Approval and Promulgation of Air Quality Implementation Plans; La Grande PM10, 14393-14399 [06-2698]
Download as PDF
Federal Register / Vol. 71, No. 55 / Wednesday, March 22, 2006 / Rules and Regulations
14393
VERMONT NON-REGULATORY—Continued
Name of non-regulatory
SIP provision
Applicable geographic
or nonattainment area
A plan to attain and
maintain the National
Ambient Air Quality
Standard for lead.
......................................
A revision to the quality
monitoring network.
EPA approval
date
Explanation
Submitted 06/24/80,
and 11/07/80.
03/18/81, 45 FR
17192.
......................................
Submitted 03/21/79 .....
Narrative submittal ‘‘Implementation Plan for
the Protection of Visibility in the State of
Vermont’’ and ‘‘Appendices’’.
State Implementation
Plan narrative.
State Implementation
Plan narrative.
......................................
Submitted 04/15/86 .....
10/08/80, 45 FR
66789,
corrected by 03/
16/81, 46 FR
16897.
07/17/87, 52 FR
26973.
(c)(12) A plan to attain and maintain the National Ambient Air Quality Standard for lead.
A letter further explaining the state procedures for review of new major sources of
lead emissions.
(c)(13) meets the requirements of 40 CFR part
58
......................................
Submitted 12/07/90,
and 01/10/91.
Submitted 08/09/93 .....
03/05/91, 56 FR
9175.
01/10/95, 60 FR
2524.
Revisions to the State
Implementation Plan.
......................................
04/22/98, 63 FR
19825.
Revisions to the State
Implementation Plan.
......................................
Submitted 02/03/93,
08/09/93, and 08/10/
94.
Submitted 08/03/98 .....
......................................
[FR Doc. 06–2774 Filed 3–21–06; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
40 CFR Parts 52 and 81
[EPA–R10–OAR–2006–0050; FRL–8041–6]
Approval and Promulgation of Air
Quality Implementation Plans; La
Grande PM10 Maintenance Plan and
Redesignation Request
Environmental Protection
Agency (EPA).
ACTION: Direct final rule.
cprice-sewell on PROD1PC70 with RULES
AGENCY:
SUMMARY: EPA is taking direct final
action to approve a PM10 State
Implementation Plan (SIP) maintenance
plan revision for the La Grande, Oregon
nonattainment area and to redesignate
the area from nonattattainment to
attainment for PM10. PM10 air pollution
is suspended particulate matter with a
nominal diameter less than or equal to
a nominal ten micrometers. EPA is
approving the SIP revision and
redesignation request because the State
adequately demonstrates that the
control measures being implemented in
the La Grande area result in
maintenance of the PM10 National
Ambient Air Quality Standards and all
VerDate Aug<31>2005
15:10 Mar 21, 2006
Jkt 208001
State submittal date/
effective date
(c)(19) Describing procedures, notifications,
and technical evaluations to fulfill the visibility protection requirements of 40 CFR part
51, subpart P.
(c)(20) State of Vermont Air Quality Implementation Plan dated November 1990.
(c)(21) State of Vermont Air Quality Implementation Plan dated February, 1993. To meet
the emission statement requirement of the
CAAA of 1990.
(c)(25) State of the State Vermont: Air Quality
Implementation Plan dated August 1993.
07/10/00, 65 FR
42290.
(c)(26) letter from VT Air Pollution Control Division dated July 28, 1998 stating a negative
declaration for the aerospace coating operations CTG category.
other requirements of the Clean Air Act
for redesignation to attainment are met.
DATES: This direct final rule will be
effective May 22, 2006, without further
notice, unless EPA receives adverse
comments by April 21, 2006. If adverse
comments are received, EPA will
publish a timely withdrawal of the
direct final rule in the Federal Register
informing the public that the rule will
not take effect.
ADDRESSES: Submit your comments,
identified by Docket ID No. EPA–R10–
OAR–2006–0050, by one of the
following methods:
• Federal eRulemaking Portal: https://
www.regulations.gov. Follow the on-line
instructions for submitting comments.
• Mail: Donna Deneen, Office of Air,
Waste and Toxics, AWT–107, EPA,
Region 10, 1200 Sixth Avenue, Seattle,
Washington 98101.
• Hand Delivery: EPA, Region 10
Mail Room, 9th Floor, 1200 Sixth
Avenue, Seattle, Washington 98101.
Attention: Donna Deneen, Office of Air,
Waste and Toxics, AWT–107. Such
deliveries are only accepted during
normal hours of operation, and special
arrangements should be made for
deliveries of boxed information.
Instructions: Direct your comments to
Docket ID No. EPA–R10–OAR–2006–
0050. EPA’s policy is that all comments
received will be included in the public
docket without change and may be
made available online at https://
www.regulations.gov, including any
personal information provided, unless
the comment includes information
claimed to be Confidential Business
Information (CBI) or other information
whose disclosure is restricted by statute.
Do not submit information that you
consider to be CBI or otherwise
protected through https://
www.regulations.gov. The https://
www.regulations.gov Web site is an
‘‘anonymous access’’ system, which
means EPA will not know your identity
or contact information unless you
provide it in the body of your comment.
If you send an e-mail comment directly
to EPA without going through https://
www.regulations.gov, your e-mail
address will be automatically captured
and included as part of the comment
that is placed in the public docket and
made available on the Internet. If you
submit an electronic comment, EPA
recommends that you include your
name and other contact information in
the body of your comment and with any
disk or CD–ROM you submit. If EPA
cannot read your comment due to
technical difficulties and cannot contact
you for clarification, EPA may not be
able to consider your comment.
Electronic files should avoid the use of
special characters, any form of
PO 00000
Frm 00037
Fmt 4700
Sfmt 4700
E:\FR\FM\22MRR1.SGM
22MRR1
14394
Federal Register / Vol. 71, No. 55 / Wednesday, March 22, 2006 / Rules and Regulations
cprice-sewell on PROD1PC70 with RULES
encryption, and be free of any defects or
viruses. For additional information
about EPA’s public docket visit the EPA
Docket Center homepage at https://
www.epa.gov/epahome/dockets.htm
Docket: All documents in the docket
are listed in the https://
www.regulations.gov index. Although
listed in the index, some information is
not publicly available, such as CBI or
other information whose disclosure is
restricted by statute. Certain other
material, such as copyrighted material,
is not placed on the Internet and will be
publicly available only in hard copy
form. Publicly available docket
materials are available either
electronically in https://
www.regulations.gov or in hard copy at
EPA Region 10, Office of Air, Waste and
Toxics, 1200 Sixth Avenue, Seattle,
Washington. EPA requests that, if
possible, you contact the person listed
in the FOR FURTHER INFORMATION
CONTACT section to schedule your
inspection.
FOR FURTHER INFORMATION CONTACT:
Donna Deneen at telephone number:
(206) 553–6706, e-mail address:
deneen.donna@epa.gov, fax number:
(206) 553–0110, or the above EPA,
Region 10 address.
SUPPLEMENTARY INFORMATION:
Throughout this document wherever
‘‘we’’, ‘‘us’’ or ‘‘our’’ are used, we mean
EPA.
Table of Contents
I. General Overview
A. What Action Are We Taking?
B. What Is the Background for This Action?
1. Description of the Area
2. Nonattainment History of the La Grande
Area
3. Description of the Air Quality Problem
II. Review of Maintenance Plan
A. What Criteria Did EPA Use To Review
the Maintenance Plan?
1. Attainment Emissions Inventory (and
Future Year Inventory)
2. Maintenance Demonstration
3. Monitoring Network
4. Verification of Continued Attainment
5. Contingency Plan
B. What Do We Conclude About the
Maintenance Plan?
III. Review of Redesignation Request
A. What Criteria Did EPA Use To Review
the Request for Redesignation?
1. Attainment of the NAAQS
2. SIP Nonattainment Area Plan Approval
Under Section 110(k)
3. Permanent and Enforceable
Improvements in Air Quality
4. Section 110 and Part D Requirements
a. Section 110 Requirements
b. Part D Requirements
i. Section 172(c) Plan Provisions
ii. Subpart 4 Requirements
5. Transportation Conformity
6. Maintenance Plans
VerDate Aug<31>2005
15:10 Mar 21, 2006
Jkt 208001
B. What Do We Conclude About the
Request for Redesignation?
IV. Statutory and Executive Order Reviews
I. General Overview
A. What Action Are We Taking?
We are taking direct final action to
approve the SIP revision and
redesignation request submitted by the
State of Oregon Department of
Environmental Quality (DEQ or State)
on October 25, 2005, for the La Grande,
Oregon PM10 nonattainment area (La
Grande nonattainment area). We are
approving the State’s SIP revision and
request for redesignation because the
State adequately demonstrates that the
control measures being implemented in
the La Grande area result in
maintenance of the PM10 National
Ambient Air Quality Standards
(NAAQS) and all other requirements of
the Clean Air Act (the Act) for
redesignation to attainment are met. See
the Technical Support Document (TSD)
accompanying this notice for further
supporting documentation.
B. What Is the Background for This
Action?
1. Description of the Area
La Grande is located in northeast
Oregon at an elevation of 2785 feet. The
area is typified by semi-arid climate
where mean annual rainfall is 17.2
inches. The La Grande Urban Growth
Boundary (UGB), which defines the
nonattainment area boundaries, had an
estimated population of 13,809 in 2000.
It is expected to grow to approximately
16,391 by 2025. The city of La Grande
serves as an important commercial
center for northeast Oregon.
La Grande is situated at the edge of
the Grande Ronde Valley, a relatively
flat area nestled in a mountainous area
drained by the Grande Ronde River.
Because of the valley’s features, La
Grande can experience strong nighttime
inversions that break with daytime solar
heating. In the wintertime, arctic air
masses frequently move into the Grande
Ronde Valley. Temperatures can remain
well below freezing for several weeks at
a time. Winter nights are commonly
clear and cool in the valley. Under these
conditions, inversions can occur.
