Combined Notice of Filings # 1, 18315-18316 [E6-5301]
Download as PDF
Federal Register / Vol. 71, No. 69 / Tuesday, April 11, 2006 / Notices
Paxton LLC; NRG Marketing Services
LLC; NRG New Jersey Energy Sales LLC;
NRG Rockford LLC; NRG Rockford II
LLC; NRG Sterling Power LLC; Oswego
Harbor Power LLC; Somerset Power
LLC; Tacoma Energy Recovery
Company; Vienna Power LLC.
Description: NRG Power Marketing
Inc, Arthur Kill Power LLC, and Astoria
Gas Turbine Power LLC et al. submits a
notification of change in status.
Filed Date: March 23, 2006.
Accession Numbers: 20060328–0099
and 20060328–0100.
Comment Date: 5 p.m. Eastern Time
on Thursday, April 13, 2006.
Docket Numbers: ER99–1115–009;
Magalie R. Salas,
ER99–1116–009; ER98–1127–009;
Secretary.
ER98–1796–008; ER06–820–000.
[FR Doc. E6–5300 Filed 4–10–06; 8:45 am]
Applicants: Cabrillo Power I LLC;
BILLING CODE 6717–01–P
Cabrillo Power II LLC; El Segundo
Power, LLC; Long Beach Generation,
LLC.
DEPARTMENT OF ENERGY
Description: WCP Project Companies
submits an amended and restated
Federal Energy Regulatory
version of each of their market-based
Commission
rate tariffs.
Filed Date: March 23, 2006.
Combined Notice of Filings # 1
Accession Number: 20060328–0079.
April 5, 2006.
Comment Date: 5 p.m. Eastern Time
Take notice that the Commission
on Thursday, April 13, 2006.
received the following electric rate
Docket Numbers: ER03–951–007;
filings.
ER03–416–008; ER04–94–005; ER03–
Docket Numbers: ER97–4281–015;
296–007; ER05–534–005; ER05–365–
ER99–2161–006; ER99–3000–005;
005; ER01–3121–006; ER02–418–005;
ER02–1572–003; ER02–1572–003;
ER05–332–005; ER06–1–003; ER02–
ER02–1571–003; ER99–1115–010;
417–005; ER05–1146–005; ER06–200–
ER99–1116–010; ER98–4515–007;
004; ER05–481–005; ER06–821–000.
ER00–2810–004; ER99–4359–003;
Applicants: Moraine Wind LLC;
ER99–4358–003; ER99–2168–006;
Klondike Wind Power LLC; Mountain
ER98–1127–010; ER99–2162–006;
View Power Partners III, LLC; Flying
ER00–2807–004; ER00–2809–004;
Cloud Power Partners, LLC; Eastern
ER98–1796–009; ER00–1259–005;
Desert Power LLC; Elk River Windfarm
ER99–4355–003; ER99–4356–003;
LLC; Klamath Energy LLC; Klamath
ER01–1558–003; ER00–3160–005;
Generation LLC; Klondike Wind Power
ER99–4357–003; ER01–2969–004;
II LLC; Leaning Juniper Wind Power
ER00–2313–005; ER03–955–005; ER02– LLC; Phoenix Wind Power LLC; Shiloh
2032–003; ER02–1396–003; ER02–1412– I Wind Project, LLC; Big Horn Wind
003; ER00–3718–004; ER99–3637–004;
Project LLC; Trimont Wind I LLC.
ER99–1712–006; ER00–1250–003;
Description: PPM Companies submits
ER00–2808–004.
proposed amendments to their marketApplicants: NRG Power Marketing,
based rate schedules to remove the
Inc; Aurthur Kill power LLC; Astoria
prohibition against transactions with
Gas Turbines Power LLC; Bayou Cove
Pacificorp etc. under ER03–951 et al.
Peaking Power LLC; Big Cajun I Peaking
Filed Date: March 23, 2006.
Power LLC; Cabrillo Power I LLC;
Accession Number: 20060328–0088.
Cabrillo Power II LLC; Cadillac
Comment Date: 5 p.m. Eastern Time
Renewable Energy LLC; Cadillac
on Thursday, April 13, 2006.
Renewable Energy LLC; Connecticut Jet
Docket Numbers: ER06–368–001.
Power LLC; Devon Power LLC; Dunkirk
Applicants: MidAmerican Energy
Power LLC; El Segundo Power, LLC;
Company.
