Environmental Impacts Statements; Notice of Availability, 17846-17847 [E6-5090]
Download as PDF
17846
Federal Register / Vol. 71, No. 67 / Friday, April 7, 2006 / Notices
data, analyses, or discussion should be
included in the final EIS.
wwhite on PROD1PC61 with NOTICES
Category 3—Inadequate
EPA does not believe that the draft
EIS adequately assesses potentially
significant environmental impacts of the
action, or the EPA reviewer has
identified new, reasonably available
alternatives that are outside of the
spectrum of alternatives analyzed in the
draft EIS, which should be analyzed in
order to reduce the potentially
significant environmental impacts. EPA
believes that the identified additional
information, data, analyses, or
discussions are of such a magnitude that
they should have full public review at
a draft stage. EPA does not believe that
the draft EIS is adequate for the
purposes of the NEPA and/or Section
309 review, and thus should be formally
revised and made available for public
comment in a supplemental or revised
draft EIS. On the basis of the potential
significant impacts involved, this
proposal could be a candidate for
referral to the CEQ.
Draft EISs
EIS No. 20050530, ERP No. D–FHW–
L40229–ID, ID–75 Timmerman to
Ketchum—US–20 to Saddle Road,
Increase Roadway and Transportation
Safety, Cities of Bellevue, Hailey,
Ketchum and the City of Sun Valley,
Blaine County, ID
Summary: EPA expressed
environmental concerns about the
aquatic resources, ecological
connectivity, habitat permeability for
wildlife, and air toxic, and is also
concerned about the limited range of
alternatives analyzed and the secondary
effects of induced travel demand and
land use change. Rating EC2.
EIS No. 20050544, ERP No. D–FHW–
E40805–KY, Newtown Pike Extension
Project, Road Connection from West
Main Street to South Limestone Street
in Lexington, Fayette County, KY
Summary: EPA expressed
environmental concerns about the air
quality impacts, noise impacts, and the
adequacy of mitigation for
environmental justice issues. Rating
EC2.
EIS No. 20060011, ERP No. D–BLM–
J02050–UT, Chapita Wells-Stagecoach
Area Natural Gas Development,
Drilling and Production Operations of
Natural Gas Wells and Associated
Access Road, and Pipelines, Uintah
County, UT
Summary: EPA expressed
environmental concerns about impacts
to riparian areas along the White River
and wildlife habitat in specific locations
VerDate Aug<31>2005
19:13 Apr 06, 2006
Jkt 208001
of the project area, and recommended
that the final EIS should include
analysis and comparison of the full
range of alternatives considered. Rating
EC2.
EIS No. 20060032, ERP No. D–AFS–
L65502–AK, Kuiu Timber Sale Area,
Proposes to Harvest Timer and Build
Associated Temporary Roads, US.
Army COE Section 10 and 404
Permits, North Kuiu Island,
Petersburg Ranger District, Tongass
National Forest, AK
Summary: EPA expressed
environmental concerns about sediment
loading to streams from timber
harvesting, and recommended
Alternative 2 because it would
minimize potential adverse impacts to
water quality and aquatic habitat. Rating
EC1.
EIS No. 20060036, ERP No. D–BLM–
L65503–OR, North Steens Ecosystem
Restoration Project, To Reduce
Juniper-Related Fuels and Restore
Various Plant Communities,
Implementation, Andrews Resource
Area, Cooperative Management and
Protection Area (CMPA), Harney
County, OR
Summary: EPA expressed
environmental concerns about impacts
to air quality, water quality and riparian
areas, and requested that the above
impacts be avoided and/or mitigated.
Rating EC2.
EIS No. 20060038, ERP No. D–BLM–
J02051–UT, Greater Deadman Bench
Oil and Gas Producing Region,
Proposes to Develop Oil and Gas
Resources, Right-of-Way Grants and
Applications for Permit to Drill,
Vernal, Uintah County, UT
Summary: EPA expressed
environmental concerns about potential
impacts to riparian areas and wildlife
habitat, and recommended that the final
EIS provide a detailed management
plan, including mitigation and
monitoring for the duration of the
proposed action. Rating EC2.
Final EISs
EIS No. 20060039, ERP No. F–FAA–
K51042–AZ, Phoenix Sky Harbor
International Airport (PHX),
Construction and Operation of a
Terminal, Airfield and Surface
Transportation, City of Phoenix,
Maricopa County, AZ
Summary: EPA does not object to the
proposed project but continues to
recommend additional voluntary
mitigation measures for constructionrelated air emissions.
EIS No. 20060049, ERP No. F–FHW–
L40217–AK, South Extension of the
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
Coastal Trail Project, Extending the
existing Tony Knowles Coastal Trail
from Kincaid Park through the Project
Area to the Potter Weigh Station, COE
Section 10 and 404 Permits,
Municipality of Anchorage,
Anchorage, AK
Summary: EPA does not object to the
preferred alternative.
