Alexander & Baldwin, Inc. et al.; Electric Rate and Corporate Filings, 17842 [E6-5093]
Download as PDF
17842
Federal Register / Vol. 71, No. 67 / Friday, April 7, 2006 / Notices
will not be required to serve copies of
filed documents on all other parties.
The Commission’s rules require that
persons filing comments in opposition
to the project provide copies of their
protests only to the applicant. However,
the non-party commenters will not
receive copies of all documents filed by
other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the Internet in lieu
of paper. See, 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
Comment Date: April 21, 2006.
Magalie Salas,
Secretary.
[FR Doc. E6–5097 Filed 4–6–06; 8:45 am]
Comment Date: 5 p.m. eastern time on
April 17, 2006.
3. Hawkeye Funding, Inc.
[Docket No. PH06–34–000]
Take notice that on March 27, 2006,
Hawkeye Funding, Inc. filed a Petition
for Exemption of the Requirements of
The Public Utility Holding Company
Act of 2005, pursuant to 18 CFR
366.3(b) 366.4(b)(1) of the Commission’s
regulations.
Comment Date: 5 p.m. eastern time on
April 17, 2006.
4. Juniper Capital GP, LLC
[Docket No. PH06–35–000]
Take notice that on March 27, 2006,
Juniper Capital GP, LLC filed a Petition
for Exemption of the Requirements of
The Public Utility Holding Company
Act of 2005, pursuant to 18 CFR
366.3(b) 366.4(b)(1) of the Commission’s
regulations.
Comment Date: 5 p.m. eastern time on
April 17, 2006.
BILLING CODE 6717–01–P
5. JMG Capital, Inc.
[Docket No. PH06–36–000]
DEPARTMENT OF ENERGY
Take notice that on March 27, 2006,
JMG Capital, Inc. filed a Petition for
Exemption of the Requirements of The
Public Utility Holding Company Act of
2005, pursuant to 18 CFR 366.3(b)
366.4(b)(1) of the Commission’s
regulations.
Comment Date: 5 p.m. eastern time on
April 17, 2006.
Federal Energy Regulatory
Commission
[Docket Nos. PH06–32–000, et al.]
Alexander & Baldwin, Inc. et al.;
Electric Rate and Corporate Filings
March 31, 2006.
The following filings have been made
with the Commission. The filings are
listed in ascending order within each
docket classification.
1. Alexander & Baldwin, Inc.; McBryde
Sugar Company, Limited
[Docket No. PH06–32–000]
Take notice that on March 20, 2006,
Alexander & Baldwin, Inc. and McBryde
Sugar Company, Limited filed a Petition
for Waiver of the Requirements of The
Public Utility Holding Company Act of
2005, pursuant to 18 CFR 366.3(c)(1)
and 366.4(c)(1) of the Commission’s
regulations on the basis that it is a single
state holding company.
Comment Date: 5 p.m. eastern time on
April 10, 2006.
2. LMB Capital, Inc.
wwhite on PROD1PC61 with NOTICES
[Docket No. PH06–33–000]
Take notice that on March 27, 2006,
LMB Capital, Inc. filed a Petition for
Exemption of the Requirements of The
Public Utility Holding Company Act of
2005, pursuant to 18 CFR 366.3(a)
366.4(b)(1) of the Commission’s
regulations.
VerDate Aug<31>2005
19:13 Apr 06, 2006
Jkt 208001
6. Wygen Capital, Inc.
[Docket No. PH06–37–000]
Take notice that on March 27, 2006,
Wygen Capital, Inc. filed a Petition for
Exemption of the Requirements of The
Public Utility Holding Company Act of
2005, pursuant to 18 CFR 366.3(a) and
366.4(b)(1) of the Commission’s
regulations.
Comment Date: 5 p.m. eastern time on
April 17, 2006.
[Docket No. PH06–38–000]
Take notice that on March 27, 2006,
LIC Capital, Inc. filed a Petition for
Exemption of the Requirements of The
Public Utility Holding Company Act of
2005, pursuant to 18 CFR 366.3(a)
366.4(b)(1) of the Commission’s
regulations.
Comment Date: 5 p.m. eastern time on
April 17, 2006.
Standard Paragraph
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Frm 00038
Fmt 4703
Sfmt 4703
Magalie R. Salas,
Secretary.
