Duke Energy Corporation, North Carolina Power Agency No. 1, Piedmont Municipal Power Agency, Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for a Hearing, 9169-9170 [06-1556]
Download as PDF
cprice-sewell on PROD1PC66 with NOTICES
Federal Register / Vol. 71, No. 35 / Wednesday, February 22, 2006 / Notices
be transferred, directly or indirectly,
through transfer of control of the
license, unless the Commission shall
give its consent in writing. The
Commission will approve the
application for the indirect transfer of a
license, if the Commission determines
that the proposed merger will not affect
the qualifications of the licensee to hold
the license, and that the transfer is
otherwise consistent with applicable
provisions of law, regulations, and
orders issued by the Commission
pursuant thereto.
The filing of requests for hearing and
petitions for leave to intervene, and
written comments with regard to the
license transfer application, are
discussed below.
Within 20 days from the date of
publication of this notice, any person
whose interest may be affected by the
Commission’s action on the application
may request a hearing and, if not the
applicant, may petition for leave to
intervene in a hearing proceeding on the
Commission’s action. Requests for a
hearing and petitions for leave to
intervene should be filed in accordance
with the Commission’s rules of practice
set forth in Subpart C ‘‘Rules of General
Applicability: Hearing Requests,
Petitions to Intervene, Availability of
Documents, Selection of Specific
Hearing Procedures, Presiding Officer
Powers, and General Hearing
Management for NRC Adjudicatory
Hearings,’’ of 10 CFR Part 2. In
particular, such requests and petitions
must comply with the requirements set
forth in 10 CFR 2.309. Untimely
requests and petitions may be denied, as
provided in 10 CFR 2.309(c)(1), unless
good cause for failure to file on time is
established. In addition, an untimely
request or petition should address the
factors that the Commission will also
consider, in reviewing untimely
requests or petitions, set forth in 10 CFR
2.309(c)(1)(i) through (viii).
Requests for a hearing and petitions
for leave to intervene should be served
upon Mr. Jay M. Gutierrez at Morgan,
Lewis & Bockius, LLP, 1111
Pennsylvania Avenue, Washington, DC
20004, telephone: 202–739–5466, fax:
202–739–3001, and e-mail
jgutierrez@morganlewis.com; the
General Counsel, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001 (e-mail address for
filings regarding license transfer cases
only: OGCLT@NRC.gov); and the
Secretary of the Commission, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemakings and Adjudications Staff, in
accordance with 10 CFR 2.302 and
2.305.
VerDate Aug<31>2005
14:35 Feb 21, 2006
Jkt 208001
The Commission will issue a notice or
order granting or denying a hearing
request or intervention petition,
designating the issues for any hearing
that will be held and designating the
Presiding Officer. A notice granting a
hearing will be published in the Federal
Register and served on the parties to the
hearing.
As an alternative to requests for
hearing and petitions to intervene,
within 30 days from the date of
publication of this notice, persons may
submit written comments regarding the
license transfer application, as provided
for in 10 CFR 2.1305. The Commission
will consider and, if appropriate,
respond to these comments, but such
comments will not otherwise constitute
part of the decisional record. Comments
should be submitted to the Secretary,
U.S. Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemakings and Adjudications Staff,
and should cite the publication date and
page number of this Federal Register
notice.
For further details with respect to this
action, see the application dated January
23, 2006, available for public inspection
at the Commission’s Public Document
Room (PDR), located at One White Flint
North, Public File Area O1 F21, 11555
Rockville Pike (first floor), Rockville,
Maryland. Publicly available records
will be accessible electronically from
the Agency wide Documents Access and
Management System’s (ADAMS) Public
Electronic Reading Room on the Internet
at the NRC Web site, https://
www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to
ADAMS or who encounter problems in
accessing the documents located in
ADAMS, should contact the NRC PDR
Reference staff by telephone at 1–800–
397–4209, 301–415–4737 or by e-mail to
pdr@nrc.gov.
Dated at Rockville, Maryland, this 13th day
of February 2006.
For the Nuclear Regulatory Commission.