Dated: April 4, 2006.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E6–5113 Filed 4–6–06; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6673–9]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed March 27, 2006 Through March
31, 2006
Pursuant to 40 CFR 1506.9.
EIS No. 20060108, Revised Final EIS,
AFS, CO, Gold Camp Road Plan,
Develop a Feasible Plan to Manage the
Operation of Tunnel #3 and the 8.5
mile Road Segment, Pike National
Forest, Pikes Peak Ranger District,
Colorado Springs, El Paso County,
CO, Wait Period Ends: May 8, 2006,
Contact: Frank Landis 719–477–4203.
EIS No. 20060109, Draft EIS, NPS, KY,
Abraham Lincoln Birthplace National
Historic Site, General Management
Plan, Implementation, LaRue County,
KY, Comment Period Ends: June 5,
2006, Contact: Matthew Safford 303–
969–2898.
EIS No. 20060110, Draft EIS, AFS, MT,
Whitetail-Pipestone Travel
Management, Develop Site-Specific
Travel Management Plan, Jefferson
and Butte Ranger Districts,
Beaverhead-Deerlodge National
Forest, Jefferson and Silver Bow
Counties, MT, Comment Period Ends:
May 22, 2006, Contact: Cheryl Martin
406–287–3223 Ext 107.
EIS No. 20060111, Final Supplement,
COE, MO, St. Johns Bayou and New
Madrid Floodway Project, Channel
Enlargement and Improvement,
Revised Information to Clarify and
Address Issues of Concern, Flood
Control National Economic
Development (NED), New Madrid,
Mississippi and Scott Counties, MO,
E:\FR\FM\07APN1.SGM
07APN1
Federal Register / Vol. 71, No. 67 / Friday, April 7, 2006 / Notices
wwhite on PROD1PC61 with NOTICES
Wait Period Ends: May 8, 2006,
Contact: Daniel D. Ward 901–544–
0709.
EIS No. 20060112, Final EIS, OSM, PA,
Adoption—Dents Run Watershed
Ecosystem Restoration, Construction
and Operation of Six Acid Mine
Drainage Abatement Projects,
Implementation, Benezette Township,
Susquehana River Basin, Elk County,
PA, Wait Period Ends: May 8, 2006,
Contact: Fred Sherfy 717–782–4931
Ext 19. OSM has adopted the Corps of
Engineer’s, FEIS #20020021 filed
January 11, 2002. OSM was not a
Cooperating Agency on the FEIS.
Under Section 1506.3(b) of the CEQ
Regulation, the FEIS must be
Recirculated for a 30-day Wait Period.
EIS No. 20060113, Draft EIS, FHW, MO,
Interstate 29/35 Paseo Bridge
Corridor, Reconstruct and Widen I–
29/35, Missouri River, North Kansas
City and Kansas City, Clay and
Jackson Counties, MO, Comment
Period Ends: May 22, 2006, Contact:
Peggy Casey 573–636–7104.
EIS No. 20060114, Final EIS, EPA, CA,
Regional Non-Potable Water
Distribution System Project, Funding,
U.S. Army COE Section 404 Permit,
Riverside and San Bernardino County,
CA, Wait Period Ends: May 8, 2006,
Contact: Elizabeth Borowiec 415–972–
3419.
EIS No. 20060115, Draft EIS, AFS, UT,
Upper Strawberry Allotments
Grazing, Authorize Liverstock
Grazing, Heber Ranger District, Uinta
National Forest, Wasatch County, UT,
Comment Period Ends: May 22, 2006,
Contact: Jim Percy 435–654–0470.
EIS No. 20060116, Final EIS, NPS, OH,
First Ladies National Historic Site
General Management Plan,
Implementation, Canton, OH, Wait
Period Ends: May 8, 2006, Contact:
Carol J. Spears 440–974–2993.
EIS No. 20060117, Draft EIS, FHW, LA,
I–49 South Wax Lake Outlet to
Berwick Route US–90, Transportation
Improvements, Funding and Right-ofWay Acquisition, St. Mary Parish, LA,
Comment Period Ends: 05/31/2006,
Contact: William C. Farr 225–757–
7615.
EIS No. 20060118, Final EIS, AFS, OR,
Drew Creek Diamond Rock and
Divide Cattle Allotments, Alternative
VerDate Aug<31>2005
19:13 Apr 06, 2006
Jkt 208001
2 Preferred Alternative, Issuance of
Term Grazing Permits on Livestock
Allotments on Tiller Ranger District,
Implementation, Umpqua National
Forest, Douglas and Jackson Counties,
OR, Wait Period Ends: May 8, 2006,
Contact: Wes Yamamoto 541–825–
3100.
