FPL Energy Duane Arnold, LLC, Duane Arnold Energy Center; Notice of Consideration of Approval of Application Regarding Proposed Merger and Opportunity for a Hearing, 9172-9173 [06-1555]
Download as PDF
cprice-sewell on PROD1PC66 with NOTICES
9172
Federal Register / Vol. 71, No. 35 / Wednesday, February 22, 2006 / Notices
consider, in reviewing untimely
requests or petitions, set forth in 10 CFR
2.309(c)(1)(i) through (viii).
Requests for a hearing and petitions
for leave to intervene should be served
upon M. S. Ross, Managing Attorney,
Florida Power & Light Company, P.O.
Box 14000, Juno Beach, FL 33408–0420
(telephone: 561–691–7126, fax: 561–
694–6274, e-mail: mitch_ross@fpl.com);
the General Counsel, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001 (e-mail address for
filings regarding license transfer cases
only: OGCLT@NRC.gov); and the
Secretary of the Commission, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemakings and Adjudications Staff, in
accordance with 10 CFR 2.302 and
2.305.
The Commission will issue a notice or
order granting or denying a hearing
request or intervention petition,
designating the issues for any hearing
that will be held and designating the
Presiding Officer. A notice granting a
hearing will be published in the Federal
Register and served on the parties to the
hearing.
As an alternative to requests for
hearing and petitions to intervene,
within 30 days from the date of
publication of this notice, persons may
submit written comments regarding the
license transfer application, as provided
for in 10 CFR 2.1305. The Commission
will consider and, if appropriate,
respond to these comments, but such
comments will not otherwise constitute
part of the decisional record. Comments
should be submitted to the Secretary,
U.S. Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemakings and Adjudications Staff,
and should cite the publication date and
page number of this Federal Register
notice.
For further details with respect to this
action, see the application dated January
20, 2006, available for public inspection
at the Commission’s Public Document
Room (PDR), located at One White Flint
North, Public File Area O1 F21, 11555
Rockville Pike (first floor), Rockville,
Maryland. Publicly available records
will be accessible electronically from
the Agency wide Documents Access and
Management System’s (ADAMS) Public
Electronic Reading Room on the Internet
at the NRC Web site, https://
www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to
ADAMS or who encounter problems in
accessing the documents located in
ADAMS, should contact the NRC PDR
Reference staff by telephone at 1–800–
397–4209, 301–415–4737 or by e-mail to
pdr@nrc.gov.
VerDate Aug<31>2005
14:35 Feb 21, 2006
Jkt 208001
Dated at Rockville, Maryland, this 13th day
of February 2006.
For the Nuclear Regulatory Commission.
Brendan T. Moroney,
Project Manager, Plant Licensing Branch II–
2, Division of Operating Reactor Licensing,
Office of Nuclear Reactor Regulation.
[FR Doc. 06–1560 Filed 2–21–06; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. 50–331]
FPL Energy Duane Arnold, LLC, Duane
Arnold Energy Center; Notice of
Consideration of Approval of
Application Regarding Proposed
Merger and Opportunity for a Hearing
The U.S. Nuclear Regulatory
Commission (the Commission) is
considering the issuance of an order
under Title 10 of the Code of Federal
Regulations, Section 50.80 approving
the indirect transfer of Facility
Operating License DPR–49 for the
Duane Arnold Energy Center, to the
extent currently held by FPL Energy
Duane Arnold LLC, as a co-owner and
licensed operator of Duane Arnold
Energy Center.
According to an application for
approval filed by FPL Energy Duane
Arnold LLC, FPL Group, Inc., the parent
organization of FPL Energy Duane
Arnold LLC, will merge with a newly
created subsidiary of Constellation
Energy Group, Inc. and become a wholly
owned subsidiary of Constellation
Energy. FPL Energy Duane Arnold LLC
will continue to own its 70 percent
ownership interest in and operate the
Duane Arnold Energy Center, and hold
the license, to the same extent now
held. The other co-owners of the
facility, Central Iowa Power Cooperative
and Corn Belt Power Cooperative, are
not involved in the proposed
transaction.
No physical changes to the Duane
Arnold Energy Center facility or
operational changes are being proposed
in the application.
Pursuant to 10 CFR 50.80, no license,
or any right thereunder, shall be
transferred, directly or indirectly,
through transfer of control of the
license, unless the Commission shall
give its consent in writing. The
Commission will approve the
application for the indirect transfer of
the license, if the Commission
determines that the proposed merger
will not affect the qualifications of the
licensee to hold the license, and that the
transfer is otherwise consistent with
applicable provisions of law,
PO 00000
Frm 00092
Fmt 4703
Sfmt 4703
regulations, and orders issued by the
Commission pursuant thereto.
