Availability of Non-Exclusive, Exclusive License or Partially Exclusive Licensing of U.S. Patent Concerning Method of Producing an Article of Footwear With Temperature Regulation Means, 14856 [06-2860]
Download as PDF
14856
Federal Register / Vol. 71, No. 57 / Friday, March 24, 2006 / Notices
Pentagon, Rm 5D982, Washington DC
20330–1180, (703) 697–4811.
Boa-Anh Trinh,
Air Force Federal Register Liaison Officer.
[FR Doc. E6–4264 Filed 3–23–06; 8:45 am]
BILLING CODE 5001–05–P
DEPARTMENT OF DEFENSE
Department of the Army
Availability of Non-Exclusive,
Exclusive License or Partially
Exclusive Licensing of U.S. Patent
Concerning Method of Producing an
Article of Footwear With Temperature
Regulation Means
Department of the Army, DoD.
Notice.
AGENCY:
ACTION:
SUMMARY: In accordance with 37 CFR
404.6, announcement is made of the
availability for licensing of U.S. Patent
No. U.S. 7,0011,781 B2 entitled
‘‘Method of Producing an Article of
Footwear with Temperature Regulation
Means’’ issued March 14, 2006. This
patent has been assigned to the United
States Government as represented by the
Secretary of the Army.
FOR FURTHER INFORMATION CONTACT: Mr.
Arnold Boucher at U.S. Army Soldier
Systems Center, Kansas Street, Natick,
MA 01760, Phone; (508) 233–5431 or Email: Arnold.Boucher@natick.army.mil.
SUPPLEMENTARY INFORMATION: Any
licenses granted shall comply with 35
U.S.C. 209 and 37 CFR part 404.
Brenda S. Bowen,
Army Federal Register Liaison Officer.
[FR Doc. 06–2860 Filed 3–23–06; 8:45 am]
BILLING CODE 3710–08–M
DEPARTMENT OF DEFENSE
Department of the Army; Corps of
Engineers
Department of the Army, U.S.
Army Corps of Engineers, DoD.
ACTION: Notice of intent.
wwhite on PROD1PC61 with NOTICES
AGENCY:
SUMMARY: Pursuant to the National
Environmental Policy Act (NEPA), the
U.S. Army Corps of Engineers (Corps),
Huntington District will prepare a
Supplemental Environmental Impact
Statement (SEIS). The SEIS will
evaluate potential impacts to the
natural, physical, and human
environment as a result of utilizing soil
18:26 Mar 23, 2006
Jkt 208001
1. Authority
3. Public Participation
The proposed project is authorized
under Section 580 of the Water
Resources Development Act (WRDA) of
1996, which provides the Corps
authority ‘‘. . . to conduct a limited
reevaluation of the watershed plan and
environmental impact statement prepare
for the Lower Mud River, Milton, W.V.,
by the Natural Resources Conservation
Service, pursuant to the Watershed
Protection and Flood Prevention Act (16
U.S.C. 1001 et seq.) and may carry out
the project’’, and Section 340 of the
WRDA of 2000, which reads: ‘‘Modifies
Lower Mud River project at Milton
authority (Sec 580 of WRDA of 1996) to
direct the COE to construct the project
as selected in the COE reevaluation
report.’’
The Corps invites full public
participation to promote open
communication and better decisionmaking. All persons and organizations
that have an interest in the Lower Mud
River flooding problems as they affect
the community of Milton, WV and the
environment are urged to participate in
this NEPA environmental analysis
process. Assistance will be provided
upon request to anyone having
difficulty with learning how to
participate.
Public comments are welcomed
anytime throughout the NEPA process.
Formal opportunities for public
participation include: (1) Public
meetings to be held near the community
of Milton; (2) Anytime during the NEPA
process via mail, telephone or e-mail;
(3) During Review and Comment on the
Draft SEIS—approximately August
2006; and, (4) Review of the Final EIS—
Fall 2006. Schedules and locations will
be announced in local news media.
Interested parties should submit contact
information to be included on the
mailing list for public distribution of
meeting announcements and documents
(See ADDRESSES).
