Florida Power and Light Company, Turkey Point, Units 3 and 4; Notice of Consideration of Approval of Application Regarding Proposed Merger and Opportunity for a Hearing, 9170-9171 [06-1559]
Download as PDF
cprice-sewell on PROD1PC66 with NOTICES
9170
Federal Register / Vol. 71, No. 35 / Wednesday, February 22, 2006 / Notices
the Secretary or the Chief
Administrative Judge of the Atomic
Safety and Licensing Board will issue a
notice of a hearing or an appropriate
order.
As required by 10 CFR 2.309, a
petition for leave to intervene shall set
forth with particularity the interest of
the petitioner/requestor in the
proceeding, and how that interest may
be affected by the results of the
proceeding. The petition should
specifically explain the reasons why
intervention should be permitted with
particular reference to the following
general requirements: (1) The name,
address and telephone number of the
requestor or petitioner; (2) the nature of
the requestor’s/petitioner’s right under
the Act to be made a party to the
proceeding; (3) the nature and extent of
the requestor’s/petitioner’s property,
financial, or other interest in the
proceeding; and (4) the possible effect of
any decision or order which may be
entered in the proceeding on the
requestor’s/petitioner’s interest. The
petition must also identify the specific
contentions which the petitioner/
requestor seeks to have litigated at the
proceeding.
Each contention must consist of a
specific statement of the issue of law or
fact to be raised or controverted. In
addition, the petitioner/requestor shall
provide a brief explanation of the bases
for the contention and a concise
statement of the alleged facts or expert
opinion which support the contention
and on which the petitioner intends to
rely in proving the contention at the
hearing. The petitioner must also
provide references to those specific
sources and documents of which the
petitioner is aware and on which the
petitioner intends to rely to establish
those facts or expert opinion. The
petition must include sufficient
information to show that a genuine
dispute exists with the applicant on a
material issue of law or fact.
Contentions shall be limited to matters
within the scope of the amendment
under consideration. The contention
must be one which, if proven, would
entitle the petitioner/requestor to relief.
A petitioner/requestor who fails to
satisfy these requirements with respect
to at least one contention will not be
permitted to participate as a party.
Those permitted to intervene become
parties to the proceeding, subject to any
limitations in the order granting leave to
intervene, and have the opportunity to
participate fully in the conduct of the
hearing.
Nontimely requests and/or petitions
and contentions will not be entertained
absent a determination by the
VerDate Aug<31>2005
14:35 Feb 21, 2006
Jkt 208001
Commission or the presiding officer of
the Atomic Safety and Licensing Board
that the petition, request and/or the
contentions should be granted based on
a balancing of the factors specified in 10
CFR 2.309(a)(1)(i) through (viii).
A request for a hearing or a petition
for leave to intervene must be filed by:
(1) First class mail addressed to the
Office of the Secretary of the
Commission, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, Attention: Rulemaking and
Adjudications Staff; (2) courier, express
mail, and expedited delivery services:
Office of the Secretary, Sixteenth Floor,
One White Flint North, 11555 Rockville
Pike, Rockville, Maryland, 20852,
Attention: Rulemaking and
Adjudications Staff; (3) E-mail
addressed to the Office of the Secretary,
U.S. Nuclear Regulatory Commission,
hearingdocket@nrc.gov; or (4) facsimile
transmission addressed to the Office of
the Secretary, U.S. Nuclear Regulatory
Commission, Washington, DC,
Attention: Rulemakings and
Adjudications Staff at (301) 415–1101,
verification number is (301) 415–1966.
A copy of the request for hearing and
petition for leave to intervene should
also be sent to the Office of the General
Counsel, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, and it is requested that copies be
transmitted either by means of facsimile
transmission to 301–415–3725 or by
e-mail to OGCMailCenter@nrc.gov. A
copy of the request for hearing and
petition for leave to intervene should
also be sent to Ms. Lisa F. Vaughn, Legal
Department (PBOSE), 422 South Church
Street, Charlotte, NC 28201–1006,
attorney for the licensee.
If a request for a hearing is received,
the Commission’s staff may issue the
amendment after it completes its
technical review and prior to the
completion of any required hearing if it
publishes a further notice for public
comment of its proposed finding of no
significant hazards consideration in
accordance with 10 CFR 50.91 and
50.92.
For further details with respect to this
action, see the application for
amendment dated December 19, 2005,
as supplemented February 2, 2006,
which are available for public
inspection at the Commission’s PDR,
located at One White Flint North, Public
File Area O1 F21, 11555 Rockville Pike
(first floor), Rockville, Maryland.