EIS No. 20060119, Draft EIS, FHW, VA,
Harrisonburg Southeast Connector
Location Study, Transportation
Improvements from U.S. Route 11 to
U.S. Route 33, Funding and US Army
COE Section 404 Permit, City of
Harrisonburg, Rockingham County,
VA, Comment Period Ends: May 26,
2006, Contact: John Simkins 804–
775–3342.
EIS No. 20060120, Final Supplement,
FTA, WA, Central Link Light Rail
Transit Project (Sound Transit)
Construction and Operation of the
North Link Light Rail Extension, from
Downtown Seattle and Northgate,
Updated Information on Refined
Design Concepts, Funding, Right-ofWay and U.S. Army COE Section 404
Permits, King County, WA, Wait
Period Ends: May 8, 2006, Contact:
James Irish 206–398–5000.
EIS No. 20060121, Final EIS, CGD, 00,
Compass Port and Deepwater Port
License Application, To Construct a
Liquefied Natural Gas (LNG)
Receiving, Storage and Regasification
Facility, Proposed Offshore Pipeline
and Fabrication Site, NPDES Permit,
U.S. Army COE Section 10 and 404
Permits, Mobile County, AL and San
Patricio and Nueces County, TX, Wait
Period Ends: May 22, 2006, Contact:
M.A. Prescott 202–267–0225.
17847
Notice and request for
comments.
ACTION:
SUMMARY: The Export-Import Bank, as a
part of its continuing effort to reduce
paperwork and respondent burden,
invites the general public and other
Federal Agencies to comment on the
proposed information collection, as
required by the Paperwork Reduction
Act of 1995. The form will be used by
Banks to apply for comprehensive or
political insurance coverage on foreign
banks for letter of credit transactions.
Our customers will be able to submit
this form on paper or electronically.
Written comments should be
received on or before May 8, 2006 to be
assured of consideration.
DATES:
Address all comments to
David Rostker, Office of Management
and Budget, Office of Information and
Regulatory Affairs, NEOB, Room 10202,
Washington, DC 20503, (202) 395–3897.
ADDRESSES:
SUPPLEMENTARY INFORMATION:
[Public Notice 83]
Time and Form Number: ExportImport Bank of the United States
Application for Issuing Bank Credit
Limit (IBCL) Under Bank Letter of
Credit Policy, EIB 92–36.
OMB Number: None.
Type of Review: Regular.
Need and Use: The information
requested enables the applicant to
provide Ex-Im Bank with the
information necessary to process credit
risk applications involving foreign letter
of credit issuing banks.
Affected Public: The form affects
entities involved in the export of U.S.
goods and services.
Estimated Annual Respondents: 60.
Estimated Time per Respondent: 20
minutes.
Estimated Annual Burden: 240 hours.
Frequency of Reporting or Use: 1 to 12
times per year depending on the
particular respondent’s need/risk
portfolio.
Agency Information Collection
Activities: Submission for OMB
Review; Comment Request
Dated: March 31, 2006.
Solomon Bush,
Agency Clearance Officer.
Dated: April 4, 2006.
Ken Mittelholtz,
Environmental Protection Specialist, NEPA
Compliance Division, Office of Federal
Activities.
[FR Doc. E6–5090 Filed 4–6–06; 8:45 am]
BILLING CODE 6560–50–P
EXPORT-IMPORT BANK
AGENCY:
PO 00000
Export-Import Bank of U.S.
Frm 00043
Fmt 4703
Sfmt 4703
BILLING CODE 6690–01–M
E:\FR\FM\07APN1.SGM
07APN1
Agencies
[Federal Register Volume 71, Number 67 (Friday, April 7, 2006)]
[Notices]
[Pages 17846-17847]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-5090]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6673-9]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed March 27, 2006 Through March 31, 2006
Pursuant to 40 CFR 1506.9.
EIS No. 20060108, Revised Final EIS, AFS, CO, Gold Camp Road Plan,
Develop a Feasible Plan to Manage the Operation of Tunnel 3
and the 8.5 mile Road Segment, Pike National Forest, Pikes Peak Ranger
District, Colorado Springs, El Paso County, CO, Wait Period Ends: May
8, 2006, Contact: Frank Landis 719-477-4203.
EIS No. 20060109, Draft EIS, NPS, KY, Abraham Lincoln Birthplace
National Historic Site, General Management Plan, Implementation, LaRue
County, KY, Comment Period Ends: June 5, 2006, Contact: Matthew Safford
303-969-2898.