The filing of requests for hearing and
petitions for leave to intervene, and
written comments with regard to the
license transfer application, are
discussed below.
Within 20 days from the date of
publication of this notice, any person
whose interest may be affected by the
Commission’s action on the application
may request a hearing and, if not the
applicant, may petition for leave to
intervene in a hearing proceeding on the
Commission’s action. Requests for a
hearing and petitions for leave to
intervene should be filed in accordance
with the Commission’s rules of practice
set forth in Subpart C ‘‘Rules of General
Applicability: Hearing Requests,
Petitions to Intervene, Availability of
Documents, Selection of Specific
Hearing Procedures, Presiding Officer
Powers, and General Hearing
Management for NRC Adjudicatory
Hearings,’’ of 10 CFR part 2. In
particular, such requests and petitions
must comply with the requirements set
forth in 10 CFR 2.309. Untimely
requests and petitions may be denied, as
provided in 10 CFR 2.309(c)(1), unless
good cause for failure to file on time is
established. In addition, an untimely
request or petition should address the
factors that the Commission will also
consider, in reviewing untimely
requests or petitions, set forth in 10 CFR
2.309(c)(1)(i) through (viii).
Requests for a hearing and petitions
for leave to intervene should be served
upon M.S. Ross, Managing Attorney,
Florida Power & Light Company, P.O.
Box 14000, Juno Beach, FL 33408–0420
(telephone: 561–691–7126, fax: 561–
694–6274, e-mail: mitch_ross@fpl.com);
the General Counsel, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001 (e-mail address for
filings regarding license transfer cases
only: OGCLT@NRC.gov); and the
Secretary of the Commission, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemakings and Adjudications Staff, in
accordance with 10 CFR 2.302 and
2.305.
The Commission will issue a notice or
order granting or denying a hearing
request or intervention petition,
designating the issues for any hearing
that will be held and designating the
Presiding Officer. A notice granting a
hearing will be published in the Federal
Register and served on the parties to the
hearing.
As an alternative to requests for
hearing and petitions to intervene,
within 30 days from the date of
publication of this notice, persons may
E:\FR\FM\22FEN1.SGM
22FEN1
Federal Register / Vol. 71, No. 35 / Wednesday, February 22, 2006 / Notices
submit written comments regarding the
license transfer application, as provided
for in 10 CFR 2.1305. The Commission
will consider and, if appropriate,
respond to these comments, but such
comments will not otherwise constitute
part of the decisional record. Comments
should be submitted to the Secretary,
U.S. Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemakings and Adjudications Staff,
and should cite the publication date and
page number of this Federal Register
notice.
For further details with respect to this
action, see the application dated January
20, 2006, available for public inspection
at the Commission’s Public Document
Room (PDR), located at One White Flint
North, Public File Area O1 F21, 11555
Rockville Pike (first floor), Rockville,
Maryland. Publicly available records
will be accessible electronically from
the Agency wide Documents Access and
Management System’s (ADAMS) Public
Electronic Reading Room on the Internet
at the NRC Web site, https://
www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to
ADAMS or who encounter problems in
accessing the documents located in
ADAMS, should contact the NRC PDR
Reference staff by telephone at 1–800–
397–4209, 301–415–4737 or by e-mail to
pdr@nrc.gov.
Dated at Rockville, Maryland, this 13th day
of February 2006.
For the Nuclear Regulatory Commission.
Deirdre W. Spaulding,
Project Manager, Plant Licensing Branch III–
1, Division of Operating Reactor Licensing,
Office of Nuclear Reactor Regulation.
[FR Doc. 06–1555 Filed 2–21–06; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. 50–443]
cprice-sewell on PROD1PC66 with NOTICES
FPL Energy Seabrook, LLC, Seabrook
Station, Unit No. 1; Notice of
Consideration of Approval of
Application Regarding Proposed
Merger and Opportunity for a Hearing
The Nuclear Regulatory Commission
(NRC or the Commission) is considering
the issuance of an order under Title 10
of the Code of Federal Regulations (10
CFR) Section 50.80 approving the
indirect transfer of Facility Operating
License No. NPF–86 for the Seabrook
Station, Unit No. 1 (Seabrook), to the
extent currently held by FPL Energy
Seabrook, LLC (FPLE) as a co-owner and
licensed operator of Seabrook.
VerDate Aug<31>2005
14:35 Feb 21, 2006
Jkt 208001
According to an application for
approval filed by FPLE, FPL Group, Inc.,
the parent organization of FPLE, will
merge with a newly created subsidiary
of Constellation Energy Group, Inc. and
become a wholly owned subsidiary of
Constellation Energy Group, Inc. FPLE
will continue to own its 88.23 percent
ownership interest in Seabrook, operate
Seabrook, and hold the license to the
same extent now held. The other coowners of Seabrook, Hudson Light &
Power Department, Massachusetts
Municipal Wholesale Electric Company,
and Taunton Municipal Light Plant, are
not involved in the proposed
transaction.
