Download as PDF dsatterwhite on PROD1PC65 with NOTICES Federal Register / Vol. 71, No. 32 / Thursday, February 16, 2006 / Notices The Executive Committee will meet in closed session on March 2, 2006, from 5:15 p.m. to 6:15 p.m. From 5:15 p.m. to 5:45 p.m., the Committee will receive independent government cost estimates from the Associate Commissioner, National Center for Education Statistics, for options affecting current and planned operations under current contracts due to the one percent reduction in the NAEP budget in FY 2006. From 5:45 p.m. to 6:15 p.m. the Associate Commissioner will present additional independent cost estimates for newly proposed activities under current contracts including item development for the science assessment, bridge studies, and validity research. The discussion of independent government cost estimates prior to decision making on which projects to approve is necessary so that NAEP contracts meet congressionally mandated goals and adhere to Board policies on NAEP assessments. This part of the meeting must be conducted in closed session because public disclosure of this information would likely have an adverse financial effect on the NAEP program and will provide an advantage to potential bidders attending the meeting. The discussion of this information would be likely to significantly impede implementation of a proposed agency action if conducted in open session. Such matters are protected by exemption 9(B) of section 552b(c) of Title 5 U.S.C. On March 3, the full Board will meet in open session from 8:30 a.m. to 4:15 p.m. From 8:30 a.m. to 9:45 a.m. the Board will approve the agenda, introduce and administer the oath of office to a new Board member, receive the Executive Director’s report, and hear an update on the work of the National Center for Education Statistics (NCES). From 10 a.m. to 12:30 p.m. on March 3, the Board’s standing committees—the Assessment Development Committee; the Committee on Standards, Design, and Methodology; and the Reporting and Dissemination Committee—will meet in open session. From 12:30 p.m. to 1:45 p.m., the full Board will discuss inclusion and accommodations in NAEP, followed by discussion and action on the NAEP 2009 Science Specifications from 1:45 p.m. to 3 p.m. On March 3, from 3:15 p.m. to 4:15 p.m. the Board will hear a presentation on revisions to the NAEP 12th Grade Mathematics Objectives upon which the March 3 session of the Board meeting will conclude. On March 4, 2006 the Nomination Committee will meet in closed session from 7:45 a.m. to 8:45 a.m. to discuss VerDate Aug<31>2005 17:48 Feb 15, 2006 Jkt 208001 nominations for Board vacancies. This discussion pertains solely to internal personnel rules and practices of an agency and will disclose information of a personal nature where disclosure would constitute an unwarranted invasion of personal privacy. As such, the discussions are protected by exemptions 2 and 6 of section 552b(c) of Title 5 U.S.C. The full Board will convene in open session from 9 a.m. to 12 p.m. At 9 a.m., the Board will receive a briefing on the National Assessment of Adult Literacy with a discussion on lessons for NAEP. Board actions on policies and Committee reports are scheduled to take place between 10:15 a.m. and 12 p.m., upon which the March 4, 2006 session of the Board meeting will adjourn. Detailed minutes of the meeting, including summaries of the activities of the closed sessions and related matters that are informative to the public and consistent with the policy of section 5 U.S.C. 552b(c) will be available to the public within 14 days of the meeting. Records are kept of all Board proceedings and are available for public inspection at the U.S. Department of Education, National Assessment Governing Board, Suite #825, 800 North Capitol Street, NW., Washington, DC, from 9 a.m. to 5 p.m. eastern standard time. Dated: February 13, 2006. Charles E. Smith, Executive Director, National Assessment Governing Board. [FR Doc. 06–1445 Filed 2–15–06; 8:45 am] BILLING CODE 4000–01–M DEPARTMENT OF ENERGY Advance Notice of Intent To Prepare an Environmental Impact Statement for Implementation of the FutureGen Project Department of Energy. Advance Notice of Intent to Prepare an Environmental Impact Statement. AGENCY: ACTION: SUMMARY: The U.S. Department of Energy (DOE) is announcing in advance its intent to prepare an Environmental Impact Statement (EIS), pursuant to the National Environmental Policy Act of 1969 (NEPA) (42 U.S.C. 4321 et seq.), for the proposed action of providing Federal funding (up to $700 million) for the FutureGen Project. FutureGen would comprise the planning, design, construction and operation by a privatesector organization of a coal-fired electric power and hydrogen gas (H2) production plant integrated with carbon PO 00000 Frm 00013 Fmt 4703 Sfmt 4703 8283 dioxide (CO2) capture and geologic sequestration of the captured gas. DOE has prepared this Advance Notice of Intent (ANOI) in accordance with DOE’s NEPA regulations [(10 CFR 1021.311(b)] to inform interested parties of a pending EIS and to invite early public comments on the proposed action, including: (1) The proposed plans for implementing the FutureGen Project, (2) the potential range of environmental issues and alternatives to be analyzed, and (3) the nature of the impact analyses to be considered in the EIS. DOE will later issue a Notice of Intent (NOI) and initiate a public scoping process during which DOE will conduct public meetings and invite the public to comment on the scope, proposed action, and alternatives to be considered in the EIS. Following President George W. Bush’s announcement that the United States would sponsor a $1 billion, 10-year FutureGen initiative to build the world’s first coal-based, near-zero emissions power plant that produces both electricity and H2, the DOE signed, on December 2, 2005, a Cooperative Agreement (DE–FC26–06NT42073) that provides financial assistance to the FutureGen Industrial Alliance, Inc. (Alliance), which will undertake the planning, design, construction and operation of the project facilities. The FutureGen initiative would establish the technical and economic feasibility of coproducing electricity and H2 from coal while capturing and sequestering the CO2 generated in the process. The Alliance is a consortium led by the coal-fueled electric power industry and the coal production industry. Members of the Alliance collectively own and produce over 40 percent of the Nation’s coal and about 20 percent of its coal-fueled electricity. The Alliance would plan, design, construct and operate the FutureGen power plant and the sequestration facility. The Alliance would also monitor, measure, and verify geologic sequestration of CO2. DOE will provide technical and programmatic guidance to the Alliance, retain certain review and approval rights as defined in the Cooperative Agreement, and oversee Alliance activities for compliance with the terms of the Cooperative Agreement. DOE will be responsible for NEPA compliance activities. Both DOE and the Alliance would consider ways for state and local agencies, local communities, the environmental community, international stakeholders, and research