Notice of Application Accepted for Filing and Soliciting Motions To Intervene, Protests, and Comments, 16150-16151 [E6-4647]
Download as PDF
16150
Federal Register / Vol. 71, No. 61 / Thursday, March 30, 2006 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application Accepted for
Filing and Soliciting Motions To
Intervene, Protests, and Comments
cprice-sewell on PROD1PC66 with NOTICES
March 24, 2006.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: 12646–000.
c. Date filed: February 1, 2006.
d. Applicant: City of Broken Bow,
Oklahoma.
e. Name of Project: Pine Creek Lake
Hydroelectric Project.
f. Location: The project would be
located at the existing Army Corps of
Engineers Pine Creek Lake Dam on the
Little River in McCurtain County,
Oklahoma.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: City of Broken
Bow, Oklahoma, 210 N. Broadway,
Broken Bow, Oklahoma 74728, (580)–
584–2885.
i. FERC Contact: Chris Yeakel, (202)
502–8132.
j. Deadline for Filing Comments,
Protests, and Motions to Intervene: 60
days from the issuance date of this
notice.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. Description of Project: The
proposed project would use the existing
Army Corps of Engineers’ Pine Creek
Lake Dam and consist of: (1) A
powerhouse containing two generating
units with an installed capacity of 6.4
megawatts, (2) a proposed 13-footdiameter steel penstock (3) a proposed
switchyard, (4) a proposed diversion
structure, (5) a proposed tailrace, (6) a
proposed 14.4 kilovolt transmission
line; and (7) appurtenant facilities. The
project would have an annual
generation of 16.2 gigawatt-hours,
which would be sold to a local utility.
l. Locations of Applications: A copy of
the application is available for
inspection and reproduction at the
VerDate Aug<31>2005
15:32 Mar 29, 2006
Jkt 208001
Commission in the Public Reference
Room, located at 888 First Street NE,
Room 2A, Washington DC 20426, or by
calling (202) 502–8371. This filing may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item h
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Competing Preliminary Permit:
Anyone desiring to file a competing
application for preliminary permit for a
proposed project must submit the
competing application itself, or a notice
of intent to file such an application, to
the Commission on or before the
specified comment date for the
particular application (see 18 CFR 4.36).
Submission of a timely notice of intent
allows an interested person to file the
competing preliminary permit
application no later than 30 days after
the specified comment date for the
particular application. A competing
preliminary permit application must
conform with 18 CFR 4.30(b) and 4.36.
o. Competing Development
Application: Any qualified development
applicant desiring to file a competing
development application must submit to
the Commission, on or before a
specified comment date for the
particular application, either a
competing development application or a
notice of intent to file such an
application. Submission of a timely
notice of intent to file a development
application allows an interested person
to file the competing application no
later than 120 days after the specified
comment date for the particular
application. A competing license
application must conform with 18 CFR
4.30(b) and 4.36.
p. Notice of Intent: A notice of intent
must specify the exact name, business
address, and telephone number of the
prospective applicant, and must include
an unequivocal statement of intent to
submit, if such an application may be
filed, either a preliminary permit
application or a development
application (specify which type of
application). A notice of intent must be
served on the applicant(s) named in this
public notice.
q. Proposed Scope of Studies under
Permit: A preliminary permit, if issued,
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
does not authorize construction. The
term of the proposed preliminary permit
would be 36 months. The work
proposed under the preliminary permit
would include economic analysis,
preparation of preliminary engineering
plans, and a study of environmental
impacts. Based on the results of these
studies, the Applicant would decide
whether to proceed with the preparation
of a development application to
construct and operate the project.
r. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper; See 18 C.F.R.
