Environmental Impacts Statements; Notice of Availability, 17846-17847 [E6-5090]

Download as PDF 17846 Federal Register / Vol. 71, No. 67 / Friday, April 7, 2006 / Notices data, analyses, or discussion should be included in the final EIS. wwhite on PROD1PC61 with NOTICES Category 3—Inadequate EPA does not believe that the draft EIS adequately assesses potentially significant environmental impacts of the action, or the EPA reviewer has identified new, reasonably available alternatives that are outside of the spectrum of alternatives analyzed in the draft EIS, which should be analyzed in order to reduce the potentially significant environmental impacts. EPA believes that the identified additional information, data, analyses, or discussions are of such a magnitude that they should have full public review at a draft stage. EPA does not believe that the draft EIS is adequate for the purposes of the NEPA and/or Section 309 review, and thus should be formally revised and made available for public comment in a supplemental or revised draft EIS. On the basis of the potential significant impacts involved, this proposal could be a candidate for referral to the CEQ. Draft EISs EIS No. 20050530, ERP No. D–FHW– L40229–ID, ID–75 Timmerman to Ketchum—US–20 to Saddle Road, Increase Roadway and Transportation Safety, Cities of Bellevue, Hailey, Ketchum and the City of Sun Valley, Blaine County, ID Summary: EPA expressed environmental concerns about the aquatic resources, ecological connectivity, habitat permeability for wildlife, and air toxic, and is also concerned about the limited range of alternatives analyzed and the secondary effects of induced travel demand and land use change. Rating EC2. EIS No. 20050544, ERP No. D–FHW– E40805–KY, Newtown Pike Extension Project, Road Connection from West Main Street to South Limestone Street in Lexington, Fayette County, KY Summary: EPA expressed environmental concerns about the air quality impacts, noise impacts, and the adequacy of mitigation for environmental justice issues. Rating EC2. EIS No. 20060011, ERP No. D–BLM– J02050–UT, Chapita Wells-Stagecoach Area Natural Gas Development, Drilling and Production Operations of Natural Gas Wells and Associated Access Road, and Pipelines, Uintah County, UT Summary: EPA expressed environmental concerns about impacts to riparian areas along the White River and wildlife habitat in specific locations VerDate Aug<31>2005 19:13 Apr 06, 2006 Jkt 208001 of the project area, and recommended that the final EIS should include analysis and comparison of the full range of alternatives considered. Rating EC2. EIS No. 20060032, ERP No. D–AFS– L65502–AK, Kuiu Timber Sale Area, Proposes to Harvest Timer and Build Associated Temporary Roads, US. Army COE Section 10 and 404 Permits, North Kuiu Island, Petersburg Ranger District, Tongass National Forest, AK Summary: EPA expressed environmental concerns about sediment loading to streams from timber harvesting, and recommended Alternative 2 because it would minimize potential adverse impacts to water quality and aquatic habitat. Rating EC1. EIS No. 20060036, ERP No. D–BLM– L65503–OR, North Steens Ecosystem Restoration Project, To Reduce Juniper-Related Fuels and Restore Various Plant Communities, Implementation, Andrews Resource Area, Cooperative Management and Protection Area (CMPA), Harney County, OR Summary: EPA expressed environmental concerns about impacts to air quality, water quality and riparian areas, and requested that the above impacts be avoided and/or mitigated. Rating EC2. EIS No. 20060038, ERP No. D–BLM– J02051–UT, Greater Deadman Bench Oil and Gas Producing Region, Proposes to Develop Oil and Gas Resources, Right-of-Way Grants and Applications for Permit to Drill, Vernal, Uintah County, UT Summary: EPA expressed environmental concerns about potential impacts to riparian areas and wildlife habitat, and recommended that the final EIS provide a detailed management plan, including mitigation and monitoring for the duration of the proposed action. Rating EC2. Final EISs EIS No. 20060039, ERP No. F–FAA– K51042–AZ, Phoenix Sky Harbor International Airport (PHX), Construction and Operation of a Terminal, Airfield and Surface Transportation, City of Phoenix, Maricopa County, AZ Summary: EPA does not object to the proposed project but continues to recommend additional voluntary mitigation measures for constructionrelated air emissions. EIS No. 20060049, ERP No. F–FHW– L40217–AK, South Extension of the PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 Coastal Trail Project, Extending the existing Tony Knowles Coastal Trail from Kincaid Park through the Project Area to the Potter Weigh Station, COE Section 10 and 404 Permits, Municipality of Anchorage, Anchorage, AK Summary: EPA does not object to the preferred alternative. Dated: April 4, 2006. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E6–5113 Filed 4–6–06; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6673–9] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7167 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed March 27, 2006 Through March 31, 2006 Pursuant to 40 CFR 1506.9. EIS No. 20060108, Revised Final EIS, AFS, CO, Gold Camp Road Plan, Develop a Feasible Plan to Manage the Operation of Tunnel #3 and the 8.5 mile Road Segment, Pike National Forest, Pikes Peak Ranger District, Colorado Springs, El Paso County, CO, Wait Period Ends: May 8, 2006, Contact: Frank Landis 719–477–4203. EIS No. 20060109, Draft EIS, NPS, KY, Abraham Lincoln Birthplace National Historic Site, General Management Plan, Implementation, LaRue County, KY, Comment Period Ends: June 5, 2006, Contact: Matthew Safford 303– 969–2898. EIS No. 20060110, Draft EIS, AFS, MT, Whitetail-Pipestone Travel Management, Develop Site-Specific Travel Management Plan, Jefferson and Butte Ranger Districts, Beaverhead-Deerlodge National Forest, Jefferson and Silver Bow