organizations to participate in the Project, including involvement in testing, monitoring and verification protocols for CO2 sequestration. E:\FR\FM\16FEN1.SGM 16FEN1 8284 Federal Register / Vol. 71, No. 32 / Thursday, February 16, 2006 / Notices DOE invites Federal agencies, Native American Tribes, state and local governments, other organizations and members of the public to provide early assistance in environmental planning for the FutureGen Project and to identify significant environmental issues and alternatives to be analyzed in the forthcoming FutureGen Project EIS. DOE will consider public comments and other relevant information relating to environmental planning for the FutureGen Project. Comments in response to this ANOI are requested by March 20, 2006. DOE anticipates issuing a NOI to prepare an EIS for the FutureGen Project after DOE makes a preliminary determination regarding the alternative sites to be evaluated. After the NOI is issued, DOE will conduct public scoping meetings to assist in defining the scope of the EIS, including alternative sites and issues to be addressed. The dates and locations of the scoping meetings will be announced in the NOI or subsequent Federal Register notices and in local media before the meetings. ADDRESSES: Written comments or suggestions on the scope of the EIS should be submitted to Mark L. McKoy, NEPA Document Manager for the FutureGen Project, U.S. Department of Energy, National Energy Technology Laboratory P.O. Box 880, Morgantown, West Virginia, 26507–0880. Comments also may be submitted by telephone: 304–285–4426, fax: 304–285–4403, electronic mail: mmckoy@netl.doe.gov, or toll-free telephone number: 800–432– 8330 (ext. 4426). FOR FURTHER INFORMATION, CONTACT: For information on the FutureGen Project or to receive a copy of the Draft EIS for review when it is issued, contact Mark L. McKoy as described in ADDRESSES above. For general information on the DOE NEPA process, contact: Ms. Carol M. Borgstrom, Director, Office of NEPA Policy and Compliance (EH–42), U.S. Department of Energy, 1000 Independence Avenue, SW., Washington, DC 20585–0119, telephone: 202–586–4600, fax: 202–586–7031, or leave a toll-free message at 800–472– 2756. Additional NEPA information is available at the DOE NEPA Web site: https://www.eh.doe.gov/nepa/. Additional information on the FutureGen Project can be found at the following Web site: https:// www.fossil.energy.gov/programs/ powersystems/futuregen. Information from the Alliance, including the draft Request for Proposals discussed below, can be found at https:// www.FutureGenAlliance.org. Comments on the draft Request for Proposals are to dsatterwhite on PROD1PC65 with NOTICES DATES: VerDate Aug<31>2005 15:56 Feb 15, 2006 Jkt 208001 be sent to the Alliance in accordance with the instructions provided by the Alliance. While comments related to the NEPA process are due to DOE by March 20, 2006, comments on the draft Request for Proposals are due to the Alliance by February 28, 2006. SUPPLEMENTARY INFORMATION: Background President Bush announced during 2003 that the United States has committed to proceed with a $1 billion, 10-year project to build the world’s first coal-fueled plant to produce electricity and H2 with near-zero emissions. In response to this announcement, the U.S. Department of Energy unveiled plans for a FutureGen plant that would establish the technical and economic feasibility of producing electricity and H2 from coal— a low-cost and abundant energy resource—while capturing and geologically storing the CO2 generated in the process. The FutureGen Project would showcase cutting-edge technologies that could address environmental concerns associated with the use of coal. DOE plans to implement the FutureGen Project through a cooperative agreement that provides financial assistance to the FutureGen Industrial Alliance, Inc., which is a non-profit corporation that represents a global coalition of coal and energy companies. Members of the Alliance are expected to provide an estimated $250 million to help fund project development. The Alliance members are: American Electric Power; BHP Billiton; the China Huaneng Group; CONSOL Energy Inc.; Foundation Coal; Kennecott Energy, a member of the Rio Tinto Group; Peabody Energy; and Southern Company. The U.S. government and foreign governments would invest about $700 million in the project. The Alliance is a consortium of industrial companies that collectively own and produce over 40 percent of the Nation’s coal and about 20 percent of the Nation’s coal-fueled electricity. The Alliance is: (a) Geographically diverse by including both eastern and western domestic coal producers and coal-fueled electricity generators; and (b) resource diverse by including producers and users of the full range of coal types. Purpose and Need for Agency Action In pursuing its goal of providing safe, affordable and clean energy for the citizens of the United States, DOE has determined that coal, as the Nation’s most abundant fossil fuel resource, must play an important role in the Nation’s efforts to increase its energy independence. DOE has identified a PO 00000 Frm 00014 Fmt 4703 Sfmt 4703 need for a near-zero emissions, coal-toenergy option that would produce electric power and H2 from coal while permanently sequestering CO2 in deep geological formations. The technical, economic, and environmental feasibility of producing electric power and H2 from coal, when coupled with geologic sequestration technology, must be proven. The electricity and transportation sectors are responsible for nearly threefourths of the country’s anthropogenic greenhouse gas emissions. The continued use of coal entails the need to address environmental and greenhouse gas mitigation challenges. A key DOE mission is to ensure that fossil fuels—particularly coal—are available components of the future energy mix. An alternative source of fuel for the transportation sector, such as coalderived H2, could also reduce our dependence on fuel imports. In the absence of proven operations of a large, integrated, near-zero emissions power plant, the contribution of coal to the energy mix could be reduced if environmental regulations continue to tighten. This could cause an imbalance in the diversity of the domestic energy portfolio, which would impact energy security. Accordingly, DOE needs to promote development of such a facility to address the environmental concerns over the use of coal, thus protecting both energy diversity and security. Proposed Action DOE proposes to provide financial assistance (up to $700 million) for the Alliance to plan, design, construct, and operate the FutureGen facility, an advanced integrated coal gasification combined cycle power plant and CO2 sequestration facility sized nominally at 275 MW (equivalent output). The goal of this initiative would be to prove the technical and economic feasibility of a near-zero emissions, coal-to-energy option that could be deployed by 2020. During the first phase of the project, the Alliance and DOE will quantify the specific emissions objectives of the project. The facility would co-produce electric power and H2 in an industrial/ utility setting while capturing