EIS No. 20060110, Draft EIS, AFS, MT, Whitetail-Pipestone Travel
Management, Develop Site-Specific Travel Management Plan, Jefferson and
Butte Ranger Districts, Beaverhead-Deerlodge National Forest, Jefferson
and Silver Bow Counties, MT, Comment Period Ends: May 22, 2006,
Contact: Cheryl Martin 406-287-3223 Ext 107.
EIS No. 20060111, Final Supplement, COE, MO, St. Johns Bayou and New
Madrid Floodway Project, Channel Enlargement and Improvement, Revised
Information to Clarify and Address Issues of Concern, Flood Control
National Economic Development (NED), New Madrid, Mississippi and Scott
Counties, MO,
[[Page 17847]]
Wait Period Ends: May 8, 2006, Contact: Daniel D. Ward 901-544-0709.
EIS No. 20060112, Final EIS, OSM, PA, Adoption--Dents Run Watershed
Ecosystem Restoration, Construction and Operation of Six Acid Mine
Drainage Abatement Projects, Implementation, Benezette Township,
Susquehana River Basin, Elk County, PA, Wait Period Ends: May 8, 2006,
Contact: Fred Sherfy 717-782-4931 Ext 19. OSM has adopted the Corps of
Engineer's, FEIS 20020021 filed January 11, 2002. OSM was not
a Cooperating Agency on the FEIS. Under Section 1506.3(b) of the CEQ
Regulation, the FEIS must be Recirculated for a 30-day Wait Period.
EIS No. 20060113, Draft EIS, FHW, MO, Interstate 29/35 Paseo Bridge
Corridor, Reconstruct and Widen I-29/35, Missouri River, North Kansas
City and Kansas City, Clay and Jackson Counties, MO, Comment Period
Ends: May 22, 2006, Contact: Peggy Casey 573-636-7104.
EIS No. 20060114, Final EIS, EPA, CA, Regional Non-Potable Water
Distribution System Project, Funding, U.S. Army COE Section 404 Permit,
Riverside and San Bernardino County, CA, Wait Period Ends: May 8, 2006,
Contact: Elizabeth Borowiec 415-972-3419.
EIS No. 20060115, Draft EIS, AFS, UT, Upper Strawberry Allotments
Grazing, Authorize Liverstock Grazing, Heber Ranger District, Uinta
National Forest, Wasatch County, UT, Comment Period Ends: May 22, 2006,
Contact: Jim Percy 435-654-0470.
EIS No. 20060116, Final EIS, NPS, OH, First Ladies National Historic
Site General Management Plan, Implementation, Canton, OH, Wait Period
Ends: May 8, 2006, Contact: Carol J. Spears 440-974-2993.
EIS No. 20060117, Draft EIS, FHW, LA, I-49 South Wax Lake Outlet to
Berwick Route US-90, Transportation Improvements, Funding and Right-of-
Way Acquisition, St. Mary Parish, LA, Comment Period Ends: 05/31/2006,
Contact: William C. Farr 225-757-7615.
EIS No. 20060118, Final EIS, AFS, OR, Drew Creek Diamond Rock and
Divide Cattle Allotments, Alternative 2 Preferred Alternative, Issuance
of Term Grazing Permits on Livestock Allotments on Tiller Ranger
District, Implementation, Umpqua National Forest, Douglas and Jackson
Counties, OR, Wait Period Ends: May 8, 2006, Contact: Wes Yamamoto 541-
825-3100.
EIS No. 20060119, Draft EIS, FHW, VA, Harrisonburg Southeast Connector
Location Study, Transportation Improvements from U.S. Route 11 to U.S.
Route 33, Funding and US Army COE Section 404 Permit, City of
Harrisonburg, Rockingham County, VA, Comment Period Ends: May 26, 2006,
Contact: John Simkins 804-775-3342.
EIS No. 20060120, Final Supplement, FTA, WA, Central Link Light Rail
Transit Project (Sound Transit) Construction and Operation of the North
Link Light Rail Extension, from Downtown Seattle and Northgate, Updated
Information on Refined Design Concepts, Funding, Right-of-Way and U.S.
Army COE Section 404 Permits, King County, WA, Wait Period Ends: May 8,
2006, Contact: James Irish 206-398-5000.
EIS No. 20060121, Final EIS, CGD, 00, Compass Port and Deepwater Port
License Application, To Construct a Liquefied Natural Gas (LNG)
Receiving, Storage and Regasification Facility, Proposed Offshore
Pipeline and Fabrication Site, NPDES Permit, U.S. Army COE Section 10
and 404 Permits, Mobile County, AL and San Patricio and Nueces County,
TX, Wait Period Ends: May 22, 2006, Contact: M.A. Prescott 202-267-
0225.
Dated: April 4, 2006.
Ken Mittelholtz,
Environmental Protection Specialist, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E6-5090 Filed 4-6-06; 8:45 am]
BILLING CODE 6560-50-P