Environmental Impact Statements and Regulations; Availability of EPA Comments, 10965 [E6-3079]

Download as PDF Federal Register / Vol. 71, No. 42 / Friday, March 3, 2006 / Notices Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E6–3042 Filed 3–2–06; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6672–8] Environmental Impact Statements and Regulations; Availability of EPA Comments Availability of EPA comments prepared pursuant to the Environmental Review Process (ERP), under section 309 of the Clean Air Act and section 102(2)(c) of the National Environmental Policy Act as amended. Requests for copies of EPA comments can be directed to the Office of Federal Activities at 202–564–7167. An explanation of the ratings assigned to draft environmental impact statements (EISs) was published in FR dated April 1, 2005 (70 FR 16815). wwhite on PROD1PC61 with NOTICES Draft EISs EIS No. 20050532, ERP No. D–FRC– G03029–LA, Creole Trail Liquefied National Gas (LNG) Terminal and Pipeline Project, Construction and Operation, Cameron, Calcasieu, Beauregard, Allen, Jefferson, Davis and Acadia Parishes, LA. Summary: EPA expressed environmental concerns about potential impacts to aquatic resources, and requested additional information regarding contaminant testing and suitability of dredge material for beach nourishment. Rating EC2. EIS No. 20050472, ERP No. DA–AFS– J65277–CO, Sheep Flats Diversity Unit, Timber Sales and Related Road Construction, Additional Information Regarding Wildlife Resources, Grand Mesa Uncompahgre and Gunnison National Forests, Grand Valley Ranger District, Mesa County, CO. Summary: EPA expressed environmental concerns about potential impacts from sedimentation to surface water, the adequacy of the buffer zones and mitigation measures. Rating EC2. VerDate Aug<31>2005 16:43 Mar 02, 2006 Jkt 208001 Final EISs EIS No. 20050524, ERP No. F–BLM– K08028–CA, Desert Southwest Transmission Line Project, New Substation/Switching Station Construction, Operation and Maintenance, Issuance of Right-ofWay Grant and U.S. Army COE Section 10 and 404 Permits, North Palm Springs and Blythe, CA. Summary: EPA does not object to the proposed project. EIS No. 20050547, ERP No. F–AFS– L65472–ID, Paddy Flat Vegetation Project, Harvesting and Regenerate Timber Stands Precommercially Thin Plantations, Rapid, Kennally and Camp Creeks, Payette National Forest, McCall Ranger District, Valley County, ID. Summary: EPA continues to have environmental concerns about potential impacts to water quality from stream bank erosion and encourages source water mapping and protection if necessary be included as part of the project. EIS No. 20060009, ERP No. F–NPS– L61228–AK, Denali National Park and Preserve Revised Final Backcountry Management Plan, General Management Plan Amendment, Implementation, AK. Summary: The final EIS adequately responded to EPA’s concerns with potential impacts to water quality, wetlands, permafrost soils and impacts to wildlife from snowmobile use; therefore, EPA does not object the proposed project. EIS No. 20060018, ERP No. F–COE– G39044–TX, Upper Trinity River Basin Project, To Provide Flood Damage Reduction, Ecosystem Improvement, Recreation and Urban Revitalization, Trinity River, Central City, Fort Worth, Tarrant County, TX. Summary: EPA does not object to the proposed action. EIS No. 20060020, ERP No. F–COE– E11055–NC, Fort Bragg Headquarters for XVII Airborne Corps and Army Special Operations Command, To Determine the Level of Training on the Overhills Tract Program, Cumberland and Harnett Counties, NC. Summary: EPA does not object to the proposed training upgrade. Dated: February 28, 2006. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E6–3079 Filed 3–2–06; 8:45 am] BILLING CODE 6560–50–P PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 10965 ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6672–9] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7167 or https://www.epa.gov/ compliance/nepa/. Weekly Receipt of Environmental Impact Statements Filed February 21, 2006 Through February 24, 2006 Pursuant to 40 CFR 1506.9. EIS No. 20060060, Final EIS, HUD, NE, Ashburton Avenue Master Plan and Urban Renewal Plan/Mulford Hope VI Revitalization Plan, Development, Implementation, Yonkers City, Westchester County, NY, Wait Period Ends: April 3, 2006, Contact: Daisy Colon 914–377–6560. EIS No. 20060061, Final EIS, HUD, CA, Stillwater Business Park, New and Revised Information, Development of Business Park, Annexation AN1–01, Shastec Redevelopment Project Area, Airport Land Use Plan Amendment, Pre-Zone, General Plan Amendment GPA–2–01, Rezone RZ–1–01, Funding and U.S. Army COE 404 Permit, City of Redding, Shasta County, CA, Wait Period Ends: April 3, 2006, Contact: Nathan Cherpeski, 530–225–4519. This document is available on the Internet at https://ci.redding.ca.us/cm/ major_pr/still_buspk.htm1. EIS No. 20060062, Final EIS, AFS, CO, Copper Mountain Resort Trails and Facilities Improvements, Implementation, Special Use Permit, White River National Forest, Dillon Ranger District, Summit County, CO, Wait Period Ends: April 3, 2006, Contact: Joe Foreman, 970–468–5400. EIS No. 20060063, Draft EIS, FHW, CA, Big Bear Lake Bridge Replacement Project, near Big Bear Lake on CA–18 from Kilopost 71.1/71.9, Realignment and Widening Roadways, U.S. COE Section 404 Permit, Funding, San Bernardino National Forest, San Bernardino County, CA, Comment Period Ends: April 17, 2006, Contact: Lisa Cathcart-Randall, 916–498–5048. EIS No. 20060064, Draft EIS, FHW, PA, Williow Creek All-Terrain Vehicle Trail Expansion, Improvements, located in Marshburg/Stickney Intensive Use Area, Alleghany National Forest, McKean County, PA, Comment Period Ends: April 17, 2006, Contact: Mark Conn, 814–723– 5150. EIS No. 20060065, Draft EIS, FRC, WA, Priest Rapids Hydroelectric Project, E:\FR\FM\03MRN1.SGM 03MRN1