2. Nonattainment History of the La
Grande Area
On July 1, 1987 (52 FR 24634), the
Environmental Protection Agency (EPA)
revised the National Ambient Air
Quality Standards (NAAQS) for
particulate matter with a new indicator
that includes only those particles with
an aerodynamic diameter less than or
equal to a nominal 10 micrometers
PO 00000
Frm 00038
Fmt 4700
Sfmt 4700
(PM10). See 40 CFR 50.6. The 24-hour
primary PM10 standard is 150
micrograms per cubic meter (µg/m3),
with no more than one expected
exceedance per year over a three-year
period. The annual primary PM10
standard is 50 µg/m3 expected annual
arithmetic mean over a three-year
period. The secondary PM10 standards
are identical to the primary standards.
By operation of law upon enactment
of the 1990 Clean Air Act Amendments,
La Grande, Oregon was designated
‘‘nonattainment’’ for PM10 and classified
as moderate under section 107(d)(4)(B)
and 188(a) (see 56 FR 56694 (November
6, 1991) and 40 CFR 81.338). Under
subsections 188(a) and (c)(1) of the
Clean Air Act, all initial moderate PM10
nonattainment areas had the same
applicable attainment date of December
31, 1994.
The State developed a nonattainment
area SIP revision designed to bring
about attainment of the PM10 NAAQS.
Oregon’s Clean Air Act Part D initial
PM10 plan (nonattainment area plan) for
the La Grande PM10 nonattainment area
was submitted on November 15, 1991.
EPA approved the La Grande PM10
nonattainment area plan on February
15, 1995. 60 FR 8563.
In order for the La Grande
nonattainment area to be redesignated to
attainment for PM10, a 10-year
maintenance plan and redesignation
request is required for the area. A SIP
revision containing these elements was
submitted to EPA on October 25, 2005.
We are approving both these elements
in this action.
3. Description of the Air Quality
Problem
La Grande has not had an exceedance
of the PM10 NAAQS for over 15
consecutive years. The last recorded
exceedance occurred on January 28,
1991 (173 µg/m3) and was the only
exceedance in 1991. Because there were
no exceedances in the following three
years, 1992, 1993, and 1994, La Grande
attained the 24-hour PM10 NAAQS by
the Clean Air Act deadline of December
31, 1994. La Grande has not violated the
annual PM10 NAAQS. The highest
annual average PM10 concentration was
31.7 µg/m3 in 1992.
PM10 concentrations have been
measured at the same location (Willow
Street) in the La Grande UGB since
monitoring began in 1986. Higher levels
of PM10 are typically a wintertime
problem in La Grande due to
temperature inversions that trap
particulate matter emissions in the area.
A combination of area sources,
industrial sources, and mobile and non-
E:\FR\FM\22MRR1.SGM
22MRR1
Federal Register / Vol. 71, No. 55 / Wednesday, March 22, 2006 / Rules and Regulations
mobile sources contribute to the area’s
PM10 levels.
II. Review of Maintenance Plan
A. What Criteria Did EPA Use To
Review the Maintenance plan?
Section 107(d)(3)(E) of the Act
stipulates that for an area to be
redesignated to attainment, EPA must
fully approve a maintenance plan which
meets the requirements of section 175A.
Section 175A defines the general
framework of a maintenance plan,
which must provide for maintenance
(i.e., continued attainment) of the
relevant NAAQS in the area for at least
ten years after redesignation. The
following is a list of core provisions
required in an approvable maintenance
plan.
1. The State must develop an
attainment emissions inventory to
identify the level of emissions in the
area which is sufficient to attain the
NAAQS.
2. The State must demonstrate
maintenance of the NAAQS.
3. The State must verify continued
attainment through operation of an
appropriate air quality monitoring
network.
4. The maintenance plan must
include contingency provisions to
promptly correct any violation of the
NAAQS that occurs after redesignation
of the area.
As explained below, the PM10
maintenance plan for the La Grande
nonattainment area complies with each
of these requirements.
cprice-sewell on PROD1PC70 with RULES
1. Attainment Emissions Inventory (and
Future Year Inventory)
The State should develop an
attainment year emissions inventory to
identify the level of emissions in the
area which is sufficient to attain the
NAAQS. Where the State has made an
adequate demonstration that air quality
has improved as a result of the control
measures in the SIP, the attainment
inventory will generally be an inventory
of actual emissions at the time the area
attained the standards. This inventory
should be consistent with EPA’s most
recent guidance on emissions
inventories for nonattainment areas
available at the time and should include
the emissions during the time period
associated with the monitoring data
showing attainment.
The State submitted a PM10
attainment emissions inventory for
2001, a year in which no PM10
exceedances occurred and one of the
five years used to determine the area’s
PM10 design value for the La Grande
maintenance plan. Based on the 2001
VerDate Aug<31>2005
15:10 Mar 21, 2006
Jkt 208001
worst case day emissions inventory,
area sources (wood stoves, other forms
of home heating, open burning,
industrial and commercial heating,
fugitive dust, and burning activities not
categorized elsewhere) account for 54
percent of the emissions. The rest are
attributed to major industry, onroad
sources and nonroad sources. These
sources account for 15 percent, 29
percent, and 2 percent, respectively.
Annually, area sources accounted for 29
percent of the emissions, with major
industry, onroad, and nonroad sources
accounting for 21 percent, 46 percent,
and 4 percent, respectively.
The state also submitted a 2017
emissions inventory to correspond with
the end of the 10-year period covered by
the maintenance plan. The total
emissions projected for 2017 are about
14 percent higher than those of the 2001
attainment inventory on a worst case
day and 18 percent higher annually. The
increase is primarily due to the use of
allowable emissions from the existing
point sources and a projected increase
in emissions from onroad mobile
sources. The projected growth in
population, housing and employment is
expected to be about 0.8, 0.7 and 0.3
percent per year, respectively, and
vehicle miles traveled (VMT) are
projected to increase at 1.9 percent per
year. In addition to the VMT projection
of 1.9 percent per year, an additional ten
percent was added to VMT to address
future unanticipated transportation
projects.
Based on review of the emissions
inventories, EPA concludes that the
methods used to develop the emissions
inventories are consistent with EPA
guidelines. The assumptions and
calculations were checked and found to
be thorough and comprehensive. In
sum, the State has adequately developed
an attainment emissions inventory for
2001 that identifies the levels of
emissions of PM10 in the area that is
sufficient to attain the NAAQS. Further,
the State has adequately developed a
future year (2017) inventory for use in
demonstrating maintenance with the
NAAQS at least ten years after
redesignation.
2. Maintenance Demonstration
A State may generally demonstrate
maintenance of the NAAQS by either
showing that future emissions of a
pollutant or its precursors will not
exceed the level of the attainment
inventory, or by modeling to show that
the future mix of sources and emission
rates will not cause a violation of the
NAAQS. Under the Act, PM10 areas are
required to submit modeled attainment
demonstrations to show that proposed
PO 00000
Frm 00039
Fmt 4700
Sfmt 4700
14395
reductions in emissions will be
sufficient to attain the applicable
NAAQS. For these areas, the
maintenance demonstration should be
based upon the same level of modeling.
The demonstration should be for a
period of 10 years following the
redesignation.
EPA approved the use of proportional
roll-back with receptor analysis for the
La Grande attainment demonstration. 60
FR 8563 (February 15, 1995). The
proportional roll-back approach
assumes that future air quality levels are
directly proportional to increases or
decreases in total emissions for the area.
Receptor analysis (chemical mass
balance (CMB) in this case) determines
the amount and kind of emission
reductions that are required to attain the
NAAQS. Using this combined approach,
DEQ concluded that a reduction in
woodsmoke, industrial emissions, and
road sanding emissions would bring the
total 24-hour PM10 concentration below
the NAAQS. The State subsequently
implemented control measures to
reduce emissions from these sources,
and soon after, the area’s PM10 levels
dropped. As of the Clean Air Act
December 31, 1994, deadline, the La
Grande area attained the PM10 NAAQS.
To demonstrate the area will continue
to maintain the PM10 NAAQS, DEQ
relied on the same level of modeling as
was used for the attainment
demonstration. DEQ used actual 24hour emissions for 2001, the area’s 2001
design value, and the projected 24-hour
emissions for the maintenance year of
2017 to estimate 24-hour PM10 levels in
2017. To predict worst case 2017 annual
PM10 concentrations, DEQ used the
increase in emissions from 2001 (actual
emissions) to 2017 (projected
emissions). Based on these assumptions,
DEQ’s modeling results show the
estimated 24-hour PM10 concentration
for La Grande on a worst case day in
2017 is 103 µg/m3. The estimated
annual concentration for La Grande in
2017 is 25 µg/m3. Both of these values
are well below the levels of the PM10
NAAQS.
In sum, the modeling results show
that the La Grande area will meet both
the 24-hour and annual PM10 NAAQS at
least until 2017. We therefore conclude
that the State meets the requirements
under section 175A of the Act to
demonstrate maintenance of the
NAAQS for PM10.
3. Monitoring Network
DEQ has operated an ambient air
quality monitoring network for PM10 in
Oregon since the mid 1980s. The State
network includes one monitoring site in
La Grande and utilizes EPA reference or
E:\FR\FM\22MRR1.SGM
22MRR1
14396
Federal Register / Vol. 71, No. 55 / Wednesday, March 22, 2006 / Rules and Regulations
equivalent method monitors and routine
precision and accuracy checks of the
monitoring equipment and makes
necessary maintenance performed when
warranted. EPA routinely reviews the
State monitoring program and it meets
Federal requirements.
4. Verification of Continued Attainment
Once an area has been redesignated,
the State must continue to operate an
appropriate air quality monitoring
network, in accordance with 40 CFR
part 58, to verify the attainment status
of the area. The maintenance plan
should contain provisions for continued
operation of air quality monitors that
will provide such verification. The La
Grande maintenance plan provides for
continued ambient monitoring in the
area.
cprice-sewell on PROD1PC70 with RULES
5. Contingency Plan
Section 175A of the Act also requires
that a maintenance plan include
contingency provisions, as necessary, to
correct promptly any violation of the
NAAQS that occurs after redesignation.
