Centennial Power, Inc. et al.; Electric Rate and Corporate Filings, 12349 [E6-3458]

Download as PDF Federal Register / Vol. 71, No. 47 / Friday, March 10, 2006 / Notices docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time, March 23, 2006. Filing of Changes in Status and Market Analysis. Comment Date: 5 p.m. Eastern Time on March 6, 2006. Magalie R. Salas, Secretary. [FR Doc. E6–3448 Filed 3–9–06; 8:45 am] [Docket No. ER06–70–001] 8. Kandiyohi Power Cooperative Take notice that on February 21, 2006, ISO New England Inc and Northeast Utilities Service Company on behalf of its affiliate, The Connecticut Light and Power Company, submitted their Standard Large Generator Interconnection Agreement. Comment Date: 5 p.m. Eastern Time on March 14, 2006. [Docket No. PH06–10–000] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EC06–87–000, et al.] 4. ISO New England, Inc., Kleen Energy Systems, LLC, The Connecticut Light and Power Company 5. Duquesne Keystone, LLC, Duquesne Conemaugh, LLC, Duquesne Power, L.P., Duquesne Light Company, Monmouth Energy, Inc. Centennial Power, Inc. et al.; Electric Rate and Corporate Filings March 3, 2006. The following filings have been made with the Commission. The filings are listed in ascending order within each docket classification. 1. Centennial Power, Inc., San Joaquin Cogen, L.L.C., NAPG San Joaquin Cogen, L.L.C. [Docket No. EC06–87–000] Take notice that on February 28, 2006 Centennial Power, Inc., NAPG San Joaquin, L.L.C., and San Joaquin Cogen, L.L.C. filed an Application Under Section 203 of the Federal Power Act For Authorization To Transfer Jurisdictional Assets of San Joaquin Cogen, L.L.C. Comment Date: 5 p.m. Eastern Time on March 21, 2006. 2. New York Independent System Operator, Inc. [Docket No. EL06–57–000] dsatterwhite on PROD1PC65 with PROPOSAL 12349 Take notice that on March 3, 2006, the New York Independent System Operator, Inc. (NYISO) submitted a filing under section 206 of the Federal Power Act to extend the effective date of the current Voltage Support Service rate contained in Rate Schedule 2 of the NYISO’s Services Tariff, pending further studies and work to establish a permanent Voltage Support Service rate methodology. The NYISO seeks an effective date of April 5, 2006 for this filing. Comment Date: 5 p.m. Eastern Time on March 13, 2006. [Docket Nos. ER06–398–000; ER06–399–000; ER04–268–003; ER98–4159–006; ER99– 1293–005] Take notice that on December 27, 2005, Duquesne Keystone, LLC and Duquesne Conemaugh, LLC (collectively, Applicants) hereby submit for filing an application containing initial market-based rate schedules. Comment Date: 5 p.m. Eastern Time on March 13, 2006. 6. TransCanada Corporation, TransCanada Pipelines Limited, 701671 Alberta Ltd., TransCanada Energy Ltd., TransCanada Energy Investments Ltd., TransCanada Energy Management Inc., Bruce Power Inc., Bruce Power A Inc., Huron Wind Inc., TransCanada Wind Ltd./TransCanada Eolien Ltee, TransCanada AAV Ltd., TransCanada BDS Ltd., TransCanada CAR Ltd., TransCanada GM Ltd., TransCanada LM Ltd., TransCanada MS Ltd., TransCanada PipeLine USA Ltd., TransCanada OSP Holding Ltd., TCPL OSP Ltd., TC Ocean State Corporation, TCPL Power Ltd., TCPL Ocean State Ltd. [Docket No. PH06–6–000] 3. ATCO Power Canada Ltd. Take notice that on February 22, 2006, TransCanada Corporation filed a Notification of Petition for Exemption from the Requirements of The Public Utility Holding Company Act of 2005 pursuant to 18 CFR 366.4(b)(1), et al., on behalf of itself and its subsidiaries as mentioned above. Comment Date: 5 p.m. Eastern Time on March 15, 2006. [Docket No. ER99–3282–006] 7. DTE Energy Company Take notice that on February 17, 2006, ATCO Power Canada Ltd., submitted for filing an amendment to its Triennial [Docket No. PH06–8–000] VerDate Aug<31>2005 20:31 Mar 09, 2006 Jkt 208001 Take notice that on February 24, 2006, DTE Energy Company filed a Petition PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 for Waiver of the Commission’s Regulations pursuant to Requirements of The Public Utility Holding Company Act of 2005, 18 CFR 366.4(c)(1) and 366.3(c)(1). Comment Date: 5 p.m. Eastern Time on March 17, 2006. Take notice that on February 27, 2006, Kandiyohi Power Cooperative filed a FERC–65A Exemption Notification pursuant to The Public Utility Holding Company Act of 2005, 18 CFR 366.4(b)(1). Comment Date: 5 p.m. Eastern Time on March 20, 2006. Standard Paragraph Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E6–3458 Filed 3–9–06; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\10MRN1.SGM 10MRN1

Agencies

[Federal Register Volume 71, Number 47 (Friday, March 10, 2006)]
[Notices]
[Page 12349]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-3458]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. EC06-87-000, et al.]


