Notice of Meeting; Sunshine Act, 19885-19886 [06-3736]
Download as PDF
Federal Register / Vol. 71, No. 74 / Tuesday, April 18, 2006 / Notices
the Commission’s calendar located at:
https://www.ferc.gov/EventCalendar/
EventsADay.aspx?Date=5/1/
2006&CalendarID=0 along with other
related information.
Whether, or not you attend one of
these meetings, you are invited to
submit written comments on the draft
EIS. Comments should be filed with
Magalie R. Salas, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
All comments must be filed by May 30,
2006, and should reference Project No.
2150–033. Comments may be filed
electronically via the Internet in lieu of
paper. The Commission strongly
encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and instructions
on the Commission’s Web site at https://
www.ferc.gov under the e-Library link.
The Commission staff will consider
comments made on the draft EIS in
preparing a final EIS for the project.
Before the Commission makes a
licensing decision, it will take into
account all concerns relevant to the
public interest. The final EIS will be
part of the record from which the
Commission will make its decision.
By this notice, we are modifying our
processing schedule for Puget’s license
application. The modified schedule is:
Issue Final Environmental Impact
Statement: June 2006.
Ready for Commission Decision on
Application: September 2006.
For further information, contact Steve
Hocking at (202) 502–8753 or at
steve.hocking@ferc.gov.
Magalie R. Salas,
Secretary.
[FR Doc. E6–5730 Filed 4–17–06; 8:45 am]
BILLING CODE 6717–01–P
Item No.
19885
Federal Energy Regulatory
Commission
Notice of Meeting, Notice of Vote,
Explanation of Action Closing Meeting
and List of Persons to Attend;
Sunshine Act
are expected to attend the meeting.
Other staff members from the
Commission’s program offices who will
advise the Commissioners in the matters
discussed will also be present.
Magalie R. Salas,
Secretary.
[FR Doc. 06–3735 Filed 4–14–06; 11:14 am]
DEPARTMENT OF ENERGY
BILLING CODE 6717–01–P
April 13, 2006.
The following notice of meeting is
published pursuant to section 3(a) of the
Government in the Sunshine Act (Pub.
L. No. 94–409), 5 U.S.C. 552b:
AGENCY HOLDING MEETING: Federal
Energy Regulatory Commission.
DATE AND TIME: April 20, 2006 (Within
a relatively short time after the
Commission’s open meeting on April
20, 2006).
PLACE: Room 2C, Commission Meeting
Room, 888 First Street, NE.,
Washington, DC 20426.
STATUS: Closed.
MATTERS TO BE CONSIDERED: Non-Public
Investigations and Inquiries,
Enforcement Related Matters, and
Security of Regulated Facilities.
FOR FURTHER INFORMATION CONTACT:
Magalie R. Salas, Secretary, Telephone
(202) 502–8400.
Chairman Kelliher and
Commissioners Brownell, and Kelly
voted to hold a closed meeting on April
20, 2005. The certification of the
General Counsel explaining the action
closing the meeting is available for
public inspection in the Commission’s
Public Reference Room at 888 First
Street, NW., Washington, DC 20426.
The Chairman and the
Commissioners, their assistants, the
Commission’s Secretary and her
assistant, the General Counsel and
members of his staff, and a stenographer
Docket No.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Meeting; Sunshine Act
April 13, 2006.
The following notice of meeting is
published pursuant to section 3(a) of the
government in the Sunshine Act (Pub.
L. 94–409), 5 U.S.C. 552b:
AGENCY HOLDING MEETING: Federal
Energy Regulatory Commission.
DATE AND TIME: April 20, 2006, 10 a.m.
PLACE: Room 2C, 888 First Street, NE.,
Washington, DC 20426.
STATUS: Open.
MATTERS TO BE CONSIDERED: Agenda.
Note: Items listed on the agenda may be
deleted without further notice.
FOR FURTHER INFORMATION CONTACT:
Magalie R. Salas, Secretary, Telephone
(202) 502–8400.
For a recording listing items stricken
from or added to the meeting, call (202)
502–8627.
This is a list of matters to be
considered by the Commission. It does
not include a listing of all papers
relevant to the items on the agenda;
however, all public documents may be
examined in the Public Reference Room.