Patrick D. Milano,
Senior Project Manager, Plant Licensing
Branch I–1, Division of Operating Reactor
Licensing, Office of Nuclear Reactor
Regulation.
[FR Doc. 06–1618 Filed 2–21–06; 8:45 am]
BILLING CODE 7590–01–P
PO 00000
Frm 00089
Fmt 4703
Sfmt 4703
9169
NUCLEAR REGULATORY
COMMISSION
[Docket No. 50–414]
Duke Energy Corporation, North
Carolina Power Agency No. 1,
Piedmont Municipal Power Agency,
Notice of Consideration of Issuance of
Amendment to Facility Operating
License and Opportunity for a Hearing
The U.S. Nuclear Regulatory
Commission (the Commission) is
considering issuance of an amendment
to Renewed Facility Operating License
No. NPF–52, issued to Duke Energy
Corporation (the licensee), for operation
of the Catawba Nuclear Station, Unit 2
located in York County, South Carolina.
The proposed amendment would
revise the Technical Specifications and
Operating License on a one-time basis,
to modify the steam generator tube
repair criteria and add more restrictive
steam generator primary to secondary
leakage limits for end of cycle 14 and
operating cycle 15.
Before issuance of the proposed
license amendment, the Commission
will have made findings required by the
Atomic Energy Act of 1954, as amended
(the Act), and the Commission’s
regulations.
Within 60 days after the date of
publication of this notice, the licensee
may file a request for a hearing with
respect to issuance of the amendment to
the subject facility operating license and
any person whose interest may be
affected by this proceeding and who
wishes to participate as a party in the
proceeding must file a written request
for a hearing and a petition for leave to
intervene. Requests for a hearing and a
petition for leave to intervene shall be
filed in accordance with the
Commission’s ‘‘Rules of Practice for
Domestic Licensing Proceedings’’ in 10
CFR part 2. Interested persons should
consult a current copy of 10 CFR 2.309,
which is available at the Commission’s
public document room (PDR), located at
One White Flint North, Public File Area
01F21, 11555 Rockville Pike (first floor),
Rockville, Maryland. Publicly available
records will be accessible from the
Agencywide Documents Access and
Management System’s (ADAMS) Public
Electronic Reading Room on the Internet
at the NRC Web site, https://
www.nrc.gov/reading-rm/doccollections/cfr/. If a request for a hearing
or petition for leave to intervene is filed
by the above date, the Commission or a
presiding officer designated by the
Commission or by the Chief
Administrative Judge of the Atomic
Safety and Licensing Board Panel, will
rule on the request and/or petition; and
E:\FR\FM\22FEN1.SGM
22FEN1
cprice-sewell on PROD1PC66 with NOTICES
9170
Federal Register / Vol. 71, No. 35 / Wednesday, February 22, 2006 / Notices
the Secretary or the Chief
Administrative Judge of the Atomic
Safety and Licensing Board will issue a
notice of a hearing or an appropriate
order.
As required by 10 CFR 2.309, a
petition for leave to intervene shall set
forth with particularity the interest of
the petitioner/requestor in the
proceeding, and how that interest may
be affected by the results of the
proceeding. The petition should
specifically explain the reasons why
intervention should be permitted with
particular reference to the following
general requirements: (1) The name,
address and telephone number of the
requestor or petitioner; (2) the nature of
the requestor’s/petitioner’s right under
the Act to be made a party to the
proceeding; (3) the nature and extent of
the requestor’s/petitioner’s property,
financial, or other interest in the
proceeding; and (4) the possible effect of
any decision or order which may be
entered in the proceeding on the
requestor’s/petitioner’s interest. The
petition must also identify the specific
contentions which the petitioner/
requestor seeks to have litigated at the
proceeding.
Each contention must consist of a
specific statement of the issue of law or
fact to be raised or controverted. In
addition, the petitioner/requestor shall
provide a brief explanation of the bases
for the contention and a concise
statement of the alleged facts or expert
opinion which support the contention
and on which the petitioner intends to
rely in proving the contention at the
hearing. The petitioner must also
provide references to those specific
sources and documents of which the
petitioner is aware and on which the
petitioner intends to rely to establish
those facts or expert opinion. The
petition must include sufficient
information to show that a genuine
dispute exists with the applicant on a
material issue of law or fact.