and geologically sequestering approximately one to two million metric tons of CO2 per year. As discussed further below, the FutureGen Project would incorporate both cutting-edge research and demonstrations of emerging technologies ready for testing at a large scale to achieve its goal of validating the technical and economic feasibility of an integrated near-zero emissions plant. Establishing the technical feasibility and projected economic viability of a E:\FR\FM\16FEN1.SGM 16FEN1 Federal Register / Vol. 71, No. 32 / Thursday, February 16, 2006 / Notices dsatterwhite on PROD1PC65 with NOTICES near-zero emissions, coal-based system that integrates advanced technologies at a large scale through the FutureGen Project would contribute to DOE’s goals by: • Addressing environmental issues and barriers to fossil fuel use, while maintaining the availability and affordability of fossil-fuel-derived energy; • improving energy efficiency; • developing technologies that foster a diverse supply of reliable, affordable, and environmentally sound energy; • providing scientific and technological information and analysis to assist policymakers and regulators in their decision-making on control of greenhouse gas emissions and use of fossil fuels; and • focusing on public benefits-driven investment in high-risk, high-return technology that private companies alone cannot undertake. The FutureGen facility is intended to be a near-zero emissions facility that would be the cleanest fossil-fuel-based power system in the world. The project would require approximately 10 years for completion, not including postproject monitoring. Performance and economic tests results would be shared among all participants, industry, the environmental community, and the public. DOE intends to invite participation from international organizations to maximize the global applicability and acceptance of FutureGen’s results, helping to support an international consensus on the role of coal and geological sequestration in addressing global greenhouse gas emissions and energy security. Broad engagement of stakeholders early in the FutureGen effort is critical to the successful achievement of understanding and acceptance of geologic sequestration as part of a nearzero emissions, coal-based energy option. FutureGen Project Processes The FutureGen Project would employ advanced coal gasification technology integrated with combined cycle electricity generation, H2 production, CO2 capture and CO2 sequestration in geologic repositories. The gasification process would combine coal, oxygen (O2), and steam to produce a H2-rich ‘‘synthesis gas.’’ After exiting the conversion reactor, the composition of the synthesis gas would be ‘‘shifted’’ to produce additional H2. The product stream would consist mostly of H2, steam, and CO2. Following separation of these three gas components, the H2 would be used to generate electricity in a gas turbine and/or fuel cell. Some of VerDate Aug<31>2005 15:56 Feb 15, 2006 Jkt 208001 the H2 could be used as a feedstock for chemical plants or petroleum refineries or as a transportation fuel. Steam from the process could be condensed, treated, and recycled into the gasifier or added to the plant’s cooling water circuit. CO2 from the process would be sequestered in deep underground geologic formations that would be monitored to verify the permanence of CO2 storage. Overall Project Objectives • Establish technical and economic feasibility of producing electricity and H2 from coal with near-zero emissions (including CO2); • Verify sustained, integrated operation of coal conversion system with geologic sequestration of CO2; • Verify effectiveness, safety, and permanence of geologic sequestration of CO2; • Establish standardized technologies and protocols for CO2 measuring, monitoring, and verification; • Confirm the potential of the FutureGen concept to achieve economic competitiveness with other near-zero emissions approaches through advances in technology by 2020; and • Gain acceptance by the coal and electricity industries, environmental community, international community, and public-at-large for the concept of coal-based systems with near-zero emissions through the successful operation of FutureGen. Power Plant Performance Objectives • Sequester CO2 at an operational rate of approximately one to two million metric tons per year; • Produce electricity and H2 at ratios (may be variable) consistent with market needs (equivalent to plant capacity of 275 MW electricity output); • Sequester at least 90 percent of CO2 initially with the eventual potential for up to 100 percent sequestration; • Locate plant consistent with, inter alia, adequate coal feedstock availability, proximity to market for products (especially electricity) as part of proving potential economic viability, and proximity to geologic formations for sequestration (e.g., deep saline reservoirs, unmineable coal seams, depleted oil and natural gas reservoirs, basalt formations); • Achieve environmental (near-zero emissions) requirements; • Provide a design database for subsequent, near-zero emissions, commercial demonstrations and/or deployments; and • Design capability for full-flow testing of advanced technologies and advanced technology modules, and design incorporation of loosely PO 00000 Frm 00015 Fmt 4703 Sfmt 4703 8285 integrated units that increase flexibility and enhance operability and reliability. CO2 Sequestration Monitoring and Verification Performance Objectives • Accurately quantify storage potential of the geologic formation(s); • Detect and monitor surface and subsurface leakage, if it occurs (capability to measure CO2 slightly above atmospheric concentration of 370 ppm), and demonstrate effectiveness of mitigation; • Provide the scientific basis for carbon accounting and assurance of permanent storage; • Account for co-sequestration of CO2 impurities; and • Develop information necessary to estimate costs of future CO2 management systems. Technology Alternatives The FutureGen Project would incorporate both cutting-edge research and demonstrations of emerging technologies ready for testing at a large scale to achieve its goal of validating the technical and economic feasibility of an integrated near-zero emissions plant. The FutureGen power plant would be designed to provide a capability for fullscale testing of new technologies prior to their commercial demonstration and deployment. The FutureGen facility may integrate some combination of new technologies for gasification, O2 production, H2 production, combustion gas cleanup, H2 turbines, fuel cells and fuel cell/turbine hybrids, CO2 sequestration, advanced materials, instrumentation, sensors and controls, and byproduct utilization. Decisions on incorporation of specific technologies would be made by the Alliance keeping in mind the ability to achieve the overall project goal of proving the technical and economic feasibility of the near-zero emissions concept. Alternatives, Including the Proposed Action Under the proposed action, DOE would implement the FutureGen Project to achieve the President’s goals. The EIS will analyze the reasonable alternatives for implementing the FutureGen Project. Once a list