385.2001 (a)(1)(iii) and the instructions
on the Commission’s web site under ‘‘efiling’’ link. The Commission strongly
encourages electronic filing.
s. Filing and Service of Responsive
Documents: Any filings must bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS’’,
‘‘PROTEST’’,’’COMPETING
APPLICATION’’ OR ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
Any of the above-named documents
must be filed by providing the original
and the number of copies provided by
the Commission’s regulations to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. A copy of any
motion to intervene must also be served
upon each representative of the
Applicant specified in the particular
application.
t. Agency Comments: Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
E:\FR\FM\30MRN1.SGM
30MRN1
Federal Register / Vol. 71, No. 61 / Thursday, March 30, 2006 / Notices
agency’s comments must also be sent to
the Applicant’s representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E6–4647 Filed 3–29–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application for Transfer of
License, and Soliciting Comments,
Motions To Intervene, and Protests
cprice-sewell on PROD1PC66 with NOTICES
March 24, 2006.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Transfer of
License.
b. Project No.: 2593–026.
c. Date Filed: March 3, 2006.
d. Applicants: Beaver Falls Hydro
Associates and Wilmington Trust
Company (transferors); and Algonquin
Power (Beaver Falls), LLC (transferee)
e. Name and Location of Project: The
Upper Beaver Falls Project is located on
the Beaver River in Lewis County, New
York.
f. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
g. Applicant Contacts: For the
transferors: Joseph B. Feil, Wilmington
Trust Company, 1100 North Market
Street, Wilmington, DE 19890–0001,
(302) 636–6466, and Terry L. Ott, Beaver
Falls Hydro Associates, Swissvale Drive,
Manlius, NY 13104 and P.O. Box 101,
Skaneteles, NY 13153.
For the Transferee: Sean Fairfield,
Algonquin Power (Beaver Falls), LLC,
2845 Oakville Bristol Circle, Ontario,
Canada, L6H7H4, (905) 465–4518, and
June Broadstone, Skadden, Arps, Slate,
Meagher, and Flom, LLR, 1440 New
York Avenue, NW., Washington, DC
20005, (202) 371–7000.
h. FERC Contact: Robert Bell at (202)
502–6062.
i. Deadline for Filing, Comments,
Protests, and Motions to Intervene: April
24, 2006.
All documents (original and eight
copies) should be filed with: Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
VerDate Aug<31>2005
15:32 Mar 29, 2006
Jkt 208001
Please include the Project Number on
any comments or motions filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing a document with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the documents
on that resource agency.
j. Description of Application:
Applicants seek Commission approval
to transfer the license for the Upper
Beaver Falls Project from Beaver Falls
Hydro Associates and Wilmington Trust
Company (Wilmington) to Algonquin
Power (Beaver Falls), LLC (Algonquin).
The application was filed by Algonquin
and co-licensee Wilmington. The other
co-licensee, Beaver Falls Hydro
Associates, did not respond to
Wilmington’s certified letter (Exhibit F–
4 of the application) requesting it to be
an applicant. However, Beaver Falls
Hydro Associates executed an
agreement (Exhibit F–3 of the
application) with Wilmington that
provides Wilmington with power of
attorney to apply for approval to transfer
the license on behalf of Beaver Falls
Hydro Associates.
k. This filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘FERRIS’’ link.
Enter the docket number (P–9985) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the addresses in item g.
above.
l. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
m. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
16151
comment date for the particular
application.
n. Filing and Service of Responsive
Documents: Any filings must bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, OR ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
Any of the above-named documents
must be filed by providing the original
and eight copies to: The Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. A copy of any motion to
intervene must also be served upon each
representative of the Applicants
specified in the particular application.
o. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicants. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicants’ representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E6–4649 Filed 3–29–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application for Non-Project
Use of Project Lands and Waters and
Soliciting Comments, Motions To
Intervene, and Protests
March 24, 2006.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Non-Project Use
of Project Lands and Waters.
b. Project No: 271–088 (Notice ReIssuance).
c. Date filed: February 9, 2006.
d. Applicant: Entergy Arkansas, Inc.
e. Name of Project: Carpenter-Remmel
Project.
f. Location: The project is located on
the Quachita River in Hot Springs and
Garland Counties, Arkansas.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r) and §§ 799
and 801.
h. Applicant Contact: Blake Hogue,
141 West County Line Rd., Malvern, AR
72104, (501) 844–2148.
