Atomic Safety and Licensing Board; In the Matter of David Geisen; Notice of Hearing (Enforcement Order), 18362 [E6-5255]
Download as PDF
18362
Federal Register / Vol. 71, No. 69 / Tuesday, April 11, 2006 / Notices
at the NRC Public Document Room, One
White Flint North, 11555 Rockville
Pike, Room O–1 F21, Rockville, MD
20852. OMB clearance requests are
available at the NRC worldwide Web
site: https://www.nrc.gov/public-involve/
doc-comment/omb/. The
document will be available on the NRC
home page site for 60 days after the
signature date of this notice.
Comments and questions about the
information collection requirements
may be directed to the NRC Clearance
Officer, Brenda Jo. Shelton, U.S. Nuclear
Regulatory Commission, T–5 F53,
Washington, DC 20555–0001, by
telephone at 301–415–7233, or by
Internet electronic mail to
infocollects@nrc.gov.
Dated at Rockville, Maryland, this 4th day
of April 2006.
For the Nuclear Regulatory Commission.
Brenda Jo. Shelton,
NRC Clearance Officer, Office of Information
Services.
[FR Doc. E6–5260 Filed 4–10–06; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. IA–05–052; ASLBP No. 06–845–
01–EA]
Atomic Safety and Licensing Board; In
the Matter of David Geisen; Notice of
Hearing (Enforcement Order)
wwhite on PROD1PC61 with NOTICES
April 5, 2006.
Before Administrative Judges: Michael
C. Farrar, Chairman, E. Roy Hawkens.
Nicholas G. Trikouros.
This proceeding stems from an
immediately-effective Enforcement
Order issued on January 4, 2006, by the
Nuclear Regulatory Commission Staff
against Mr. David Geisen, prohibiting
him from ‘‘engaging in NRC-licensed
activities’’ for five years because of
certain actions the NRC Staff believes he
took in 2001 when he was employed at
the Davis-Besse Nuclear Power Plant,
located some 25 miles east of Toledo
near Oak Harbor, Ohio. That Order,
published in the Federal Register (71
FR 2571) on January 17, 2006, detailed
the Staff’s assertions that Mr. Geisen
had deliberately provided materially
incomplete and inaccurate information
in connection with an issue affecting the
continued operation of the Davis-Besse
facility, and provided Mr. Geisen with
the opportunity, under 10 CFR 2.202(b),
to request a hearing to contest the
matters set out in the Order. Through
counsel, Mr. Geisen timely filed such a
request on February 23, 2006.
VerDate Aug<31>2005
19:37 Apr 10, 2006
Jkt 208001
This Atomic Safety and Licensing
Board was established on March 16,
2006, to consider Mr. Geisen’s hearing
request. With the NRC Staff having
indicated no objection thereto, we
granted that request on March 27, 2006,
in a Memorandum and Order that also
granted the hearing requests of two
other former Davis-Besse employees
who were the subjects of immediatelyeffective Staff Enforcement Orders
likewise suspending them from
employment in the regulated nuclear
industry.
In light of the foregoing, and
consistent with 10 CFR 2.318(a) (see
also id. §§ 2.203 and 2.312(a)), please
take notice that a hearing will be
conducted in this proceeding. The
hearing will be governed by the specific
hearing procedures set forth in 10 CFR
Part 2, Subpart G (10 CFR 2.700–2.713),
which procedures supplement the
general rules set forth in 10 CFR Part 2,
Subpart C (10 CFR 2.300–2.390). During
the course of the proceeding, the Board
may, among other measures, hold oral
arguments (id. § 2.331) and pre-hearing
conferences (id. § 2.329), and may
conduct evidentiary hearings (id.
§ 2.711). The public is invited to attend
any oral argument, pre-hearing
conference, or evidentiary hearing
unless otherwise ordered by the
Commission (id. §§ 2.327–2.328). The
time and place of any such sessions will
be fixed by subsequent order(s); notices
thereof will be published in the Federal
Register and/or made available to the
public at the NRC Public Document
Room, located in One White Flint
North, 11555 Rockville Pike (first floor),
Rockville, Maryland, and through the
NRC Web site, https://www.nrc.gov.
