Combined Notice of Filings #1, 14195-14196 [E6-4032]
Download as PDF
Federal Register / Vol. 71, No. 54 / Tuesday, March 21, 2006 / Notices
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on March 9, 2006.
Magalie R. Salas,
Secretary.
[FR Doc. E6–4033 Filed 3–20–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
sroberts on PROD1PC70 with NOTICES
March 13, 2006.
Take notice that the Commission
received the following electric rate
filings
Docket Numbers: ER01–1305–011
Applicants: Westar Generating, Inc.
Description: Westar Generating, Inc
submits corrections to two previously
submitted informational filings and a
refund report.
Filed Date: 03/07/2006.
Accession Number: 20060309–0018
Comment Date: 5 p.m. Eastern Time
on Tuesday, March 28, 2006.
Docket Numbers: ER03–775–004;
ER00–136–003
Applicants: FortisOntario, Inc;
FortisUS Energy Corporation.
Description: FortisOntario Inc &
FortisUs Energy Corp submit a response
to the informal request for information
received by FERC Staff re the
acquisition by Fortis Inc of Princeton
Light & Power Co Limited.
Filed Date: 03/07/2006.
Accession Number: 20060309–0038
Comment Date: 5 p.m. Eastern Time
on Tuesday, March 28, 2006.
Docket Numbers: ER05–1475–004
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: Midwest Independent
Transmission System Operator Inc
submits a revised Attachment X—Large
Generator Interconnection Procedures
and Large Generator Interconnection
Agreement of its OATT and EMT.
Filed Date: 03/08/2006.
Accession Number: 20060310–0193
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 29, 2006.
Docket Numbers: ER06–189–001
Applicants: Electric Energy, Inc.
Description: Electric Energy, Inc
submits an amended and restated copy
of the Power Supply Agreement which
incorporates all changes after September
1987 which remained in effect as of 1/
1/03.
Filed Date: 03/08/2006.
VerDate Aug<31>2005
19:01 Mar 20, 2006
Jkt 208001
Accession Number: 20060310–0188
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 29, 2006.
Docket Numbers: ER06–301–001
Applicants: Xcel Energy Services Inc.
Description: Xcel Energy Services, Inc
on behalf of itself and the Xcel Energy
Operating Companies responds to
FERC’s 2/6/06 letter re its Joint
Operating Agreement.
Filed Date: 03/08/2006.
Accession Number: 20060310–0184
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 29, 2006.
Docket Numbers: ER06–306–001
Applicants: Pennsylvania Electric
Company; Jersey Central Power & Light
Company; Metropolitan Edison
Company.
Description: Jersey Central Power &
Light Co, Metropolitan Edison Co and
Pennsylvania Electric Co submit a
compliance filing pursuant to FERC’s 2/
6/06 Order.
Filed Date: 03/08/2006.
Accession Number: 20060310–0189
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 29, 2006.
Docket Numbers: ER06–486–001
Applicants: Central Illinois Public
Service Company; Illinois Power
Company; Union Electric Company.
Description: Ameren Services Co on
behalf of Central Illinois Public Service
Co et al submit revisions to the
designation of the two modified Facility
Use Agreements pursuant to FERC’s 3/
2/06 letter order.
Filed Date: 03/07/2006.
Accession Number: 20060309–0015
Comment Date: 5 p.m. Eastern Time
on Tuesday, March 28, 2006.
Docket Numbers: ER06–515–001
Applicants: Mirant Peaker, LLC.
Description: Mirant Peaker, LLC
amends the Notice of Cancellation of its
FERC Electric Tariff, First Revised
Volume 1.
Filed Date: 03/07/2006.
Accession Number: 20060309–0017
Comment Date: 5 p.m. Eastern Time
on Friday, March 17, 2006.
Docket Numbers: ER06–700–000
Applicants: California Independent
System Operator Corporation.
Description: California Independent
System Operator Corp submits an
amendment to their Simplified and
Reorganized Tariff.
Filed Date: 03/07/2006.
Accession Number: 20060309–0032
Comment Date: 5 p.m. Eastern Time
on Tuesday, March 28, 2006.
Docket Numbers: ER06–706–000
Applicants: Entergy Services, Inc.
Description: Entergy Services, Inc on
behalf of Entergy Arkansas, Inc submits
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
14195
the 2006 Wholesale Formula Rate
Update in accordance with the Power
Coordination, Interchange and
Transmission Service Agreements.
Filed Date: 03/08/2006.
Accession Number: 20060310–0192
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 29, 2006.