These contingency measures are
distinguished from those generally
required for nonattainment areas under
section 172(c)(9). For the purposes of
section 175A, a State is not required to
have fully adopted contingency
measures that will take effect without
further action by the State in order for
the maintenance plan to be approved.
At a minimum, a contingency plan must
require that the State will implement all
measures contained in the Part D
nonattainment plan for the area prior to
redesignation.
Under the maintenance plan, the State
will continue to implement the
measures contained in its Part D
nonattainment plan. The measures
carried over address the following
sources: Residential woodstoves,
outdoor burning activities, winter road
sanding, forest burning, agricultural
burning, and fugitive dust. With regard
to new industrial sources, once the La
Grande area is redesignated to
attainment and becomes a maintenance
area, the PSD and maintenance NSR
programs apply instead of the
nonattainment NSR program. This
means that Best Achievable Control
Technology (BACT) will apply instead
of Lowest Achievable Emission Rate
(LAER) technology. Oregon is retaining
the requirement to obtain offsets for new
and expanding major sources in the La
Grande PM10 Maintenance Area. By
having maintenance NSR requirements
in addition to PSD requirements, the La
Grande maintenance plan goes beyond
what is required by the Clean Air Act.
VerDate Aug<31>2005
15:10 Mar 21, 2006
Jkt 208001
In addition to continuing to
implement the measures contained in
the Part D nonattainment area plan, the
State provides for additional
contingency measures under a ‘‘phased’’
approach. Phase One is triggered if PM10
concentrations equal or exceed 90
percent (135 µg/m3) of the 24-hour or 90
percent (45 µg/m3) of the annual
NAAQS. If Phase One is triggered, the
air quality committee and DEQ will
evaluate the cause of the exceedance
and recommend strategies to be
considered for implementation. Within
six months of the trigger, the committee
will evaluate the cause of the near
exceedance and if necessary, identify
and recommend an action plan with a
schedule for implementation of
additional strategies as necessary to
prevent an exceedance or violation of
the PM10 standards. The schedule will
include automatic implementation of
more stringent requirements should
Phase Two need to be implemented.
Phase Two is triggered if a violation
of the PM10 standard occurs and is
validated by DEQ. If Phase Two is
triggered, reinstatement of
nonattainment Part D New Source
Review requirements for major sources
of PM10 will automatically be
implemented. In addition, strategies
developed under Phase One, or reevaluated under Phase Two, will be
implemented on a schedule in an action
plan, with all actions permanent and
enforceable. The contingency strategies
to be considered include various
measures to reduce emissions from
residential wood smoke, other types of
burning, winter road sanding, and from
vehicles. They also include adding dust
controls to land-use planning, reviewing
alternative heating systems, and
developing additional strategies to
address the most significant sources of
particulate in the area.
In carrying over the control measures
from the La Grande nonattainment area
plan and providing for additional
contingency measures under its phased
approach, the La Grande PM10
maintenance plan meets the
contingency plan requirements under
section 175A of the Act.
B. What Do We Conclude About the
Maintenance Plan?
Based on our review of the La Grande
maintenance plan and for the reasons
discussed above, we conclude that the
requirements for an approvable
maintenance plan under the Act have
been met. Therefore, we are approving
the maintenance plan for PM10
submitted for the La Grande
nonattainment area.
PO 00000
Frm 00040
Fmt 4700
Sfmt 4700
III. Review of Redesignation Request
A. What Criteria Did EPA Use To
Review the Request for Redesignation?
The criteria used to review the
redesignation request are derived from
the Act, the General Preamble, and a
policy and guidance memorandum from
John Calcagni, dated September 4, 1992,
entitled Procedures for Processing
Requests to Redesignate Areas to
Attainment. Section 107(d)(3)(E) of the
Act states that the EPA can redesignate
an area to attainment if the following
conditions are met:
1. The Administrator has determined
the area has attained the NAAQS.
2. The Administrator has fully
approved the applicable
implementation plan under section
110(k).
3. The Administrator has determined
that the improvement in air quality is
due to permanent and enforceable
reductions in emissions.
4. The State has met all applicable
requirements for the area under section
110 and Part D.
5. The Administrator has fully
approved a maintenance plan, including
a contingency plan, for the area under
section 175A.
1. Attainment of the NAAQS
According to the Calcagni
memorandum, the demonstration that
the area has attained the PM10 NAAQS
involves submitting ambient air quality
data from an ambient air monitoring
network representing peak PM10
concentrations. The data also should be
recorded in the EPA’s Air Quality
System (AQS) database. The 24-hour
PM10 NAAQS is 150 µg/m3. An area has
attained the 24-hour standard when the
average number of expected
exceedances per year is less than or
equal to one, when averaged over a
three year period. 40 CFR 50.6. To make
this determination, three consecutive
years of complete ambient air quality
monitoring data must be collected in
accordance with federal requirements
(40 CFR part 58, including appendices).
Oregon’s redesignation request for the
La Grande PM10 nonattainment area is
based on valid ambient air quality data
for 1991 through 2003. These data were
collected and analyzed according to 40
CFR 50.6 and 40 CFR part 50, Appendix
J and stored in EPA’s Air Quality
System (AQS). These data meet
minimum quality assurance
requirements and have been certified by
the State as being valid.
EPA reviewed the 1991–2004 PM10
data reported to EPA’s Air Quality
System (AQS) for the La Grande
nonattainment area. There have been no
E:\FR\FM\22MRR1.SGM
22MRR1
Federal Register / Vol. 71, No. 55 / Wednesday, March 22, 2006 / Rules and Regulations
exceedences of the 24-hour PM10
standard since 1991, and the area has
attained the standard (the average
number of expected exceedances
averaged over a three year period has
been less than or equal to one) since the
three year period ending on December
31, 1994.
The annual PM10 NAAQS is 50 µg/m3.
To determine attainment, the expected
annual mean PM10 concentration, which
is the average of the weighted annual
mean for three consecutive years, is
compared to the annual standard. The
weighted annual mean for each year,
1991 through 2004 for La Grande, is
below 50 µg/m3. Because these values
are below the 50 µg/m3 standard, the
nonattainment area is in attainment
with the annual PM10 NAAQS.
The La Grande nonattainment area in
Oregon attained the 24-hour and annual
PM10 NAAQS as of December 31, 1994,
as required by the Clean Air Act. The
area continues to be in attainment with
both the 24-hour and annual PM10
NAAQS.
cprice-sewell on PROD1PC70 with RULES
2. SIP Nonattainment Area Plan
Approval Under Section 110(k)
In order for an area to qualify for
redesignation, the SIP for the area must
be fully approved under section 110(k)
of the Act.
Oregon’s Clean Air Act Part D initial
PM10 plan for the La Grande PM10
nonattainment area was submitted on
September 15, 1991. EPA approved the
La Grande PM10 nonattainment area
plan on February 15, 1995. 60 FR 8563.
Thus, the area has a fully approved
nonattainment area SIP.
3. Permanent and Enforceable
Improvement in Air Quality
The State must be able to reasonably
attribute the improvement in air quality
to permanent and enforceable emissions
reductions. In making this showing, the
State must demonstrate that air quality
improvements are the result of actual
enforceable emissions reductions. This
showing should consider emission rates,
production capacities, and other related
information. The analysis should
assume that sources are operating at
permitted levels (or historic peak levels)
unless evidence is presented that such
an assumption is unrealistic.
Improvements in air quality in the La
Grande nonattainment area are
reasonably attributed to permanent and
enforceable emissions reductions. La
Grande’s exceedances dropped to zero
after the 1990–1991 winter season,
corresponding with implementation of
the area’s voluntary woodstove
curtailment program and a mandatory
woodstove change-out program. In
VerDate Aug<31>2005
15:10 Mar 21, 2006
Jkt 208001
addition to the voluntary woodstove
curtailment program and a mandatory
woodstove change-out program, La
Grande’s permanent and enforceable
control measures include a mandatory
woodstove certification program
requiring all new woodstoves sold in
the State to be laboratory tested for
emissions and efficiency prior to sale; a
ban on burn barrels and other open
burning restrictions; and a major road
improvement project that oil matted or
paved residential streets. Finally, DEQ
relied on its major new source review
program as a growth management
strategy for industry.
The State also has demonstrated that
the improvement in air quality was not
due to either economic or
meteorological conditions. Using
population, employment and
unemployment data for Union County
(the county in which La Grande is
located) as indicators, DEQ found that
population has remained relatively
stable, employment has generally
increased slightly, and unemployment
has generally decreased slightly since
the early 1990s. Despite this growth in
population and employment and a
decrease in unemployment between
1992 and 1995, La Grande reached
attainment in 1994 and continues to
measure PM10 levels well below the
standards. The area’s PM10 reductions
do not appear to be the result of an
economic recession.
With regard to meteorology, DEQ
reviewed periods of low sustained wind
speeds during winter heating seasons
from 1989 through 2003 to indicate
periods of poor ventilation and the
potential for exceedance conditions. As
a result of its review, DEQ concluded
that there has been an improvement in
air quality even during the worst
ventilation periods. We agree with
DEQ’s analysis and that it is reasonable
to conclude that the steady decrease in
PM10 concentrations from the early
1990s to the early 2000s is due to
permanent and enforceable control
measures and not to a change in
economic or meteorological conditions.
4. Section 110 and Part D Requirements
Before EPA may approve a
redesignation request, the applicable
programs under section 110 and Part D
that were due prior to the submission of
a redesignation request must be adopted
by the State and approved by EPA into
the SIP.
a. Section 110 Requirements
Section 110(a)(2) of the Act contains
general requirements for nonattainment
area plans. These requirements include,
but are not limited to, submission of a
PO 00000
Frm 00041
Fmt 4700
Sfmt 4700
14397
SIP that has been adopted by the State
after reasonable notice and public
hearing; provisions for establishment
and operation of appropriate apparatus,
methods, systems and procedures
necessary to monitor ambient air
quality; implementation of a permit
program; provisions for Part C—
Prevention of Significant Deterioration
(PSD) and Part D—New Source Review
(NSR) permit programs; criteria for
stationary source emission control
measures, monitoring, and reporting,
provisions for modeling; and provisions
for public and local agency
participation.