In the same March 27, 2006
Memorandum and Order in which it
granted Mr. Geisen’s hearing request,
this Board called for oral argument on
the Staff’s March 20, 2006, motion to
hold this matter in abeyance pending
the outcome of the criminal proceeding
brought by the government against Mr.
Geisen based on substantially the same
allegations (Mr. Geisen’s response to the
Staff’s motion was duly filed on March
30, 2006). The oral argument on the
motion will be held on Tuesday, April
11, 2006, at 10 a.m. in the courtroom at
the NRC’s Rockville, Maryland
Headquarters, on the third floor of the
Two White Flint North Building at
11545 Rockville Pike. That oral
argument, which is not expected to last
more than approximately 90 minutes,
will be open for the public to observe.
Documents relating to this proceeding
are available for public inspection at the
NRC’s Public Document Room or
electronically from the publicly
PO 00000
Frm 00095
Fmt 4703
Sfmt 4703
available records component of NRC’s
document system (ADAMS). ADAMS is
accessible from the NRC Web site at
https://www.nrc.gov/reading-rm/
adams.html.
Persons who do not have access to
ADAMS or who encounter problems in
accessing the documents located in
ADAMS may contact the NRC Public
Document Room reference staff by
telephone at 1–800–397–4209 or 301–
415–4737, or by e-mail to pdr@nrc.gov.
It is so ordered.
April 5, 2006.
For the Atomic Safety and Licensing
Board.
Michael C. Farrar,
Chairman, Administrative Judge, Rockville,
Maryland.
[FR Doc. E6–5255 Filed 4–10–06; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[ Docket No. IA–05–053; ASLBP No. 06–
846–02–EA]
Atomic Safety And Licensing Boards;
In the Matter of Dale L. Miller; Notice
of Hearing (Enforcement Order)
April 5, 2006.
Before Administrative Judges: Michael
C. Farrar, Chairman, E. Roy Hawkens,
Nicholas G. Trikouros.
This proceeding stems from an
immediately-effective Enforcement
Order issued on January 4, 2006, by the
Nuclear Regulatory Commission Staff
against Mr. Dale L. Miller, prohibiting
him from ‘‘engaging in NRC-licensed
activities’’ for five years because of
certain actions the NRC Staff believes he
took in 2001 when he was employed at
the Davis-Besse Nuclear Power Plant,
located some 25 miles east of Toledo
near Oak Harbor, Ohio. That Order,
published in the Federal Register (71
FR 2579) on January 17, 2006, detailed
the Staff’s assertions that Mr. Miller had
deliberately provided materially
incomplete and inaccurate information
in connection with an issue affecting the
continued operation of the Davis-Besse
facility, and provided Mr. Miller with
the opportunity, under 10 CFR 2.202(b),
to request a hearing to contest the
matters set out in the Order. Through
counsel, Mr. Miller timely filed such a
request on February 23, 2006.
This Atomic Safety and Licensing
Board was established on March 16,
2006, to consider Mr. Miller’s hearing
request. With the NRC Staff having
indicated no objection thereto, we
granted that request on March 27, 2006,
in a Memorandum and Order that also
E:\FR\FM\11APN1.SGM
11APN1
Agencies
[Federal Register Volume 71, Number 69 (Tuesday, April 11, 2006)]
[Notices]
[Page 18362]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-5255]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. IA-05-052; ASLBP No. 06-845-01-EA]
Atomic Safety and Licensing Board; In the Matter of David Geisen;
Notice of Hearing (Enforcement Order)
April 5, 2006.
Before Administrative Judges: Michael C. Farrar, Chairman, E. Roy
Hawkens. Nicholas G. Trikouros.
