Alexander & Baldwin, Inc. et al.; Electric Rate and Corporate Filings, 17842 [E6-5093]

Download as PDF 17842 Federal Register / Vol. 71, No. 67 / Friday, April 7, 2006 / Notices will not be required to serve copies of filed documents on all other parties. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the applicant. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests, and interventions via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov) under the ‘‘e-Filing’’ link. Comment Date: April 21, 2006. Magalie Salas, Secretary. [FR Doc. E6–5097 Filed 4–6–06; 8:45 am] Comment Date: 5 p.m. eastern time on April 17, 2006. 3. Hawkeye Funding, Inc. [Docket No. PH06–34–000] Take notice that on March 27, 2006, Hawkeye Funding, Inc. filed a Petition for Exemption of the Requirements of The Public Utility Holding Company Act of 2005, pursuant to 18 CFR 366.3(b) 366.4(b)(1) of the Commission’s regulations. Comment Date: 5 p.m. eastern time on April 17, 2006. 4. Juniper Capital GP, LLC [Docket No. PH06–35–000] Take notice that on March 27, 2006, Juniper Capital GP, LLC filed a Petition for Exemption of the Requirements of The Public Utility Holding Company Act of 2005, pursuant to 18 CFR 366.3(b) 366.4(b)(1) of the Commission’s regulations. Comment Date: 5 p.m. eastern time on April 17, 2006. BILLING CODE 6717–01–P 5. JMG Capital, Inc. [Docket No. PH06–36–000] DEPARTMENT OF ENERGY Take notice that on March 27, 2006, JMG Capital, Inc. filed a Petition for Exemption of the Requirements of The Public Utility Holding Company Act of 2005, pursuant to 18 CFR 366.3(b) 366.4(b)(1) of the Commission’s regulations. Comment Date: 5 p.m. eastern time on April 17, 2006. Federal Energy Regulatory Commission [Docket Nos. PH06–32–000, et al.] Alexander & Baldwin, Inc. et al.; Electric Rate and Corporate Filings March 31, 2006. The following filings have been made with the Commission. The filings are listed in ascending order within each docket classification. 1. Alexander & Baldwin, Inc.; McBryde Sugar Company, Limited [Docket No. PH06–32–000] Take notice that on March 20, 2006, Alexander & Baldwin, Inc. and McBryde Sugar Company, Limited filed a Petition for Waiver of the Requirements of The Public Utility Holding Company Act of 2005, pursuant to 18 CFR 366.3(c)(1) and 366.4(c)(1) of the Commission’s regulations on the basis that it is a single state holding company. Comment Date: 5 p.m. eastern time on April 10, 2006. 2. LMB Capital, Inc. wwhite on PROD1PC61 with NOTICES [Docket No. PH06–33–000] Take notice that on March 27, 2006, LMB Capital, Inc. filed a Petition for Exemption of the Requirements of The Public Utility Holding Company Act of 2005, pursuant to 18 CFR 366.3(a) 366.4(b)(1) of the Commission’s regulations. VerDate Aug<31>2005 19:13 Apr 06, 2006 Jkt 208001 6. Wygen Capital, Inc. [Docket No. PH06–37–000] Take notice that on March 27, 2006, Wygen Capital, Inc. filed a Petition for Exemption of the Requirements of The Public Utility Holding Company Act of 2005, pursuant to 18 CFR 366.3(a) and 366.4(b)(1) of the Commission’s regulations. Comment Date: 5 p.m. eastern time on April 17, 2006. [Docket No. PH06–38–000] Take notice that on March 27, 2006, LIC Capital, Inc. filed a Petition for Exemption of the Requirements of The Public Utility Holding Company Act of 2005, pursuant to 18 CFR 366.3(a) 366.4(b)(1) of the Commission’s regulations. Comment Date: 5 p.m. eastern time on April 17, 2006. Standard Paragraph Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Frm 00038 Fmt 4703 Sfmt 4703 Magalie R. Salas, Secretary. [FR Doc. E6–5093 Filed 4–6–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IS06–191–000] Colonial Pipeline Company; Notice of Technical Conference 7. LIC Capital, Inc. PO 00000 Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. March 31, 2006. Take notice that a technical conference will be convened on Wednesday, May 3, 2006, at 10 a.m. (EDT), in a room to be designated at the offices of the Federal Energy Regulatory Commission (FERC), 888 First Street, NE., Washington, DC 20426. If necessary, the technical conference will convene again on Thursday, May 4, 2006, at the same time and place. The technical conference will deal with issues related to Colonial Pipeline Company’s (Colonial) tariff supplements proposing changes relating to the E:\FR\FM\07APN1.SGM 07APN1