Company
ADMINISTRATIVE AGENDA
A–1 ..........................
A–2 ..........................
A–3 ..........................
AD02–1–000 ..........................................
AD02–7–000 ..........................................
AD06–3–000 ..........................................
Agency Administrative Matters.
Customer Matters, Reliability, Security and Market Operations.
Energy Market Update.
ELECTRIC
RM05–5–000 .........................................
E–2 ..........................
E–3 ..........................
E–4 ..........................
hsrobinson on PROD1PC68 with NOTICES
E–1 ..........................
RM05–34–001 .......................................
ER05–1065–000 ....................................
EL05–148–000 ......................................
ER05–1410–000.
OMITTED.
ER06–666–000 ......................................
ER06–674–000 ......................................
OMITTED.
EL06–52–000 ........................................
EL05–103–000 ......................................
E–5 ..........................
E–6 ..........................
E–7 ..........................
E–8 ..........................
E–9 ..........................
E–10 ........................
VerDate Aug<31>2005
16:13 Apr 17, 2006
Jkt 208001
PO 00000
Frm 00037
Standards for Business Practices and Communication Protocols for Public Utilities.
Transactions Subject to FPA Section 203.
Entergy Services, Inc.
PJM Interconnection, L.L.C.
Midwest Independent Transmission System operator, Inc.
Conectiv Energy Supply, Inc.
New York Power Authority v. Consolidated Edison Company of New York, Inc.
Northern Indiana Public Service Company v. Midwest Independent Transmission System Operator, Inc. and PJM Interconnection, L.L.C.
Fmt 4703
Sfmt 4703
E:\FR\FM\18APN1.SGM
18APN1
19886
Federal Register / Vol. 71, No. 74 / Tuesday, April 18, 2006 / Notices
Item No.
Docket No.
Company
E–11 ........................
E–12 ........................
ER03–1003–002 ....................................
ER03–622–000 ......................................
ER02–2001–005 ....................................
ER02–2338–000 ....................................
ER04–683–000 ......................................
ER03–101–000 ......................................
ER02–1499–000 ....................................
ER02–1595–000 ....................................
EL05–147–000 ......................................
RM04–12–001 .......................................
ER05–853–001 ......................................
EC05–110–001 ......................................
Michigan Electric Transmission Company, LLC.
Capital Power, Inc.
Electric Quarterly Reports.
Energy Investments Management, Inc.
New Light Energy, LLC.
Preimer Energy Marketing L.L.C.
Sprague Energy Corporation.
TME Energy Services.
Milford Power Company, LLC v. ISO New England, Inc.
Regional Transmission Organizations Accounting and Financial Reporting.
San Diego Gas & Electric Company.
MidAmerican Energy Holdings Company, Scottish Power plc, PacifiCorp Holdings, Inc. and PacifiCorp.
E–13
E–14
E–15
E–16
........................
........................
........................
........................
E–17 ........................
E–18 ........................
E–19 ........................
OMITTED.
ER04–691–065 ......................................
EL05–2–000 ..........................................
ER01–615–009.
ER01–615–010.
ER01–615–011.
ER96–1551–013.
ER96–1551–014.
ER96–1551–015.
Midwest Independent Transmission System Operator.
Public Service Company of New Mexico.
MISCELLANEOUS
M–1 .........................
RM05–32–001 .......................................
M–2 .........................
RM06–11–000 .......................................
Repeal of the Public Utility Holding Company Act of 1935 and Enactment of the
Public Utility Holding Company Act of 2005.
Financial Accounting, Reporting and Records Retention Requirements Under
the Public Utility Holding Company Act of 2005.
GAS
G–1
G–2
G–3
G–4
G–5
.........................
.........................
.........................
.........................
.........................
OMITTED.
RP06–231–000 ......................................
OMITTED.
RP00–107–009 ......................................
OMITTED.
Norstar Operating, LLC v. Columbia Gas Transmission Corporation.
Williston Basin Interstate Pipeline Company.
ENERGY PROJECTS—HYDRO
H–1 .........................
H–2
H–3
H–4
H–5
H–6
.........................
.........................
.........................
.........................
.........................
P–12606–001 ........................................
P–2545–095.