The Administrator has fully approved
the applicable implementation plan
under section 110(k). In 40 CFR
52.1972, EPA has approved Oregon’s
SIP for the attainment and maintenance
of the national standards under section
110. We also fully-approved Oregon’s
nonattainment NSR program, most
recently on January 22, 2003. 68 FR
29530. In addition, Oregon has a fully
approved Prevention of Significant
Deterioration (PSD) program, also
approved on January 22, 2003. 68 FR
29530. See Oregon Administrative Rules
Chapter 340, Divisions 200, 202, 209,
212, 216, 222, 224, 225 and 268.
b. Part D Requirements
Part D consists of general
requirements applicable to all areas
which are designated nonattainment
based on a violation of the NAAQS. The
general requirements are followed by a
series of subparts specific to each
pollutant. All PM10 nonattainment areas
must meet the applicable general
provisions of subpart 1 and the specific
PM10 provisions in subpart 4,
‘‘Additional Provisions for Particulate
Matter Nonattainment Areas.’’ The
following paragraphs discuss these
requirements as they apply to the La
Grande nonattainment area.
i. Section 172(c) Plan Provisions
This section contains general
requirements for nonattainment area
plans. A thorough discussion of these
requirements may be found in the
general preamble to Title I (57 FR 13498
(April 16, 1992)). The requirements for
reasonable further progress,
identification of certain emissions
increases, emissions inventory, and
other measures needed for attainment
are satisfied by the nonattainment area
plan submitted for the La Grande
nonattainment area and approved on
February 15, 1995. 60 FR 8563.
ii. Subpart 4 Requirements
As a moderate PM10 nonattainment
area, the La Grande, Oregon area must
E:\FR\FM\22MRR1.SGM
22MRR1
14398
Federal Register / Vol. 71, No. 55 / Wednesday, March 22, 2006 / Rules and Regulations
cprice-sewell on PROD1PC70 with RULES
meet Part D, subpart 4, sections 189(a),
(c), and (e) requirements before the area
can be redesignated to attainment.
These requirements must be fully
approved into the SIP:
(a) Provisions to assure that RACM
was implemented by December 10,
1993;
(b) Either a demonstration that the
plan provided for attainment as
expeditiously as practicable but not
later than December 31, 1994, or a
demonstration that attainment by that
date was impracticable;
(c) Quantitative milestones which
were achieved every 3 years and which
demonstrate reasonable further progress
(RFP) toward attainment by December
31, 1994;
(d) Provisions to assure that the
control requirements applicable to
major stationary sources of PM10 also
apply to major stationary sources of
PM10 precursors, except where the
Administrator determined that such
sources do not contribute significantly
to PM10 levels which exceed the
NAAQS in the area.
(e) Permit program under section 173
for the construction and operation of
new and modified major stationary
sources of PM10.
EPA approved the nonattainment area
plan for the La Grande nonattainment
area, which met the initial requirements
of the 1990 Clean Air Act for moderate
PM10 nonattainment areas, on February
15, 1995. 60 FR 8563. This plan met
requirements for RACM/BACM,
demonstrating attainment, quantitative
milestones, PM10 precursors,
contingency measures, and quantitative
milestones for demonstrating RFP. As
mentioned above, the provisions related
to NSR were most recently approved in
the Oregon SIP on January 22, 2003. 68
FR 29530. Oregon also has a fully
approved Prevention of Significant
Deterioration (PSD) program, also
approved on January 22, 2003. 68 FR
29530. See Oregon Administrative Rules
Chapter 340, Divisions 200, 202, 209,
212, 216, 222, 224, 225 and 268.
5. Transportation Conformity
Under section 176(c) of the Act,
transportation plans, programs and
projects in nonattainment or
maintenance areas that are funded or
approved under Title 23 U.S.C. or the
Federal Transit Laws must conform to
the applicable SIP. In short, a
transportation plan is deemed to
conform to the applicable SIP if the
emissions resulting from the
implementation of that transportation
plan are less than or equal to the motor
vehicle emissions level or ‘‘budget’’
established in the SIP for the
VerDate Aug<31>2005
15:10 Mar 21, 2006
Jkt 208001
maintenance year and other analysis
years.
DEQ has developed a PM10 MVEB for
La Grande through 2017 that meets the
transportation conformity criteria in 40
CFR 93.118(e)(4). The motor vehicle
emissions budget is established for all
years. The budget is as follows:
LA GRANDE PM10 MOTOR VEHICLE
EMISSIONS BUDGET THROUGH 2017
[Pounds PM10/24-hour winter day]
Year
All years
Motor Vehicle Emissions
Budget ...............................
2750
The TSD summarizes how the PM10
motor vehicle emissions budget meets
the criteria contained in the conformity
rule at 40 CFR 93.118(e)(4).
6. Maintenance Plans
Section 107(d)(3)(E) of the Act
stipulates that for an area to be
redesignated, EPA must fully approve a
maintenance plan which meets the
requirements of section 175A. A State
may submit both the redesignation
request and the maintenance plan at the
same time and rulemaking on both may
proceed on a parallel track.
On October 25, 2005, DEQ submitted
a PM10 maintenance plan and
redesignation request for the La Grande
nonattainment area. In section II above,
we evaluated the plan and concluded
that the requirements for an approvable
maintenance plan under the Act have
been met.
B. What Do We Conclude About the
Request for Redesignation?
Based on our evaluation of DEQ’s
October 25, 2005 SIP submittal, we
conclude that all the requirements for
redesignation in section 107(d)(3)(E)
have been met. Therefore, we are
redesignating the La Grande PM10
nonattainment area to attainment.
IV. Statutory and Executive Order
Reviews
Under Executive Order 12866 (58 FR
51735, October 4, 1993), this action is
not a ‘‘significant regulatory action’’ and
therefore is not subject to review by the
Office of Management and Budget. For
this reason, this action is also not
subject to Executive Order 13211,
‘‘Actions Concerning Regulations That
Significantly Affect Energy Supply,
Distribution, or Use’’ (66 FR 28355, May
22, 2001). This action merely approves
state law as meeting Federal
requirements and imposes no additional
requirements beyond those imposed by
state law. Accordingly, the
PO 00000
Frm 00042
Fmt 4700
Sfmt 4700
Administrator certifies that this rule
will not have a significant economic
impact on a substantial number of small
entities under the Regulatory Flexibility
Act (5 U.S.C. 601 et seq.). Because this
rule approves pre-existing requirements
under state law and does not impose
any additional enforceable duty beyond
that required by state law, it does not
contain any unfunded mandate or
significantly or uniquely affect small
governments, as described in the
Unfunded Mandates Reform Act of 1995
(Pub. L. 104–4).
This rule also does not have tribal
implications because it will not have a
substantial direct effect on one or more
Indian tribes, on the relationship
between the Federal Government and
Indian tribes, or on the distribution of
power and responsibilities between the
Federal Government and Indian tribes,
as specified by Executive Order 13175
(65 FR 67249, November 9, 2000). This
action also does not have Federalism
implications because it does not have
substantial direct effects on the States,
on the relationship between the national
government and the States, or on the
distribution of power and
responsibilities among the various
levels of government, as specified in
Executive Order 13132 (64 FR 43255,
August 10, 1999). This action merely
approves a state rule implementing a
Federal standard, and does not alter the
relationship or the distribution of power
and responsibilities established in the
Clean Air Act. This rule also is not
subject to Executive Order 13045
‘‘Protection of Children from
Environmental Health Risks and Safety
Risks’’ (62 FR 19885, April 23, 1997),
because it is not economically
significant.
In reviewing SIP submissions, EPA’s
role is to approve state choices,
provided that they meet the criteria of
the Clean Air Act. In this context, in the
absence of a prior existing requirement
for the State to use voluntary consensus
standards (VCS), EPA has no authority
to disapprove a SIP submission for
failure to use VCS. It would thus be
inconsistent with applicable law for
EPA, when it reviews a SIP submission,
to use VCS in place of a SIP submission
that otherwise satisfies the provisions of
the Clean Air Act. Thus, the
requirements of section 12(d) of the
National Technology Transfer and
Advancement Act of 1995 (15 U.S.C.
272 note) do not apply. This rule does
not impose an information collection
burden under the provisions of the
Paperwork Reduction Act of 1995 (44
U.S.C. 3501 et seq.).
The Congressional Review Act, 5
U.S.C. 801 et seq., as added by the Small
E:\FR\FM\22MRR1.SGM
22MRR1
14399
Federal Register / Vol. 71, No. 55 / Wednesday, March 22, 2006 / Rules and Regulations
Business Regulatory Enforcement
Fairness Act of 1996, generally provides
that before a rule may take effect, the
agency promulgating the rule must
submit a rule report, which includes a
copy of the rule, to each House of the
Congress and to the Comptroller General
of the United States. EPA will submit a
report containing this rule and other
required information to the U.S. Senate,
the U.S. House of Representatives, and
the Comptroller General of the United
States prior to publication of the rule in
the Federal Register. A major rule
cannot take effect until 60 days after it
is published in the Federal Register.
This action is not a ‘‘major rule’’ as
defined by 5 U.S.C. 804(2).
Under section 307(b)(1) of the Clean
Air Act, petitions for judicial review of
this action must be filed in the United
States Court of Appeals for the
appropriate circuit by May 22, 2006.
Filing a petition for reconsideration by
the Administrator of this final rule does
not affect the finality of this rule for the
purposes of judicial review nor does it
extend the time within which a petition
for judicial review may be filed, and
shall not postpone the effectiveness of
such rule or action. This action may not
be challenged later in proceedings to
enforce its requirements. See section
307(b)(2).
Grande PM10 nonattainment area to
attainment for PM10. The State’s
maintenance plan and the redesignation
request meet the requirements of the
Clean Air Act.
(i) Incorporation by reference.
(A) Oregon Administrative Rule 340–
204–0030 and 0040, as effective
September 9, 2005.