Publicly available records will be
accessible electronically from the
ADAMS Public Electronic Reading
Room on the Internet at the NRC Web
site, https://www.nrc.gov/reading-rm/
adams.html. Persons who do not have
PO 00000
Frm 00090
Fmt 4703
Sfmt 4703
access to ADAMS or who encounter
problems in accessing the documents
located in ADAMS, should contact the
NRC PDR Reference staff by telephone
at 1–800–397–4209, 301–415–4737, or
by e-mail to pdr@nrc.gov.
Dated at Rockville, Maryland, this 13th day
of February 2006.
For the Nuclear Regulatory Commission.
John Stang,
Senior Project Manager, Plant Licensing
Branch II–1, Division of Operating Reactor
Licensing, Office of Nuclear Reactor
Regulation.
[FR Doc. 06–1556 Filed 2–21–06; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 50–250 and 50–251]
Florida Power and Light Company,
Turkey Point, Units 3 and 4; Notice of
Consideration of Approval of
Application Regarding Proposed
Merger and Opportunity for a Hearing
The U.S. Nuclear Regulatory
Commission (the Commission) is
considering the issuance of an order
under Title 10 of the Code of Federal
Regulations (10 CFR), Section 50.80
approving the indirect transfer of the
Renewed Facility Operating Licenses,
which are numbered DPR–31 and DPR–
41, for the Turkey Point Nuclear Plant,
Units 3 and 4, currently held by Florida
Power and Light Company (FPL), as
owner and licensed operator of the
Turkey Point Nuclear Plant.
According to an application for
approval filed by FPL, FPL Group, Inc.,
the parent organization of FPL, will
merge with a newly created subsidiary
of Constellation Energy Group, Inc., and
become a wholly owned subsidiary of
Constellation Energy. FPL will continue
to own and operate the Turkey Point
facilities and hold the licenses.
No physical changes to the Turkey
Point facilities or operational changes
are being proposed in the application.
Pursuant to 10 CFR 50.80, no license,
or any right thereunder, shall be
transferred, directly or indirectly,
through transfer of control of the
license, unless the Commission shall
give its consent in writing. The
Commission will approve the
application for the indirect transfer of
the licenses, if the Commission
determines that the proposed merger
will not affect the qualifications of the
licensee to hold the licenses, and that
the transfer is otherwise consistent with
applicable provisions of law,
regulations, and orders issued by the
Commission pursuant thereto.
E:\FR\FM\22FEN1.SGM
22FEN1
cprice-sewell on PROD1PC66 with NOTICES
Federal Register / Vol. 71, No. 35 / Wednesday, February 22, 2006 / Notices
The filing of requests for hearing and
petitions for leave to intervene, and
written comments with regard to the
license transfer application, are
discussed below.
Within 20 days from the date of
publication of this notice, any person
whose interest may be affected by the
Commission’s action on the application
may request a hearing and, if not the
applicant, may petition for leave to
intervene in a hearing proceeding on the
Commission’s action. Requests for a
hearing and petitions for leave to
intervene should be filed in accordance
with the Commission’s rules of practice
set forth in Subpart C ‘‘Rules of General
Applicability: Hearing Requests,
Petitions to Intervene, Availability of
Documents, Selection of Specific
Hearing Procedures, Presiding Officer
Powers, and General Hearing
Management for NRC Adjudicatory
Hearings,’’ of 10 CFR part 2. In
particular, such requests and petitions
must comply with the requirements set
forth in 10 CFR 2.309. Untimely
requests and petitions may be denied, as
provided in 10 CFR 2.309(c)(1), unless
good cause for failure to file on time is
established. In addition, an untimely
request or petition should address the
factors that the Commission will also
consider, in reviewing untimely
requests or petitions, set forth in 10 CFR
2.309(c)(1)(i) through (viii).
Requests for a hearing and petitions
for leave to intervene should be served
upon M. S. Ross, Managing Attorney,
Florida Power & Light Company, P.O.
Box 14000, Juno Beach, FL 33408–0420
(telephone: 561–691–7126, fax: 561–
694–6274, e-mail: mitch_ross@fpl.com);
the General Counsel, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001 (e-mail address for
filings regarding license transfer cases
only: OGCLT@NRC.gov); and the
Secretary of the Commission, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemakings and Adjudications Staff, in
accordance with 10 CFR 2.302 and
2.305.
The Commission will issue a notice or
order granting or denying a hearing
request or intervention petition,
designating the issues for any hearing
that will be held and designating the
Presiding Officer. A notice granting a
hearing will be published in the Federal
Register and served on the parties to the
hearing.
As an alternative to requests for
hearing and petitions to intervene,
within 30 days from the date of
publication of this notice, persons may
submit written comments regarding the
license transfer application, as provided
VerDate Aug<31>2005
14:35 Feb 21, 2006
Jkt 208001
for in 10 CFR 2.1305. The Commission
will consider and, if appropriate,
respond to these comments, but such
comments will not otherwise constitute
part of the decisional record. Comments
should be submitted to the Secretary,
U.S. Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemakings and Adjudications Staff,
and should cite the publication date and
page number of this Federal Register
notice.