P–77–144 ..............................................
P–2210–128 ..........................................
P–2100–138 ..........................................
P–2082–041 ..........................................
P–2082–040 ..........................................
Avista Corporation.
Pacific Gas and Electric Company.
Appalachian Power Company.
California Department of Water Resources.
PacifiCorp.
PacifiCorp.
ENERGY PROJECTS—CERTIFICATES
C–1 .........................
C–2 .........................
CP06–32–000 ........................................
CP06–57–000 ........................................
hsrobinson on PROD1PC68 with NOTICES
Magalie R. Salas,
Secretary.
A free webcast of this event is
available through https://www.ferc.gov.
Anyone with Internet access who
desires to view this event can do so by
navigating to https://www.ferc.gov’s
Calendar of Events and locating this
event in the Calendar. The event will
contain a link to its webcast. The
Capitol Connection provides technical
support for the free webcasts. It also
offers access to this event via television
in the DC area and via phone bridge for
a fee. If you have any questions, visit
https://www.CapitolConnection.org or
VerDate Aug<31>2005
15:03 Apr 17, 2006
Jkt 208001
Maritimes & Northeast Pipeline, L.L.C.
El Paso Natural Gas Company.
contact Danelle Perkowski or David
Reininger at 703–993–3100.
Immediately following the conclusion
of the Commission Meeting, a press
briefing will be held in Hearing Room
2. Members of the public may view this
briefing in the Commission Meeting
overflow room. This statement is
intended to notify the public that the
press briefings that follow Commission
meetings may now be viewed remotely
at Commission headquarters, but will
not be telecast through the Capitol
Connection service.
[FR Doc. 06–3736 Filed 4–14–06; 11:14 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER06–432–000]
Southwest Power Pool, Inc.; Notice
Allowing Post-Technical Conference
Comments
April 11, 2006.
A technical conference was convened
on Monday, April 10, 2006, from 1 p.m.
to 4 p.m. at the offices of the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The technical conference addressed the
E:\FR\FM\18APN1.SGM
18APN1
Agencies
[Federal Register Volume 71, Number 74 (Tuesday, April 18, 2006)]
[Notices]
[Pages 19885-19886]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 06-3736]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Meeting; Sunshine Act
April 13, 2006.
The following notice of meeting is published pursuant to section
3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C.
552b:
Agency Holding Meeting: Federal Energy Regulatory Commission.
Date and Time: April 20, 2006, 10 a.m.
Place: Room 2C, 888 First Street, NE., Washington, DC 20426.
Status: Open.
Matters to be Considered: Agenda.
Note: Items listed on the agenda may be deleted without further
notice.
FOR FURTHER INFORMATION CONTACT: Magalie R. Salas, Secretary, Telephone
(202) 502-8400.
For a recording listing items stricken from or added to the
meeting, call (202) 502-8627.
This is a list of matters to be considered by the Commission. It
does not include a listing of all papers relevant to the items on the
agenda; however, all public documents may be examined in the Public
Reference Room.
------------------------------------------------------------------------
Item No. Docket No. Company
------------------------------------------------------------------------
ADMINISTRATIVE AGENDA
------------------------------------------------------------------------
A-1........................... AD02-1-000....... Agency Administrative
Matters.
A-2........................... AD02-7-000....... Customer Matters,
Reliability,
Security and Market
Operations.
A-3........................... AD06-3-000....... Energy Market Update.
------------------------------------------------------------------------
ELECTRIC
------------------------------------------------------------------------
E-1........................... RM05-5-000....... Standards for
Business Practices
and Communication
Protocols for Public
Utilities.
E-2........................... RM05-34-001...... Transactions Subject
to FPA Section 203.
E-3........................... ER05-1065-000.... Entergy Services,
Inc.
E-4........................... EL05-148-000..... PJM Interconnection,
L.L.C.
ER05-1410-000....
E-5........................... OMITTED..........
E-6........................... ER06-666-000..... Midwest Independent
Transmission System
operator, Inc.
E-7........................... ER06-674-000..... Conectiv Energy
Supply, Inc.
E-8........................... OMITTED..........
E-9........................... EL06-52-000...... New York Power
Authority v.