of best qualified sites is delivered by the Alliance to DOE, DOE will consider all of the available alternatives in ascertaining which ones are reasonable. The EIS also may analyze technologies and strategies for implementing important elements of the Project. Under the no-action alternative, DOE would not fund the proposed Project. In the absence of DOE funding, it would be unlikely that the Alliance, or industry in E:\FR\FM\16FEN1.SGM 16FEN1 8286 Federal Register / Vol. 71, No. 32 / Thursday, February 16, 2006 / Notices dsatterwhite on PROD1PC65 with NOTICES general, would soon undertake the utility-scale integration of CO2 capture and geologic sequestration with a coalfired power plant. Absent DOE’s investment in a utility-scale facility, the development of integrated CO2 capture and sequestration with power plant operations could occur more slowly through a series of small steps, and only then in the presence of a regulatory requirement. Given a regulatory requirement for the curtailment of greenhouse gas emissions, the no-action alternative could result in higher costs of electricity due to the use of more expensive, commercially available technology and due to a reduction in plant availability as a result of the lack of integrated test operations data and experience that would have otherwise been available from a FutureGen-type facility. DOE may consider other reasonable alternatives that are suggested during the public scoping period. Preliminary Identification of Environmental Issues DOE intends to address the issues listed below when considering the potential impacts resulting from the siting, construction and operation of the FutureGen power plant. This list is neither intended to be all-inclusive nor a predetermined set of potential impacts. DOE invites comments on these and any other issues that should be considered in the EIS. The environmental issues include: • Air quality impacts: potential for air emissions during construction and operation of the power plant and appurtenant facilities to impact local sensitive receptors, local environmental conditions, and special-use areas, including impacts to smog and haze and impacts from dust and any significant vapor plumes; • Noise and light impacts: potential impacts from construction, transportation of materials, and facility operations; • Traffic issues: potential impacts from the construction and operation of the facilities, including changes in local traffic patterns, deterioration of roads, traffic hazards, and traffic controls; • Floodplains: potential impacts to flood flow resulting from earthen fills, access roads, and dikes that might be needed in a floodplain; • Wetlands: potential impacts resulting from fill, sediment deposition, vegetation clearing and facility erection that might be needed in a wetland; • Visual impacts associated with facility structures: views from neighborhoods, impacts to scenic views (e.g., impacts from water vapor plumes, VerDate Aug<31>2005 15:56 Feb 15, 2006 Jkt 208001 power transmission lines, pipelines), internal and external perception of the community or locality; • Historic and cultural resources: potential impacts from the site selection, design, construction and operation of the facilities; • Water quality impacts: potential impacts from water utilization and consumption, plus potential impacts from wastewater discharges; • Infrastructure and land use impacts: potential environmental and socioeconomic impacts of project site selection, construction, delivery of feed materials, and distribution of products (e.g., power transmission lines, pipelines); • Marketability of products and market access to feed stocks; • Solid wastes: pollution prevention plans and waste management strategies, including the handling of ash, slag, water treatment sludge, and hazardous materials; • Disproportionate impacts on minority and low-income populations; • Connected actions: potential development of support facilities or supporting infrastructure; • Ecological: potential on-site and offsite impacts to vegetation, terrestrial wildlife, aquatic wildlife, threatened or endangered species, and ecologically sensitive habitats; • Geologic impacts: potential impacts from the sequestration of CO2 and other captured gases on underground resources such as potable water supplies, mineral resources, and fossil fuel resources; • Ground surface impacts from CO2 sequestration: potential impacts from leakage of injected CO2, potential impacts from induced flows of native fluids to the ground surface or near the ground surface, and the potential for induced ground heave and/or microseisms; • Fate and stability of sequestered CO2 and other captured gases; • Health and safety issues associated with CO2 capture and sequestration; • Cumulative effects that result from the incremental impacts of the proposed project when added to the other past, present, and reasonably foreseeable future projects; • Compliance with regulatory requirements and environmental permitting; • Environmental monitoring plans associated with the power plant and with the CO2 sequestration site; and • Ultimate closure plans for the CO2 sequestration site and reservoirs. Host Site Selection The Alliance will conduct a site competition to identify one or more PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 candidate sites suitable for the FutureGen facility. The process will be an open competition in which States, tribes, private organizations and other interested parties can offer sites to the Alliance for consideration. The selection process will include the use of both qualification criteria and scoring criteria. Qualification criteria will be used to initially screen proposals and thereby identify qualified sites meriting further evaluation for the FutureGen Project. Scoring criteria will be used by the Alliance to distinguish among the initial set of qualified sites to identify the candidates (proposals and sites) that merit evaluation under the NEPA process. Categories of criteria that will be considered by the Alliance include: Suitability of the proposed site for construction of the power plant, suitability of the proposed sequestration reservoir for permanently sequestering CO2, availability of necessary infrastructure and resources (e.g. railroads, roads, natural gas lines, power transmission lines, and water), access, environmental factors, and costs. Following the development of a site selection plan and the site screening criteria and subsequent to DOE approval of these items, the Alliance is issuing a draft Request for Proposals (RFP) for a two-week comment period. Following the public comment period, the Alliance will issue the final RFP (proposed for March 2006) seeking proposals for a host site. The draft RFP and other information provided by the Alliance will be available at https:// www.FutureGenAlliance.org. Site proponents will be required to submit information that the Alliance will use to determine how, and the extent to which, each of the screening criteria would be met at each site. Proponents of each site will be required to submit sufficient acceptable technical, environmental and economic information. The RFP will also state that, for