 12, 2006.
Gerald Zaffos,
Director, Contract Policy Division.
Therefore, DoD, GSA, and NASA
amend 48 CFR part 19 as set forth
below:
I
PART 19—SMALL BUSINESS
PROGRAMS
1. The authority citation for 48 CFR
part 19 continues to read as follows:
I
Authority: 40 U.S.C. 121(c); 10 U.S.C.
chapter 137; and 42 U.S.C. 2473(c).
19.1005
[Amended]
2. Amend section 19.1005 in
paragraph (a) in Item 3 of the NAICS
Description by removing from the end of
NAICS code entry ‘‘541310’’ the word
‘‘or’’.
I
[FR Doc. 06–3687 Filed 4–18–06; 8:45 am]
BILLING CODE 6820–EP–S
DEPARTMENT OF DEFENSE
GENERAL SERVICES
ADMINISTRATION
BILLING CODE 6820–EP–S
NATIONAL AERONAUTICS AND
SPACE ADMINISTRATION
List of Subjects in 48 CFR Parts 52
Government procurement.
DEPARTMENT OF DEFENSE
48 CFR Chapter 1
Dated: April 12, 2006.
Gerald Zaffos,
Director,Contract Policy Division.
GENERAL SERVICES
ADMINISTRATION
Therefore, DoD, GSA, and NASA
amend 48 CFR part 52 as set forth
below:
NATIONAL AERONAUTICS AND
SPACE ADMINISTRATION
I
1. The authority citation for 48 CFR
part 52 continues to read as follows:
I
AGENCIES: Department of Defense (DoD),
General Services Administration (GSA),
and National Aeronautics and Space
Administration (NASA).
ACTION: Final rule.
2. Amend section 52.213–1 by
revising the date of the clause and
paragraphs (c)(1)(ii), (c)(3), and (e) to
read as follows:
I
*
*
Fast Payment Procedure.
*
*
*
FAST PAYMENT PROCEDURE (APR 2006)
*
*
*
*
*
(c) * * *
(1) * * *
(ii) Display prominently on the invoice
‘‘FAST PAY.’’ Invoices not prominently
marked ‘‘FAST PAY’’ via manual or
electronic means may be accepted by the
VerDate Aug<31>2005
18:56 Apr 18, 2006
Jkt 208001
[FAC 2005–09; Item X; Docket FAR–2006–
0021]
Federal Acquisition Regulation;
Technical Amendment
Authority: 40 U.S.C. 121(c); 10 U.S.C.
chapter 137; and 42 U.S.C. 2473(c).
52.213–1
[Docket FAR–2006–0023]
48 CFR Part 19
PART 52—SOLICITATION PROVISIONS
AND CONTRACT CLAUSES
wwhite on PROD1PC65 with RULES3
20309
SUMMARY: This document amends the
Federal Acquisition Regulation (FAR) to
make an editorial correction.
DATES: Effective Date: April 19, 2006.
FOR FURTHER INFORMATION CONTACT: The
FAR Secretariat, Room 4035, GS
Building, Washington, DC, 20405, (202)
501–4755, for information pertaining to
status or publication schedules. Please
PO 00000
Frm 00017
Fmt 4701
Sfmt 4700
Federal Acquisition Regulation;
Federal Acquisition Circular 2005–09;
Small Entity Compliance Guide
Department of Defense (DoD),
General Services Administration (GSA),
and National Aeronautics and Space
Administration (NASA).
ACTION: Small Entity Compliance Guide.
AGENCIES:
SUMMARY: This document is issued
under the joint authority of the
Secretary of Defense, the Administrator
of General Services and the
Administrator for the National
Aeronautics and Space Administration.
This Small Entity Compliance Guide has
been prepared in accordance with
Section 212 of the Small Business
Regulatory Enforcement Fairness Act of
1996. It consists of a summary of rules
appearing in Federal Acquisition
Circular (FAC) 2005–09 which amend
the FAR. An asterisk (*) next to a rule
indicates that a regulatory flexibility
analysis has been prepared. Interested
parties may obtain further information
regarding these rules by referring to FAC
E:\FR\FM\19APR3.SGM
19APR3
Agencies
[Federal Register Volume 71, Number 75 (Wednesday, April 19, 2006)]
[Rules and Regulations]
[Pages 20308-20309]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 06-3686]
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
GENERAL SERVICES ADMINISTRATION
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
48 CFR Part 52
[FAC 2005-09; FAR Case 2004-031; Item IX; Docket FAR-2006-0020]
RIN 9000-AK24
Federal Acquisition Regulation; FAR Case 2004-031, Fast Payment
Procedures
AGENCIES: Department of Defense (DoD), General Services Administration
(GSA), and National Aeronautics and Space Administration (NASA).
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: The Civilian Agency Acquisition Council and the Defense
Acquisition Regulations Council (Councils) have agreed on a final rule
amending the Federal Acquisition Regulation (FAR) by revising fast
payment procedures. The revision permits, but does not require, fast
payment when invoices and/or outer shipping containers are not marked
``Fast Pay'' provided the contract includes the ``Fast Payment
Procedure'' clause. As highlighted in the clause, if the clause is in
the contract, the invoices will no longer be rejected, as is the
current practice. Instead, they will be paid using either fast payment
or normal payment procedures. In addition, the revision deletes the
requirement for marking invoices ``No Receiving Report Prepared.''