Docket Numbers: ER06–707–000
Applicants: Entergy Services, Inc.
Description: Entergy Services, Inc on
behalf of Entergy Arkansas, Inc submits
the 2006 Wholesale Formula Rate
update.
Filed Date: 03/08/2006.
Accession Number: 20060310–0191
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 29, 2006.
Docket Numbers: ER06–708–000
Applicants: Midwest Independent
Transmission System.
Description: Midwest Independent
Transmission System Operator, Inc
submits a Large Generator
Interconnection Agreement with
Northern States Power Co dba Xcel
Energy-Generation Function et al.
Filed Date: 03/08/2006.
Accession Number: 20060310–0190
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 29, 2006.
Docket Numbers: ER94–1188–039;
ER99–1623–008; EL05–99–003; ER98–
4540–008; ER98–1279–010
Applicants: LG&E Energy Marketing
Inc.; Kentucky Utilities Company;
Louisville Gas & Electric Company;
Western Kentucky Energy Corporation.
Description: LG&E Marketing Inc,
Louisville Gas & Electric Co et al submit
a compliance filing pursuant to FERC’s
2/15/06 Letter Order.
Filed Date: 03/08/2006.
Accession Number: 20060310–0187
Comment Date: 5 p.m. Eastern Time
on Wednesday, March 29, 2006.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
E:\FR\FM\21MRN1.SGM
21MRN1
14196
Federal Register / Vol. 71, No. 54 / Tuesday, March 21, 2006 / Notices
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St. NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–4032 Filed 3–20–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PF06–13–000]
Downeast LNG, Inc.; Notice of Intent
To Prepare an Environmental Impact
Statement for the Downeast LNG
Project, Request for Comments on
Environmental Issues and Notice of a
Joint Public Meeting
sroberts on PROD1PC70 with NOTICES
March 13, 2006.
The Federal Energy Regulatory
Commission (FERC or Commission) and
the U.S. Department of Homeland
Security, U.S. Coast Guard (Coast
Guard) are in the process of evaluating
the Downeast Liquefied Natural Gas
(LNG) Project planned by Downeast
LNG, Inc. (Downeast). The project
would consist of an onshore LNG
import and storage terminal, located on
the south side of Mill Cove in the Town
of Robbinston, near the confluence of
Passamaquoddy Bay and the St. Croix
VerDate Aug<31>2005
19:01 Mar 20, 2006
Jkt 208001
River, in Washington County, Maine;
and an approximately 31-mile-long
natural gas sendout pipeline, extending
from the terminal to the existing
Maritimes & Northeast (M&NE) pipeline
system at the Baileyville, Maine,
compressor station.
As a part of this evaluation, FERC
staff will prepare an environmental
impact statement (EIS) that will address
the environmental impacts of the project
and the Coast Guard will assess the
maritime safety and security of the
project. As described below, the FERC
and the Coast Guard will hold a joint
public meeting to allow the public to
provide input to these assessments.
The Commission will use the EIS in
its decision-making process to
determine whether or not to authorize
the project. This Notice of Intent (NOI)
explains the scoping process we 1 will
use to gather information on the project
from the public and interested agencies
and summarizes the process that the
Coast Guard will use. Your input will
help identify the issues that need to be
evaluated in the EIS and in the Coast
Guard’s maritime safety and security
assessment. Please note that scoping
comments are requested by April 17,
2006.
Comments on the project may be
submitted in written form or verbally.
Further details on how to submit
written comments are provided in the
Public Participation section of this NOI.
In lieu of sending written comments, we
invite you to attend the public scoping
meeting scheduled as follows: Tuesday,
March 28, 2006, 6:30 p.m. Robbinston
Grade School, 904 U.S. Route 1,
Robbinston, ME 04671. 207–454–3694.
The public scoping meeting listed
above will be combined with the Coast
Guard’s public meeting regarding the
maritime safety and security of the
project. At the meeting, the Coast Guard
will discuss: (1) The waterway safety
assessment that it will conduct to
determine whether or not the waterway
can safely accommodate the LNG carrier
traffic and operation of the planned
LNG marine terminal; and (2) the
security assessment it will conduct in
accordance with the requirements of the
Maritime Transportation Security Act.
The Coast Guard will not be issuing a
separate meeting notice for the maritime
safety and security aspects of the
project.
The Coast Guard is responsible for
matters related to navigation safety,
vessel engineering and safety standards,
and all matters pertaining to the safety
1 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
environmental staff of the FERC’s Office of Energy
Projects.