For further details with respect to this
action, see the application dated January
20, 2006, available for public inspection
at the Commission’s Public Document
Room (PDR), located at One White Flint
North, Public File Area O1 F21, 11555
Rockville Pike (first floor), Rockville,
Maryland. Publicly available records
will be accessible electronically from
the Agency wide Documents Access and
Management System’s (ADAMS) Public
Electronic Reading Room on the Internet
at the NRC Web site, https://
www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to
ADAMS or who encounter problems in
accessing the documents located in
ADAMS, should contact the NRC PDR
Reference staff by telephone at 1–800–
397–4209, 301–415–4737 or by e-mail to
pdr@nrc.gov.
Dated at Rockville, Maryland this 13th day
of February 2006.
For the Nuclear Regulatory Commission.
Brendan T. Moroney,
Project Manager, Plant Licensing Branch II–
2, Division of Operating Reactor Licensing,
Office of Nuclear Reactor Regulation.
[FR Doc. 06–1559 Filed 2–21–06; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 50–335 and 50–389]
Florida Power and Light Company; St.
Lucie Nuclear Plant; Units 1 and 2;
Notice of Consideration of Approval of
Application Regarding Proposed
Merger and Opportunity for a Hearing
The U.S. Nuclear Regulatory
Commission (the Commission) is
considering the issuance of an order
under Title 10 of the Code of Federal
Regulations (CFR), Section 50.80
approving the indirect transfer of the
Renewed Facility Operating Licenses,
which are numbered DPR–67 and NPF–
16, for the St. Lucie Nuclear Plant, Units
1 and 2, to the extent currently held by
Florida Power and Light Company
(FPL), as owner and licensed operator of
St. Lucie Unit 1 and co-owner and
licensed operator of St. Lucie Unit 2.
PO 00000
Frm 00091
Fmt 4703
Sfmt 4703
9171
According to an application for
approval filed by FPL, FPL Group, Inc.,
the parent organization of FPL, will
merge with a newly created subsidiary
of Constellation Energy Group, Inc., and
become a wholly owned subsidiary of
Constellation Energy. FPL will continue
to own and operate St. Lucie Unit 1, and
continue to own its 85.1 percent
ownership interest in and operate St.
Lucie Unit 2, and hold the licenses to
the extent now held. The other coowners of St. Lucie Unit 2, Orlando
Utilities Commission of the City of
Orlando, Florida, and the Florida
Municipal Power Agency, are not
involved in the proposed transaction.
No physical changes to the St. Lucie
facilities or operational changes are
being proposed in the application.
Pursuant to 10 CFR 50.80, no license,
or any right thereunder, shall be
transferred, directly or indirectly,
through transfer of control of the
license, unless the Commission shall
give its consent in writing. The
Commission will approve the
application for the indirect transfer of
the licenses, if the Commission
determines that the proposed merger
will not affect the qualifications of the
licensee to hold the licenses, and that
the transfer is otherwise consistent with
applicable provisions of law,
regulations, and orders issued by the
Commission pursuant thereto.
The filing of requests for hearing and
petitions for leave to intervene, and
written comments with regard to the
license transfer application, are
discussed below.
Within 20 days from the date of
publication of this notice, any person
whose interest may be affected by the
Commission’s action on the application
may request a hearing and, if not the
applicant, may petition for leave to
intervene in a hearing proceeding on the
Commission’s action. Requests for a
hearing and petitions for leave to
intervene should be filed in accordance
with the Commission’s rules of practice
set forth in Subpart C ‘‘Rules of General
Applicability: Hearing Requests,
Petitions to Intervene, Availability of
Documents, Selection of Specific
Hearing Procedures, Presiding Officer
Powers, and General Hearing
Management for NRC Adjudicatory
Hearings,’’ of 10 CFR part 2. In
particular, such requests and petitions
must comply with the requirements set
forth in 10 CFR 2.309. Untimely
requests and petitions may be denied, as
provided in 10 CFR 2.309(c)(1), unless
good cause for failure to file on time is
established. In addition, an untimely
request or petition should address the
factors that the Commission will also
E:\FR\FM\22FEN1.SGM
22FEN1
Agencies
[Federal Register Volume 71, Number 35 (Wednesday, February 22, 2006)]
[Notices]
[Pages 9170-9171]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 06-1559]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-250 and 50-251]
Florida Power and Light Company, Turkey Point, Units 3 and 4;
Notice of Consideration of Approval of Application Regarding Proposed
Merger and Opportunity for a Hearing
The U.S. Nuclear Regulatory Commission (the Commission) is
considering the issuance of an order under Title 10 of the Code of
Federal Regulations (10 CFR), Section 50.80 approving the indirect
transfer of the Renewed Facility Operating Licenses, which are numbered
DPR-31 and DPR-41, for the Turkey Point Nuclear Plant, Units 3 and 4,
currently held by Florida Power and Light Company (FPL), as owner and
licensed operator of the Turkey Point Nuclear Plant.
