Notice of Commission Staff Attendance at Midwest ISO Advisory Committee and Annual Stakeholder Meetings, 15410-15411 [E6-4461]
Download as PDF
cprice-sewell on PROD1PC66 with NOTICES
15410
Federal Register / Vol. 71, No. 59 / Tuesday, March 28, 2006 / Notices
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
Motions to intervene, protests,
comments, terms and conditions,
recommendations, and prescriptions
may be filed electronically via the
Internet in lieu of paper. The
Commission strongly encourages
electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
k. This application has been accepted
and is now ready for environmental
analysis.
l. Description of Project: The
Corriveau Hydroelectric Project would
consist of the following existing
facilities: (1) The 150-foot-long by 9foot-high dam; (2) a 2.0 acre reservoir,
(3) a 125-foot-long intake canal; (4) a
powerhouse containing three generating
units with total installed generating
capacity of 350 kilowatts (kW); and (4)
appurtenant facilities. The restored
project would have an average annual
generation of 1,306,900 kilowatt-hours.
The dam and existing project facilities
are owned by the applicant.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact
FERCO Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item h above.
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Any qualified applicant desiring to
file a competing application must
submit to the Commission, on or before
the specified deadline date for the
particular application, a competing
development application, or a notice of
intent to file such an application.
Submission of a timely notice of intent
allows an interested person to file the
competing development application no
VerDate Aug<31>2005
15:19 Mar 27, 2006
Jkt 208001
later than 120 days after the specified
deadline date for the particular
application. Applications for
preliminary permits will not be
accepted in response to this notice.
A notice of intent must specify the
exact name, business address, and
telephone number of the prospective
applicant, and must include an
unequivocal statement of intent to
submit, if such an application may be
filed, either a preliminary permit
application or a development
application (specify which type of
application). A notice of intent must be
served on the applicant(s) named in this
public notice.
Anyone may submit comments, a
protest, or a motion to intervene in
accordance with the requirements of
Rules of Practice and Procedure, 18 CFR
385.210, .211, .214. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
All filings must (1) Bear in all capital
letters the title ‘‘PROTEST’’, ‘‘MOTION
TO INTERVENE’’, ‘‘NOTICE OF
INTENT TO FILE COMPETING
APPLICATION,’’ ‘‘COMPETING
APPLICATION,’’ ‘‘COMMENTS,’’
‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. A copy of all other filings
in reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
o. Procedural schedule: The
Commission staff proposes to issue one
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
Environmental Assessment (EA) rather
than issuing a draft and final EA. Staff
intend to allow 30 days for entities to
comment on the EA, and will take into
consideration all comments received on
the EA before final action is taken on
the exemption application. The
application will be processed according
to the following schedule, but revisions
to the schedule may be made as
appropriate:
Action
Notice availability of EA .....
Ready for Commission Decision on Application.
Date
July 2006.
September
2006.
Magalie R. Salas,
Secretary.
[FR Doc. E6–4464 Filed 3–27–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER02–2595, et al.]
Notice of Commission Staff
Attendance at Midwest ISO Advisory
Committee and Annual Stakeholder
Meetings
March 21, 2006.
The Federal Energy Regulatory
Commission hereby gives notice that
members of its staff may attend the
following Midwest Independent
Transmission System Operator, Inc.
(Midwest ISO) Advisory Committee and
Annual Stakeholder Meetings:
• Midwest ISO Advisory Committee
Meeting—April 12, 2006, 10 a.m.–11
a.m. (EST)
Lakeside Conference Center, 630 West
Carmel Drive, Carmel, IN 46032.
• Midwest ISO Annual Stakeholder
Meeting—April 19, 2006, 10 a.m.–4 p.m.
(EST)
Marriott Indianapolis North, 3645
River Crossing parkway, Indianapolis,
IN 46240. 800–228–9290.
For further information regarding the
times and agendas of meetings, please
see https://www.midwestiso.org/
calendar/index.php or https://
www.midwestmarket.org.home.
The discussions at each of the
meetings described above may address
matters at issue in the following
proceedings:
Docket No. ER02–2595, et al., Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER04–375, Midwest
Independent Transmission System
Operator, Inc., et al.
E:\FR\FM\28MRN1.SGM
28MRN1
cprice-sewell on PROD1PC66 with NOTICES
Federal Register / Vol. 71, No. 59 / Tuesday, March 28, 2006 / Notices
Docket No. ER04–458, et al., Midwest
Independent Transmission System
Operator, Inc.
Docket Nos. ER04–691, EL04–104 and
ER04–106, et al., Midwest
Independent Transmission System
Operator, Inc., et al.
Docket No. ER05–6, et al., Midwest
Independent Transmission System
Operator, Inc., et al.
Docket No. ER05–752, Midwest
Independent Transmission System
Operator, Inc. and PJM
Interconnection, L.L.C.