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
of facilities or equipment located in or
adjacent to navigable waters up to the
last valve immediately before the
receiving tanks. The Coast Guard also
has authority for LNG facility security
plan review, approval, and compliance
verification as provided in Title 33 CFR
part 105, and recommendation for siting
as it pertains to the management of
vessel traffic in and around the LNG
facility.
Upon receipt of a letter of intent from
an owner or operator intending to build
a new LNG facility, the Coast Guard
Captain of the Port (COTP) conducts an
analysis that results in a letter of
recommendation issued to the owner or
operator and to the state and local
governments having jurisdiction,
addressing the suitability of the
waterway to accommodate LNG vessels.
Specifically the letter of
recommendation addresses the
suitability of the waterway based on:
• The physical location and layout of
the facility and its berthing and mooring
arrangements.
• The LNG vessels’ characteristics
and the frequency of LNG shipments to
the facility.
• Commercial, industrial,
environmentally sensitive, and
residential area in and adjacent to the
waterway used by the LNG vessels en
route to the facility.
• Density and character of the marine
traffic on the waterway.
• Bridges or other manmade
obstructions in the waterway.
• Depth of water.
• Tidal range.
• Natural hazards, including rocks
and sandbars.
• Underwater pipelines and cables.
• Distance of berthed LNG vessels
from the channel, and the width of the
channel.
In addition, the Coast Guard will
review and approve the facility’s
operations manual and emergency
response plan (33 CFR 127.019), as well
as the facility’s security plan (33 CFR
105.410). The Coast Guard will also
provide input to other Federal, state,
and local government agencies
reviewing the project.
In order to complete a thorough
analysis and fulfill the regulatory
mandates cited above, the COTP Sector
Northern New England will be
conducting a formal risk assessment
evaluating the various safety and
security aspects associated with the
Downeast LNG proposed project. This
risk assessment will be accomplished
through a series of workshops focusing
on the areas of waterways safety, port
security, and consequence management,
with involvement from a broad cross-
E:\FR\FM\21MRN1.SGM
21MRN1
Agencies
[Federal Register Volume 71, Number 54 (Tuesday, March 21, 2006)]
[Notices]
[Pages 14195-14196]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-4032]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 1
March 13, 2006.
Take notice that the Commission received the following electric
rate filings
Docket Numbers: ER01-1305-011
Applicants: Westar Generating, Inc.
Description: Westar Generating, Inc submits corrections to two
previously submitted informational filings and a refund report.
Filed Date: 03/07/2006.
Accession Number: 20060309-0018
Comment Date: 5 p.m. Eastern Time on Tuesday, March 28, 2006.
Docket Numbers: ER03-775-004; ER00-136-003
Applicants: FortisOntario, Inc; FortisUS Energy Corporation.
Description: FortisOntario Inc & FortisUs Energy Corp submit a
response to the informal request for information received by FERC Staff
re the acquisition by Fortis Inc of Princeton Light & Power Co Limited.
Filed Date: 03/07/2006.
Accession Number: 20060309-0038
Comment Date: 5 p.m. Eastern Time on Tuesday, March 28, 2006.
Docket Numbers: ER05-1475-004
Applicants: Midwest Independent Transmission System Operator, Inc.
Description: Midwest Independent Transmission System Operator Inc
submits a revised Attachment X--Large Generator Interconnection
Procedures and Large Generator Interconnection Agreement of its OATT
and EMT.
Filed Date: 03/08/2006.
Accession Number: 20060310-0193
Comment Date: 5 p.m. Eastern Time on Wednesday, March 29, 2006.
Docket Numbers: ER06-189-001
Applicants: Electric Energy, Inc.
Description: Electric Energy, Inc submits an amended and restated
copy of the Power Supply Agreement which incorporates all changes after
September 1987 which remained in effect as of 1/1/03.
Filed Date: 03/08/2006.
Accession Number: 20060310-0188
Comment Date: 5 p.m. Eastern Time on Wednesday, March 29, 2006.
Docket Numbers: ER06-301-001
Applicants: Xcel Energy Services Inc.
Description: Xcel Energy Services, Inc on behalf of itself and the
Xcel Energy Operating Companies responds to FERC's 2/6/06 letter re its
Joint Operating Agreement.
Filed Date: 03/08/2006.
Accession Number: 20060310-0184
Comment Date: 5 p.m. Eastern Time on Wednesday, March 29, 2006.
Docket Numbers: ER06-306-001
Applicants: Pennsylvania Electric Company; Jersey Central Power &
Light Company; Metropolitan Edison Company.