E:\FR\FM\30MRN1.SGM
30MRN1
Agencies
[Federal Register Volume 71, Number 61 (Thursday, March 30, 2006)]
[Notices]
[Pages 16150-16151]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-4647]
[[Page 16150]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application Accepted for Filing and Soliciting Motions
To Intervene, Protests, and Comments
March 24, 2006.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Preliminary Permit.
b. Project No.: 12646-000.
c. Date filed: February 1, 2006.
d. Applicant: City of Broken Bow, Oklahoma.
e. Name of Project: Pine Creek Lake Hydroelectric Project.
f. Location: The project would be located at the existing Army
Corps of Engineers Pine Creek Lake Dam on the Little River in McCurtain
County, Oklahoma.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: City of Broken Bow, Oklahoma, 210 N.
Broadway, Broken Bow, Oklahoma 74728, (580)-584-2885.
i. FERC Contact: Chris Yeakel, (202) 502-8132.
j. Deadline for Filing Comments, Protests, and Motions to
Intervene: 60 days from the issuance date of this notice.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person in the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
k. Description of Project: The proposed project would use the
existing Army Corps of Engineers' Pine Creek Lake Dam and consist of:
(1) A powerhouse containing two generating units with an installed
capacity of 6.4 megawatts, (2) a proposed 13-foot-diameter steel
penstock (3) a proposed switchyard, (4) a proposed diversion structure,
(5) a proposed tailrace, (6) a proposed 14.4 kilovolt transmission
line; and (7) appurtenant facilities. The project would have an annual
generation of 16.2 gigawatt-hours, which would be sold to a local
utility.
l. Locations of Applications: A copy of the application is
available for inspection and reproduction at the Commission in the
Public Reference Room, located at 888 First Street NE, Room 2A,
Washington DC 20426, or by calling (202) 502-8371. This filing may also
be viewed on the Commission's Web site at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item h
above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Competing Preliminary Permit: Anyone desiring to file a
competing application for preliminary permit for a proposed project
must submit the competing application itself, or a notice of intent to
file such an application, to the Commission on or before the specified
comment date for the particular application (see 18 CFR 4.36).
Submission of a timely notice of intent allows an interested person to
file the competing preliminary permit application no later than 30 days
after the specified comment date for the particular application. A
competing preliminary permit application must conform with 18 CFR
4.30(b) and 4.36.
o. Competing Development Application: Any qualified development
applicant desiring to file a competing development application must
submit to the Commission, on or before a specified comment date for the
particular application, either a competing development application or a
notice of intent to file such an application. Submission of a timely
notice of intent to file a development application allows an interested
person to file the competing application no later than 120 days after
the specified comment date for the particular application. A competing
license application must conform with 18 CFR 4.30(b) and 4.36.
p. Notice of Intent: A notice of intent must specify the exact
name, business address, and telephone number of the prospective
applicant, and must include an unequivocal statement of intent to
submit, if such an application may be filed, either a preliminary
permit application or a development application (specify which type of
application). A notice of intent must be served on the applicant(s)
named in this public notice.
q. Proposed Scope of Studies under Permit: A preliminary permit, if
issued, does not authorize construction. The term of the proposed
preliminary permit would be 36 months. The work proposed under the
preliminary permit would include economic analysis, preparation of
preliminary engineering plans, and a study of environmental impacts.
Based on the results of these studies, the Applicant would decide
whether to proceed with the preparation of a development application to
construct and operate the project.
r. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper; See 18 C.F.R. 385.2001 (a)(1)(iii)
and the instructions on the Commission's web site under ``e-filing''
link. The Commission strongly encourages electronic filing.
s. Filing and Service of Responsive Documents: Any filings must
bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS
FOR TERMS AND CONDITIONS'', ``PROTEST'',''COMPETING APPLICATION'' OR
``MOTION TO INTERVENE'', as applicable, and the Project Number of the
particular application to which the filing refers. Any of the above-
named documents must be filed by providing the original and the number
of copies provided by the Commission's regulations to: The Secretary,
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426. A copy of any motion to intervene must also be
served upon each representative of the Applicant specified in the
particular application.
t. Agency Comments: Federal, State, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
[[Page 16151]]
agency's comments must also be sent to the Applicant's representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E6-4647 Filed 3-29-06; 8:45 am]