Huntley Power LLC; Indian River Power
Description: MidAmerican Energy Co
LLC; Keystone Power LLC; Long Beach
submits its response to the deficiency
Generation LLC; Louisiana Generating
items noted in FERC’s February 23,
LLC; LLC; Middletown Power LLC;
2006 deficiency letter.
Montville Power LLC; NEO California
Filed Date: March 27, 2006.
Power LLC; NEO Chester-Gen LLC;
Accession Number: 20060330–0061.
Comment Date: 5 p.m. Eastern Time
Norwalk Power LLC; NRG Audrain
on Monday, April 17, 2006.
Generating LLC; NRG Energy Center
wwhite on PROD1PC61 with NOTICES
888 First Street, NE., Washington, DC
20426.
This filing is accessible online at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
VerDate Aug<31>2005
19:37 Apr 10, 2006
Jkt 208001
PO 00000
Frm 00048
Fmt 4703
Sfmt 4703
18315
Docket Numbers: ER06–698–001.
Applicants: First Commodities Ltd.
Description: First Commodities Ltd
submits its revised Rate Schedule and
Petition for acceptance of Initial Rate
Schedule, Waivers and Blanket
Authority incorporating the
requirements for change in status.
Filed Date: March 24, 2006.
Accession Number: 20060331–0179.
Comment Date: 5 p.m. Eastern Time
on Friday, April 14, 2006.
Docket Numbers: ER06–762–000.
Applicants: Maine Public Service
Company.
Description: Maine Public Service Co
submits an informational filing setting
forth the changed loss factor effective
March 1, 2006 pursuant to the
Commission’s April 12, 2001 order.
Filed Date: March 15, 2006.
Accession Number: 20060324–0021.
Comment Date: 5 p.m. Eastern Time
on Monday, April 10, 2006.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and § 385.214) on or before 5 p.m.
Eastern time on the specified comment
date. It is not necessary to separately
intervene again in a subdocket related to
a compliance filing if you have
previously intervened in the same
docket. Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant. In
reference to filings initiating a new
proceeding, interventions or protests
submitted on or before the comment
deadline need not be served on persons
other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St. NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
E:\FR\FM\11APN1.SGM
11APN1
18316
Federal Register / Vol. 71, No. 69 / Tuesday, April 11, 2006 / Notices
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–5301 Filed 4–10–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER06–804–000, et al.]
Great Lakes Hydro America, LLC et al.;
Electric Rate and Corporate Filings
April 5, 2005.
The following filings have been made
with the Commission. The filings are
listed in ascending order within each
docket classification.
1. Great Lakes Hydro America, LLC
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible online at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–5321 Filed 4–10–06; 8:45 am]
BILLING CODE 6717–01–P
[Docket No. ER06–804–000]
Take notice that on March 28, 2006,
Great Lakes America, LLC filed
revisions to its Market-Base Rate Tariff,
FERC Electric Tariff Second Revised
Volume No. 1, to completely update and
modernize its Tariff.
Comment Date: 5 p.m. Eastern Time
on April 7, 2006.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PF06–19–000]
[Docket No. ER06–805–000]
Take notice that on March 28, 2006,
Brookfield Energy Marketing Inc. filed
revisions to its Market-Based Rate Tariff,
FERC Electric Tariff Original Volume
No. 1, to completely update and
modernize its Tariff.
Comment Date: 5 p.m. Eastern Time
on April 7, 2006.
Questar Overthrust Pipeline Company;
Notice of Intent To Prepare an
Environmental Impact Statement for
the Proposed Wamsutter Expansion
Project, Request for Comments on
Environmental Issues, and Notice of
Public Scoping Meeting
April 3, 2006.
2. Brookfield Energy Marketing Inc.
wwhite on PROD1PC61 with NOTICES
Standard Paragraph
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
VerDate Aug<31>2005
19:37 Apr 10, 2006
Jkt 208001
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental impact statement (EIS)
that discusses the environmental
impacts of the proposed Wamsutter
Expansion Project (the Project). This
project involves the construction and
operation of facilities by Questar
Overthrust Pipeline Company
(Overthrust) in Lincoln and Sweetwater
Counties, Wyoming. These facilities
would include approximately 77 miles
of 36-inch-diameter natural gas
pipeline, two new compressor stations,
PO 00000
Frm 00049
Fmt 4703
Sfmt 4703
two new receipt points, and one new
delivery point.