Counties, MT, Comment Period Ends: May 22, 2006, Contact: Cheryl Martin 406–287–3223 Ext 107. EIS No. 20060111, Final Supplement, COE, MO, St. Johns Bayou and New Madrid Floodway Project, Channel Enlargement and Improvement, Revised Information to Clarify and Address Issues of Concern, Flood Control National Economic Development (NED), New Madrid, Mississippi and Scott Counties, MO, E:\FR\FM\07APN1.SGM 07APN1 Federal Register / Vol. 71, No. 67 / Friday, April 7, 2006 / Notices wwhite on PROD1PC61 with NOTICES Wait Period Ends: May 8, 2006, Contact: Daniel D. Ward 901–544– 0709. EIS No. 20060112, Final EIS, OSM, PA, Adoption—Dents Run Watershed Ecosystem Restoration, Construction and Operation of Six Acid Mine Drainage Abatement Projects, Implementation, Benezette Township, Susquehana River Basin, Elk County, PA, Wait Period Ends: May 8, 2006, Contact: Fred Sherfy 717–782–4931 Ext 19. OSM has adopted the Corps of Engineer’s, FEIS #20020021 filed January 11, 2002. OSM was not a Cooperating Agency on the FEIS. Under Section 1506.3(b) of the CEQ Regulation, the FEIS must be Recirculated for a 30-day Wait Period. EIS No. 20060113, Draft EIS, FHW, MO, Interstate 29/35 Paseo Bridge Corridor, Reconstruct and Widen I– 29/35, Missouri River, North Kansas City and Kansas City, Clay and Jackson Counties, MO, Comment Period Ends: May 22, 2006, Contact: Peggy Casey 573–636–7104. EIS No. 20060114, Final EIS, EPA, CA, Regional Non-Potable Water Distribution System Project, Funding, U.S. Army COE Section 404 Permit, Riverside and San Bernardino County, CA, Wait Period Ends: May 8, 2006, Contact: Elizabeth Borowiec 415–972– 3419. EIS No. 20060115, Draft EIS, AFS, UT, Upper Strawberry Allotments Grazing, Authorize Liverstock Grazing, Heber Ranger District, Uinta National Forest, Wasatch County, UT, Comment Period Ends: May 22, 2006, Contact: Jim Percy 435–654–0470. EIS No. 20060116, Final EIS, NPS, OH, First Ladies National Historic Site General Management Plan, Implementation, Canton, OH, Wait Period Ends: May 8, 2006, Contact: Carol J. Spears 440–974–2993. EIS No. 20060117, Draft EIS, FHW, LA, I–49 South Wax Lake Outlet to Berwick Route US–90, Transportation Improvements, Funding and Right-ofWay Acquisition, St. Mary Parish, LA, Comment Period Ends: 05/31/2006, Contact: William C. Farr 225–757– 7615. EIS No. 20060118, Final EIS, AFS, OR, Drew Creek Diamond Rock and Divide Cattle Allotments, Alternative VerDate Aug<31>2005 19:13 Apr 06, 2006 Jkt 208001 2 Preferred Alternative, Issuance of Term Grazing Permits on Livestock Allotments on Tiller Ranger District, Implementation, Umpqua National Forest, Douglas and Jackson Counties, OR, Wait Period Ends: May 8, 2006, Contact: Wes Yamamoto 541–825– 3100. EIS No. 20060119, Draft EIS, FHW, VA, Harrisonburg Southeast Connector Location Study, Transportation Improvements from U.S. Route 11 to U.S. Route 33, Funding and US Army COE Section 404 Permit, City of Harrisonburg, Rockingham County, VA, Comment Period Ends: May 26, 2006, Contact: John Simkins 804– 775–3342. EIS No. 20060120, Final Supplement, FTA, WA, Central Link Light Rail Transit Project (Sound Transit) Construction and Operation of the North Link Light Rail Extension, from Downtown Seattle and Northgate, Updated Information on Refined Design Concepts, Funding, Right-ofWay and U.S. Army COE Section 404 Permits, King County, WA, Wait Period Ends: May 8, 2006, Contact: James Irish 206–398–5000. EIS No. 20060121, Final EIS, CGD, 00, Compass Port and Deepwater Port License Application, To Construct a Liquefied Natural Gas (LNG) Receiving, Storage and Regasification Facility, Proposed Offshore Pipeline and Fabrication Site, NPDES Permit, U.S. Army COE Section 10 and 404 Permits, Mobile County, AL and San Patricio and Nueces County, TX, Wait Period Ends: May 22, 2006, Contact: M.A. Prescott 202–267–0225. 17847 Notice and request for comments. ACTION: SUMMARY: The Export-Import Bank, as a part of its continuing effort to reduce paperwork and respondent burden, invites the general public and other Federal Agencies to comment on the proposed information collection, as required by the Paperwork Reduction Act of 1995. The form will be used by Banks to apply for comprehensive or political insurance coverage on foreign banks for letter of credit transactions. Our customers will be able to submit this form on paper or electronically. Written comments should be received on or before May 8, 2006 to be assured of consideration. DATES: Address all comments to David Rostker, Office of Management and Budget, Office of Information and Regulatory Affairs, NEOB, Room 10202, Washington, DC 20503, (202) 395–3897. ADDRESSES: SUPPLEMENTARY INFORMATION: [Public Notice 83] Time and Form Number: ExportImport Bank of the United States Application for Issuing Bank Credit Limit (IBCL) Under Bank Letter of Credit Policy, EIB 92–36. OMB Number: None. Type of Review: Regular. Need and Use: The information requested enables the applicant to provide Ex-Im Bank with the information necessary to process credit risk applications involving foreign letter of credit issuing banks. Affected Public: The form affects entities involved in the export of U.S. goods and services. Estimated Annual Respondents: 60. Estimated Time per Respondent: 20 minutes. Estimated Annual Burden: 240 hours. Frequency of Reporting or Use: 1 to 12 times per year depending on the particular respondent’s need/risk portfolio. Agency Information Collection Activities: Submission for OMB Review; Comment Request Dated: March 31, 2006. Solomon Bush, Agency Clearance Officer. Dated: April 4, 2006. Ken Mittelholtz, Environmental Protection Specialist, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E6–5090 Filed 4–6–06; 8:45 am] BILLING CODE 6560–50–P EXPORT-IMPORT BANK AGENCY: PO 00000 Export-Import Bank of U.S. Frm 00043 Fmt 4703 Sfmt 4703 BILLING CODE 6690–01–M E:\FR\FM\07APN1.SGM 07APN1