I 3. Section 52.1973 is amended by
adding paragraph (e)(3) to read as
follows:
List of Subjects
40 CFR Part 52
Environmental protection, Air
pollution control, Incorporation by
reference, Intergovernmental relations,
Particulate matter, Reporting and
recordkeeping requirements.
40 CFR Part 81
Environmental protection, Air
pollution control, National parks,
Wilderness areas.
Dated: February 24, 2006.
Julie M. Hagensen,
Acting Regional Administrator, Region 10.
§ 52.1973
*
*
*
*
(e) * * *
(3) EPA approves as a revision to the
Oregon State Implementation Plan, the
La Grande PM10 maintenance plan
adopted by the Oregon Environmental
Quality Commission on August 11, 2005
and submitted to EPA on October 25,
2005.
*
*
*
*
*
Chapter I, title 40 of the Code of
Federal Regulations is amended as
follows:
I
PART 52—[AMENDED]
1. The authority citation for part 52
continues to read as follows:
I
Authority: 42 U.S.C. 7401, et seq.
PART 81—[AMENDED]
Subpart MM—Oregon
4. The authority citation for part 81
continues to read as follows:
I
2. Section 52.1970 is amended by
adding paragraph (c)(146) to read as
follows:
I
§ 52.1970
Approval of plans.
*
Authority: 42 U.S.C. 7401, et seq.
5. In § 81.338, the table entitled
‘‘Oregon PM–10’’ is amended by
revising the entry for ‘‘La Grande (the
Urban Growth Boundary Area)’’ to read
as follows:
I
Identification of plan.
*
*
*
*
*
(c) * * *
(146) On October 25, 2005, the Oregon
Department of Environmental Quality
submitted a PM10 maintenance plan and
requested redesignation of the La
§ 81.338
*
*
Oregon.
*
*
*
OREGON—PM–10
Designation
Classification
Designated area
Date
*
*
*
*
La Grande (the Urban Growth Boundary area) ............................................
*
*
*
*
*
*
*
*
[FR Doc. 06–2698 Filed 3–21–06; 8:45 am]
BILLING CODE 6560–50–P
Type
*
5/22/06
*
ENVIRONMENTAL PROTECTION
AGENCY
40 CFR Parts 52 and 81
cprice-sewell on PROD1PC70 with RULES
Approval and Promulgation of Air
Quality Implementation Plans;
Lakeview PM10 Maintenance Plan and
Redesignation Request
Environmental Protection
Agency (EPA).
ACTION: Direct final rule.
SUMMARY: EPA is taking direct final
action to approve a PM10 State
15:10 Mar 21, 2006
Jkt 208001
PO 00000
Frm 00043
Fmt 4700
*
Sfmt 4700
*
*
*
AGENCY:
Type
*
Attainment.
[EPA–R10–OAR–2006–0010; FRL–8041–9]
VerDate Aug<31>2005
Date
Implementation Plan (SIP) maintenance
plan revision for the Lakeview, Oregon
nonattainment area and to redesignate
the area from nonattattainment to
attainment for PM10. PM10 air pollution
is suspended particulate matter with a
nominal diameter less than or equal to
a nominal ten micrometers. EPA is
approving the SIP revision and
redesignation request because the State
adequately demonstrates that the
control measures being implemented in
the Lakeview area result in maintenance
of the PM10 National Ambient Air
Quality Standards and all other
requirements of the Clean Air Act for
redesignation to attainment are met.
E:\FR\FM\22MRR1.SGM
22MRR1
Agencies
[Federal Register Volume 71, Number 55 (Wednesday, March 22, 2006)]
[Rules and Regulations]
[Pages 14393-14399]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 06-2698]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Parts 52 and 81
[EPA-R10-OAR-2006-0050; FRL-8041-6]
Approval and Promulgation of Air Quality Implementation Plans; La
Grande PM10 Maintenance Plan and Redesignation Request
AGENCY: Environmental Protection Agency (EPA).
ACTION: Direct final rule.
-----------------------------------------------------------------------
SUMMARY: EPA is taking direct final action to approve a PM10
State Implementation Plan (SIP) maintenance plan revision for the La
Grande, Oregon nonattainment area and to redesignate the area from
nonattattainment to attainment for PM10. PM10 air
pollution is suspended particulate matter with a nominal diameter less
than or equal to a nominal ten micrometers. EPA is approving the SIP
revision and redesignation request because the State adequately
demonstrates that the control measures being implemented in the La
Grande area result in maintenance of the PM10 National
Ambient Air Quality Standards and all other requirements of the Clean
Air Act for redesignation to attainment are met.
DATES: This direct final rule will be effective May 22, 2006, without
further notice, unless EPA receives adverse comments by April 21, 2006.
If adverse comments are received, EPA will publish a timely withdrawal
of the direct final rule in the Federal Register informing the public
that the rule will not take effect.
ADDRESSES: Submit your comments, identified by Docket ID No. EPA-R10-
OAR-2006-0050, by one of the following methods:
Federal eRulemaking Portal: https://www.regulations.gov.
Follow the on-line instructions for submitting comments.
Mail: Donna Deneen, Office of Air, Waste and Toxics, AWT-
107, EPA, Region 10, 1200 Sixth Avenue, Seattle, Washington 98101.
Hand Delivery: EPA, Region 10 Mail Room, 9th Floor, 1200
Sixth Avenue, Seattle, Washington 98101. Attention: Donna Deneen,
Office of Air, Waste and Toxics, AWT-107. Such deliveries are only
accepted during normal hours of operation, and special arrangements
should be made for deliveries of boxed information.
Instructions: Direct your comments to Docket ID No. EPA-R10-OAR-
2006-0050. EPA's policy is that all comments received will be included
in the public docket without change and may be made available online at
https://www.regulations.gov, including any personal information
provided, unless the comment includes information claimed to be
Confidential Business Information (CBI) or other information whose
disclosure is restricted by statute. Do not submit information that you
consider to be CBI or otherwise protected through https://
www.regulations.gov. The https://www.regulations.gov Web site is an
``anonymous access'' system, which means EPA will not know your
identity or contact information unless you provide it in the body of
your comment. If you send an e-mail comment directly to EPA without
going through https://www.regulations.gov, your e-mail address will be
automatically captured and included as part of the comment that is
placed in the public docket and made available on the Internet. If you
submit an electronic comment, EPA recommends that you include your name
and other contact information in the body of your comment and with any
disk or CD-ROM you submit. If EPA cannot read your comment due to
technical difficulties and cannot contact you for clarification, EPA
may not be able to consider your comment. Electronic files should avoid
the use of special characters, any form of
[[Page 14394]]
encryption, and be free of any defects or viruses. For additional
information about EPA's public docket visit the EPA Docket Center
homepage at https://www.epa.gov/epahome/dockets.htm
Docket: All documents in the docket are listed in the https://
www.regulations.gov index. Although listed in the index, some
information is not publicly available, such as CBI or other information
whose disclosure is restricted by statute. Certain other material, such
as copyrighted material, is not placed on the Internet and will be
publicly available only in hard copy form. Publicly available docket
materials are available either electronically in https://
www.regulations.gov or in hard copy at EPA Region 10, Office of Air,
Waste and Toxics, 1200 Sixth Avenue, Seattle, Washington. EPA requests
that, if possible, you contact the person listed in the FOR FURTHER
INFORMATION CONTACT section to schedule your inspection.
FOR FURTHER INFORMATION CONTACT: Donna Deneen at telephone number:
(206) 553-6706, e-mail address: deneen.donna@epa.gov, fax number: (206)
553-0110, or the above EPA, Region 10 address.
SUPPLEMENTARY INFORMATION: Throughout this document wherever ``we'',
``us'' or ``our'' are used, we mean EPA.
Table of Contents
I. General Overview
A. What Action Are We Taking?
B. What Is the Background for This Action?
1. Description of the Area
2. Nonattainment History of the La Grande Area
3. Description of the Air Quality Problem
II. Review of Maintenance Plan
A. What Criteria Did EPA Use To Review the Maintenance Plan?
1. Attainment Emissions Inventory (and Future Year Inventory)
2. Maintenance Demonstration
3. Monitoring Network
4. Verification of Continued Attainment
5. Contingency Plan
B. What Do We Conclude About the Maintenance Plan?
III. Review of Redesignation Request
A. What Criteria Did EPA Use To Review the Request for
Redesignation?
1. Attainment of the NAAQS
2. SIP Nonattainment Area Plan Approval Under Section 110(k)
3. Permanent and Enforceable Improvements in Air Quality
4. Section 110 and Part D Requirements
a. Section 110 Requirements
b. Part D Requirements
i. Section 172(c) Plan Provisions
ii. Subpart 4 Requirements
5. Transportation Conformity
6. Maintenance Plans
B. What Do We Conclude About the Request for Redesignation?
IV. Statutory and Executive Order Reviews
I. General Overview
A. What Action Are We Taking?
We are taking direct final action to approve the SIP revision and
redesignation request submitted by the State of Oregon Department of
Environmental Quality (DEQ or State) on October 25, 2005, for the La
Grande, Oregon PM10 nonattainment area (La Grande
nonattainment area). We are approving the State's SIP revision and
request for redesignation because the State adequately demonstrates
that the control measures being implemented in the La Grande area
result in maintenance of the PM10 National Ambient Air
Quality Standards (NAAQS) and all other requirements of the Clean Air
Act (the Act) for redesignation to attainment are met. See the
Technical Support Document (TSD) accompanying this notice for further
supporting documentation.
B. What Is the Background for This Action?
1. Description of the Area
La Grande is located in northeast Oregon at an elevation of 2785
feet. The area is typified by semi-arid climate where mean annual
rainfall is 17.2 inches. The La Grande Urban Growth Boundary (UGB),
which defines the nonattainment area boundaries, had an estimated
population of 13,809 in 2000. It is expected to grow to approximately
16,391 by 2025. The city of La Grande serves as an important commercial
center for northeast Oregon.
