Combined Notice of Filings #1, 16300-16301 [E6-4706]
Download as PDF
16300
Federal Register / Vol. 71, No. 62 / Friday, March 31, 2006 / Notices
market-based rate schedules, the
wholesale power sales agreements there
under and those facilities necessary to
interconnect with the transmission grid.
Comment Date: 5 p.m. eastern time on
April 6, 2006.
Standard Paragraph
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–4694 Filed 3–30–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
dsatterwhite on PROD1PC76 with NOTICES
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
March 28, 2006.
Take notice that the Commission
received the following electric rate
filings.
Docket Numbers: ER04–805–004.
VerDate Aug<31>2005
16:35 Mar 30, 2006
Jkt 208001
Applicants: Wabash Valley Power
Association, Inc.
Description: Wabash Valley Power
Association, Inc submits revision to its
market-based rate tariff.
Filed Date: 3/17/2006.
Accession Number: 20060324–0037.
Comment Date: 5 p.m. eastern time on
Friday, April 7, 2006.
Docket Numbers: ER05–1230–001.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: Midwest Independent
Transmission System Operator, Inc
submits proposed revisions to Sheet 208
to FERC Electric Tariff, Third Revised
Volume No. 1.
Filed Date: 3/15/2006.
Accession Number: 20060324–0033.
Comment Date: 5 p.m. eastern time on
Wednesday, April 5, 2006.
Docket Numbers: ER06–321–002.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: Midwest ISO submits the
signature page for the City Water Light
and Power, IL signed by the Mayor of
Springfield, IL in reference to December
14, 2005 filing.
Filed Date: 3/15/2006.
Accession Number: 20060324–0034.
Comment Date: 5 p.m. eastern time on
Wednesday, April 3, 2006.
Docket Numbers: ER06–360–002;
ER06–361–002; ER06–362–002; ER06–
363–002; ER06–366–002; ER06–372–
002.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: Midwest Independent
Transmission System Operator Inc &
Midwest ISO Transmission Owners
submit proposed revisions to Schedule
23 of Midwest ISO’s OAT and Energy
Market Tariff.
Filed Date: 3/20/2006.
Accession Number: 20060324–0038.
Comment Date: 5 p.m. eastern time on
Monday, April 10, 2006.
Docket Numbers: ER06–503–001.
Applicants: Puget Sound Energy, Inc.
Description: Puget Sound Energy, Inc
submits a revision to Annex A, which
includes the pro forma Large Generator
Interconnection Procedures and Large
Generator Interconnection Agreement.
Filed Date: 3/17/2006.
Accession Number: 20060324–0035.
Comment Date: 5 p.m. eastern time on
Friday, April 7, 2006.
Docket Numbers: ER06–523–001.
Applicants: Ohio Valley Electric
Corporation.
Description: Ohio Valley Electric Corp
submits an amendment to the First
Supplemental Agreement to the Facility
Agreement with Cinergy Services, Inc.
Filed Date: 3/17/2006.
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
Accession Number: 20060324–0036.
Comment Date: 5 p.m. eastern time on
Monday, April 3, 2006.
Docket Numbers: ER06–690–001.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: Midwest Independent
Transmission System Operator, Inc.
submits Substitute Third Revised Sheet
No. 207 to FERC Electric Tariff, Third
Revised Volume No. 1.
Filed Date: 3/16/2006.
Accession Number: 20060324–0032.
Comment Date: 5 p.m. eastern time on
Thursday, April 6, 2006.
Docket Numbers: ER06–763–000.
Applicants: Motiva Enterprises LLC—
Port Arthur Refinery.
Description: Motiva Enterprises LLC
submits its proposed market-based rate
tariff for its qualifying cogeneration
facility.
Filed Date: 3/16/2006.
Accession Number: 20060324–0023.
Comment Date: 5 p.m. eastern time on
Thursday, April 6, 2006.
Docket Numbers: ER06–768–000.
Applicants: Akula Energy, LLC.
Description: Akula Energy LLC
submits a petition for acceptance of
initial rate schedule, waivers and
blanket authority.
Filed Date: 3/20/2006.
Accession Number: 20060324–0028.
Comment Date: 5 p.m. eastern time on
Monday, April 10, 2006.
Docket Numbers: ER06–770–000;
ER03–478–000.
Applicants: PPM Energy, Inc.
Description: PPM Energy, Inc submits
proposed amendments to its marketbased rate schedule to remove the
prohibition against transactions with
PacifiCorp as well as the codes of
conduct.
Filed Date: 3/20/2006.
Accession Number: 20060324–0067.