those sites that will be analyzed in the EIS, additional information may be requested from site proponents. Such information may require some field work, but will not require drilling of exploratory wells or conducting seismic surveys, because the EIS will be based on readily available information. The Alliance will review the proposals received to identify those sites that are reasonable from a technical, environmental, and economic perspective. At the conclusion of the review of proposals, the Alliance will provide DOE with a report that describes the screening process and findings and identifies the sites that the Alliance concludes are candidates (i.e., those believed by the Alliance to be E:\FR\FM\16FEN1.SGM 16FEN1 Federal Register / Vol. 71, No. 32 / Thursday, February 16, 2006 / Notices reasonable alternatives). DOE will review the Alliance’s selection process for fairness, openness and compliance with the established approach. Based on its review of the Alliance’s identification of candidate sites and other relevant information, DOE will then preliminarily determine the reasonable alternatives to be addressed in the EIS. DOE’s NOI to prepare an EIS for the FutureGen Project will identify the proposed reasonable alternative sites. The Alliance may assist the DOE and DOE contractors in gathering additional information to support completion of the EIS. However, the DOE and DOE contractors will develop the EIS. Following the completion of the EIS and the public involvement process, the DOE will announce in a Record of Decision (ROD) either the no-action alternative or those sites, if any, that are acceptable to the DOE for the project. If the action alternative is selected, the Alliance will subsequently select a host site from among those, if any, that are listed in the ROD as being acceptable to the DOE. Following the tentative selection of a host site, the Alliance will conduct extensive site characterization work on the chosen site. Information obtained from the characterization will be reviewed by the DOE and will support the completion of a supplement analysis by DOE to determine whether the newly gained information would have altered in a significant way the findings in the EIS. The supplement analysis will be used to determine whether a Supplemental EIS must be prepared. dsatterwhite on PROD1PC65 with NOTICES Future Public Involvement This ANOI does not serve as a substitute for the Notice of Intent that will initiate the public scoping process for the FutureGen Project EIS. Following publication of the Notice of Intent, DOE will hold scoping meetings, prepare and distribute the Draft EIS for public review, hold public hearings to solicit public comment on the Draft EIS, and publish a Final EIS. Not less than 30 days after publication of the U.S. Environmental Protection Agency’s Notice of Availability of the Final EIS, DOE may issue a Record of Decision documenting its decision concerning the proposed action. Preliminary EIS Schedule DOE anticipates issuance of a NOI to prepare an EIS in July 2006. The NOI or subsequent notices published in the Federal Register will announce the dates for public scoping meetings and the target date for completion of a Draft EIS. VerDate Aug<31>2005 15:56 Feb 15, 2006 Jkt 208001 A Notice of Availability of the Draft EIS will be published in the Federal Register upon completion of the Draft EIS and will announce the locations and dates for public hearings on the Draft EIS and the means for providing comments. DOE will hold public hearings at locations comparable to those for the scoping meetings. DOE will consider all comments received at public hearings or otherwise during preparation of the Final EIS. Issued in Washington, DC, on February 13, 2006. John Spitaleri Shaw, Assistant Secretary for Environment, Safety and Health. [FR Doc. E6–2222 Filed 2–15–06; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Office of Science; DOE/NSF Nuclear Science Advisory Committee Department of Energy. Notice of open meeting. AGENCY: ACTION: SUMMARY: This notice announces a meeting of the DOE/NSF Nuclear Science Advisory Committee (NSAC). Federal Advisory Committee Act (Pub. L. 92–463, 86 Stat. 770) requires that public notice of these meetings be announced in the Federal Register. DATES: Thursday, March 2, 2006, 10 a.m. to 6 p.m.; Friday, March 3, 2006, 8 a.m. to 3:15 p.m. ADDRESSES: Doubletree Hotel, 1750 Rockville Pike, Rockville, Maryland 20852–1699. FOR FURTHER INFORMATION CONTACT: Brenda L. May, U.S. Department of Energy; SC–26/Germantown Building, 1000 Independence Avenue, SW., Washington, D.C. 20585–1290; Telephone: 301–903–0536. SUPPLEMENTARY INFORMATION: Purpose of Meeting: To provide advice and guidance on a continuing basis to the Department of Energy and the National Science Foundation on scientific priorities within the field of basic nuclear science research. Tentative Agenda: Agenda will include discussions of the following: Thursday, March 2, 2006 • Perspectives from Department of Energy and National Science Foundation. • Presentation of the Neutrino Scientific Assessment Group Subcommittee Report. • Public Comment (10-minute rule). Friday, March 3, 2006 • Discussion of NuSAG Report. PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 8287 • Preparation of Transmittal Letter. • Possible Future Charges. • Public Comment (10-minute rule). Public Participation: The meeting is open to the public. If you would like to file a written statement with the Committee, you may do so either before or after the meeting. If you would like to make oral statements regarding any of these items on the agenda, you should contact Brenda L. May, 301–903–0536 or Brenda.May@science.doe.gov (email). You must make your request for an oral statement at least 5 business days before the meeting. Reasonable provision will be made to include the scheduled oral statements on the agenda. The Chairperson of the Committee will conduct the meeting to facilitate the orderly conduct of business. Public comment will follow the 10-minute rule. Minutes: The minutes of the meeting will be available for public review and copying within 30 days at the Freedom of Information Public Reading Room; Room 1E–190; Forrestal Building; 1000 Independence Avenue, SW.; Washington, DC, between 9 a.m. and 4 p.m., Monday through Friday, except Federal holidays. Issued at Washington, DC, on February 9, 2006. Carol Matthews, Acting Advisory Committee Management Officer. [FR Doc. E6–2228 Filed 2–15–06; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Environmental Management SiteSpecific Advisory Board, Oak Ridge Reservation Department of Energy. Notice of open meeting. AGENCY: ACTION: SUMMARY: This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Oak Ridge Reservation. The Federal Advisory Committee Act (Pub. L. 92–463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register. DATES: Wednesday, March 8, 2006, 6 p.m. DOE Information Center, 475 Oak Ridge Turnpike, Oak Ridge, Tennessee. ADDRESSES: Pat Halsey, Federal Coordinator, Department of Energy Oak Ridge Operations Office, P.O. Box 2001, EM– 90, Oak Ridge, TN 37831. Phone (865) FOR FURTHER INFORMATION CONTACT: E:\FR\FM\16FEN1.SGM 16FEN1