La Grande is situated at the edge of the Grande Ronde Valley, a
relatively flat area nestled in a mountainous area drained by the
Grande Ronde River. Because of the valley's features, La Grande can
experience strong nighttime inversions that break with daytime solar
heating. In the wintertime, arctic air masses frequently move into the
Grande Ronde Valley. Temperatures can remain well below freezing for
several weeks at a time. Winter nights are commonly clear and cool in
the valley. Under these conditions, inversions can occur.
2. Nonattainment History of the La Grande Area
On July 1, 1987 (52 FR 24634), the Environmental Protection Agency
(EPA) revised the National Ambient Air Quality Standards (NAAQS) for
particulate matter with a new indicator that includes only those
particles with an aerodynamic diameter less than or equal to a nominal
10 micrometers (PM10). See 40 CFR 50.6. The 24-hour primary
PM10 standard is 150 micrograms per cubic meter ([mu]g/
m\3\), with no more than one expected exceedance per year over a three-
year period. The annual primary PM10 standard is 50 [mu]g/
m\3\ expected annual arithmetic mean over a three-year period. The
secondary PM10 standards are identical to the primary
standards.
By operation of law upon enactment of the 1990 Clean Air Act
Amendments, La Grande, Oregon was designated ``nonattainment'' for
PM10 and classified as moderate under section 107(d)(4)(B)
and 188(a) (see 56 FR 56694 (November 6, 1991) and 40 CFR 81.338).
Under subsections 188(a) and (c)(1) of the Clean Air Act, all initial
moderate PM10 nonattainment areas had the same applicable
attainment date of December 31, 1994.
The State developed a nonattainment area SIP revision designed to
bring about attainment of the PM10 NAAQS. Oregon's Clean Air
Act Part D initial PM10 plan (nonattainment area plan) for
the La Grande PM10 nonattainment area was submitted on
November 15, 1991. EPA approved the La Grande PM10
nonattainment area plan on February 15, 1995. 60 FR 8563.
In order for the La Grande nonattainment area to be redesignated to
attainment for PM10, a 10-year maintenance plan and
redesignation request is required for the area. A SIP revision
containing these elements was submitted to EPA on October 25, 2005. We
are approving both these elements in this action.
3. Description of the Air Quality Problem
La Grande has not had an exceedance of the PM10 NAAQS
for over 15 consecutive years. The last recorded exceedance occurred on
January 28, 1991 (173 [mu]g/m\3\) and was the only exceedance in 1991.
Because there were no exceedances in the following three years, 1992,
1993, and 1994, La Grande attained the 24-hour PM10 NAAQS by
the Clean Air Act deadline of December 31, 1994. La Grande has not
violated the annual PM10 NAAQS. The highest annual average
PM10 concentration was 31.7 [mu]g/m\3\ in 1992.
PM10 concentrations have been measured at the same
location (Willow Street) in the La Grande UGB since monitoring began in
1986. Higher levels of PM10 are typically a wintertime
problem in La Grande due to temperature inversions that trap
particulate matter emissions in the area. A combination of area
sources, industrial sources, and mobile and non-
[[Page 14395]]
mobile sources contribute to the area's PM10 levels.
II. Review of Maintenance Plan
A. What Criteria Did EPA Use To Review the Maintenance plan?
Section 107(d)(3)(E) of the Act stipulates that for an area to be
redesignated to attainment, EPA must fully approve a maintenance plan
which meets the requirements of section 175A. Section 175A defines the
general framework of a maintenance plan, which must provide for
maintenance (i.e., continued attainment) of the relevant NAAQS in the
area for at least ten years after redesignation. The following is a
list of core provisions required in an approvable maintenance plan.
1. The State must develop an attainment emissions inventory to
identify the level of emissions in the area which is sufficient to
attain the NAAQS.
2. The State must demonstrate maintenance of the NAAQS.
3. The State must verify continued attainment through operation of
an appropriate air quality monitoring network.
4. The maintenance plan must include contingency provisions to
promptly correct any violation of the NAAQS that occurs after
redesignation of the area.
As explained below, the PM10 maintenance plan for the La
Grande nonattainment area complies with each of these requirements.
1. Attainment Emissions Inventory (and Future Year Inventory)
The State should develop an attainment year emissions inventory to
identify the level of emissions in the area which is sufficient to
attain the NAAQS. Where the State has made an adequate demonstration
that air quality has improved as a result of the control measures in
the SIP, the attainment inventory will generally be an inventory of
actual emissions at the time the area attained the standards. This
inventory should be consistent with EPA's most recent guidance on
emissions inventories for nonattainment areas available at the time and
should include the emissions during the time period associated with the
monitoring data showing attainment.
The State submitted a PM10 attainment emissions
inventory for 2001, a year in which no PM10 exceedances
occurred and one of the five years used to determine the area's
PM10 design value for the La Grande maintenance plan. Based
on the 2001 worst case day emissions inventory, area sources (wood
stoves, other forms of home heating, open burning, industrial and
commercial heating, fugitive dust, and burning activities not
categorized elsewhere) account for 54 percent of the emissions. The
rest are attributed to major industry, onroad sources and nonroad
sources. These sources account for 15 percent, 29 percent, and 2
percent, respectively. Annually, area sources accounted for 29 percent
of the emissions, with major industry, onroad, and nonroad sources
accounting for 21 percent, 46 percent, and 4 percent, respectively.
The state also submitted a 2017 emissions inventory to correspond
with the end of the 10-year period covered by the maintenance plan. The
total emissions projected for 2017 are about 14 percent higher than
those of the 2001 attainment inventory on a worst case day and 18
percent higher annually. The increase is primarily due to the use of
allowable emissions from the existing point sources and a projected
increase in emissions from onroad mobile sources. The projected growth
in population, housing and employment is expected to be about 0.8, 0.7
and 0.3 percent per year, respectively, and vehicle miles traveled
(VMT) are projected to increase at 1.9 percent per year. In addition to
the VMT projection of 1.9 percent per year, an additional ten percent
was added to VMT to address future unanticipated transportation
projects.
Based on review of the emissions inventories, EPA concludes that
the methods used to develop the emissions inventories are consistent
with EPA guidelines. The assumptions and calculations were checked and
found to be thorough and comprehensive. In sum, the State has
adequately developed an attainment emissions inventory for 2001 that
identifies the levels of emissions of PM10 in the area that
is sufficient to attain the NAAQS. Further, the State has adequately
developed a future year (2017) inventory for use in demonstrating
maintenance with the NAAQS at least ten years after redesignation.
2. Maintenance Demonstration
A State may generally demonstrate maintenance of the NAAQS by
either showing that future emissions of a pollutant or its precursors
will not exceed the level of the attainment inventory, or by modeling
to show that the future mix of sources and emission rates will not
cause a violation of the NAAQS. Under the Act, PM10 areas
are required to submit modeled attainment demonstrations to show that
proposed reductions in emissions will be sufficient to attain the
applicable NAAQS. For these areas, the maintenance demonstration should
be based upon the same level of modeling. The demonstration should be
for a period of 10 years following the redesignation.
EPA approved the use of proportional roll-back with receptor
analysis for the La Grande attainment demonstration. 60 FR 8563
(February 15, 1995). The proportional roll-back approach assumes that
future air quality levels are directly proportional to increases or
decreases in total emissions for the area. Receptor analysis (chemical
mass balance (CMB) in this case) determines the amount and kind of
emission reductions that are required to attain the NAAQS. Using this
combined approach, DEQ concluded that a reduction in woodsmoke,
industrial emissions, and road sanding emissions would bring the total
24-hour PM10 concentration below the NAAQS. The State
subsequently implemented control measures to reduce emissions from
these sources, and soon after, the area's PM10 levels
dropped. As of the Clean Air Act December 31, 1994, deadline, the La
Grande area attained the PM10 NAAQS.
To demonstrate the area will continue to maintain the
PM10 NAAQS, DEQ relied on the same level of modeling as was
used for the attainment demonstration. DEQ used actual 24-hour
emissions for 2001, the area's 2001 design value, and the projected 24-
hour emissions for the maintenance year of 2017 to estimate 24-hour
PM10 levels in 2017. To predict worst case 2017 annual
PM10 concentrations, DEQ used the increase in emissions from
2001 (actual emissions) to 2017 (projected emissions). Based on these
assumptions, DEQ's modeling results show the estimated 24-hour
PM10 concentration for La Grande on a worst case day in 2017
is 103 [mu]g/m\3\. The estimated annual concentration for La Grande in
2017 is 25 [mu]g/m\3\. Both of these values are well below the levels
of the PM10 NAAQS.
In sum, the modeling results show that the La Grande area will meet
both the 24-hour and annual PM10 NAAQS at least until 2017.
We therefore conclude that the State meets the requirements under
section 175A of the Act to demonstrate maintenance of the NAAQS for
PM10.
3. Monitoring Network
DEQ has operated an ambient air quality monitoring network for
PM10 in Oregon since the mid 1980s. The State network
includes one monitoring site in La Grande and utilizes EPA reference or
[[Page 14396]]
equivalent method monitors and routine precision and accuracy checks of
the monitoring equipment and makes necessary maintenance performed when
warranted. EPA routinely reviews the State monitoring program and it
meets Federal requirements.
4. Verification of Continued Attainment
Once an area has been redesignated, the State must continue to
operate an appropriate air quality monitoring network, in accordance
with 40 CFR part 58, to verify the attainment status of the area. The
maintenance plan should contain provisions for continued operation of
air quality monitors that will provide such verification. The La Grande
maintenance plan provides for continued ambient monitoring in the area.
5. Contingency Plan
Section 175A of the Act also requires that a maintenance plan
include contingency provisions, as necessary, to correct promptly any
violation of the NAAQS that occurs after redesignation. These
contingency measures are distinguished from those generally required
for nonattainment areas under section 172(c)(9). For the purposes of
section 175A, a State is not required to have fully adopted contingency
measures that will take effect without further action by the State in
order for the maintenance plan to be approved. At a minimum, a
contingency plan must require that the State will implement all
measures contained in the Part D nonattainment plan for the area prior
to redesignation.