Comment Date: 5 p.m. eastern time on
Monday, April 10, 2006.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
E:\FR\FM\31MRN1.SGM
31MRN1
Federal Register / Vol. 71, No. 62 / Friday, March 31, 2006 / Notices
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–4706 Filed 3–30–06; 8:45 am]
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
[Docket Nos. EC06–100–000, et al.]
Dominion Nuclear Marketing III, L.L.C.,
et al.; Electric Rate and Corporate
Filings
March 27, 2006.
dsatterwhite on PROD1PC76 with NOTICES
The following filings have been made
with the Commission. The filings are
listed in ascending order within each
docket classification.
1. Dominion Nuclear Marketing III,
L.L.C.; Dominion Nuclear Connecticut,
Inc. and Dominion Energy Marketing,
Inc.
[Docket Nos. EC06–100–000, ER06–778–000]
Take notice that on March 21, 2006,
Dominion Nuclear Marketing III, L.L.C.
16:35 Mar 30, 2006
2. Granite Ridge I SPE LLC; Granite
Ridge Energy, LLC; Merrill Lynch
Credit Products, LLC; Electron
Holdings, LLC; Cargill Financial
Services International, Inc.; Stonehill
Institutional Partners, L.P.
[Docket No. EC06–101–000]
Take notice that on March 23, 2006,
Granite Ridge I SPE LLC, Granite Ridge
Energy, LLC, Merrill Lynch Credit
Products, LLC, Electron Holdings, LLC,
Cargill Financial Services International,
Inc. and Stonehill Institutional Partners,
L.P. filed an application pursuant to
section 203 of the Federal Power Act
seeking authorization to transfer equity
and voting interests in Granite Ridge I
to and/or from MLCP, Electron, Cargill
Financial and Stonehill.
Comment Date: 5 p.m. eastern time on
April 13, 2006.
3. PPM Energy, Inc.; PPM Wind Energy
LLC; Aeolus Wind Power I LLC;
Moraine Wind LLC; Klondike Wind
Power LLC; Mountain View Power
Partners III, LLC; Flying Cloud Power
Partners, LLC
[Docket No. EC06–102–000]
DEPARTMENT OF ENERGY
VerDate Aug<31>2005
(‘‘DNM III’’), Dominion Nuclear
Connecticut, Inc. (‘‘DNC’’) and
Dominion Energy Marketing, Inc.
(‘‘DEMI’’) submitted an application
pursuant to section 203 of the Federal
Power Act for authorization of a
disposition of jurisdictional facilities as
a result of an internal corporate
reorganization where DNC interest will
be transferred to DEMI and DNM III’s
market-based rate schedule Original
Volume No. 1 shall be cancelled,
effective upon the date of
reorganization.
Comment Date: 5 p.m. eastern time on
April 11, 2006.
Jkt 208001
Take notice that on March 23, 2006,
PPM Energy, Inc., PPM Wind Energy
LLC, Aeolus Wind Power I LLC,
Moraine Wind LLC, Klondike Wind
Power LLC, Mountain View Power
Partners III, LLC and Flying Cloud
Power Partners, LLC, filed a joint
application pursuant to section 203 of
the Federal Power Act for authorization
for an intra-corporate reorganization and
for the sale to FC Energy Finance I, Inc.
of Class B membership interests in
Aeolus Wind Power.
Comment Date: 5 p.m. eastern time on
April 13, 2006.
16301
submit a response to the deficiency
letter issued on March 23, 2006 in the
above-referenced proceeding to the
February 16, 2006 joint filing.
Comment Date: 5 p.m. eastern time on
April 3, 2006.
Standard Paragraph
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–4712 Filed 3–30–06; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6673–8]
[Docket No. ER06–647–001]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Take notice that on March 24, 2006,
ISO New England Inc. and the New
England Power Pool (NEPOOL)
Participants Committee hereby joint
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and section
4. ISO New England Inc.
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
E:\FR\FM\31MRN1.SGM
31MRN1
Agencies
[Federal Register Volume 71, Number 62 (Friday, March 31, 2006)]
[Notices]
[Pages 16300-16301]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-4706]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 1
March 28, 2006.
Take notice that the Commission received the following electric
rate filings.
Docket Numbers: ER04-805-004.
Applicants: Wabash Valley Power Association, Inc.
Description: Wabash Valley Power Association, Inc submits revision
to its market-based rate tariff.
Filed Date: 3/17/2006.
Accession Number: 20060324-0037.
Comment Date: 5 p.m. eastern time on Friday, April 7, 2006.
Docket Numbers: ER05-1230-001.
Applicants: Midwest Independent Transmission System Operator, Inc.
Description: Midwest Independent Transmission System Operator, Inc
submits proposed revisions to Sheet 208 to FERC Electric Tariff, Third
Revised Volume No. 1.