This proceeding stems from an immediately-effective Enforcement
Order issued on January 4, 2006, by the Nuclear Regulatory Commission
Staff against Mr. David Geisen, prohibiting him from ``engaging in NRC-
licensed activities'' for five years because of certain actions the NRC
Staff believes he took in 2001 when he was employed at the Davis-Besse
Nuclear Power Plant, located some 25 miles east of Toledo near Oak
Harbor, Ohio. That Order, published in the Federal Register (71 FR
2571) on January 17, 2006, detailed the Staff's assertions that Mr.
Geisen had deliberately provided materially incomplete and inaccurate
information in connection with an issue affecting the continued
operation of the Davis-Besse facility, and provided Mr. Geisen with the
opportunity, under 10 CFR 2.202(b), to request a hearing to contest the
matters set out in the Order. Through counsel, Mr. Geisen timely filed
such a request on February 23, 2006.
This Atomic Safety and Licensing Board was established on March 16,
2006, to consider Mr. Geisen's hearing request. With the NRC Staff
having indicated no objection thereto, we granted that request on March
27, 2006, in a Memorandum and Order that also granted the hearing
requests of two other former Davis-Besse employees who were the
subjects of immediately-effective Staff Enforcement Orders likewise
suspending them from employment in the regulated nuclear industry.
In light of the foregoing, and consistent with 10 CFR 2.318(a) (see
also id. Sec. Sec. 2.203 and 2.312(a)), please take notice that a
hearing will be conducted in this proceeding. The hearing will be
governed by the specific hearing procedures set forth in 10 CFR Part 2,
Subpart G (10 CFR 2.700-2.713), which procedures supplement the general
rules set forth in 10 CFR Part 2, Subpart C (10 CFR 2.300-2.390).
During the course of the proceeding, the Board may, among other
measures, hold oral arguments (id. Sec. 2.331) and pre-hearing
conferences (id. Sec. 2.329), and may conduct evidentiary hearings
(id. Sec. 2.711). The public is invited to attend any oral argument,
pre-hearing conference, or evidentiary hearing unless otherwise ordered
by the Commission (id. Sec. Sec. 2.327-2.328). The time and place of
any such sessions will be fixed by subsequent order(s); notices thereof
will be published in the Federal Register and/or made available to the
public at the NRC Public Document Room, located in One White Flint
North, 11555 Rockville Pike (first floor), Rockville, Maryland, and
through the NRC Web site, https://www.nrc.gov.
In the same March 27, 2006 Memorandum and Order in which it granted
Mr. Geisen's hearing request, this Board called for oral argument on
the Staff's March 20, 2006, motion to hold this matter in abeyance
pending the outcome of the criminal proceeding brought by the
government against Mr. Geisen based on substantially the same
allegations (Mr. Geisen's response to the Staff's motion was duly filed
on March 30, 2006). The oral argument on the motion will be held on
Tuesday, April 11, 2006, at 10 a.m. in the courtroom at the NRC's
Rockville, Maryland Headquarters, on the third floor of the Two White
Flint North Building at 11545 Rockville Pike. That oral argument, which
is not expected to last more than approximately 90 minutes, will be
open for the public to observe.
Documents relating to this proceeding are available for public
inspection at the NRC's Public Document Room or electronically from the
publicly available records component of NRC's document system (ADAMS).
ADAMS is accessible from the NRC Web site at https://www.nrc.gov/
reading-rm/adams.html.
Persons who do not have access to ADAMS or who encounter problems
in accessing the documents located in ADAMS may contact the NRC Public
Document Room reference staff by telephone at 1-800-397-4209 or 301-
415-4737, or by e-mail to pdr@nrc.gov.
It is so ordered.
April 5, 2006.
For the Atomic Safety and Licensing Board.
Michael C. Farrar,
Chairman, Administrative Judge, Rockville, Maryland.
[FR Doc. E6-5255 Filed 4-10-06; 8:45 am]
BILLING CODE 7590-01-P