Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 11610-11611 [E6-3199]
Download as PDF
erjones on PROD1PC68 with NOTICES
11610
Federal Register / Vol. 71, No. 45 / Wednesday, March 8, 2006 / Notices
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper; see 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Please include the project number
(P–12640–000) on any comments or
motions filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. Competing Application: Project No.
12613–000, Date Filed: September 19,
2005, Notice Issued: November 18,
2005, Due Date: January 17, 2006.
l. Description of Project: The proposed
project would use the U.S. Army Corps
of Engineer’s Tygart Dam and consist of:
(1) A proposed powerhouse containing
two generating units with a total
installed capacity of 20 megawatts, (3) a
proposed 6,700-foot-long, 138-kilovolt
transmission line, and (4) appurtenant
facilities. The project would have an
annual generation of 117 gigawatt hours,
which would be sold to a local utility.
m. Locations of Applications: A copy
of the application is available for
inspection and reproduction at the
Commission in the Public Reference
Room, located at 888 First Street NE.,
Room 2A, Washington, DC 20426, or by
calling (202) 502–8371. This filing may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item h.
above.
n. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
o. Proposed Scope of Studies under
Permit: A preliminary permit, if issued,
does not authorize construction. The
term of the proposed preliminary permit
would be 36 months. The work
proposed under the preliminary permit
would include economic analysis,
VerDate Aug<31>2005
15:53 Mar 07, 2006
Jkt 208001
preparation of preliminary engineering
plans, and a study of environmental
impacts. Based on the results of these
studies, the Applicant would decide
whether to proceed with the preparation
of a development application to
construct and operate the project.
p. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, 385.211,
385.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
q. Filing and Service of Responsive
Documents: Any filings must bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘NOTICE OF INTENT TO FILE
COMPETING APPLICATION’’,
‘‘COMPETING APPLICATION’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
Any of the above-named documents
must be filed by providing the original
and the number of copies provided by
the Commission’s regulations to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. An additional
copy must be sent to Director, Division
of Hydropower Administration and
Compliance, Federal Energy Regulatory
Commission, at the above-mentioned
address. A copy of any notice of intent,
competing application or motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper; see 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
r. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
agency’s comments must also be sent to
the Applicant’s representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E6–3198 Filed 3–7–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Protests
February 28, 2006.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Competing
Preliminary Permit.
b. Project No: 12647–000.
c. Date Filed: January 30, 2006.
d. Applicant: Eastern Shoshone Tribe
of the Wind River, Wyoming.
e. Name of Project: Bull Lake Dam
Project.
f. Location: The project would be
located on the Bull Lake Creek, in
Fremont County, Wyoming. The project
would use the Bull Lake Dam owned by
the U.S. Bureau of Reclamation.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contacts: Mr. Ivan
Posey, Shoshone Business Council, P.O.
Box 217, Fort Washakie, WY 82514,
(307) 332–3532.
i. FERC Contact: Mr. Robert Bell,
(202) 502–6062.
j. Deadline for filing motions to
intervene, protests and comments: 30
days from the issuance date of this
notice.
All documents (original and eight
copies) should be filed with: Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Comments, protests, and interventions
may be filed electronically via Internet
in lieu of paper; see 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Please include the project number
(P–12647–000) on any comments or
motions filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
E:\FR\FM\08MRN1.SGM
08MRN1
erjones on PROD1PC68 with NOTICES
Federal Register / Vol. 71, No. 45 / Wednesday, March 8, 2006 / Notices
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. Competing Application: Project No.
12602–000, Date Filed: July 1, 2005,
Notice Issued: November 1, 2005, Due
Date: December 31, 2005.
l. Description of Project: The proposed
project using the U.S. Bureau of
Reclamation’s Bull Lake Dam would
consist of: (1) A proposed 260-foot-long,
8.5-foot-diameter, steel penstock, (2) a
proposed powerhouse containing a
generating unit with an installed
capacity of 4 megawatts, (3) a proposed
2-mile-long 25 kilovolt transmission
line, and (4) appurtenant facilities. The
project would have an annual
generation of 26 gigawatt hours which
would be sold to a local utility.
m. Locations of Applications: A copy
of the application is available for
inspection and reproduction at the
Commission in the Public Reference
Room, located at 888 First Street NE.,
Room 2A, Washington, DC 20426, or by
calling (202) 502–8371. This filing may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item h
above.
n. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
o. Proposed Scope of Studies under
Permit: A preliminary permit, if issued,
does not authorize construction. The
term of the proposed preliminary permit
would be 36 months. The work
proposed under the preliminary permit
would include economic analysis,
preparation of preliminary engineering
plans, and a study of environmental
impacts. Based on the results of these
studies, the Applicant would decide
whether to proceed with the preparation
of a development application to
construct and operate the project.
p. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, 385.211,
385.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
VerDate Aug<31>2005
15:53 Mar 07, 2006
Jkt 208001
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
q. Filing and Service of Responsive
Documents: Any filings must bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘NOTICE OF INTENT TO FILE
COMPETING APPLICATION’’,
‘‘COMPETING APPLICATION’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
Any of the above-named documents
must be filed by providing the original
and the number of copies provided by
the Commission’s regulations to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. An additional
copy must be sent to Director, Division
of Hydropower Administration and
Compliance, Federal Energy Regulatory
Commission, at the above-mentioned
address. A copy of any notice of intent,
competing application or motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper; see 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
r. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E6–3199 Filed 3–7–06; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
11611
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application Accepted for
Filing; Ready for Environmental
Analysis; and Soliciting Motions To
Intervene, Protests, Comments on
Application and Settlement
Agreement; and Recommendations,
Terms and Conditons and
Prescriptions
February 28, 2006.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License and approval of Settlement
Agreement.