Agencies

[Federal Register Volume 71, Number 32 (Thursday, February 16, 2006)]
[Notices]
[Pages 8283-8287]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-2222]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY


Advance Notice of Intent To Prepare an Environmental Impact 
Statement for Implementation of the FutureGen Project

AGENCY: Department of Energy.

ACTION: Advance Notice of Intent to Prepare an Environmental Impact 
Statement.

-----------------------------------------------------------------------

SUMMARY: The U.S. Department of Energy (DOE) is announcing in advance 
its intent to prepare an Environmental Impact Statement (EIS), pursuant 
to the National Environmental Policy Act of 1969 (NEPA) (42 U.S.C. 4321 
et seq.), for the proposed action of providing Federal funding (up to 
$700 million) for the FutureGen Project. FutureGen would comprise the 
planning, design, construction and operation by a private-sector 
organization of a coal-fired electric power and hydrogen gas 
(H2) production plant integrated with carbon dioxide 
(CO2) capture and geologic sequestration of the captured 
gas. DOE has prepared this Advance Notice of Intent (ANOI) in 
accordance with DOE's NEPA regulations [(10 CFR 1021.311(b)] to inform 
interested parties of a pending EIS and to invite early public comments 
on the proposed action, including: (1) The proposed plans for 
implementing the FutureGen Project, (2) the potential range of 
environmental issues and alternatives to be analyzed, and (3) the 
nature of the impact analyses to be considered in the EIS. DOE will 
later issue a Notice of Intent (NOI) and initiate a public scoping 
process during which DOE will conduct public meetings and invite the 
public to comment on the scope, proposed action, and alternatives to be 
considered in the EIS.
    Following President George W. Bush's announcement that the United 
States would sponsor a $1 billion, 10-year FutureGen initiative to 
build the world's first coal-based, near-zero emissions power plant 
that produces both electricity and H2, the DOE signed, on 
December 2, 2005, a Cooperative Agreement (DE-FC26-06NT42073) that 
provides financial assistance to the FutureGen Industrial Alliance, 
Inc. (Alliance), which will undertake the planning, design, 
construction and operation of the project facilities. The FutureGen 
initiative would establish the technical and economic feasibility of 
co-producing electricity and H2 from coal while capturing 
and sequestering the CO2 generated in the process.
    The Alliance is a consortium led by the coal-fueled electric power 
industry and the coal production industry. Members of the Alliance 
collectively own and produce over 40 percent of the Nation's coal and 
about 20 percent of its coal-fueled electricity. The Alliance would 
plan, design, construct and operate the FutureGen power plant and the 
sequestration facility. The Alliance would also monitor, measure, and 
verify geologic sequestration of CO2. DOE will provide 
technical and programmatic guidance to the Alliance, retain certain 
review and approval rights as defined in the Cooperative Agreement, and 
oversee Alliance activities for compliance with the terms of the 
Cooperative Agreement. DOE will be responsible for NEPA compliance 
activities. Both DOE and the Alliance would consider ways for state and 
local agencies, local communities, the environmental community, 
international stakeholders, and research organizations to participate 
in the Project, including involvement in testing, monitoring and 
verification protocols for CO2 sequestration.

[[Page 8284]]


DATES: DOE invites Federal agencies, Native American Tribes, state and 
local governments, other organizations and members of the public to 
provide early assistance in environmental planning for the FutureGen 
Project and to identify significant environmental issues and 
alternatives to be analyzed in the forthcoming FutureGen Project EIS. 
DOE will consider public comments and other relevant information 
relating to environmental planning for the FutureGen Project. Comments 
in response to this ANOI are requested by March 20, 2006. DOE 
anticipates issuing a NOI to prepare an EIS for the FutureGen Project 
after DOE makes a preliminary determination regarding the alternative 
sites to be evaluated. After the NOI is issued, DOE will conduct public 
scoping meetings to assist in defining the scope of the EIS, including 
alternative sites and issues to be addressed. The dates and locations 
of the scoping meetings will be announced in the NOI or subsequent 
Federal Register notices and in local media before the meetings.

ADDRESSES: Written comments or suggestions on the scope of the EIS 
should be submitted to Mark L. McKoy, NEPA Document Manager for the 
FutureGen Project, U.S. Department of Energy, National Energy 
Technology Laboratory P.O. Box 880, Morgantown, West Virginia, 26507-
0880. Comments also may be submitted by telephone: 304-285-4426, fax: 
304-285-4403, electronic mail: mmckoy@netl.doe.gov, or toll-free 
telephone number: 800-432-8330 (ext. 4426).

FOR FURTHER INFORMATION, CONTACT: For information on the FutureGen 
Project or to receive a copy of the Draft EIS for review when it is 
issued, contact Mark L. McKoy as described in ADDRESSES above. For 
general information on the DOE NEPA process, contact: Ms. Carol M. 
Borgstrom, Director, Office of NEPA Policy and Compliance (EH-42), U.S. 
Department of Energy, 1000 Independence Avenue, SW., Washington, DC 
20585-0119, telephone: 202-586-4600, fax: 202-586-7031, or leave a 
toll-free message at 800-472-2756. Additional NEPA information is 
available at the DOE NEPA Web site: https://www.eh.doe.gov/nepa/. 
Additional information on the FutureGen Project can be found at the 
following Web site: https://www.fossil.energy.gov/programs/powersystems/
futuregen. Information from the Alliance, including the draft Request 
for Proposals discussed below, can be found at https://
www.FutureGenAlliance.org. Comments on the draft Request for Proposals 
are to be sent to the Alliance in accordance with the instructions 
provided by the Alliance. While comments related to the NEPA process 
are due to DOE by March 20, 2006, comments on the draft Request for 
Proposals are due to the Alliance by February 28, 2006.