Agencies

[Federal Register Volume 71, Number 67 (Friday, April 7, 2006)]
[Notices]
[Pages 17846-17847]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-5090]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6673-9]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements
Filed March 27, 2006 Through March 31, 2006
Pursuant to 40 CFR 1506.9.

EIS No. 20060108, Revised Final EIS, AFS, CO, Gold Camp Road Plan, 
Develop a Feasible Plan to Manage the Operation of Tunnel 3 
and the 8.5 mile Road Segment, Pike National Forest, Pikes Peak Ranger 
District, Colorado Springs, El Paso County, CO, Wait Period Ends: May 
8, 2006, Contact: Frank Landis 719-477-4203.
EIS No. 20060109, Draft EIS, NPS, KY, Abraham Lincoln Birthplace 
National Historic Site, General Management Plan, Implementation, LaRue 
County, KY, Comment Period Ends: June 5, 2006, Contact: Matthew Safford 
303-969-2898.
EIS No. 20060110, Draft EIS, AFS, MT, Whitetail-Pipestone Travel 
Management, Develop Site-Specific Travel Management Plan, Jefferson and 
Butte Ranger Districts, Beaverhead-Deerlodge National Forest, Jefferson 
and Silver Bow Counties, MT, Comment Period Ends: May 22, 2006, 
Contact: Cheryl Martin 406-287-3223 Ext 107.
EIS No. 20060111, Final Supplement, COE, MO, St. Johns Bayou and New 
Madrid Floodway Project, Channel Enlargement and Improvement, Revised 
Information to Clarify and Address Issues of Concern, Flood Control 
National Economic Development (NED), New Madrid, Mississippi and Scott 
Counties, MO,