Agencies

[Federal Register Volume 71, Number 67 (Friday, April 7, 2006)]
[Notices]
[Page 17842]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-5093]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. PH06-32-000, et al.]


Alexander & Baldwin, Inc. et al.; Electric Rate and Corporate 
Filings

March 31, 2006.
    The following filings have been made with the Commission. The 
filings are listed in ascending order within each docket 
classification.

1. Alexander & Baldwin, Inc.; McBryde Sugar Company, Limited

[Docket No. PH06-32-000]

    Take notice that on March 20, 2006, Alexander & Baldwin, Inc. and 
McBryde Sugar Company, Limited filed a Petition for Waiver of the 
Requirements of The Public Utility Holding Company Act of 2005, 
pursuant to 18 CFR 366.3(c)(1) and 366.4(c)(1) of the Commission's 
regulations on the basis that it is a single state holding company.
    Comment Date: 5 p.m. eastern time on April 10, 2006.

2. LMB Capital, Inc.

[Docket No. PH06-33-000]

    Take notice that on March 27, 2006, LMB Capital, Inc. filed a 
Petition for Exemption of the Requirements of The Public Utility 
Holding Company Act of 2005, pursuant to 18 CFR 366.3(a) 366.4(b)(1) of 
the Commission's regulations.
    Comment Date: 5 p.m. eastern time on April 17, 2006.

3. Hawkeye Funding, Inc.

[Docket No. PH06-34-000]

    Take notice that on March 27, 2006, Hawkeye Funding, Inc. filed a 
Petition for Exemption of the Requirements of The Public Utility 
Holding Company Act of 2005, pursuant to 18 CFR 366.3(b) 366.4(b)(1) of 
the Commission's regulations.
    Comment Date: 5 p.m. eastern time on April 17, 2006.

4. Juniper Capital GP, LLC

[Docket No. PH06-35-000]

    Take notice that on March 27, 2006, Juniper Capital GP, LLC filed a 
Petition for Exemption of the Requirements of The Public Utility 
Holding Company Act of 2005, pursuant to 18 CFR 366.3(b) 366.4(b)(1) of 
the Commission's regulations.
    Comment Date: 5 p.m. eastern time on April 17, 2006.

5. JMG Capital, Inc.

[Docket No. PH06-36-000]

    Take notice that on March 27, 2006, JMG Capital, Inc. filed a 
Petition for Exemption of the Requirements of The Public Utility 
Holding Company Act of 2005, pursuant to 18 CFR 366.3(b) 366.4(b)(1) of 
the Commission's regulations.
    Comment Date: 5 p.m. eastern time on April 17, 2006.

6. Wygen Capital, Inc.

[Docket No. PH06-37-000]

    Take notice that on March 27, 2006, Wygen Capital, Inc. filed a 
Petition for Exemption of the Requirements of The Public Utility 
Holding Company Act of 2005, pursuant to 18 CFR 366.3(a) and 
366.4(b)(1) of the Commission's regulations.
    Comment Date: 5 p.m. eastern time on April 17, 2006.

7. LIC Capital, Inc.

[Docket No. PH06-38-000]

    Take notice that on March 27, 2006, LIC Capital, Inc. filed a 
Petition for Exemption of the Requirements of The Public Utility 
Holding Company Act of 2005, pursuant to 18 CFR 366.3(a) 366.4(b)(1) of 
the Commission's regulations.
    Comment Date: 5 p.m. eastern time on April 17, 2006.

Standard Paragraph

    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. On or 
before the comment date, it is not necessary to serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Magalie R. Salas,
Secretary.
 [FR Doc. E6-5093 Filed 4-6-06; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.