Contentions shall be limited to matters
within the scope of the amendment
under consideration. The contention
must be one which, if proven, would
entitle the petitioner/requestor to relief.
A petitioner/requestor who fails to
satisfy these requirements with respect
to at least one contention will not be
permitted to participate as a party.
Those permitted to intervene become
parties to the proceeding, subject to any
limitations in the order granting leave to
intervene, and have the opportunity to
participate fully in the conduct of the
hearing.
Nontimely requests and/or petitions
and contentions will not be entertained
absent a determination by the
VerDate Aug<31>2005
14:35 Feb 21, 2006
Jkt 208001
Commission or the presiding officer of
the Atomic Safety and Licensing Board
that the petition, request and/or the
contentions should be granted based on
a balancing of the factors specified in 10
CFR 2.309(a)(1)(i) through (viii).
A request for a hearing or a petition
for leave to intervene must be filed by:
(1) First class mail addressed to the
Office of the Secretary of the
Commission, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, Attention: Rulemaking and
Adjudications Staff; (2) courier, express
mail, and expedited delivery services:
Office of the Secretary, Sixteenth Floor,
One White Flint North, 11555 Rockville
Pike, Rockville, Maryland, 20852,
Attention: Rulemaking and
Adjudications Staff; (3) E-mail
addressed to the Office of the Secretary,
U.S. Nuclear Regulatory Commission,
hearingdocket@nrc.gov; or (4) facsimile
transmission addressed to the Office of
the Secretary, U.S. Nuclear Regulatory
Commission, Washington, DC,
Attention: Rulemakings and
Adjudications Staff at (301) 415–1101,
verification number is (301) 415–1966.
A copy of the request for hearing and
petition for leave to intervene should
also be sent to the Office of the General
Counsel, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, and it is requested that copies be
transmitted either by means of facsimile
transmission to 301–415–3725 or by
e-mail to OGCMailCenter@nrc.gov. A
copy of the request for hearing and
petition for leave to intervene should
also be sent to Ms. Lisa F. Vaughn, Legal
Department (PBOSE), 422 South Church
Street, Charlotte, NC 28201–1006,
attorney for the licensee.
If a request for a hearing is received,
the Commission’s staff may issue the
amendment after it completes its
technical review and prior to the
completion of any required hearing if it
publishes a further notice for public
comment of its proposed finding of no
significant hazards consideration in
accordance with 10 CFR 50.91 and
50.92.
For further details with respect to this
action, see the application for
amendment dated December 19, 2005,
as supplemented February 2, 2006,
which are available for public
inspection at the Commission’s PDR,
located at One White Flint North, Public
File Area O1 F21, 11555 Rockville Pike
(first floor), Rockville, Maryland.
Publicly available records will be
accessible electronically from the
ADAMS Public Electronic Reading
Room on the Internet at the NRC Web
site, https://www.nrc.gov/reading-rm/
adams.html. Persons who do not have
PO 00000
Frm 00090
Fmt 4703
Sfmt 4703
access to ADAMS or who encounter
problems in accessing the documents
located in ADAMS, should contact the
NRC PDR Reference staff by telephone
at 1–800–397–4209, 301–415–4737, or
by e-mail to pdr@nrc.gov.
Dated at Rockville, Maryland, this 13th day
of February 2006.
For the Nuclear Regulatory Commission.
John Stang,
Senior Project Manager, Plant Licensing
Branch II–1, Division of Operating Reactor
Licensing, Office of Nuclear Reactor
Regulation.
