Notice of Application for Amendment of Shoreline Management Plan and Soliciting Comments, Motions To Intervene, and Protests, 14873 [E6-4253]
Download as PDF
Federal Register / Vol. 71, No. 57 / Friday, March 24, 2006 / Notices
[FR Doc. 06–2842 Filed 3–23–06; 8:45 am]
BILLING CODE 6450–01–C
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application for Amendment
of Shoreline Management Plan and
Soliciting Comments, Motions To
Intervene, and Protests
wwhite on PROD1PC61 with NOTICES
March 16, 2006.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Amendment of
Shoreline Management Plan.
b. Project No: 2210–131.
c. Dates Filed: March 16, 2006.
d. Applicant: Appalachian Power
Company (APC).
e. Name of Project: Smith Mountain
Pumped Storage Project.
f. Location: The project is located on
the Roanoke River, in Bedford,
Pittsylvania,Franklin, and Roanoke
Counties, Virginia.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r) and 799
and 801.
h. Applicant Contact: Frank M.
Simms, Hydro Generation Department,
American Electric Power, P.O. Box
2021, Roanoke, VA 24022–2121, (540)
985–2875.
i. FERC Contact: Any questions on
this notice should be addressed to Mrs.
Heather Campbell at (202) 502–6182, or
e-mail address:
heather.campbell@ferc.gov or Mr. Bob
Fletcher at (202) 502–8901, or e-mail
address: robert.fletcher@ferc.gov.
j. Deadline for filing comments and or
motions: April 14, 2006.
All documents (original and eight
copies) should be filed with: Ms.
Magalie R. Salas, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington DC 20426.
Please include the project number (P–
2210–131) on any comments or motions
filed. Comments, protests, and
interventions may be filed electronically
via the internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the
e-Filing’’ link. The Commission strongly
encourages e-filings.
k. Description of Request: The
licensee requests to amend the July 5,
2005 Order Modifying and Approving
Shoreline Management Plan (112 FERC
¶ 61,026) to revise ordering paragraph
(D) from: ‘‘All in-water construction,
VerDate Aug<31>2005
18:26 Mar 23, 2006
Jkt 208001
except pile driving and associated above
water dock construction activities, is
prohibited from February 15 through
June 15. Pile driving and associated inwater dock construction activities are
prohibited from April 15 to June 15.
Installation or maintenance of
navigational markers is exempt from
these time-of-year restrictions.’’ To ‘‘All
in-water construction, except pile
driving and associated above water dock
construction activities, is prohibited
from February 15 through June 15. Pile
driving shall include the removal of
existing piles necessary for construction
of the associated facility and be limited
to only piling installed utilizing impact
equipment.’’
l. Location of the Application: This
filing is available for review at the
Commission in the Public Reference
Room 888 First Street, NE., Room 2A,
Washington, DC 20426 or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the ‘‘elibrary’’ link. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item h.
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers. A copy of any motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
14873
p. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described
applications. Copies of the applications
may be obtained by agencies directly
from the Applicant. If an agency does
not file comments within the time
specified for filing comments, it will be
presumed to have no comments. One
copy of an agency’s comments must also
be sent to the Applicant’s
representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E6–4253 Filed 3–23–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP06–85–000]
CenterPoint Energy Gas Transmission
Company; Notice of Application
March 17, 2006.
On March 10, 2006, in Docket No.