Docket No. ER05–1083, et al., Midwest
Independent Transmission System
Operator, Inc., et al.
Docket No. ER05–1085, et al., Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER05–1138, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER05–1201, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER05–1230, Midwest
Independent Transmission System
Operator, Inc.
Docket No. EL05–103, Northern Indiana
Power Service Co. v. Midwest
Independent Transmission System
Operator, Inc. and PJM
Interconnection, L.L.C.
Docket No. EL05–128, Quest Energy,
L.L.C. v. Midwest Independent
Transmission System Operator, Inc.
Docket No. ER06–18, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER06–27, Midwest
Independent Transmission System
Operator, Inc., et al.
Docket Nos. EC06–4 and ER06–20, LGE
Energy LLC, et al.
Docket No. ER06–360, et al., Midwest
Independent Transmission System
Operator, Inc., et al.
Docket No. ER06–356, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER06–532, Midwest
Independent Transmission System
Operator, Inc.
Docket No. EL06–31, Midwest
Independent Transmission System
Operator, Inc., et al.
Docket No. EL06–49, Midwest
Independent Transmission System
Operator, Inc., et al.
Docket No. ER06–56, Midwest
Independent Transmission System
Operator, Inc.
These meetings are open to the
public.
For more information, contact Patrick
Clarey, Office of Energy Markets and
Reliability, Federal Energy Regulatory
VerDate Aug<31>2005
15:19 Mar 27, 2006
Jkt 208001
Commission at (317) 249–5937 or
patrick.clarey@ferc.gov, or Christopher
Miller, Office of Energy Markets and
Reliability, Federal Energy Regulatory
Commission at (317) 249–5936 or
christopher.miller@ferc.gov.
Magalie R. Salas,
Secretary.
[FR Doc. E6–4461 Filed 3–27–06; 8:45 am]
BILLING CODE 6717–01–P
15411
(866) 208–3372 (voice) or 202–502–8659
(TTY), or send a fax to 202–208–2106
with the required accommodations.
All interested persons are permitted
to attend. For further information please
contact Jignasa Gadani at (202) 502–
8608 or e-mail jignasa.gadani@ferc.gov.
Magalie R. Salas,
Secretary.
[FR Doc. E6–4451 Filed 3–27–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. ER06–432–000]
Southwest Power Pool, Inc.; Notice of
Technical Conference
March 22, 2006.
Take notice that a technical
conference will be convened on
Monday, April 10, 2006, from 1 p.m. to
4 p.m. (EST), in Conference Room 3M–
3 at the offices of the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The technical conference will deal
with two issues related to Southwest
Power Pool, Inc.’s proposed credit
policy, as discussed in the
Commission’s February 28, 2006 Order.1
Specifically the Commission directed
Commission staff to examine SPP’s
proposed total debt to total
capitalization and debt service coverage
scores and SPP’s proposed $50,000
unsecured credit floor for not-for-profit
entities.2 The Commission found that
SPP’s proposal may not be just and
reasonable, and may be unjust,
unreasonable, unduly discriminatory, or
otherwise unlawful. Accordingly, the
Commission accepted SPP’s Credit
Policy for filing and suspended it to
become effective on March 1, 2006,
subject to refund and the outcome of a
technical conference. A report on the
technical conference is due to the
Commission no later than May 30, 2006.
Attached to this notice are questions
to the parties in this proceeding.
Responses to these questions should be
filed no later than ten days before the
date of the conference. The submitted
information will be discussed at the
technical conference and used to
supplement the record.
FERC conferences are accessible
under section 508 of the Rehabilitation
Act of 1973. For accessibility
accommodations please send an e-mail
to accessibility@ferc.gov or call toll free
1 Southwest Power Pool, Inc., 114 FERC ¶ 61,222
(2006).
2 Id. at P 32 and 62.
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
Notice of FERC Staff Attendance at
Meetings of Southwest Power Pool
Regional State Committee and Board
of Directors/Members Committee
March 21, 2006.
The Federal Energy Regulatory
Commission hereby gives notice that
members of its staff may attend the
meetings of the Southwest Power Pool
(SPP) Regional State Committee and
Board of Directors/Members Committee
noted below. Their attendance is part of
the Commission’s ongoing outreach
efforts.
SPP Regional State Committee—April
24, 2006 (1 p.m.–5 p.m.) (CST).
Renaissance Hotel & Cox Convention
Center, 10 North Broadway, Oklahoma
City, OK 73102, 405–228–8000.
SPP Board of Directors/Members
Committee—April 25, 2006 (8 a.m.–3
p.m.) (CST).
Renaissance Hotel & Cox Convention
Center, 10 North Broadway, Oklahoma
City, OK 73102, 405–228–8000.