[FR Doc. 06–1556 Filed 2–21–06; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 50–250 and 50–251]
Florida Power and Light Company,
Turkey Point, Units 3 and 4; Notice of
Consideration of Approval of
Application Regarding Proposed
Merger and Opportunity for a Hearing
The U.S. Nuclear Regulatory
Commission (the Commission) is
considering the issuance of an order
under Title 10 of the Code of Federal
Regulations (10 CFR), Section 50.80
approving the indirect transfer of the
Renewed Facility Operating Licenses,
which are numbered DPR–31 and DPR–
41, for the Turkey Point Nuclear Plant,
Units 3 and 4, currently held by Florida
Power and Light Company (FPL), as
owner and licensed operator of the
Turkey Point Nuclear Plant.
According to an application for
approval filed by FPL, FPL Group, Inc.,
the parent organization of FPL, will
merge with a newly created subsidiary
of Constellation Energy Group, Inc., and
become a wholly owned subsidiary of
Constellation Energy. FPL will continue
to own and operate the Turkey Point
facilities and hold the licenses.
No physical changes to the Turkey
Point facilities or operational changes
are being proposed in the application.
Pursuant to 10 CFR 50.80, no license,
or any right thereunder, shall be
transferred, directly or indirectly,
through transfer of control of the
license, unless the Commission shall
give its consent in writing. The
Commission will approve the
application for the indirect transfer of
the licenses, if the Commission
determines that the proposed merger
will not affect the qualifications of the
licensee to hold the licenses, and that
the transfer is otherwise consistent with
applicable provisions of law,
regulations, and orders issued by the
Commission pursuant thereto.
E:\FR\FM\22FEN1.SGM
22FEN1
Agencies
[Federal Register Volume 71, Number 35 (Wednesday, February 22, 2006)]
[Notices]
[Pages 9169-9170]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 06-1556]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-414]
Duke Energy Corporation, North Carolina Power Agency No. 1,
Piedmont Municipal Power Agency, Notice of Consideration of Issuance of
Amendment to Facility Operating License and Opportunity for a Hearing
The U.S. Nuclear Regulatory Commission (the Commission) is
considering issuance of an amendment to Renewed Facility Operating
License No. NPF-52, issued to Duke Energy Corporation (the licensee),
for operation of the Catawba Nuclear Station, Unit 2 located in York
County, South Carolina.
The proposed amendment would revise the Technical Specifications
and Operating License on a one-time basis, to modify the steam
generator tube repair criteria and add more restrictive steam generator
primary to secondary leakage limits for end of cycle 14 and operating
cycle 15.
Before issuance of the proposed license amendment, the Commission
will have made findings required by the Atomic Energy Act of 1954, as
amended (the Act), and the Commission's regulations.
Within 60 days after the date of publication of this notice, the
licensee may file a request for a hearing with respect to issuance of
the amendment to the subject facility operating license and any person
whose interest may be affected by this proceeding and who wishes to
participate as a party in the proceeding must file a written request
for a hearing and a petition for leave to intervene. Requests for a
hearing and a petition for leave to intervene shall be filed in
accordance with the Commission's ``Rules of Practice for Domestic
Licensing Proceedings'' in 10 CFR part 2. Interested persons should
consult a current copy of 10 CFR 2.309, which is available at the
Commission's public document room (PDR), located at One White Flint
North, Public File Area 01F21, 11555 Rockville Pike (first floor),
Rockville, Maryland. Publicly available records will be accessible from
the Agencywide Documents Access and Management System's (ADAMS) Public
Electronic Reading Room on the Internet at the NRC Web site, https://
www.nrc.gov/reading-rm/doc-collections/cfr/. If a request for a hearing
or petition for leave to intervene is filed by the above date, the
Commission or a presiding officer designated by the Commission or by
the Chief Administrative Judge of the Atomic Safety and Licensing Board
Panel, will rule on the request and/or petition; and
[[Page 9170]]
the Secretary or the Chief Administrative Judge of the Atomic Safety
and Licensing Board will issue a notice of a hearing or an appropriate
order.