Consolidated Edison
Company of New York,
Inc.
E-10.......................... EL05-103-000..... Northern Indiana
Public Service
Company v. Midwest
Independent
Transmission System
Operator, Inc. and
PJM Interconnection,
L.L.C.
[[Page 19886]]
E-11.......................... ER03-1003-002.... Michigan Electric
Transmission
Company, LLC.
E-12.......................... ER03-622-000..... Capital Power, Inc.
ER02-2001-005.... Electric Quarterly
Reports.
ER02-2338-000.... Energy Investments
Management, Inc.
ER04-683-000..... New Light Energy,
LLC.
ER03-101-000..... Preimer Energy
Marketing L.L.C.
ER02-1499-000.... Sprague Energy
Corporation.
ER02-1595-000.... TME Energy Services.
E-13.......................... EL05-147-000..... Milford Power
Company, LLC v. ISO
New England, Inc.
E-14.......................... RM04-12-001...... Regional Transmission
Organizations
Accounting and
Financial Reporting.
E-15.......................... ER05-853-001..... San Diego Gas &
Electric Company.
E-16.......................... EC05-110-001..... MidAmerican Energy
Holdings Company,
Scottish Power plc,
PacifiCorp Holdings,
Inc. and PacifiCorp.
E-17.......................... OMITTED..........
E-18.......................... ER04-691-065..... Midwest Independent
Transmission System
Operator.
E-19.......................... EL05-2-000....... Public Service
Company of New
Mexico.
ER01-615-009.....
ER01-615-010.....
ER01-615-011.....
ER96-1551-013....
ER96-1551-014....
ER96-1551-015....
------------------------------------------------------------------------
MISCELLANEOUS
------------------------------------------------------------------------
M-1........................... RM05-32-001...... Repeal of the Public
Utility Holding
Company Act of 1935
and Enactment of the
Public Utility
Holding Company Act
of 2005.
M-2........................... RM06-11-000...... Financial Accounting,
Reporting and
Records Retention
Requirements Under
the Public Utility
Holding Company Act
of 2005.
------------------------------------------------------------------------
GAS
------------------------------------------------------------------------
G-1........................... OMITTED..........
G-2........................... RP06-231-000..... Norstar Operating,
LLC v. Columbia Gas
Transmission
Corporation.
G-3........................... OMITTED..........
G-4........................... RP00-107-009..... Williston Basin
Interstate Pipeline
Company.
G-5........................... OMITTED..........
------------------------------------------------------------------------
ENERGY PROJECTS--HYDRO
------------------------------------------------------------------------
H-1........................... P-12606-001...... Avista Corporation.
P-2545-095.......
H-2........................... P-77-144......... Pacific Gas and
Electric Company.
H-3........................... P-2210-128....... Appalachian Power
Company.
H-4........................... P-2100-138....... California Department
of Water Resources.
H-5........................... P-2082-041....... PacifiCorp.
H-6........................... P-2082-040....... PacifiCorp.
------------------------------------------------------------------------
ENERGY PROJECTS--CERTIFICATES
------------------------------------------------------------------------
C-1........................... CP06-32-000...... Maritimes & Northeast
Pipeline, L.L.C.
C-2........................... CP06-57-000...... El Paso Natural Gas
Company.
------------------------------------------------------------------------
Magalie R. Salas,
Secretary.
A free webcast of this event is available through https://
www.ferc.gov. Anyone with Internet access who desires to view this
event can do so by navigating to https://www.ferc.gov's Calendar of
Events and locating this event in the Calendar. The event will contain
a link to its webcast. The Capitol Connection provides technical
support for the free webcasts. It also offers access to this event via
television in the DC area and via phone bridge for a fee. If you have
any questions, visit https://www.CapitolConnection.org or contact
Danelle Perkowski or David Reininger at 703-993-3100.
Immediately following the conclusion of the Commission Meeting, a
press briefing will be held in Hearing Room 2. Members of the public
may view this briefing in the Commission Meeting overflow room. This
statement is intended to notify the public that the press briefings
that follow Commission meetings may now be viewed remotely at
Commission headquarters, but will not be telecast through the Capitol
Connection service.
[FR Doc. 06-3736 Filed 4-14-06; 11:14 am]