Centennial Power, Inc. et al.; Electric Rate and Corporate 
Filings

March 3, 2006.
    The following filings have been made with the Commission. The 
filings are listed in ascending order within each docket 
classification.

1. Centennial Power, Inc., San Joaquin Cogen, L.L.C.,NAPG San Joaquin 
Cogen, L.L.C.

[Docket No. EC06-87-000]

    Take notice that on February 28, 2006 Centennial Power, Inc., NAPG 
San Joaquin, L.L.C., and San Joaquin Cogen, L.L.C. filed an Application 
Under Section 203 of the Federal Power Act For Authorization To 
Transfer Jurisdictional Assets of San Joaquin Cogen, L.L.C.
    Comment Date: 5 p.m. Eastern Time on March 21, 2006.

2. New York Independent System Operator, Inc.

[Docket No. EL06-57-000]

    Take notice that on March 3, 2006, the New York Independent System 
Operator, Inc. (NYISO) submitted a filing under section 206 of the 
Federal Power Act to extend the effective date of the current Voltage 
Support Service rate contained in Rate Schedule 2 of the NYISO's 
Services Tariff, pending further studies and work to establish a 
permanent Voltage Support Service rate methodology. The NYISO seeks an 
effective date of April 5, 2006 for this filing.
    Comment Date: 5 p.m. Eastern Time on March 13, 2006.

3. ATCO Power Canada Ltd.

[Docket No. ER99-3282-006]

    Take notice that on February 17, 2006, ATCO Power Canada Ltd., 
submitted for filing an amendment to its Triennial Filing of Changes in 
Status and Market Analysis.
    Comment Date: 5 p.m. Eastern Time on March 6, 2006.

4. ISO New England, Inc., Kleen Energy Systems, LLC, The Connecticut 
Light and Power Company

[Docket No. ER06-70-001]

    Take notice that on February 21, 2006, ISO New England Inc and 
Northeast Utilities Service Company on behalf of its affiliate, The 
Connecticut Light and Power Company, submitted their Standard Large 
Generator Interconnection Agreement.
    Comment Date: 5 p.m. Eastern Time on March 14, 2006.

5. Duquesne Keystone, LLC, Duquesne Conemaugh, LLC,Duquesne Power, 
L.P., Duquesne Light Company, Monmouth Energy, Inc.

[Docket Nos. ER06-398-000; ER06-399-000; ER04-268-003; ER98-4159-006; 
ER99-1293-005]

    Take notice that on December 27, 2005, Duquesne Keystone, LLC and 
Duquesne Conemaugh, LLC (collectively, Applicants) hereby submit for 
filing an application containing initial market-based rate schedules.
    Comment Date: 5 p.m. Eastern Time on March 13, 2006.

6. TransCanada Corporation, TransCanada Pipelines Limited,701671 
Alberta Ltd., TransCanada Energy Ltd., TransCanada Energy Investments 
Ltd., TransCanada Energy Management Inc.,Bruce Power Inc., Bruce Power 
A Inc., Huron Wind Inc.,TransCanada Wind Ltd./TransCanada Eolien 
Ltee,TransCanada AAV Ltd., TransCanada BDS Ltd., TransCanada CAR 
Ltd.,TransCanada GM Ltd., TransCanada LM Ltd., TransCanada MS 
Ltd.,TransCanada PipeLine USA Ltd., TransCanada OSP Holding Ltd.,TCPL 
OSP Ltd., TC Ocean State Corporation, TCPL Power Ltd.,TCPL Ocean State 
Ltd.

[Docket No. PH06-6-000]

    Take notice that on February 22, 2006, TransCanada Corporation 
filed a Notification of Petition for Exemption from the Requirements of 
The Public Utility Holding Company Act of 2005 pursuant to 18 CFR 
366.4(b)(1), et al., on behalf of itself and its subsidiaries as 
mentioned above.
    Comment Date: 5 p.m. Eastern Time on March 15, 2006.

7. DTE Energy Company

[Docket No. PH06-8-000]

    Take notice that on February 24, 2006, DTE Energy Company filed a 
Petition for Waiver of the Commission's Regulations pursuant to 
Requirements of The Public Utility Holding Company Act of 2005, 18 CFR 
366.4(c)(1) and 366.3(c)(1).
    Comment Date: 5 p.m. Eastern Time on March 17, 2006.

8. Kandiyohi Power Cooperative

[Docket No. PH06-10-000]

    Take notice that on February 27, 2006, Kandiyohi Power Cooperative 
filed a FERC-65A Exemption Notification pursuant to The Public Utility 
Holding Company Act of 2005, 18 CFR 366.4(b)(1).
    Comment Date: 5 p.m. Eastern Time on March 20, 2006.

Standard Paragraph

    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. On or 
before the comment date, it is not necessary to serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Magalie R. Salas,
Secretary.
 [FR Doc. E6-3458 Filed 3-9-06; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.