SUPPLEMENTARY INFORMATION:

Background

    President Bush announced during 2003 that the United States has 
committed to proceed with a $1 billion, 10-year project to build the 
world's first coal-fueled plant to produce electricity and 
H2 with near-zero emissions. In response to this 
announcement, the U.S. Department of Energy unveiled plans for a 
FutureGen plant that would establish the technical and economic 
feasibility of producing electricity and H2 from coal--a 
low-cost and abundant energy resource--while capturing and geologically 
storing the CO2 generated in the process.
    The FutureGen Project would showcase cutting-edge technologies that 
could address environmental concerns associated with the use of coal. 
DOE plans to implement the FutureGen Project through a cooperative 
agreement that provides financial assistance to the FutureGen 
Industrial Alliance, Inc., which is a non-profit corporation that 
represents a global coalition of coal and energy companies. Members of 
the Alliance are expected to provide an estimated $250 million to help 
fund project development. The Alliance members are: American Electric 
Power; BHP Billiton; the China Huaneng Group; CONSOL Energy Inc.; 
Foundation Coal; Kennecott Energy, a member of the Rio Tinto Group; 
Peabody Energy; and Southern Company. The U.S. government and foreign 
governments would invest about $700 million in the project.
    The Alliance is a consortium of industrial companies that 
collectively own and produce over 40 percent of the Nation's coal and 
about 20 percent of the Nation's coal-fueled electricity. The Alliance 
is: (a) Geographically diverse by including both eastern and western 
domestic coal producers and coal-fueled electricity generators; and (b) 
resource diverse by including producers and users of the full range of 
coal types.

Purpose and Need for Agency Action

    In pursuing its goal of providing safe, affordable and clean energy 
for the citizens of the United States, DOE has determined that coal, as 
the Nation's most abundant fossil fuel resource, must play an important 
role in the Nation's efforts to increase its energy independence. DOE 
has identified a need for a near-zero emissions, coal-to-energy option 
that would produce electric power and H2 from coal while 
permanently sequestering CO2 in deep geological formations. 
The technical, economic, and environmental feasibility of producing 
electric power and H2 from coal, when coupled with geologic 
sequestration technology, must be proven.
    The electricity and transportation sectors are responsible for 
nearly three-fourths of the country's anthropogenic greenhouse gas 
emissions. The continued use of coal entails the need to address 
environmental and greenhouse gas mitigation challenges. A key DOE 
mission is to ensure that fossil fuels--particularly coal--are 
available components of the future energy mix. An alternative source of 
fuel for the transportation sector, such as coal-derived H2, 
could also reduce our dependence on fuel imports.
    In the absence of proven operations of a large, integrated, near-
zero emissions power plant, the contribution of coal to the energy mix 
could be reduced if environmental regulations continue to tighten. This 
could cause an imbalance in the diversity of the domestic energy 
portfolio, which would impact energy security. Accordingly, DOE needs 
to promote development of such a facility to address the environmental 
concerns over the use of coal, thus protecting both energy diversity 
and security.

Proposed Action

    DOE proposes to provide financial assistance (up to $700 million) 
for the Alliance to plan, design, construct, and operate the FutureGen 
facility, an advanced integrated coal gasification combined cycle power 
plant and CO2 sequestration facility sized nominally at 275 
MW (equivalent output). The goal of this initiative would be to prove 
the technical and economic feasibility of a near-zero emissions, coal-
to-energy option that could be deployed by 2020. During the first phase 
of the project, the Alliance and DOE will quantify the specific 
emissions objectives of the project. The facility would co-produce 
electric power and H2 in an industrial/utility setting while 
capturing and geologically sequestering approximately one to two 
million metric tons of CO2 per year. As discussed further 
below, the FutureGen Project would incorporate both cutting-edge 
research and demonstrations of emerging technologies ready for testing 
at a large scale to achieve its goal of validating the technical and 
economic feasibility of an integrated near-zero emissions plant.
    Establishing the technical feasibility and projected economic 
viability of a

[[Page 8285]]

near-zero emissions, coal-based system that integrates advanced 
technologies at a large scale through the FutureGen Project would 
contribute to DOE's goals by:
     Addressing environmental issues and barriers to fossil 
fuel use, while maintaining the availability and affordability of 
fossil-fuel-derived energy;
     improving energy efficiency;
     developing technologies that foster a diverse supply of 
reliable, affordable, and environmentally sound energy;
     providing scientific and technological information and 
analysis to assist policymakers and regulators in their decision-making 
on control of greenhouse gas emissions and use of fossil fuels; and
     focusing on public benefits-driven investment in high-
risk, high-return technology that private companies alone cannot 
undertake.
    The FutureGen facility is intended to be a near-zero emissions 
facility that would be the cleanest fossil-fuel-based power system in 
the world. The project would require approximately 10 years for 
completion, not including post-project monitoring. Performance and 
economic tests results would be shared among all participants, 
industry, the environmental community, and the public. DOE intends to 
invite participation from international organizations to maximize the 
global applicability and acceptance of FutureGen's results, helping to 
support an international consensus on the role of coal and geological 
sequestration in addressing global greenhouse gas emissions and energy 
security. Broad engagement of stakeholders early in the FutureGen 
effort is critical to the successful achievement of understanding and 
acceptance of geologic sequestration as part of a near-zero emissions, 
coal-based energy option.

FutureGen Project Processes

    The FutureGen Project would employ advanced coal gasification 
technology integrated with combined cycle electricity generation, 
H2 production, CO2 capture and CO2 
sequestration in geologic repositories. The gasification process would 
combine coal, oxygen (O2), and steam to produce a 
H2-rich ``synthesis gas.'' After exiting the conversion 
reactor, the composition of the synthesis gas would be ``shifted'' to 
produce additional H2. The product stream would consist 
mostly of H2, steam, and CO2. Following 
separation of these three gas components, the H2 would be 
used to generate electricity in a gas turbine and/or fuel cell. Some of 
the H2 could be used as a feedstock for chemical plants or 
petroleum refineries or as a transportation fuel. Steam from the 
process could be condensed, treated, and recycled into the gasifier or 
added to the plant's cooling water circuit. CO2 from the 
process would be sequestered in deep underground geologic formations 
that would be monitored to verify the permanence of CO2 
storage.