DATES: Effective Date: May 19, 2006.
FOR FURTHER INFORMATION CONTACT: For clarification of content, contact
Mr. Jeremy Olson, Procurement Analyst, at (202) 501-3221. Please cite
FAC 2005-09, FAR case 2004-031. For information pertaining to status or
publication schedules, contact the FAR Secretariat at (202) 501-4755.
SUPPLEMENTARY INFORMATION:
A. Background
DoD, GSA, and NASA published a proposed rule, FAR case 2004-031, at
70 FR 40279 on July 13, 2005, to obtain comments on a proposal to amend
the policies and contract clause regarding Fast Pay procedures. No
comments were submitted and the rule was converted to a final rule
without change from the proposed rule. FAR 52.213-1, Fast Payment
Procedure, is revised to permit acceptance and payment under invoices
that are not prominently marked ``FAST PAY.''
This change provides the payment office flexibility to make fast
payments when invoices and/or outer shipping containers are not marked
``FAST PAY.'' The change permits, but does not require, fast payment
when invoices and/or outer shipping containers are not marked ``FAST
PAY'' provided the contract includes the ``Fast Payment Procedure''
clause. However, if the payment office decides to not process invoices
as ``FAST PAY'' because the proper markings are not present, the
payment date will be the payment date that would have applied had the
``Fast Payment Procedure'' clause not been in the contract. In this
manner, an unmarked invoice will not be rejected. This change does not
eliminate the requirement for the contractor to annotate an invoice
``FAST PAY;'' the contractor remains at risk that fast payment
procedures will not be applied unless the invoice is annotated
accordingly.
If a receiving report is not prepared, it is imperative that the
invoice includes sufficient information to facilitate follow-up
verification that the item was received. The FAR revision does not
eliminate that requirement for such information on the invoice.
However, the revision does not require the statement ``No Receiving
Report Prepared'' on the invoice.
This is not a significant regulatory action and, therefore, was not
subject to
[[Page 20309]]
review under Section 6(b) of Executive Order 12866, Regulatory Planning
and Review, dated September 30, 1993. This rule is not a major rule
under 5 U.S.C. 804.
B. Regulatory Flexibility Act
The Department of Defense, the General Services Administration, and
the National Aeronautics and Space Administration certify that this
final rule will not have a significant economic impact on a substantial
number of small entities within the meaning of the Regulatory
Flexibility Act, 5 U.S.C. 601, et seq., because it will have a
beneficial, but small, impact. Under the prior policy and clause, small
businesses which failed to follow the fast payment clause instructions
to mark the invoice ``FAST PAY'' had their invoices rejected, which
means they would not be paid until they sent a corrected invoice. The
clause revisions mean the invoices would not have to be automatically
rejected. No comments were received from small entities or other
members of the public.
C. Paperwork Reduction Act
The Paperwork Reduction Act does not apply because the changes to
the FAR do not impose information collection requirements that require
the approval of the Office of Management and Budget under 44 U.S.C.
3501, et seq.
List of Subjects in 48 CFR Parts 52
Government procurement.
Dated: April 12, 2006.
Gerald Zaffos,
Director,Contract Policy Division.
0
Therefore, DoD, GSA, and NASA amend 48 CFR part 52 as set forth below:
PART 52--SOLICITATION PROVISIONS AND CONTRACT CLAUSES
0
1. The authority citation for 48 CFR part 52 continues to read as
follows:
Authority: 40 U.S.C. 121(c); 10 U.S.C. chapter 137; and 42
U.S.C. 2473(c).
0
2. Amend section 52.213-1 by revising the date of the clause and
paragraphs (c)(1)(ii), (c)(3), and (e) to read as follows:
52.213-1 Fast Payment Procedure.
* * * * *
FAST PAYMENT PROCEDURE (APR 2006)
* * * * *
(c) * * *
(1) * * *
(ii) Display prominently on the invoice ``FAST PAY.'' Invoices
not prominently marked ``FAST PAY'' via manual or electronic means
may be accepted by the payment office for fast payment. If the
payment office declines to make fast payment, the Contractor shall
be paid in accordance with procedures applicable to invoices to
which the Fast Payment clause does not apply.
* * * * *
(3) If this contract, order, or blanket purchase agreement
requires the preparation of a receiving report, the Contractor shall
either--
(i) Submit the receiving report on the prescribed form with the
invoice; or
(ii) Include the following information on the invoice:
(A) Shipment number.
(B) Mode of shipment.
(C) At line item level--
(1) National stock number and/or manufacturer's part number;
(2) Unit of measure;
(3) Ship-To Point;
(4) Mark-For Point, if in the contract; and
(5) FEDSTRIP/MILSTRIP document number, if in the contract.
* * * * *
(e) Fast pay container identification. The Contractor shall mark
all outer shipping containers ``FAST PAY.'' When outer shipping
containers are not marked ``FAST PAY,'' the payment office may make
fast payment. If the payment office declines to make fast payment,
the Contractor shall be paid in accordance with procedures
applicable to invoices to which the Fast Payment clause does not
apply.
(End of clause)
[FR Doc. 06-3686 Filed 4-18-06; 8:45 am]
BILLING CODE 6820-EP-S