The Wamsutter Expansion Project is a
necessary and supporting component of
the overall Rockies Express Pipeline
Project, Western Phase, currently under
review in the Commission’s Pre-Filing
Process in Docket No. PF06–3–000.
Therefore, the environmental analysis
for the Wamsutter Expansion Project
will be incorporated into the EIS being
prepared for the Rockies Express
Pipeline Project. The EIS will be used
by the Commission in its decisionmaking process to determine whether
the proposed facilities are in the public
convenience and necessity.
This notice explains the scoping
process that will be used to gather input
from the public and interested agencies
on the Project. Your input will help
FERC staff determine which issues/
impacts associated with the Project need
to be evaluated in the EIS. Please note
that the scoping period for the Project
will close on May 5, 2006.
Comments may be submitted in
written form or verbally. In lieu of or in
addition to sending written comments,
you are invited to attend the public
scoping meeting that has been
scheduled in the Project area. One
scoping meeting is scheduled for April
24, 2006, in Rock Springs, Wyoming.
Further instructions on how to submit
written comments and additional details
of the public scoping meeting are
provided in the public participation
section of this notice.
The Wamsutter Expansion Project is
currently in the preliminary stages of
design, and at this time a formal
application has not been filed with the
Commission. For this proposal, the
Commission is initiating the National
Environmental Policy Act (NEPA)
review prior to receiving the
application. This allows interested
stakeholders to become involved early
in Project planning and to identify and
resolve issues before an application is
filed with the FERC. A docket number
(PF06–19–000) has been established to
place information filed by Overthrust
and related documents issued by the
Commission into the public record. 1
Once a formal application is filed with
the FERC, a new docket number will be
established.
The Bureau of Land Management
(BLM) is participating as a cooperating
agency in the preparation of the EIS
because the Project would cross Federal
land under the jurisdiction of the
Rawlins, Rock Springs, and Kemmerer
1 To view information in the docket, follow the
instructions for using the eLibrary link at the end
of this notice.
E:\FR\FM\11APN1.SGM
11APN1
Agencies
[Federal Register Volume 71, Number 69 (Tuesday, April 11, 2006)]
[Notices]
[Pages 18315-18316]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-5301]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 1
April 5, 2006.
Take notice that the Commission received the following electric
rate filings.
Docket Numbers: ER97-4281-015; ER99-2161-006; ER99-3000-005; ER02-
1572-003; ER02-1572-003; ER02-1571-003; ER99-1115-010; ER99-1116-010;
ER98-4515-007; ER00-2810-004; ER99-4359-003; ER99-4358-003; ER99-2168-
006; ER98-1127-010; ER99-2162-006; ER00-2807-004; ER00-2809-004; ER98-
1796-009; ER00-1259-005; ER99-4355-003; ER99-4356-003; ER01-1558-003;
ER00-3160-005; ER99-4357-003; ER01-2969-004; ER00-2313-005; ER03-955-
005; ER02-2032-003; ER02-1396-003; ER02-1412-003; ER00-3718-004; ER99-
3637-004; ER99-1712-006; ER00-1250-003; ER00-2808-004.
Applicants: NRG Power Marketing, Inc; Aurthur Kill power LLC;
Astoria Gas Turbines Power LLC; Bayou Cove Peaking Power LLC; Big Cajun
I Peaking Power LLC; Cabrillo Power I LLC; Cabrillo Power II LLC;
Cadillac Renewable Energy LLC; Cadillac Renewable Energy LLC;
Connecticut Jet Power LLC; Devon Power LLC; Dunkirk Power LLC; El
Segundo Power, LLC; Huntley Power LLC; Indian River Power LLC; Keystone
Power LLC; Long Beach Generation LLC; Louisiana Generating LLC; LLC;
Middletown Power LLC; Montville Power LLC; NEO California Power LLC;
NEO Chester-Gen LLC; Norwalk Power LLC; NRG Audrain Generating LLC; NRG
Energy Center Paxton LLC; NRG Marketing Services LLC; NRG New Jersey
Energy Sales LLC; NRG Rockford LLC; NRG Rockford II LLC; NRG Sterling
Power LLC; Oswego Harbor Power LLC; Somerset Power LLC; Tacoma Energy
Recovery Company; Vienna Power LLC.