The discussions may address matters
at issue in the following proceedings:
Docket Nos. RT04–1 and ER04–48,
Southwest Power Pool, Inc.
Docket No. ER05–109, Southwest Power
Pool, Inc.
Docket No. ER05–652, Southwest Power
Pool, Inc.
Docket No. ER05–799, Southwest Power
Pool, Inc.
Docket No. ER05–1065, Entergy
Services, Inc.
Docket No. ER05–1285, Southwest
Power Pool, Inc.
Docket No. ER05–1352, Southwest
Power Pool, Inc.
Docket No. ER05–1416, Southwest
Power Pool, Inc.
Docket No. ER06–15, Southwest Power
Pool, Inc.
Docket No. ER06–432, Southwest Power
Pool, Inc.
Docket No. ER06–448, Southwest Power
Pool, Inc.
Docket No. ER06–451, Southwest Power
Pool, Inc.
E:\FR\FM\28MRN1.SGM
28MRN1
Agencies
[Federal Register Volume 71, Number 59 (Tuesday, March 28, 2006)]
[Notices]
[Pages 15410-15411]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-4461]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER02-2595, et al.]
Notice of Commission Staff Attendance at Midwest ISO Advisory
Committee and Annual Stakeholder Meetings
March 21, 2006.
The Federal Energy Regulatory Commission hereby gives notice that
members of its staff may attend the following Midwest Independent
Transmission System Operator, Inc. (Midwest ISO) Advisory Committee and
Annual Stakeholder Meetings:
Midwest ISO Advisory Committee Meeting--April 12, 2006, 10
a.m.-11 a.m. (EST)
Lakeside Conference Center, 630 West Carmel Drive, Carmel, IN
46032.
Midwest ISO Annual Stakeholder Meeting--April 19, 2006, 10
a.m.-4 p.m. (EST)
Marriott Indianapolis North, 3645 River Crossing parkway,
Indianapolis, IN 46240. 800-228-9290.
For further information regarding the times and agendas of
meetings, please see https://www.midwestiso.org/calendar/index.php or
https://www.midwestmarket.org.home.
The discussions at each of the meetings described above may address
matters at issue in the following proceedings:
Docket No. ER02-2595, et al., Midwest Independent Transmission System
Operator, Inc.
Docket No. ER04-375, Midwest Independent Transmission System Operator,
Inc., et al.
[[Page 15411]]
Docket No. ER04-458, et al., Midwest Independent Transmission System
Operator, Inc.
Docket Nos. ER04-691, EL04-104 and ER04-106, et al., Midwest
Independent Transmission System Operator, Inc., et al.
Docket No. ER05-6, et al., Midwest Independent Transmission System
Operator, Inc., et al.
Docket No. ER05-752, Midwest Independent Transmission System Operator,
Inc. and PJM Interconnection, L.L.C.
Docket No. ER05-1083, et al., Midwest Independent Transmission System
Operator, Inc., et al.
Docket No. ER05-1085, et al., Midwest Independent Transmission System
Operator, Inc.
Docket No. ER05-1138, Midwest Independent Transmission System Operator,
Inc.
Docket No. ER05-1201, Midwest Independent Transmission System Operator,
Inc.
Docket No. ER05-1230, Midwest Independent Transmission System Operator,
Inc.
Docket No. EL05-103, Northern Indiana Power Service Co. v. Midwest
Independent Transmission System Operator, Inc. and PJM Interconnection,
L.L.C.
Docket No. EL05-128, Quest Energy, L.L.C. v. Midwest Independent
Transmission System Operator, Inc.
Docket No. ER06-18, Midwest Independent Transmission System Operator,
Inc.
Docket No. ER06-27, Midwest Independent Transmission System Operator,
Inc., et al.
Docket Nos. EC06-4 and ER06-20, LGE Energy LLC, et al.
Docket No. ER06-360, et al., Midwest Independent Transmission System
Operator, Inc., et al.
Docket No. ER06-356, Midwest Independent Transmission System Operator,
Inc.
Docket No. ER06-532, Midwest Independent Transmission System Operator,
Inc.
Docket No. EL06-31, Midwest Independent Transmission System Operator,
Inc., et al.
Docket No. EL06-49, Midwest Independent Transmission System Operator,
Inc., et al.
Docket No. ER06-56, Midwest Independent Transmission System Operator,
Inc.
These meetings are open to the public.
For more information, contact Patrick Clarey, Office of Energy
Markets and Reliability, Federal Energy Regulatory Commission at (317)
249-5937 or patrick.clarey@ferc.gov, or Christopher Miller, Office of
Energy Markets and Reliability, Federal Energy Regulatory Commission at
(317) 249-5936 or christopher.miller@ferc.gov.
Magalie R. Salas,
Secretary.
[FR Doc. E6-4461 Filed 3-27-06; 8:45 am]
BILLING CODE 6717-01-P