[FR Doc. E6–5093 Filed 4–6–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IS06–191–000]
Colonial Pipeline Company; Notice of
Technical Conference
7. LIC Capital, Inc.
PO 00000
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
March 31, 2006.
Take notice that a technical
conference will be convened on
Wednesday, May 3, 2006, at 10 a.m.
(EDT), in a room to be designated at the
offices of the Federal Energy Regulatory
Commission (FERC), 888 First Street,
NE., Washington, DC 20426. If
necessary, the technical conference will
convene again on Thursday, May 4,
2006, at the same time and place.
The technical conference will deal
with issues related to Colonial Pipeline
Company’s (Colonial) tariff supplements
proposing changes relating to the
E:\FR\FM\07APN1.SGM
07APN1
Agencies
[Federal Register Volume 71, Number 67 (Friday, April 7, 2006)]
[Notices]
[Page 17842]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-5093]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. PH06-32-000, et al.]
Alexander & Baldwin, Inc. et al.; Electric Rate and Corporate
Filings
March 31, 2006.
The following filings have been made with the Commission. The
filings are listed in ascending order within each docket
classification.
1. Alexander & Baldwin, Inc.; McBryde Sugar Company, Limited
[Docket No. PH06-32-000]
Take notice that on March 20, 2006, Alexander & Baldwin, Inc. and
McBryde Sugar Company, Limited filed a Petition for Waiver of the
Requirements of The Public Utility Holding Company Act of 2005,
pursuant to 18 CFR 366.3(c)(1) and 366.4(c)(1) of the Commission's
regulations on the basis that it is a single state holding company.
Comment Date: 5 p.m. eastern time on April 10, 2006.
2. LMB Capital, Inc.
[Docket No. PH06-33-000]
Take notice that on March 27, 2006, LMB Capital, Inc. filed a
Petition for Exemption of the Requirements of The Public Utility
Holding Company Act of 2005, pursuant to 18 CFR 366.3(a) 366.4(b)(1) of
the Commission's regulations.
Comment Date: 5 p.m. eastern time on April 17, 2006.
3. Hawkeye Funding, Inc.
[Docket No. PH06-34-000]
Take notice that on March 27, 2006, Hawkeye Funding, Inc. filed a
Petition for Exemption of the Requirements of The Public Utility
Holding Company Act of 2005, pursuant to 18 CFR 366.3(b) 366.4(b)(1) of
the Commission's regulations.
Comment Date: 5 p.m. eastern time on April 17, 2006.
4. Juniper Capital GP, LLC
[Docket No. PH06-35-000]
Take notice that on March 27, 2006, Juniper Capital GP, LLC filed a
Petition for Exemption of the Requirements of The Public Utility
Holding Company Act of 2005, pursuant to 18 CFR 366.3(b) 366.4(b)(1) of
the Commission's regulations.
Comment Date: 5 p.m. eastern time on April 17, 2006.
5. JMG Capital, Inc.
[Docket No. PH06-36-000]
Take notice that on March 27, 2006, JMG Capital, Inc. filed a
Petition for Exemption of the Requirements of The Public Utility
Holding Company Act of 2005, pursuant to 18 CFR 366.3(b) 366.4(b)(1) of
the Commission's regulations.
Comment Date: 5 p.m. eastern time on April 17, 2006.
6. Wygen Capital, Inc.
[Docket No. PH06-37-000]
Take notice that on March 27, 2006, Wygen Capital, Inc. filed a
Petition for Exemption of the Requirements of The Public Utility
Holding Company Act of 2005, pursuant to 18 CFR 366.3(a) and
366.4(b)(1) of the Commission's regulations.
Comment Date: 5 p.m. eastern time on April 17, 2006.
7. LIC Capital, Inc.
[Docket No. PH06-38-000]
Take notice that on March 27, 2006, LIC Capital, Inc. filed a
Petition for Exemption of the Requirements of The Public Utility
Holding Company Act of 2005, pursuant to 18 CFR 366.3(a) 366.4(b)(1) of
the Commission's regulations.
Comment Date: 5 p.m. eastern time on April 17, 2006.
Standard Paragraph
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date. On or
before the comment date, it is not necessary to serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6-5093 Filed 4-6-06; 8:45 am]
BILLING CODE 6717-01-P