CP06–85–000, CenterPoint Energy Gas
Transmission Company (CEGT),
pursuant to section 7(c) of the Natural
Gas Act, as amended, and section 157
subpart A of the Federal Energy
Regulatory Commission’s (Commission)
regulations requests authorization to
construct, own, and operate the
Carthage to Perryville Project designed
to receive and transport 1.237 billion
cubic feet per day of natural gas. The
project would consist of: 171.9 miles of
42-inch diameter pipeline; compression
totaling 41,240 hp at two compressor
stations; meter and regulator stations at
receipt points with 3 Texas intrastate
pipelines; interconnections with 4
interstate pipelines; and, appurtenant
facilities. The facilities will operate
separately from CEGT’s existing
pipeline system, and CEGT is seeking
implementation of a fixed charge for
Fuel Use and Lost and Unaccounted For
Gas (LUFG) applicable to transportation
on the new facilities, all as more fully
described in the application. CEGT
seeks waiver of the Commission’s
regulations such that the 30-day
comment period for the Final
Environmental Impact Statement may
coincide with the 30-day requested
certificate order’s rehearing period and
that notational voting be used to extent
this approach would expedite the
order’s issuance. CEGT requests that the
Commission issue requested
authorizations by October 30, 2006 so
that facilities may be operable in time
E:\FR\FM\24MRN1.SGM
24MRN1
Agencies
[Federal Register Volume 71, Number 57 (Friday, March 24, 2006)]
[Notices]
[Page 14873]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-4253]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application for Amendment of Shoreline Management Plan
and Soliciting Comments, Motions To Intervene, and Protests
March 16, 2006.
Take notice that the following application has been filed with the
Commission and is available for public inspection:
a. Application Type: Amendment of Shoreline Management Plan.
b. Project No: 2210-131.
c. Dates Filed: March 16, 2006.
d. Applicant: Appalachian Power Company (APC).
e. Name of Project: Smith Mountain Pumped Storage Project.
f. Location: The project is located on the Roanoke River, in
Bedford, Pittsylvania,Franklin, and Roanoke Counties, Virginia.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r)
and 799 and 801.
h. Applicant Contact: Frank M. Simms, Hydro Generation Department,
American Electric Power, P.O. Box 2021, Roanoke, VA 24022-2121, (540)
985-2875.
i. FERC Contact: Any questions on this notice should be addressed
to Mrs. Heather Campbell at (202) 502-6182, or e-mail address:
heather.campbell@ferc.gov or Mr. Bob Fletcher at (202) 502-8901, or e-
mail address: robert.fletcher@ferc.gov.
j. Deadline for filing comments and or motions: April 14, 2006.
All documents (original and eight copies) should be filed with: Ms.
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington DC 20426. Please include the project
number (P-2210-131) on any comments or motions filed. Comments,
protests, and interventions may be filed electronically via the
internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission's Web site at https://www.ferc.gov under
the e-Filing'' link. The Commission strongly encourages e-filings.
k. Description of Request: The licensee requests to amend the July
5, 2005 Order Modifying and Approving Shoreline Management Plan (112
FERC ] 61,026) to revise ordering paragraph (D) from: ``All in-water
construction, except pile driving and associated above water dock
construction activities, is prohibited from February 15 through June
15. Pile driving and associated in-water dock construction activities
are prohibited from April 15 to June 15. Installation or maintenance of
navigational markers is exempt from these time-of-year restrictions.''
To ``All in-water construction, except pile driving and associated
above water dock construction activities, is prohibited from February
15 through June 15. Pile driving shall include the removal of existing
piles necessary for construction of the associated facility and be
limited to only piling installed utilizing impact equipment.''
l. Location of the Application: This filing is available for review
at the Commission in the Public Reference Room 888 First Street, NE.,
Room 2A, Washington, DC 20426 or may be viewed on the Commission's Web
site at https://www.ferc.gov using the ``e-library'' link. Enter the
docket number excluding the last three digits in the docket number
field to access the document. For assistance, call toll-free 1-866-208-
3676 or e-mail FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-
8659. A copy is also available for inspection and reproduction at the
address in item h. above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents--Any filings must
bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS
FOR TERMS AND CONDITIONS'', ``PROTEST'', or ``MOTION TO INTERVENE'', as
applicable, and the Project Number of the particular application to
which the filing refers. A copy of any motion to intervene must also be
served upon each representative of the Applicant specified in the
particular application.
p. Agency Comments--Federal, state, and local agencies are invited
to file comments on the described applications. Copies of the
applications may be obtained by agencies directly from the Applicant.
If an agency does not file comments within the time specified for
filing comments, it will be presumed to have no comments. One copy of
an agency's comments must also be sent to the Applicant's
representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E6-4253 Filed 3-23-06; 8:45 am]
BILLING CODE 6717-01-P