According to an application for approval filed by FPL, FPL Group,
Inc., the parent organization of FPL, will merge with a newly created
subsidiary of Constellation Energy Group, Inc., and become a wholly
owned subsidiary of Constellation Energy. FPL will continue to own and
operate the Turkey Point facilities and hold the licenses.
No physical changes to the Turkey Point facilities or operational
changes are being proposed in the application.
Pursuant to 10 CFR 50.80, no license, or any right thereunder,
shall be transferred, directly or indirectly, through transfer of
control of the license, unless the Commission shall give its consent in
writing. The Commission will approve the application for the indirect
transfer of the licenses, if the Commission determines that the
proposed merger will not affect the qualifications of the licensee to
hold the licenses, and that the transfer is otherwise consistent with
applicable provisions of law, regulations, and orders issued by the
Commission pursuant thereto.
[[Page 9171]]
The filing of requests for hearing and petitions for leave to
intervene, and written comments with regard to the license transfer
application, are discussed below.
Within 20 days from the date of publication of this notice, any
person whose interest may be affected by the Commission's action on the
application may request a hearing and, if not the applicant, may
petition for leave to intervene in a hearing proceeding on the
Commission's action. Requests for a hearing and petitions for leave to
intervene should be filed in accordance with the Commission's rules of
practice set forth in Subpart C ``Rules of General Applicability:
Hearing Requests, Petitions to Intervene, Availability of Documents,
Selection of Specific Hearing Procedures, Presiding Officer Powers, and
General Hearing Management for NRC Adjudicatory Hearings,'' of 10 CFR
part 2. In particular, such requests and petitions must comply with the
requirements set forth in 10 CFR 2.309. Untimely requests and petitions
may be denied, as provided in 10 CFR 2.309(c)(1), unless good cause for
failure to file on time is established. In addition, an untimely
request or petition should address the factors that the Commission will
also consider, in reviewing untimely requests or petitions, set forth
in 10 CFR 2.309(c)(1)(i) through (viii).
Requests for a hearing and petitions for leave to intervene should
be served upon M. S. Ross, Managing Attorney, Florida Power & Light
Company, P.O. Box 14000, Juno Beach, FL 33408-0420 (telephone: 561-691-
7126, fax: 561-694-6274, e-mail: mitch_ross@fpl.com); the General
Counsel, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001
(e-mail address for filings regarding license transfer cases only:
OGCLT@NRC.gov); and the Secretary of the Commission, U.S. Nuclear
Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemakings and Adjudications Staff, in accordance with 10 CFR 2.302
and 2.305.
The Commission will issue a notice or order granting or denying a
hearing request or intervention petition, designating the issues for
any hearing that will be held and designating the Presiding Officer. A
notice granting a hearing will be published in the Federal Register and
served on the parties to the hearing.
As an alternative to requests for hearing and petitions to
intervene, within 30 days from the date of publication of this notice,
persons may submit written comments regarding the license transfer
application, as provided for in 10 CFR 2.1305. The Commission will
consider and, if appropriate, respond to these comments, but such
comments will not otherwise constitute part of the decisional record.
Comments should be submitted to the Secretary, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, Attention: Rulemakings and
Adjudications Staff, and should cite the publication date and page
number of this Federal Register notice.
For further details with respect to this action, see the
application dated January 20, 2006, available for public inspection at
the Commission's Public Document Room (PDR), located at One White Flint
North, Public File Area O1 F21, 11555 Rockville Pike (first floor),
Rockville, Maryland. Publicly available records will be accessible
electronically from the Agency wide Documents Access and Management
System's (ADAMS) Public Electronic Reading Room on the Internet at the
NRC Web site, https://www.nrc.gov/reading-rm/adams.html. Persons who do
not have access to ADAMS or who encounter problems in accessing the
documents located in ADAMS, should contact the NRC PDR Reference staff
by telephone at 1-800-397-4209, 301-415-4737 or by e-mail to
pdr@nrc.gov.
Dated at Rockville, Maryland this 13th day of February 2006.
For the Nuclear Regulatory Commission.
Brendan T. Moroney,
Project Manager, Plant Licensing Branch II-2, Division of Operating
Reactor Licensing, Office of Nuclear Reactor Regulation.
[FR Doc. 06-1559 Filed 2-21-06; 8:45 am]