Agencies

[Federal Register Volume 71, Number 42 (Friday, March 3, 2006)]
[Notices]
[Page 10965]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-3079]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6672-8]


Environmental Impact Statements and Regulations; Availability of 
EPA Comments

    Availability of EPA comments prepared pursuant to the Environmental 
Review Process (ERP), under section 309 of the Clean Air Act and 
section 102(2)(c) of the National Environmental Policy Act as amended. 
Requests for copies of EPA comments can be directed to the Office of 
Federal Activities at 202-564-7167.
    An explanation of the ratings assigned to draft environmental 
impact statements (EISs) was published in FR dated April 1, 2005 (70 FR 
16815).

Draft EISs

EIS No. 20050532, ERP No. D-FRC-G03029-LA, Creole Trail Liquefied 
National Gas (LNG) Terminal and Pipeline Project, Construction and 
Operation, Cameron, Calcasieu, Beauregard, Allen, Jefferson, Davis and 
Acadia Parishes, LA.

    Summary: EPA expressed environmental concerns about potential 
impacts to aquatic resources, and requested additional information 
regarding contaminant testing and suitability of dredge material for 
beach nourishment.
Rating EC2.

EIS No. 20050472, ERP No. DA-AFS-J65277-CO, Sheep Flats Diversity Unit, 
Timber Sales and Related Road Construction, Additional Information 
Regarding Wildlife Resources, Grand Mesa Uncompahgre and Gunnison 
National Forests, Grand Valley Ranger District, Mesa County, CO.

    Summary: EPA expressed environmental concerns about potential 
impacts from sedimentation to surface water, the adequacy of the buffer 
zones and mitigation measures.
Rating EC2.

Final EISs

EIS No. 20050524, ERP No. F-BLM-K08028-CA, Desert Southwest 
Transmission Line Project, New Substation/Switching Station 
Construction, Operation and Maintenance, Issuance of Right-of-Way Grant 
and U.S. Army COE Section 10 and 404 Permits, North Palm Springs and 
Blythe, CA.

    Summary: EPA does not object to the proposed project.

EIS No. 20050547, ERP No. F-AFS-L65472-ID, Paddy Flat Vegetation 
Project, Harvesting and Regenerate Timber Stands Precommercially Thin 
Plantations, Rapid, Kennally and Camp Creeks, Payette National Forest, 
McCall Ranger District, Valley County, ID.

    Summary: EPA continues to have environmental concerns about 
potential impacts to water quality from stream bank erosion and 
encourages source water mapping and protection if necessary be included 
as part of the project.

EIS No. 20060009, ERP No. F-NPS-L61228-AK, Denali National Park and 
Preserve Revised Final Backcountry Management Plan, General Management 
Plan Amendment, Implementation, AK.

    Summary: The final EIS adequately responded to EPA's concerns with 
potential impacts to water quality, wetlands, permafrost soils and 
impacts to wildlife from snowmobile use; therefore, EPA does not object 
the proposed project.

EIS No. 20060018, ERP No. F-COE-G39044-TX, Upper Trinity River Basin 
Project, To Provide Flood Damage Reduction, Ecosystem Improvement, 
Recreation and Urban Revitalization, Trinity River, Central City, Fort 
Worth, Tarrant County, TX.

    Summary: EPA does not object to the proposed action.

EIS No. 20060020, ERP No. F-COE-E11055-NC, Fort Bragg Headquarters for 
XVII Airborne Corps and Army Special Operations Command, To Determine 
the Level of Training on the Overhills Tract Program, Cumberland and 
Harnett Counties, NC.

    Summary: EPA does not object to the proposed training upgrade.

    Dated: February 28, 2006.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
 [FR Doc. E6-3079 Filed 3-2-06; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.