[[Page 17847]]

Wait Period Ends: May 8, 2006, Contact: Daniel D. Ward 901-544-0709.
EIS No. 20060112, Final EIS, OSM, PA, Adoption--Dents Run Watershed 
Ecosystem Restoration, Construction and Operation of Six Acid Mine 
Drainage Abatement Projects, Implementation, Benezette Township, 
Susquehana River Basin, Elk County, PA, Wait Period Ends: May 8, 2006, 
Contact: Fred Sherfy 717-782-4931 Ext 19. OSM has adopted the Corps of 
Engineer's, FEIS 20020021 filed January 11, 2002. OSM was not 
a Cooperating Agency on the FEIS. Under Section 1506.3(b) of the CEQ 
Regulation, the FEIS must be Recirculated for a 30-day Wait Period.
EIS No. 20060113, Draft EIS, FHW, MO, Interstate 29/35 Paseo Bridge 
Corridor, Reconstruct and Widen I-29/35, Missouri River, North Kansas 
City and Kansas City, Clay and Jackson Counties, MO, Comment Period 
Ends: May 22, 2006, Contact: Peggy Casey 573-636-7104.
EIS No. 20060114, Final EIS, EPA, CA, Regional Non-Potable Water 
Distribution System Project, Funding, U.S. Army COE Section 404 Permit, 
Riverside and San Bernardino County, CA, Wait Period Ends: May 8, 2006, 
Contact: Elizabeth Borowiec 415-972-3419.
EIS No. 20060115, Draft EIS, AFS, UT, Upper Strawberry Allotments 
Grazing, Authorize Liverstock Grazing, Heber Ranger District, Uinta 
National Forest, Wasatch County, UT, Comment Period Ends: May 22, 2006, 
Contact: Jim Percy 435-654-0470.
EIS No. 20060116, Final EIS, NPS, OH, First Ladies National Historic 
Site General Management Plan, Implementation, Canton, OH, Wait Period 
Ends: May 8, 2006, Contact: Carol J. Spears 440-974-2993.
EIS No. 20060117, Draft EIS, FHW, LA, I-49 South Wax Lake Outlet to 
Berwick Route US-90, Transportation Improvements, Funding and Right-of-
Way Acquisition, St. Mary Parish, LA, Comment Period Ends: 05/31/2006, 
Contact: William C. Farr 225-757-7615.
EIS No. 20060118, Final EIS, AFS, OR, Drew Creek Diamond Rock and 
Divide Cattle Allotments, Alternative 2 Preferred Alternative, Issuance 
of Term Grazing Permits on Livestock Allotments on Tiller Ranger 
District, Implementation, Umpqua National Forest, Douglas and Jackson 
Counties, OR, Wait Period Ends: May 8, 2006, Contact: Wes Yamamoto 541-
825-3100.
EIS No. 20060119, Draft EIS, FHW, VA, Harrisonburg Southeast Connector 
Location Study, Transportation Improvements from U.S. Route 11 to U.S. 
Route 33, Funding and US Army COE Section 404 Permit, City of 
Harrisonburg, Rockingham County, VA, Comment Period Ends: May 26, 2006, 
Contact: John Simkins 804-775-3342.
EIS No. 20060120, Final Supplement, FTA, WA, Central Link Light Rail 
Transit Project (Sound Transit) Construction and Operation of the North 
Link Light Rail Extension, from Downtown Seattle and Northgate, Updated 
Information on Refined Design Concepts, Funding, Right-of-Way and U.S. 
Army COE Section 404 Permits, King County, WA, Wait Period Ends: May 8, 
2006, Contact: James Irish 206-398-5000.
EIS No. 20060121, Final EIS, CGD, 00, Compass Port and Deepwater Port 
License Application, To Construct a Liquefied Natural Gas (LNG) 
Receiving, Storage and Regasification Facility, Proposed Offshore 
Pipeline and Fabrication Site, NPDES Permit, U.S. Army COE Section 10 
and 404 Permits, Mobile County, AL and San Patricio and Nueces County, 
TX, Wait Period Ends: May 22, 2006, Contact: M.A. Prescott 202-267-
0225.

    Dated: April 4, 2006.
Ken Mittelholtz,
Environmental Protection Specialist, NEPA Compliance Division, Office 
of Federal Activities.
[FR Doc. E6-5090 Filed 4-6-06; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.