IPP Energy LLC; Notice of Issuance of Order, 11599 [E6-3274]
Download as PDF
Federal Register / Vol. 71, No. 45 / Wednesday, March 8, 2006 / Notices
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, 385.211,
385.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filings must bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers. A copy of any motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
p. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
q. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the ‘‘eFiling’’ link.
Magalie R. Salas,
Secretary.
[FR Doc. E6–3214 Filed 3–7–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER06–459–000, ER01–688–
002]
IPP Energy LLC; Notice of Issuance of
Order
erjones on PROD1PC68 with NOTICES
March 2, 2006.
IPP Energy LLC (IPP) filed an
application for market-based rate
authority, with an accompanying rate
schedule. The proposed market-based
rate schedule provides for the sale of
energy, capacity and ancillary at market-
VerDate Aug<31>2005
15:53 Mar 07, 2006
Jkt 208001
based rates. IPP also requested waiver of
various Commission regulations. In
particular, IPP requested that the
Commission grant blanket approval
under 18 CFR part 34 of all future
issuances of securities and assumptions
of liability by IPP.
On March 1, 2006, pursuant to
delegated authority, the Director,
Division of Tariffs and Market
Development—West, granted the
request for blanket approval under part
34. The Director’s order also stated that
the Commission would publish a
separate notice in the Federal Register
establishing a period of time for the
filing of protests. Accordingly, any
person desiring to be heard or to protest
the blanket approval of issuances of
securities or assumptions of liability by
IPP should file a motion to intervene or
protest with the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426, in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure. 18 CFR 385.211, 385.214
(2004).
Notice is hereby given that the
deadline for filing motions to intervene
or protest is March 31, 2006.
Absent a request to be heard in
opposition by the deadline above, IPP is
authorized to issue securities and
assume obligations or liabilities as a
guarantor, indorser, surety, or otherwise
in respect of any security of another
person; provided that such issuance or
assumption is for some lawful object
within the corporate purposes of IPP,
compatible with the public interest, and
is reasonably necessary or appropriate
for such purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approval of IPP’s issuances of securities
or assumptions of liability.
Copies of the full text of the Director’s
Order are available from the
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at https://
www.ferc.gov, using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
11599
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E6–3274 Filed 3–7–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP06–233–000]
Iroquois Gas Transmission System,
L.P.; Notice of Proposed Changes in
FERC Gas Tariff
February 28, 2006.
Take notice that on February 24, 2006,
Iroquois Gas Transmission System, L.P.
(Iroquois) tendered for filing as part of
its FERC Gas Tariff, First Revised
Volume No. 1, First Revised Sheet No.
107D, to be effective on March 26, 2006.
Iroquois proposes to remove language
contained in section 28.22 of the
General Terms and Conditions of its
tariff that is related to shipper requests
for discounts. Iroquois believes removal
of such language is consistent with the
Commission’s Second Order on Remand
issued in Williston Basin Interstate
Pipeline Company, 110 FERC ¶ 61,210
(2005).
Iroquois states that copies of its filing
were served on all jurisdictional
customers and interested state
regulatory agencies and all parties to the
proceeding.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of section 154.210
of the Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
E:\FR\FM\08MRN1.SGM
08MRN1
Agencies
[Federal Register Volume 71, Number 45 (Wednesday, March 8, 2006)]
[Notices]
[Page 11599]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-3274]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. ER06-459-000, ER01-688-002]
IPP Energy LLC; Notice of Issuance of Order
March 2, 2006.
IPP Energy LLC (IPP) filed an application for market-based rate
authority, with an accompanying rate schedule. The proposed market-
based rate schedule provides for the sale of energy, capacity and
ancillary at market-based rates. IPP also requested waiver of various
Commission regulations. In particular, IPP requested that the
Commission grant blanket approval under 18 CFR part 34 of all future
issuances of securities and assumptions of liability by IPP.
On March 1, 2006, pursuant to delegated authority, the Director,
Division of Tariffs and Market Development--West, granted the request
for blanket approval under part 34. The Director's order also stated
that the Commission would publish a separate notice in the Federal
Register establishing a period of time for the filing of protests.
Accordingly, any person desiring to be heard or to protest the blanket
approval of issuances of securities or assumptions of liability by IPP
should file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in
accordance with Rules 211 and 214 of the Commission's Rules of Practice
and Procedure. 18 CFR 385.211, 385.214 (2004).
Notice is hereby given that the deadline for filing motions to
intervene or protest is March 31, 2006.
Absent a request to be heard in opposition by the deadline above,
IPP is authorized to issue securities and assume obligations or
liabilities as a guarantor, indorser, surety, or otherwise in respect
of any security of another person; provided that such issuance or
assumption is for some lawful object within the corporate purposes of
IPP, compatible with the public interest, and is reasonably necessary
or appropriate for such purposes.
The Commission reserves the right to require a further showing that
neither public nor private interests will be adversely affected by
continued approval of IPP's issuances of securities or assumptions of
liability.
Copies of the full text of the Director's Order are available from
the Commission's Public Reference Room, 888 First Street, NE.,
Washington, DC 20426. The Order may also be viewed on the Commission's
Web site at https://www.ferc.gov, using the eLibrary link. Enter the
docket number excluding the last three digits in the docket number
filed to access the document. Comments, protests, and interventions may
be filed electronically via the Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. The Commission strongly encourages
electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. E6-3274 Filed 3-7-06; 8:45 am]