No physical changes to the Seabrook
facility or operational changes are being
proposed in the application.
Pursuant to 10 CFR 50.80, no license,
or any right thereunder, shall be
transferred, directly or indirectly,
through transfer of control of the
license, unless the Commission shall
give its consent in writing. The
Commission will approve the
application for the indirect transfer of
the license if the Commission
determines that the proposed merger
will not affect the qualifications of the
licensee to hold the license, and that the
transfer is otherwise consistent with
applicable provisions of law,
regulations, and orders issued by the
Commission pursuant thereto.
The filing of requests for hearing and
petitions for leave to intervene, and
written comments with regard to the
license transfer application, are
discussed below.
Within 20 days from the date of
publication of this notice, any person
whose interest may be affected by the
Commission’s action on the application
may request a hearing and, if not the
applicant, may petition for leave to
intervene in a hearing proceeding on the
Commission’s action. Requests for a
hearing and petitions for leave to
intervene should be filed in accordance
with the Commission’s rules of practice
set forth in Subpart C ‘‘Rules of General
Applicability: Hearing Requests,
Petitions to Intervene, Availability of
Documents, Selection of Specific
Hearing Procedures, Presiding Officer
Powers, and General Hearing
Management for NRC Adjudicatory
Hearings,’’ of 10 CFR part 2. In
particular, such requests and petitions
must comply with the requirements set
forth in 10 CFR 2.309. Untimely
requests and petitions may be denied, as
provided in 10 CFR 2.309(c)(1), unless
good cause for failure to file on time is
established. In addition, an untimely
request or petition should address the
factors that the Commission will also
PO 00000
Frm 00093
Fmt 4703
Sfmt 4703
9173
consider, in reviewing untimely
requests or petitions, set forth in 10 CFR
2.309(c)(1)(i) through (viii).
In accordance with 10 CFR Sections
2.302 and 2.305, requests for a hearing
and petitions for leave to intervene
should be served upon M. S. Ross,
Managing Attorney, Florida Power &
Light Company, P.O. Box 14000, Juno
Beach, FL 33408–0420 (telephone: 561–
691–7126, fax: 561–694–6274, e-mail:
mitch_ross@fpl.com); the General
Counsel, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001 (e-mail address for filings
regarding license transfer cases only:
OGCLT@NRC.gov); and the Secretary of
the Commission, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001, Attention: Rulemakings
and Adjudications Staff.
The Commission will issue a notice or
order granting or denying a hearing
request or intervention petition,
designating the issues for any hearing
that will be held and designating the
Presiding Officer. A notice granting a
hearing will be published in the Federal
Register and served on the parties to the
hearing.
As an alternative to requests for
hearing and petitions to intervene,
within 30 days from the date of
publication of this notice, persons may
submit written comments regarding the
license transfer application, as provided
for in 10 CFR 2.1305. The Commission
will consider and, if appropriate,
respond to these comments, but such
comments will not otherwise constitute
part of the decisional record. Comments
should be submitted to the Secretary,
U.S. Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemakings and Adjudications Staff,
and should cite the publication date and
page number of this Federal Register
notice.
For further details with respect to this
action, see the application dated January
20, 2006, available for public inspection
at the Commission’s Public Document
Room (PDR), located at One White Flint
North, Public File Area O1 F21, 11555
Rockville Pike (first floor), Rockville,
Maryland. Publicly available records
will be accessible electronically from
the Agencywide Documents Access and
Management System (ADAMS) Public
Electronic Reading Room on the Internet
at the NRC Web site, https://
www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to
ADAMS or who encounter problems in
accessing the documents located in
ADAMS, should contact the NRC PDR
reference staff by telephone at 1–800–
397–4209, 301–415–4737 or by e-mail to
pdr@nrc.gov.
E:\FR\FM\22FEN1.SGM
22FEN1
Agencies
[Federal Register Volume 71, Number 35 (Wednesday, February 22, 2006)]
[Notices]
[Pages 9172-9173]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 06-1555]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-331]
FPL Energy Duane Arnold, LLC, Duane Arnold Energy Center; Notice
of Consideration of Approval of Application Regarding Proposed Merger
and Opportunity for a Hearing
The U.S. Nuclear Regulatory Commission (the Commission) is
considering the issuance of an order under Title 10 of the Code of
Federal Regulations, Section 50.80 approving the indirect transfer of
Facility Operating License DPR-49 for the Duane Arnold Energy Center,
to the extent currently held by FPL Energy Duane Arnold LLC, as a co-
owner and licensed operator of Duane Arnold Energy Center.