Under the maintenance plan, the State will continue to implement
the measures contained in its Part D nonattainment plan. The measures
carried over address the following sources: Residential woodstoves,
outdoor burning activities, winter road sanding, forest burning,
agricultural burning, and fugitive dust. With regard to new industrial
sources, once the La Grande area is redesignated to attainment and
becomes a maintenance area, the PSD and maintenance NSR programs apply
instead of the nonattainment NSR program. This means that Best
Achievable Control Technology (BACT) will apply instead of Lowest
Achievable Emission Rate (LAER) technology. Oregon is retaining the
requirement to obtain offsets for new and expanding major sources in
the La Grande PM10 Maintenance Area. By having maintenance
NSR requirements in addition to PSD requirements, the La Grande
maintenance plan goes beyond what is required by the Clean Air Act.
In addition to continuing to implement the measures contained in
the Part D nonattainment area plan, the State provides for additional
contingency measures under a ``phased'' approach. Phase One is
triggered if PM10 concentrations equal or exceed 90 percent
(135 [mu]g/m\3\) of the 24-hour or 90 percent (45 [mu]g/m\3\) of the
annual NAAQS. If Phase One is triggered, the air quality committee and
DEQ will evaluate the cause of the exceedance and recommend strategies
to be considered for implementation. Within six months of the trigger,
the committee will evaluate the cause of the near exceedance and if
necessary, identify and recommend an action plan with a schedule for
implementation of additional strategies as necessary to prevent an
exceedance or violation of the PM10 standards. The schedule
will include automatic implementation of more stringent requirements
should Phase Two need to be implemented.
Phase Two is triggered if a violation of the PM10
standard occurs and is validated by DEQ. If Phase Two is triggered,
reinstatement of nonattainment Part D New Source Review requirements
for major sources of PM10 will automatically be implemented.
In addition, strategies developed under Phase One, or re-evaluated
under Phase Two, will be implemented on a schedule in an action plan,
with all actions permanent and enforceable. The contingency strategies
to be considered include various measures to reduce emissions from
residential wood smoke, other types of burning, winter road sanding,
and from vehicles. They also include adding dust controls to land-use
planning, reviewing alternative heating systems, and developing
additional strategies to address the most significant sources of
particulate in the area.
In carrying over the control measures from the La Grande
nonattainment area plan and providing for additional contingency
measures under its phased approach, the La Grande PM10
maintenance plan meets the contingency plan requirements under section
175A of the Act.
B. What Do We Conclude About the Maintenance Plan?
Based on our review of the La Grande maintenance plan and for the
reasons discussed above, we conclude that the requirements for an
approvable maintenance plan under the Act have been met. Therefore, we
are approving the maintenance plan for PM10 submitted for
the La Grande nonattainment area.
III. Review of Redesignation Request
A. What Criteria Did EPA Use To Review the Request for Redesignation?
The criteria used to review the redesignation request are derived
from the Act, the General Preamble, and a policy and guidance
memorandum from John Calcagni, dated September 4, 1992, entitled
Procedures for Processing Requests to Redesignate Areas to Attainment.
Section 107(d)(3)(E) of the Act states that the EPA can redesignate an
area to attainment if the following conditions are met:
1. The Administrator has determined the area has attained the
NAAQS.
2. The Administrator has fully approved the applicable
implementation plan under section 110(k).
3. The Administrator has determined that the improvement in air
quality is due to permanent and enforceable reductions in emissions.
4. The State has met all applicable requirements for the area under
section 110 and Part D.
5. The Administrator has fully approved a maintenance plan,
including a contingency plan, for the area under section 175A.
1. Attainment of the NAAQS
According to the Calcagni memorandum, the demonstration that the
area has attained the PM10 NAAQS involves submitting ambient
air quality data from an ambient air monitoring network representing
peak PM10 concentrations. The data also should be recorded
in the EPA's Air Quality System (AQS) database. The 24-hour
PM10 NAAQS is 150 [mu]g/m\3\. An area has attained the 24-
hour standard when the average number of expected exceedances per year
is less than or equal to one, when averaged over a three year period.
40 CFR 50.6. To make this determination, three consecutive years of
complete ambient air quality monitoring data must be collected in
accordance with federal requirements (40 CFR part 58, including
appendices).
Oregon's redesignation request for the La Grande PM10
nonattainment area is based on valid ambient air quality data for 1991
through 2003. These data were collected and analyzed according to 40
CFR 50.6 and 40 CFR part 50, Appendix J and stored in EPA's Air Quality
System (AQS). These data meet minimum quality assurance requirements
and have been certified by the State as being valid.
EPA reviewed the 1991-2004 PM10 data reported to EPA's
Air Quality System (AQS) for the La Grande nonattainment area. There
have been no
[[Page 14397]]
exceedences of the 24-hour PM10 standard since 1991, and the
area has attained the standard (the average number of expected
exceedances averaged over a three year period has been less than or
equal to one) since the three year period ending on December 31, 1994.
The annual PM10 NAAQS is 50 [mu]g/m\3\. To determine
attainment, the expected annual mean PM10 concentration,
which is the average of the weighted annual mean for three consecutive
years, is compared to the annual standard. The weighted annual mean for
each year, 1991 through 2004 for La Grande, is below 50 [mu]g/m\3\.
Because these values are below the 50 [mu]g/m\3\ standard, the
nonattainment area is in attainment with the annual PM10
NAAQS.
The La Grande nonattainment area in Oregon attained the 24-hour and
annual PM10 NAAQS as of December 31, 1994, as required by
the Clean Air Act. The area continues to be in attainment with both the
24-hour and annual PM10 NAAQS.
2. SIP Nonattainment Area Plan Approval Under Section 110(k)
In order for an area to qualify for redesignation, the SIP for the
area must be fully approved under section 110(k) of the Act.
Oregon's Clean Air Act Part D initial PM10 plan for the
La Grande PM10 nonattainment area was submitted on September
15, 1991. EPA approved the La Grande PM10 nonattainment area
plan on February 15, 1995. 60 FR 8563. Thus, the area has a fully
approved nonattainment area SIP.
3. Permanent and Enforceable Improvement in Air Quality
The State must be able to reasonably attribute the improvement in
air quality to permanent and enforceable emissions reductions. In
making this showing, the State must demonstrate that air quality
improvements are the result of actual enforceable emissions reductions.
This showing should consider emission rates, production capacities, and
other related information. The analysis should assume that sources are
operating at permitted levels (or historic peak levels) unless evidence
is presented that such an assumption is unrealistic.
Improvements in air quality in the La Grande nonattainment area are
reasonably attributed to permanent and enforceable emissions
reductions. La Grande's exceedances dropped to zero after the 1990-1991
winter season, corresponding with implementation of the area's
voluntary woodstove curtailment program and a mandatory woodstove
change-out program. In addition to the voluntary woodstove curtailment
program and a mandatory woodstove change-out program, La Grande's
permanent and enforceable control measures include a mandatory
woodstove certification program requiring all new woodstoves sold in
the State to be laboratory tested for emissions and efficiency prior to
sale; a ban on burn barrels and other open burning restrictions; and a
major road improvement project that oil matted or paved residential
streets. Finally, DEQ relied on its major new source review program as
a growth management strategy for industry.
The State also has demonstrated that the improvement in air quality
was not due to either economic or meteorological conditions. Using
population, employment and unemployment data for Union County (the
county in which La Grande is located) as indicators, DEQ found that
population has remained relatively stable, employment has generally
increased slightly, and unemployment has generally decreased slightly
since the early 1990s. Despite this growth in population and employment
and a decrease in unemployment between 1992 and 1995, La Grande reached
attainment in 1994 and continues to measure PM10 levels well
below the standards. The area's PM10 reductions do not
appear to be the result of an economic recession.
With regard to meteorology, DEQ reviewed periods of low sustained
wind speeds during winter heating seasons from 1989 through 2003 to
indicate periods of poor ventilation and the potential for exceedance
conditions. As a result of its review, DEQ concluded that there has
been an improvement in air quality even during the worst ventilation
periods. We agree with DEQ's analysis and that it is reasonable to
conclude that the steady decrease in PM10 concentrations
from the early 1990s to the early 2000s is due to permanent and
enforceable control measures and not to a change in economic or
meteorological conditions.
4. Section 110 and Part D Requirements
Before EPA may approve a redesignation request, the applicable
programs under section 110 and Part D that were due prior to the
submission of a redesignation request must be adopted by the State and
approved by EPA into the SIP.
a. Section 110 Requirements
Section 110(a)(2) of the Act contains general requirements for
nonattainment area plans. These requirements include, but are not
limited to, submission of a SIP that has been adopted by the State
after reasonable notice and public hearing; provisions for
establishment and operation of appropriate apparatus, methods, systems
and procedures necessary to monitor ambient air quality; implementation
of a permit program; provisions for Part C--Prevention of Significant
Deterioration (PSD) and Part D--New Source Review (NSR) permit
programs; criteria for stationary source emission control measures,
monitoring, and reporting, provisions for modeling; and provisions for
public and local agency participation.
The Administrator has fully approved the applicable implementation
plan under section 110(k). In 40 CFR 52.1972, EPA has approved Oregon's
SIP for the attainment and maintenance of the national standards under
section 110. We also fully-approved Oregon's nonattainment NSR program,
most recently on January 22, 2003. 68 FR 29530. In addition, Oregon has
a fully approved Prevention of Significant Deterioration (PSD) program,
also approved on January 22, 2003. 68 FR 29530. See Oregon
Administrative Rules Chapter 340, Divisions 200, 202, 209, 212, 216,
222, 224, 225 and 268.
b. Part D Requirements
Part D consists of general requirements applicable to all areas
which are designated nonattainment based on a violation of the NAAQS.