Filed Date: 3/15/2006.
Accession Number: 20060324-0033.
Comment Date: 5 p.m. eastern time on Wednesday, April 5, 2006.
Docket Numbers: ER06-321-002.
Applicants: Midwest Independent Transmission System Operator, Inc.
Description: Midwest ISO submits the signature page for the City
Water Light and Power, IL signed by the Mayor of Springfield, IL in
reference to December 14, 2005 filing.
Filed Date: 3/15/2006.
Accession Number: 20060324-0034.
Comment Date: 5 p.m. eastern time on Wednesday, April 3, 2006.
Docket Numbers: ER06-360-002; ER06-361-002; ER06-362-002; ER06-363-
002; ER06-366-002; ER06-372-002.
Applicants: Midwest Independent Transmission System Operator, Inc.
Description: Midwest Independent Transmission System Operator Inc &
Midwest ISO Transmission Owners submit proposed revisions to Schedule
23 of Midwest ISO's OAT and Energy Market Tariff.
Filed Date: 3/20/2006.
Accession Number: 20060324-0038.
Comment Date: 5 p.m. eastern time on Monday, April 10, 2006.
Docket Numbers: ER06-503-001.
Applicants: Puget Sound Energy, Inc.
Description: Puget Sound Energy, Inc submits a revision to Annex A,
which includes the pro forma Large Generator Interconnection Procedures
and Large Generator Interconnection Agreement.
Filed Date: 3/17/2006.
Accession Number: 20060324-0035.
Comment Date: 5 p.m. eastern time on Friday, April 7, 2006.
Docket Numbers: ER06-523-001.
Applicants: Ohio Valley Electric Corporation.
Description: Ohio Valley Electric Corp submits an amendment to the
First Supplemental Agreement to the Facility Agreement with Cinergy
Services, Inc.
Filed Date: 3/17/2006.
Accession Number: 20060324-0036.
Comment Date: 5 p.m. eastern time on Monday, April 3, 2006.
Docket Numbers: ER06-690-001.
Applicants: Midwest Independent Transmission System Operator, Inc.
Description: Midwest Independent Transmission System Operator, Inc.
submits Substitute Third Revised Sheet No. 207 to FERC Electric Tariff,
Third Revised Volume No. 1.
Filed Date: 3/16/2006.
Accession Number: 20060324-0032.
Comment Date: 5 p.m. eastern time on Thursday, April 6, 2006.
Docket Numbers: ER06-763-000.
Applicants: Motiva Enterprises LLC--Port Arthur Refinery.
Description: Motiva Enterprises LLC submits its proposed market-
based rate tariff for its qualifying cogeneration facility.
Filed Date: 3/16/2006.
Accession Number: 20060324-0023.
Comment Date: 5 p.m. eastern time on Thursday, April 6, 2006.
Docket Numbers: ER06-768-000.
Applicants: Akula Energy, LLC.
Description: Akula Energy LLC submits a petition for acceptance of
initial rate schedule, waivers and blanket authority.
Filed Date: 3/20/2006.
Accession Number: 20060324-0028.
Comment Date: 5 p.m. eastern time on Monday, April 10, 2006.
Docket Numbers: ER06-770-000; ER03-478-000.
Applicants: PPM Energy, Inc.
Description: PPM Energy, Inc submits proposed amendments to its
market-based rate schedule to remove the prohibition against
transactions with PacifiCorp as well as the codes of conduct.
Filed Date: 3/20/2006.
Accession Number: 20060324-0067.
Comment Date: 5 p.m. eastern time on Monday, April 10, 2006.
Any person desiring to intervene or to protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.211 and
385.214) on or before 5 p.m. eastern time on the specified comment
date. It is not necessary to separately intervene again in a subdocket
related to a compliance filing if you have previously intervened in the
same docket. Protests will be considered by the Commission in
determining the appropriate action to be taken, but will not serve to
make protestants parties to the proceeding. Anyone filing a motion to
intervene or protest must serve a copy of that document on the
Applicant. In reference to filings initiating a new proceeding,
[[Page 16301]]
interventions or protests submitted on or before the comment deadline
need not be served on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://
www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
14 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First St., NE., Washington, DC 20426.
The filings in the above proceedings are accessible in the
Commission's eLibrary system by clicking on the appropriate link in the
above list. They are also available for review in the Commission's
Public Reference Room in Washington, DC. There is an eSubscription link
on the Web site that enables subscribers to receive e-mail notification
when a document is added to a subscribed dockets(s). For assistance
with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov.
or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6-4706 Filed 3-30-06; 8:45 am]