Description: Jersey Central Power & Light Co, Metropolitan Edison
Co and Pennsylvania Electric Co submit a compliance filing pursuant to
FERC's 2/6/06 Order.
Filed Date: 03/08/2006.
Accession Number: 20060310-0189
Comment Date: 5 p.m. Eastern Time on Wednesday, March 29, 2006.
Docket Numbers: ER06-486-001
Applicants: Central Illinois Public Service Company; Illinois Power
Company; Union Electric Company.
Description: Ameren Services Co on behalf of Central Illinois
Public Service Co et al submit revisions to the designation of the two
modified Facility Use Agreements pursuant to FERC's 3/2/06 letter
order.
Filed Date: 03/07/2006.
Accession Number: 20060309-0015
Comment Date: 5 p.m. Eastern Time on Tuesday, March 28, 2006.
Docket Numbers: ER06-515-001
Applicants: Mirant Peaker, LLC.
Description: Mirant Peaker, LLC amends the Notice of Cancellation
of its FERC Electric Tariff, First Revised Volume 1.
Filed Date: 03/07/2006.
Accession Number: 20060309-0017
Comment Date: 5 p.m. Eastern Time on Friday, March 17, 2006.
Docket Numbers: ER06-700-000
Applicants: California Independent System Operator Corporation.
Description: California Independent System Operator Corp submits an
amendment to their Simplified and Reorganized Tariff.
Filed Date: 03/07/2006.
Accession Number: 20060309-0032
Comment Date: 5 p.m. Eastern Time on Tuesday, March 28, 2006.
Docket Numbers: ER06-706-000
Applicants: Entergy Services, Inc.
Description: Entergy Services, Inc on behalf of Entergy Arkansas,
Inc submits the 2006 Wholesale Formula Rate Update in accordance with
the Power Coordination, Interchange and Transmission Service
Agreements.
Filed Date: 03/08/2006.
Accession Number: 20060310-0192
Comment Date: 5 p.m. Eastern Time on Wednesday, March 29, 2006.
Docket Numbers: ER06-707-000
Applicants: Entergy Services, Inc.
Description: Entergy Services, Inc on behalf of Entergy Arkansas,
Inc submits the 2006 Wholesale Formula Rate update.
Filed Date: 03/08/2006.
Accession Number: 20060310-0191
Comment Date: 5 p.m. Eastern Time on Wednesday, March 29, 2006.
Docket Numbers: ER06-708-000
Applicants: Midwest Independent Transmission System.
Description: Midwest Independent Transmission System Operator, Inc
submits a Large Generator Interconnection Agreement with Northern
States Power Co dba Xcel Energy-Generation Function et al.
Filed Date: 03/08/2006.
Accession Number: 20060310-0190
Comment Date: 5 p.m. Eastern Time on Wednesday, March 29, 2006.
Docket Numbers: ER94-1188-039; ER99-1623-008; EL05-99-003; ER98-
4540-008; ER98-1279-010
Applicants: LG&E Energy Marketing Inc.; Kentucky Utilities Company;
Louisville Gas & Electric Company; Western Kentucky Energy Corporation.
Description: LG&E Marketing Inc, Louisville Gas & Electric Co et al
submit a compliance filing pursuant to FERC's 2/15/06 Letter Order.
Filed Date: 03/08/2006.
Accession Number: 20060310-0187
Comment Date: 5 p.m. Eastern Time on Wednesday, March 29, 2006.
Any person desiring to intervene or to protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern time on the specified comment
date. It is not necessary to separately intervene again in a subdocket
related to a compliance filing if you have previously intervened in the
same docket. Protests will be considered by the Commission in
determining the appropriate action to be taken, but will not serve to
make protestants parties to the proceeding. Anyone filing a motion to
intervene or protest must serve a copy of that document on the
Applicant. In reference to filings initiating a new proceeding,
interventions or protests submitted on or before the comment deadline
need not be served on persons other than the Applicant.
[[Page 14196]]
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://
www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
14 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First St. NE., Washington, DC 20426.
The filings in the above proceedings are accessible in the
Commission's eLibrary system by clicking on the appropriate link in the
above list. They are also available for review in the Commission's
Public Reference Room in Washington, DC. There is an eSubscription link
on the Web site that enables subscribers to receive e-mail notification
when a document is added to a subscribed dockets(s). For assistance
with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov.
or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6-4032 Filed 3-20-06; 8:45 am]
BILLING CODE 6717-01-P