Columbia Gas Transmission Corporation; Notice of Proposed Changes in FERC Gas Tariff, 13363-13364 [E6-3683]

Download as PDF Federal Register / Vol. 71, No. 50 / Wednesday, March 15, 2006 / Notices Gas Tariff, First Revised Volume No 1, Forty-First Revised Sheet No. 11A, to become effective April 1, 2006. CIG states that copies of its filing have been sent to all firm customers, interruptible customers, and affected state commissions. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. sroberts on PROD1PC70 with NOTICES Magalie R. Salas, Secretary. [FR Doc. E6–3668 Filed 3–14–06; 8:45 am] BILLING CODE 6717–01–P VerDate Aug<31>2005 17:27 Mar 14, 2006 Jkt 208001 13363 (866) 208–3676 (toll free). For TTY, call (202) 502–8659. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Magalie R. Salas, Secretary. [FR Doc. E6–3682 Filed 3–14–06; 8:45 am] [Docket No. RP06–259–000] BILLING CODE 6717–01–P Columbia Gas Transmission Corporation; Notice of Proposed Changes in FERC Gas Tariff DEPARTMENT OF ENERGY March 8, 2006. Federal Energy Regulatory Commission Take notice that on March 1, 2006, Columbia Gas Transmission Corporation (Columbia) tendered for filing as part of its FERC Gas Tariff, Second Revised Volume No. 1, Sixteenth Revised Sheet No. 44, with a proposed effective date of April 1, 2006. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 [Docket No. RP06–260–000] Columbia Gas Transmission Corporation; Notice of Proposed Changes in FERC Gas Tariff March 8, 2006. Take notice that on March 1, 2006, Columbia Gas Transmission Corporation (Columbia) tendered for filing as part of its FERC Gas Tariff, Second Revised Volume No. 1, the following revised tariff sheets with a proposed effective date of April 1, 2006: Seventy-eighth Revised Sheet No. 25 Seventy-eighth Revised Sheet No. 26 Seventy-seventh Revised Sheet No. 27 Sixty-fifth Revised Sheet No. 28 Twenty-first Revised Sheet No. 31 Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for E:\FR\FM\15MRN1.SGM 15MRN1 13364 Federal Register / Vol. 71, No. 50 / Wednesday, March 15, 2006 / Notices review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E6–3683 Filed 3–14–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E6–3685 Filed 3–14–06; 8:45 am] [Docket No. RP06–262–000] BILLING CODE 6717–01–P Columbia Gas Transmission Corporation; Notice of Proposed Changes in FERC Gas Tariff DEPARTMENT OF ENERGY March 8, 2006. Take notice that on March 1, 2006, Columbia Gas Transmission Corporation (Columbia) tendered for filing as part of its FERC Gas Tariff, Second Revised Volume No. 1, the following revised tariff sheets with a proposed effective date of April 1, 2006: sroberts on PROD1PC70 with NOTICES Seventy-ninth Revised Sheet No. 25. Seventy-ninth Revised Sheet No. 26. Seventy-eighth Revised Sheet No. 27. Sixty-sixth Revised Sheet No. 28. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically VerDate Aug<31>2005 17:27 Mar 14, 2006 Jkt 208001 protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Federal Energy Regulatory Commission Magalie R. Salas, Secretary. [FR Doc. E6–3684 Filed 3–14–06; 8:45 am] [Docket No. RP06–261–000] BILLING CODE 6717–01–P Columbia Gulf Transmission Company; Notice of Proposed Changes in FERC Gas Tariff DEPARTMENT OF ENERGY March 8, 2006. Federal Energy Regulatory Commission Take notice that on March 1, 2006, Columbia Gulf Transmission Company (Columbia Gulf) tendered for filing as part of its FERC Gas Tariff, Second Revised Volume No. 1, the following revised tariff sheets, with a proposed effective date of April 1, 2006: Fortieth Revised Sheet No. 18 Twenty-eighth Revised Sheet No. 18A Forty-first Revised Sheet No. 19 Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 [Docket No. RP06–236–000] Dominion Cove Point LNG, LP; Notice of Tariff Filing March 7, 2006. Take notice that on February 28, 2006, Dominion Cove Point LNG, LP (Cove Point) tendered for filing as part of its FERC Gas Tariff, Original Volume No. 1, Second Revised Sheet No. 12, to become effective April 1, 2006. Cove Point states that the purpose of the filing is to adjust the Transmission Electric Power rates applicable to Cove Point East Shippers. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of section 154.210 of the Commission’s regulations (18 CFR E:\FR\FM\15MRN1.SGM 15MRN1

Agencies

[Federal Register Volume 71, Number 50 (Wednesday, March 15, 2006)]
[Notices]
[Pages 13363-13364]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-3683]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RP06-260-000]


Columbia Gas Transmission Corporation; Notice of Proposed Changes 
in FERC Gas Tariff

March 8, 2006.
    Take notice that on March 1, 2006, Columbia Gas Transmission 
Corporation (Columbia) tendered for filing as part of its FERC Gas 
Tariff, Second Revised Volume No. 1, the following revised tariff 
sheets with a proposed effective date of April 1, 2006:

Seventy-eighth Revised Sheet No. 25
Seventy-eighth Revised Sheet No. 26
Seventy-seventh Revised Sheet No. 27
Sixty-fifth Revised Sheet No. 28
Twenty-first Revised Sheet No. 31

    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed in accordance with the provisions of 
Section 154.210 of the Commission's regulations (18 CFR 154.210). 
Anyone filing an intervention or protest must serve a copy of that 
document on the Applicant. Anyone filing an intervention or protest on 
or before the intervention or protest date need not serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for

[[Page 13364]]

review in the Commission's Public Reference Room in Washington, DC. 
There is an ``eSubscription'' link on the Web site that enables 
subscribers to receive e-mail notification when a document is added to 
a subscribed docket(s). For assistance with any FERC Online service, 
please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll 
free). For TTY, call (202) 502-8659.

Magalie R. Salas,
Secretary.
 [FR Doc. E6-3683 Filed 3-14-06; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.