The general requirements are followed by a series of subparts specific
to each pollutant. All PM10 nonattainment areas must meet
the applicable general provisions of subpart 1 and the specific
PM10 provisions in subpart 4, ``Additional Provisions for
Particulate Matter Nonattainment Areas.'' The following paragraphs
discuss these requirements as they apply to the La Grande nonattainment
area.
i. Section 172(c) Plan Provisions
This section contains general requirements for nonattainment area
plans. A thorough discussion of these requirements may be found in the
general preamble to Title I (57 FR 13498 (April 16, 1992)). The
requirements for reasonable further progress, identification of certain
emissions increases, emissions inventory, and other measures needed for
attainment are satisfied by the nonattainment area plan submitted for
the La Grande nonattainment area and approved on February 15, 1995. 60
FR 8563.
ii. Subpart 4 Requirements
As a moderate PM10 nonattainment area, the La Grande,
Oregon area must
[[Page 14398]]
meet Part D, subpart 4, sections 189(a), (c), and (e) requirements
before the area can be redesignated to attainment. These requirements
must be fully approved into the SIP:
(a) Provisions to assure that RACM was implemented by December 10,
1993;
(b) Either a demonstration that the plan provided for attainment as
expeditiously as practicable but not later than December 31, 1994, or a
demonstration that attainment by that date was impracticable;
(c) Quantitative milestones which were achieved every 3 years and
which demonstrate reasonable further progress (RFP) toward attainment
by December 31, 1994;
(d) Provisions to assure that the control requirements applicable
to major stationary sources of PM10 also apply to major
stationary sources of PM10 precursors, except where the
Administrator determined that such sources do not contribute
significantly to PM10 levels which exceed the NAAQS in the
area.
(e) Permit program under section 173 for the construction and
operation of new and modified major stationary sources of
PM10.
EPA approved the nonattainment area plan for the La Grande
nonattainment area, which met the initial requirements of the 1990
Clean Air Act for moderate PM10 nonattainment areas, on
February 15, 1995. 60 FR 8563. This plan met requirements for RACM/
BACM, demonstrating attainment, quantitative milestones,
PM10 precursors, contingency measures, and quantitative
milestones for demonstrating RFP. As mentioned above, the provisions
related to NSR were most recently approved in the Oregon SIP on January
22, 2003. 68 FR 29530. Oregon also has a fully approved Prevention of
Significant Deterioration (PSD) program, also approved on January 22,
2003. 68 FR 29530. See Oregon Administrative Rules Chapter 340,
Divisions 200, 202, 209, 212, 216, 222, 224, 225 and 268.
5. Transportation Conformity
Under section 176(c) of the Act, transportation plans, programs and
projects in nonattainment or maintenance areas that are funded or
approved under Title 23 U.S.C. or the Federal Transit Laws must conform
to the applicable SIP. In short, a transportation plan is deemed to
conform to the applicable SIP if the emissions resulting from the
implementation of that transportation plan are less than or equal to
the motor vehicle emissions level or ``budget'' established in the SIP
for the maintenance year and other analysis years.
DEQ has developed a PM10 MVEB for La Grande through 2017
that meets the transportation conformity criteria in 40 CFR
93.118(e)(4). The motor vehicle emissions budget is established for all
years. The budget is as follows:
La Grande PM10 Motor Vehicle Emissions Budget Through 2017
[Pounds PM10/24-hour winter day]
------------------------------------------------------------------------
Year All years
------------------------------------------------------------------------
Motor Vehicle Emissions Budget.......................... 2750
------------------------------------------------------------------------
The TSD summarizes how the PM10 motor vehicle emissions
budget meets the criteria contained in the conformity rule at 40 CFR
93.118(e)(4).
6. Maintenance Plans
Section 107(d)(3)(E) of the Act stipulates that for an area to be
redesignated, EPA must fully approve a maintenance plan which meets the
requirements of section 175A. A State may submit both the redesignation
request and the maintenance plan at the same time and rulemaking on
both may proceed on a parallel track.
On October 25, 2005, DEQ submitted a PM10 maintenance
plan and redesignation request for the La Grande nonattainment area. In
section II above, we evaluated the plan and concluded that the
requirements for an approvable maintenance plan under the Act have been
met.
B. What Do We Conclude About the Request for Redesignation?
Based on our evaluation of DEQ's October 25, 2005 SIP submittal, we
conclude that all the requirements for redesignation in section
107(d)(3)(E) have been met. Therefore, we are redesignating the La
Grande PM10 nonattainment area to attainment.
IV. Statutory and Executive Order Reviews
Under Executive Order 12866 (58 FR 51735, October 4, 1993), this
action is not a ``significant regulatory action'' and therefore is not
subject to review by the Office of Management and Budget. For this
reason, this action is also not subject to Executive Order 13211,
``Actions Concerning Regulations That Significantly Affect Energy
Supply, Distribution, or Use'' (66 FR 28355, May 22, 2001). This action
merely approves state law as meeting Federal requirements and imposes
no additional requirements beyond those imposed by state law.
Accordingly, the Administrator certifies that this rule will not have a
significant economic impact on a substantial number of small entities
under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.). Because
this rule approves pre-existing requirements under state law and does
not impose any additional enforceable duty beyond that required by
state law, it does not contain any unfunded mandate or significantly or
uniquely affect small governments, as described in the Unfunded
Mandates Reform Act of 1995 (Pub. L. 104-4).
This rule also does not have tribal implications because it will
not have a substantial direct effect on one or more Indian tribes, on
the relationship between the Federal Government and Indian tribes, or
on the distribution of power and responsibilities between the Federal
Government and Indian tribes, as specified by Executive Order 13175 (65
FR 67249, November 9, 2000). This action also does not have Federalism
implications because it does not have substantial direct effects on the
States, on the relationship between the national government and the
States, or on the distribution of power and responsibilities among the
various levels of government, as specified in Executive Order 13132 (64
FR 43255, August 10, 1999). This action merely approves a state rule
implementing a Federal standard, and does not alter the relationship or
the distribution of power and responsibilities established in the Clean
Air Act. This rule also is not subject to Executive Order 13045
``Protection of Children from Environmental Health Risks and Safety
Risks'' (62 FR 19885, April 23, 1997), because it is not economically
significant.
In reviewing SIP submissions, EPA's role is to approve state
choices, provided that they meet the criteria of the Clean Air Act. In
this context, in the absence of a prior existing requirement for the
State to use voluntary consensus standards (VCS), EPA has no authority
to disapprove a SIP submission for failure to use VCS. It would thus be
inconsistent with applicable law for EPA, when it reviews a SIP
submission, to use VCS in place of a SIP submission that otherwise
satisfies the provisions of the Clean Air Act. Thus, the requirements
of section 12(d) of the National Technology Transfer and Advancement
Act of 1995 (15 U.S.C. 272 note) do not apply. This rule does not
impose an information collection burden under the provisions of the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).
The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the
Small
[[Page 14399]]
Business Regulatory Enforcement Fairness Act of 1996, generally
provides that before a rule may take effect, the agency promulgating
the rule must submit a rule report, which includes a copy of the rule,
to each House of the Congress and to the Comptroller General of the
United States. EPA will submit a report containing this rule and other
required information to the U.S. Senate, the U.S. House of
Representatives, and the Comptroller General of the United States prior
to publication of the rule in the Federal Register. A major rule cannot
take effect until 60 days after it is published in the Federal
Register. This action is not a ``major rule'' as defined by 5 U.S.C.
804(2).
Under section 307(b)(1) of the Clean Air Act, petitions for
judicial review of this action must be filed in the United States Court
of Appeals for the appropriate circuit by May 22, 2006. Filing a
petition for reconsideration by the Administrator of this final rule
does not affect the finality of this rule for the purposes of judicial
review nor does it extend the time within which a petition for judicial
review may be filed, and shall not postpone the effectiveness of such
rule or action. This action may not be challenged later in proceedings
to enforce its requirements. See section 307(b)(2).
List of Subjects
40 CFR Part 52
Environmental protection, Air pollution control, Incorporation by
reference, Intergovernmental relations, Particulate matter, Reporting
and recordkeeping requirements.
40 CFR Part 81
Environmental protection, Air pollution control, National parks,
Wilderness areas.
Dated: February 24, 2006.
Julie M. Hagensen,
Acting Regional Administrator, Region 10.
0
Chapter I, title 40 of the Code of Federal Regulations is amended as
follows:
PART 52--[AMENDED]
0
1. The authority citation for part 52 continues to read as follows:
Authority: 42 U.S.C. 7401, et seq.
Subpart MM--Oregon
0
2. Section 52.1970 is amended by adding paragraph (c)(146) to read as
follows:
Sec. 52.1970 Identification of plan.
* * * * *
(c) * * *
(146) On October 25, 2005, the Oregon Department of Environmental
Quality submitted a PM10 maintenance plan and requested
redesignation of the La Grande PM10 nonattainment area to
attainment for PM10. The State's maintenance plan and the
redesignation request meet the requirements of the Clean Air Act.
(i) Incorporation by reference.
(A) Oregon Administrative Rule 340-204-0030 and 0040, as effective
September 9, 2005.
0
3. Section 52.1973 is amended by adding paragraph (e)(3) to read as
follows:
Sec. 52.1973 Approval of plans.
* * * * *
(e) * * *
(3) EPA approves as a revision to the Oregon State Implementation
Plan, the La Grande PM10 maintenance plan adopted by the
Oregon Environmental Quality Commission on August 11, 2005 and
submitted to EPA on October 25, 2005.
* * * * *
PART 81--[AMENDED]
0
4. The authority citation for part 81 continues to read as follows:
Authority: 42 U.S.C. 7401, et seq.
0
5. In Sec. 81.338, the table entitled ``Oregon PM-10'' is amended by
revising the entry for ``La Grande (the Urban Growth Boundary Area)''
to read as follows:
Sec. 81.338 Oregon.
* * * * *
Oregon--PM-10
----------------------------------------------------------------------------------------------------------------
Designation Classification
Designated area ----------------------------------------------------------------------------
Date Type Date Type
----------------------------------------------------------------------------------------------------------------
* * * * * * *
La Grande (the Urban Growth 5/22/06 Attainment.................
Boundary area).
* * * * * * *
----------------------------------------------------------------------------------------------------------------
* * * * *
[FR Doc. 06-2698 Filed 3-21-06; 8:45 am]
BILLING CODE 6560-50-P