As required by 10 CFR 2.309, a petition for leave to intervene
shall set forth with particularity the interest of the petitioner/
requestor in the proceeding, and how that interest may be affected by
the results of the proceeding. The petition should specifically explain
the reasons why intervention should be permitted with particular
reference to the following general requirements: (1) The name, address
and telephone number of the requestor or petitioner; (2) the nature of
the requestor's/petitioner's right under the Act to be made a party to
the proceeding; (3) the nature and extent of the requestor's/
petitioner's property, financial, or other interest in the proceeding;
and (4) the possible effect of any decision or order which may be
entered in the proceeding on the requestor's/petitioner's interest. The
petition must also identify the specific contentions which the
petitioner/requestor seeks to have litigated at the proceeding.
Each contention must consist of a specific statement of the issue
of law or fact to be raised or controverted. In addition, the
petitioner/requestor shall provide a brief explanation of the bases for
the contention and a concise statement of the alleged facts or expert
opinion which support the contention and on which the petitioner
intends to rely in proving the contention at the hearing. The
petitioner must also provide references to those specific sources and
documents of which the petitioner is aware and on which the petitioner
intends to rely to establish those facts or expert opinion. The
petition must include sufficient information to show that a genuine
dispute exists with the applicant on a material issue of law or fact.
Contentions shall be limited to matters within the scope of the
amendment under consideration. The contention must be one which, if
proven, would entitle the petitioner/requestor to relief. A petitioner/
requestor who fails to satisfy these requirements with respect to at
least one contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to participate fully in the conduct of the
hearing.
Nontimely requests and/or petitions and contentions will not be
entertained absent a determination by the Commission or the presiding
officer of the Atomic Safety and Licensing Board that the petition,
request and/or the contentions should be granted based on a balancing
of the factors specified in 10 CFR 2.309(a)(1)(i) through (viii).
A request for a hearing or a petition for leave to intervene must
be filed by: (1) First class mail addressed to the Office of the
Secretary of the Commission, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, Attention: Rulemaking and Adjudications
Staff; (2) courier, express mail, and expedited delivery services:
Office of the Secretary, Sixteenth Floor, One White Flint North, 11555
Rockville Pike, Rockville, Maryland, 20852, Attention: Rulemaking and
Adjudications Staff; (3) E-mail addressed to the Office of the
Secretary, U.S. Nuclear Regulatory Commission, hearingdocket@nrc.gov;
or (4) facsimile transmission addressed to the Office of the Secretary,
U.S. Nuclear Regulatory Commission, Washington, DC, Attention:
Rulemakings and Adjudications Staff at (301) 415-1101, verification
number is (301) 415-1966. A copy of the request for hearing and
petition for leave to intervene should also be sent to the Office of
the General Counsel, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001, and it is requested that copies be transmitted either by
means of facsimile transmission to 301-415-3725 or by e-mail to
OGCMailCenter@nrc.gov. A copy of the request for hearing and petition
for leave to intervene should also be sent to Ms. Lisa F. Vaughn, Legal
Department (PBOSE), 422 South Church Street, Charlotte, NC 28201-1006,
attorney for the licensee.
If a request for a hearing is received, the Commission's staff may
issue the amendment after it completes its technical review and prior
to the completion of any required hearing if it publishes a further
notice for public comment of its proposed finding of no significant
hazards consideration in accordance with 10 CFR 50.91 and 50.92.
For further details with respect to this action, see the
application for amendment dated December 19, 2005, as supplemented
February 2, 2006, which are available for public inspection at the
Commission's PDR, located at One White Flint North, Public File Area O1
F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly
available records will be accessible electronically from the ADAMS
Public Electronic Reading Room on the Internet at the NRC Web site,
https://www.nrc.gov/reading-rm/adams.html. Persons who do not have
access to ADAMS or who encounter problems in accessing the documents
located in ADAMS, should contact the NRC PDR Reference staff by
telephone at 1-800-397-4209, 301-415-4737, or by e-mail to pdr@nrc.gov.
Dated at Rockville, Maryland, this 13th day of February 2006.
For the Nuclear Regulatory Commission.
John Stang,
Senior Project Manager, Plant Licensing Branch II-1, Division of
Operating Reactor Licensing, Office of Nuclear Reactor Regulation.
[FR Doc. 06-1556 Filed 2-21-06; 8:45 am]