b. Project No.: 2170–029.
c. Date Filed: Application—April 22,
2005; Settlement Agreement August 31,
2005.
d. Applicant: Chugach Electric
Association.
e. Name of Project Cooper Lake
Hydroelectric Project.
f. Location: On Cooper Lake,
approximately 4.8 river miles from the
mouth of Cooper Creek in south central
Alaska, 55 air miles south of Anchorage.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r) and Rule
602 of the Commission’s Rules of
Practice and Procedure, 18 CFR 385.602.
h. Applicant Contact: Burke Wick,
Chugach Electric Association, 5601
Minnesota Drive, Anchorage, Alaska
99519. (907) 762–4779.
i. FERC Contact: David Turner (202)
502–6091 or david.turner@ferc.gov.
j. Deadline for filing motions to
intervene, protests, comments on
application and settlement agreement,
recommendations, terms and conditions
and prescriptions: 60 days from the
issuance date of this notice; Applicant
reply comments are due 105 days from
issuance date of this notice.
All documents (original and eight
copies) should be filed with: Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
E:\FR\FM\08MRN1.SGM
08MRN1
Agencies
[Federal Register Volume 71, Number 45 (Wednesday, March 8, 2006)]
[Notices]
[Pages 11610-11611]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-3199]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application Accepted for Filing and Soliciting
Comments, Motions To Intervene, and Protests
February 28, 2006.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Competing Preliminary Permit.
b. Project No: 12647-000.
c. Date Filed: January 30, 2006.
d. Applicant: Eastern Shoshone Tribe of the Wind River, Wyoming.
e. Name of Project: Bull Lake Dam Project.
f. Location: The project would be located on the Bull Lake Creek,
in Fremont County, Wyoming. The project would use the Bull Lake Dam
owned by the U.S. Bureau of Reclamation.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contacts: Mr. Ivan Posey, Shoshone Business Council,
P.O. Box 217, Fort Washakie, WY 82514, (307) 332-3532.
i. FERC Contact: Mr. Robert Bell, (202) 502-6062.
j. Deadline for filing motions to intervene, protests and comments:
30 days from the issuance date of this notice.
All documents (original and eight copies) should be filed with:
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426. Comments, protests, and
interventions may be filed electronically via Internet in lieu of
paper; see 18 CFR 385.2001(a)(1)(iii) and the instructions on the
Commission's Web site under the ``e-Filing'' link. The Commission
strongly encourages electronic filings. Please include the project
number (P-12647-000) on any comments or motions filed.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person in the official service list for the
project. Further, if an intervenor files comments or documents with the
[[Page 11611]]
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
k. Competing Application: Project No. 12602-000, Date Filed: July
1, 2005, Notice Issued: November 1, 2005, Due Date: December 31, 2005.
l. Description of Project: The proposed project using the U.S.
Bureau of Reclamation's Bull Lake Dam would consist of: (1) A proposed
260-foot-long, 8.5-foot-diameter, steel penstock, (2) a proposed
powerhouse containing a generating unit with an installed capacity of 4
megawatts, (3) a proposed 2-mile-long 25 kilovolt transmission line,
and (4) appurtenant facilities. The project would have an annual
generation of 26 gigawatt hours which would be sold to a local utility.
m. Locations of Applications: A copy of the application is
available for inspection and reproduction at the Commission in the
Public Reference Room, located at 888 First Street NE., Room 2A,
Washington, DC 20426, or by calling (202) 502-8371. This filing may
also be viewed on the Commission's Web site at https://www.ferc.gov
using the ``eLibrary'' link. Enter the docket number excluding the last
three digits in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item h
above.
n. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
o. Proposed Scope of Studies under Permit: A preliminary permit, if
issued, does not authorize construction. The term of the proposed
preliminary permit would be 36 months. The work proposed under the
preliminary permit would include economic analysis, preparation of
preliminary engineering plans, and a study of environmental impacts.
Based on the results of these studies, the Applicant would decide
whether to proceed with the preparation of a development application to
construct and operate the project.
p. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210,
385.211, 385.214. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
q. Filing and Service of Responsive Documents: Any filings must
bear in all capital letters the title ``COMMENTS'', ``NOTICE OF INTENT
TO FILE COMPETING APPLICATION'', ``COMPETING APPLICATION'',
``PROTEST'', or ``MOTION TO INTERVENE'', as applicable, and the Project
Number of the particular application to which the filing refers. Any of
the above-named documents must be filed by providing the original and
the number of copies provided by the Commission's regulations to: The
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426. An additional copy must be sent to Director,
Division of Hydropower Administration and Compliance, Federal Energy
Regulatory Commission, at the above-mentioned address. A copy of any
notice of intent, competing application or motion to intervene must
also be served upon each representative of the Applicant specified in
the particular application.
Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site under the ``e-Filing''
link. The Commission strongly encourages electronic filings.
r. Agency Comments: Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E6-3199 Filed 3-7-06; 8:45 am]
BILLING CODE 6717-01-P