Federal Register / Vol. 71, No. 57 / Friday, March 24, 2006 / Notices
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. A copy of all other filings
in reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Magalie R. Salas,
Secretary.
[FR Doc. E6–4228 Filed 3–23–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application for Amendment
of License and Soliciting Comments,
Motions To Intervene, and Protests
wwhite on PROD1PC61 with NOTICES
March 16, 2006.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Temporary
Variance from Article 401 of the
License.
b. Project No.: 1494–293.
c. Date Filed: March 15, 2006.
d. Applicant: Grand River Dam
Authority.
e. Name of Project: Pensacola.
f. Location: The Project is located on
the Grand (Neosho) River in Craig,
Delaware, Mayes, and Ottawa Counties,
Oklahoma.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Robert W.
Sullivan, Jr., Assistant General Manager,
Grand River Dam Authority, P.O. Box
409, Vinita, OK 74301–0409. Tel: (918)
256–5545.
i. FERC Contact: Any questions on
this notice should be addressed to
Vedula Sarma at (202) 502–6190 or
vedula.sarma@ferc.gov.
VerDate Aug<31>2005
18:26 Mar 23, 2006
Jkt 208001
j. Deadline for filing comments and/
or motions: 10 days from the date of
issuance.
k. Description of Filing: Because of the
current drought situation in the basin,
as an emergency measure, Grand River
Dam Authority proposes to temporarily
modify the rule curve set forth in Article
401 of the license by drawing Grand
Lake below elevation 742 feet
(Pensacola Datum) to maintain a
minimum elevation of 614 feet mean sea
level at Lake Hudson. Lake Hudson is a
source for public water supply to the
towns of Locust Grove, Adair, Salina,
and Rural Water District No. 6.
l. Locations of Applications: A copy of
the application is available for
inspection and reproduction at the
Commission in the Public Reference
Room, located at 888 First Street, NE.,
Room 2A, Washington, DC 20426, or by
calling (202) 502–8371. This filing may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, call toll-free 1–866–208–
3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
PO 00000
Frm 00056
Fmt 4703
Sfmt 4703
14887
the particular application to which the
filing refers. All documents (original
and eight copies) should be filed with:
Magalie R. Salas, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
A copy of any motion to intervene must
also be served upon each representative
of the Applicant specified in the
particular application.
p. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
q. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the ‘‘eFiling’’ link.
Magalie R. Salas,
Secretary.
[FR Doc. E6–4252 Filed 3–23–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PF05–17–000]
Maritimes & Northeast Pipeline, L.L.C.;
Notice of a Public Meeting To Receive
Environmental Comments on the
Alternative Locations for the
Massachusetts Compressor Station as
Part of the Maritimes Phase IV Project
March 17, 2006.
On December 16, 2005, the
Commission issued a Notice of Intent to
Prepare an Environmental Impact
Statement For the Proposed Maritimes
Phase IV Project and Request for
Comments on Environmental Issues and
Notice of Public Scoping Meetings (NOI)
in response to Maritimes & Northeast
Pipeline, L.L.C. (Maritimes) request to
initiate the prefiling process for its
Maritimes Phase IV Project.1
In a January 31, 2006 filing, Maritimes
identified its preferred location for the
Massachusetts Compressor Station along
1 The Maritimes Phase IV Project consists of the
construction of about 146 miles of pipeline loops
in Maine and six new compressor stations in Maine
and Massachusetts. In addition, Maritimes would
modify one existing compressor station and four
existing meter stations in Maine and Massachusetts.
E:\FR\FM\24MRN1.SGM
24MRN1
Agencies
[Federal Register Volume 71, Number 57 (Friday, March 24, 2006)]
[Notices]
[Page 14887]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-4252]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application for Amendment of License and Soliciting
Comments, Motions To Intervene, and Protests
March 16, 2006.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Temporary Variance from Article 401 of the
License.
b. Project No.: 1494-293.
c. Date Filed: March 15, 2006.
d. Applicant: Grand River Dam Authority.
e. Name of Project: Pensacola.
f. Location: The Project is located on the Grand (Neosho) River in
Craig, Delaware, Mayes, and Ottawa Counties, Oklahoma.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Mr. Robert W. Sullivan, Jr., Assistant
General Manager, Grand River Dam Authority, P.O. Box 409, Vinita, OK
74301-0409. Tel: (918) 256-5545.
i. FERC Contact: Any questions on this notice should be addressed
to Vedula Sarma at (202) 502-6190 or vedula.sarma@ferc.gov.
j. Deadline for filing comments and/or motions: 10 days from the
date of issuance.
k. Description of Filing: Because of the current drought situation
in the basin, as an emergency measure, Grand River Dam Authority
proposes to temporarily modify the rule curve set forth in Article 401
of the license by drawing Grand Lake below elevation 742 feet
(Pensacola Datum) to maintain a minimum elevation of 614 feet mean sea
level at Lake Hudson. Lake Hudson is a source for public water supply
to the towns of Locust Grove, Adair, Salina, and Rural Water District
No. 6.
l. Locations of Applications: A copy of the application is
available for inspection and reproduction at the Commission in the
Public Reference Room, located at 888 First Street, NE., Room 2A,
Washington, DC 20426, or by calling (202) 502-8371. This filing may
also be viewed on the Commission's Web site at https://www.ferc.gov
using the ``eLibrary'' link. Enter the docket number excluding the last
three digits in the docket number field to access the document. You may
also register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
call toll-free 1-866-208-3676 or e-mail FERCOnlineSupport@ferc.gov. For
TTY, call (202) 502-8659. A copy is also available for inspection and
reproduction at the address in item (h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents--Any filings must
bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS
FOR TERMS AND CONDITIONS'', ``PROTEST'', or ``MOTION TO INTERVENE'', as
applicable, and the Project Number of the particular application to
which the filing refers. All documents (original and eight copies)
should be filed with: Magalie R. Salas, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. A
copy of any motion to intervene must also be served upon each
representative of the Applicant specified in the particular
application.
p. Agency Comments--Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
q. Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site at https://www.ferc.gov
under the ``e-Filing'' link.
Magalie R. Salas,
Secretary.
[FR Doc. E6-4252 Filed 3-23-06; 8:45 am]
BILLING CODE 6717-01-P