According to an application for approval filed by FPL Energy Duane
Arnold LLC, FPL Group, Inc., the parent organization of FPL Energy
Duane Arnold LLC, will merge with a newly created subsidiary of
Constellation Energy Group, Inc. and become a wholly owned subsidiary
of Constellation Energy. FPL Energy Duane Arnold LLC will continue to
own its 70 percent ownership interest in and operate the Duane Arnold
Energy Center, and hold the license, to the same extent now held. The
other co-owners of the facility, Central Iowa Power Cooperative and
Corn Belt Power Cooperative, are not involved in the proposed
transaction.
No physical changes to the Duane Arnold Energy Center facility or
operational changes are being proposed in the application.
Pursuant to 10 CFR 50.80, no license, or any right thereunder,
shall be transferred, directly or indirectly, through transfer of
control of the license, unless the Commission shall give its consent in
writing. The Commission will approve the application for the indirect
transfer of the license, if the Commission determines that the proposed
merger will not affect the qualifications of the licensee to hold the
license, and that the transfer is otherwise consistent with applicable
provisions of law, regulations, and orders issued by the Commission
pursuant thereto.
The filing of requests for hearing and petitions for leave to
intervene, and written comments with regard to the license transfer
application, are discussed below.
Within 20 days from the date of publication of this notice, any
person whose interest may be affected by the Commission's action on the
application may request a hearing and, if not the applicant, may
petition for leave to intervene in a hearing proceeding on the
Commission's action. Requests for a hearing and petitions for leave to
intervene should be filed in accordance with the Commission's rules of
practice set forth in Subpart C ``Rules of General Applicability:
Hearing Requests, Petitions to Intervene, Availability of Documents,
Selection of Specific Hearing Procedures, Presiding Officer Powers, and
General Hearing Management for NRC Adjudicatory Hearings,'' of 10 CFR
part 2. In particular, such requests and petitions must comply with the
requirements set forth in 10 CFR 2.309. Untimely requests and petitions
may be denied, as provided in 10 CFR 2.309(c)(1), unless good cause for
failure to file on time is established. In addition, an untimely
request or petition should address the factors that the Commission will
also consider, in reviewing untimely requests or petitions, set forth
in 10 CFR 2.309(c)(1)(i) through (viii).
Requests for a hearing and petitions for leave to intervene should
be served upon M.S. Ross, Managing Attorney, Florida Power & Light
Company, P.O. Box 14000, Juno Beach, FL 33408-0420 (telephone: 561-691-
7126, fax: 561-694-6274, e-mail: mitch_ross@fpl.com); the General
Counsel, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001
(e-mail address for filings regarding license transfer cases only:
OGCLT@NRC.gov); and the Secretary of the Commission, U.S. Nuclear
Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemakings and Adjudications Staff, in accordance with 10 CFR 2.302
and 2.305.
The Commission will issue a notice or order granting or denying a
hearing request or intervention petition, designating the issues for
any hearing that will be held and designating the Presiding Officer. A
notice granting a hearing will be published in the Federal Register and
served on the parties to the hearing.
As an alternative to requests for hearing and petitions to
intervene, within 30 days from the date of publication of this notice,
persons may
[[Page 9173]]
submit written comments regarding the license transfer application, as
provided for in 10 CFR 2.1305. The Commission will consider and, if
appropriate, respond to these comments, but such comments will not
otherwise constitute part of the decisional record. Comments should be
submitted to the Secretary, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, Attention: Rulemakings and Adjudications
Staff, and should cite the publication date and page number of this
Federal Register notice.
For further details with respect to this action, see the
application dated January 20, 2006, available for public inspection at
the Commission's Public Document Room (PDR), located at One White Flint
North, Public File Area O1 F21, 11555 Rockville Pike (first floor),
Rockville, Maryland. Publicly available records will be accessible
electronically from the Agency wide Documents Access and Management
System's (ADAMS) Public Electronic Reading Room on the Internet at the
NRC Web site, https://www.nrc.gov/reading-rm/adams.html. Persons who do
not have access to ADAMS or who encounter problems in accessing the
documents located in ADAMS, should contact the NRC PDR Reference staff
by telephone at 1-800-397-4209, 301-415-4737 or by e-mail to
pdr@nrc.gov.
Dated at Rockville, Maryland, this 13th day of February 2006.
For the Nuclear Regulatory Commission.
Deirdre W. Spaulding,
Project Manager, Plant Licensing Branch III-1, Division of Operating
Reactor Licensing, Office of Nuclear Reactor Regulation.
[FR Doc. 06-1555 Filed 2-21-06; 8:45 am]
BILLING CODE 7590-01-P