2. Background
Intent to Prepare a Supplemental
Environmental Impact Statement 2.0
for the Lower Mud River Watershed
Project, Milton, Cabell County, WV
VerDate Aug<31>2005
SUPPLEMENTARY INFORMATION:
In May 2004 the Corps completed the
re-evaluation study and recommended
Plan B. The Plan consists of a flood
control levee with modifications to the
Mud River. Plan B provides a high level
of flood protection, has the greatest net
benefits, and all significant
environmental impacts are mitigated by
special project features.
Further geotechnical studies after the
completion of the re-evaluation study
and EIS indicate that the proper
quantity and quality of borrow material
cannot be obtained within the
Construction Work Limits identified in
the EIS. This Supplemental EIS will
evaluate several borrow site alternatives
in the surrounding area for the purpose
of obtaining the proper quantity and
quality of soil material for construction
of the recommended plan. The
Supplemental EIS will evaluate
transportation, noise, terrestrial, aquatic,
economic, environmental justice and
cultural resource issues associated with
the selection of borrow sites.
borrow material for construction of the
selected plan for the proposed flood
damage reduction measures for the area
at the City of Milton, Cabell County, WV
(lower Mud River Project). The Corps is
soliciting public concerns/issues to be
evaluated during the study process.
ADDRESSES: Send written comments and
suggestions concerning this proposed
project to S. Michael Worley PM–PD,
U.S. Army Corps of Engineers,
Huntington District, 502 Eighth Street,
Huntington, WV, 25701–2070.
Telephone: (304) 529–5712. Electronic
mail: Stephen.M.Worley@
Lrh01.usace.army.mil. Requests to be
placed on the mailing list should also be
sent to this address.
FOR FURTHER INFORMATION CONTACT: Mrs.
Amy K. Frantz PD–F, U.S. Army Corps
of Engineers, Huntington District, 502
Eighth Street, Huntington, WV, 25701–
2070. Telephone: (304) 399–5845.
Electronic mail: amy.k.frantz@
Lrh01.usace.army.mil.
Under authority of the Watershed
Protection and Flood Prevention Act
(Pub. L. 83–566), the Natural Resources
Conservation Service (NRCS) began an
investigation of land and water resource
problems, including flooding, in the
Lower Mud River watershed in 1972.
This early investigation culminated
with completion of the Lower Mud
River Watershed Plan and
Environmental Impact Statement (EIS)
in May 1993, in which a channel
modification project on the Mud River
in the vicinity of Milton was
recommended. Section 580 of WRDA
1996 provided the Corps authority to reevaluate that study and construct a
project.
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
William E. Bulen,
COL, Corps of Engineers, Commander.
[FR Doc. 06–2862 Filed 3–23–06; 8:45 am]
BILLING CODE 3710–GM–M
E:\FR\FM\24MRN1.SGM
24MRN1
Agencies
[Federal Register Volume 71, Number 57 (Friday, March 24, 2006)]
[Notices]
[Page 14856]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 06-2860]
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Department of the Army
Availability of Non-Exclusive, Exclusive License or Partially
Exclusive Licensing of U.S. Patent Concerning Method of Producing an
Article of Footwear With Temperature Regulation Means
AGENCY: Department of the Army, DoD.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: In accordance with 37 CFR 404.6, announcement is made of the
availability for licensing of U.S. Patent No. U.S. 7,0011,781 B2
entitled ``Method of Producing an Article of Footwear with Temperature
Regulation Means'' issued March 14, 2006. This patent has been assigned
to the United States Government as represented by the Secretary of the
Army.
FOR FURTHER INFORMATION CONTACT: Mr. Arnold Boucher at U.S. Army
Soldier Systems Center, Kansas Street, Natick, MA 01760, Phone; (508)
233-5431 or E-mail: Arnold.Boucher@natick.army.mil.
SUPPLEMENTARY INFORMATION: Any licenses granted shall comply with 35
U.S.C. 209 and 37 CFR part 404.
Brenda S. Bowen,
Army Federal Register Liaison Officer.
[FR Doc. 06-2860 Filed 3-23-06; 8:45 am]
BILLING CODE 3710-08-M