Description: NRG Power Marketing Inc, Arthur Kill Power LLC, and
Astoria Gas Turbine Power LLC et al. submits a notification of change
in status.
Filed Date: March 23, 2006.
Accession Numbers: 20060328-0099 and 20060328-0100.
Comment Date: 5 p.m. Eastern Time on Thursday, April 13, 2006.
Docket Numbers: ER99-1115-009; ER99-1116-009; ER98-1127-009; ER98-
1796-008; ER06-820-000.
Applicants: Cabrillo Power I LLC; Cabrillo Power II LLC; El Segundo
Power, LLC; Long Beach Generation, LLC.
Description: WCP Project Companies submits an amended and restated
version of each of their market-based rate tariffs.
Filed Date: March 23, 2006.
Accession Number: 20060328-0079.
Comment Date: 5 p.m. Eastern Time on Thursday, April 13, 2006.
Docket Numbers: ER03-951-007; ER03-416-008; ER04-94-005; ER03-296-
007; ER05-534-005; ER05-365-005; ER01-3121-006; ER02-418-005; ER05-332-
005; ER06-1-003; ER02-417-005; ER05-1146-005; ER06-200-004; ER05-481-
005; ER06-821-000.
Applicants: Moraine Wind LLC; Klondike Wind Power LLC; Mountain
View Power Partners III, LLC; Flying Cloud Power Partners, LLC; Eastern
Desert Power LLC; Elk River Windfarm LLC; Klamath Energy LLC; Klamath
Generation LLC; Klondike Wind Power II LLC; Leaning Juniper Wind Power
LLC; Phoenix Wind Power LLC; Shiloh I Wind Project, LLC; Big Horn Wind
Project LLC; Trimont Wind I LLC.
Description: PPM Companies submits proposed amendments to their
market-based rate schedules to remove the prohibition against
transactions with Pacificorp etc. under ER03-951 et al.
Filed Date: March 23, 2006.
Accession Number: 20060328-0088.
Comment Date: 5 p.m. Eastern Time on Thursday, April 13, 2006.
Docket Numbers: ER06-368-001.
Applicants: MidAmerican Energy Company.
Description: MidAmerican Energy Co submits its response to the
deficiency items noted in FERC's February 23, 2006 deficiency letter.
Filed Date: March 27, 2006.
Accession Number: 20060330-0061.
Comment Date: 5 p.m. Eastern Time on Monday, April 17, 2006.
Docket Numbers: ER06-698-001.
Applicants: First Commodities Ltd.
Description: First Commodities Ltd submits its revised Rate
Schedule and Petition for acceptance of Initial Rate Schedule, Waivers
and Blanket Authority incorporating the requirements for change in
status.
Filed Date: March 24, 2006.
Accession Number: 20060331-0179.
Comment Date: 5 p.m. Eastern Time on Friday, April 14, 2006.
Docket Numbers: ER06-762-000.
Applicants: Maine Public Service Company.
Description: Maine Public Service Co submits an informational
filing setting forth the changed loss factor effective March 1, 2006
pursuant to the Commission's April 12, 2001 order.
Filed Date: March 15, 2006.
Accession Number: 20060324-0021.
Comment Date: 5 p.m. Eastern Time on Monday, April 10, 2006.
Any person desiring to intervene or to protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.211 and Sec.
385.214) on or before 5 p.m. Eastern time on the specified comment
date. It is not necessary to separately intervene again in a subdocket
related to a compliance filing if you have previously intervened in the
same docket. Protests will be considered by the Commission in
determining the appropriate action to be taken, but will not serve to
make protestants parties to the proceeding. Anyone filing a motion to
intervene or protest must serve a copy of that document on the
Applicant. In reference to filings initiating a new proceeding,
interventions or protests submitted on or before the comment deadline
need not be served on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://
www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
14 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First St. NE., Washington, DC 20426.
The filings in the above proceedings are accessible in the
Commission's
[[Page 18316]]
eLibrary system by clicking on the appropriate link in the above list.
They are also available for review in the Commission's Public Reference
Room in Washington, DC. There is an eSubscription link on the Web site
that enables subscribers to receive e-mail notification when a document
is added to a subscribed dockets(s). For assistance with any FERC
Online service, please e-mail FERCOnlineSupport@ferc.gov. or call (866)
208-3676 (toll free). For TTY, call (202) 502-8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6-5301 Filed 4-10-06; 8:45 am]
BILLING CODE 6717-01-P