Overall Project Objectives

     Establish technical and economic feasibility of producing 
electricity and H2 from coal with near-zero emissions 
(including CO2);
     Verify sustained, integrated operation of coal conversion 
system with geologic sequestration of CO2;
     Verify effectiveness, safety, and permanence of geologic 
sequestration of CO2;
     Establish standardized technologies and protocols for 
CO2 measuring, monitoring, and verification;
     Confirm the potential of the FutureGen concept to achieve 
economic competitiveness with other near-zero emissions approaches 
through advances in technology by 2020; and
     Gain acceptance by the coal and electricity industries, 
environmental community, international community, and public-at-large 
for the concept of coal-based systems with near-zero emissions through 
the successful operation of FutureGen.

Power Plant Performance Objectives

     Sequester CO2 at an operational rate of 
approximately one to two million metric tons per year;
     Produce electricity and H2 at ratios (may be 
variable) consistent with market needs (equivalent to plant capacity of 
275 MW electricity output);
     Sequester at least 90 percent of CO2 initially 
with the eventual potential for up to 100 percent sequestration;
     Locate plant consistent with, inter alia, adequate coal 
feedstock availability, proximity to market for products (especially 
electricity) as part of proving potential economic viability, and 
proximity to geologic formations for sequestration (e.g., deep saline 
reservoirs, unmineable coal seams, depleted oil and natural gas 
reservoirs, basalt formations);
     Achieve environmental (near-zero emissions) requirements;
     Provide a design database for subsequent, near-zero 
emissions, commercial demonstrations and/or deployments; and
     Design capability for full-flow testing of advanced 
technologies and advanced technology modules, and design incorporation 
of loosely integrated units that increase flexibility and enhance 
operability and reliability.

CO2 Sequestration Monitoring and Verification Performance 
Objectives

     Accurately quantify storage potential of the geologic 
formation(s);
     Detect and monitor surface and subsurface leakage, if it 
occurs (capability to measure CO2 slightly above atmospheric 
concentration of 370 ppm), and demonstrate effectiveness of mitigation;
     Provide the scientific basis for carbon accounting and 
assurance of permanent storage;
     Account for co-sequestration of CO2 impurities; 
and
     Develop information necessary to estimate costs of future 
CO2 management systems.

Technology Alternatives

    The FutureGen Project would incorporate both cutting-edge research 
and demonstrations of emerging technologies ready for testing at a 
large scale to achieve its goal of validating the technical and 
economic feasibility of an integrated near-zero emissions plant. The 
FutureGen power plant would be designed to provide a capability for 
full-scale testing of new technologies prior to their commercial 
demonstration and deployment. The FutureGen facility may integrate some 
combination of new technologies for gasification, O2 
production, H2 production, combustion gas cleanup, 
H2 turbines, fuel cells and fuel cell/turbine hybrids, 
CO2 sequestration, advanced materials, instrumentation, 
sensors and controls, and byproduct utilization. Decisions on 
incorporation of specific technologies would be made by the Alliance 
keeping in mind the ability to achieve the overall project goal of 
proving the technical and economic feasibility of the near-zero 
emissions concept.

Alternatives, Including the Proposed Action

    Under the proposed action, DOE would implement the FutureGen 
Project to achieve the President's goals. The EIS will analyze the 
reasonable alternatives for implementing the FutureGen Project. Once a 
list of best qualified sites is delivered by the Alliance to DOE, DOE 
will consider all of the available alternatives in ascertaining which 
ones are reasonable. The EIS also may analyze technologies and 
strategies for implementing important elements of the Project.
    Under the no-action alternative, DOE would not fund the proposed 
Project. In the absence of DOE funding, it would be unlikely that the 
Alliance, or industry in

[[Page 8286]]

general, would soon undertake the utility-scale integration of 
CO2 capture and geologic sequestration with a coal-fired 
power plant. Absent DOE's investment in a utility-scale facility, the 
development of integrated CO2 capture and sequestration with 
power plant operations could occur more slowly through a series of 
small steps, and only then in the presence of a regulatory requirement. 
Given a regulatory requirement for the curtailment of greenhouse gas 
emissions, the no-action alternative could result in higher costs of 
electricity due to the use of more expensive, commercially available 
technology and due to a reduction in plant availability as a result of 
the lack of integrated test operations data and experience that would 
have otherwise been available from a FutureGen-type facility.
    DOE may consider other reasonable alternatives that are suggested 
during the public scoping period.

Preliminary Identification of Environmental Issues

    DOE intends to address the issues listed below when considering the 
potential impacts resulting from the siting, construction and operation 
of the FutureGen power plant. This list is neither intended to be all-
inclusive nor a predetermined set of potential impacts. DOE invites 
comments on these and any other issues that should be considered in the 
EIS. The environmental issues include:
     Air quality impacts: potential for air emissions during 
construction and operation of the power plant and appurtenant 
facilities to impact local sensitive receptors, local environmental 
conditions, and special-use areas, including impacts to smog and haze 
and impacts from dust and any significant vapor plumes;
     Noise and light impacts: potential impacts from 
construction, transportation of materials, and facility operations;
     Traffic issues: potential impacts from the construction 
and operation of the facilities, including changes in local traffic 
patterns, deterioration of roads, traffic hazards, and traffic 
controls;
     Floodplains: potential impacts to flood flow resulting 
from earthen fills, access roads, and dikes that might be needed in a 
floodplain;
     Wetlands: potential impacts resulting from fill, sediment 
deposition, vegetation clearing and facility erection that might be 
needed in a wetland;
     Visual impacts associated with facility structures: views 
from neighborhoods, impacts to scenic views (e.g., impacts from water 
vapor plumes, power transmission lines, pipelines), internal and 
external perception of the community or locality;
     Historic and cultural resources: potential impacts from 
the site selection, design, construction and operation of the 
facilities;
     Water quality impacts: potential impacts from water 
utilization and consumption, plus potential impacts from wastewater 
discharges;
     Infrastructure and land use impacts: potential 
environmental and socioeconomic impacts of project site selection, 
construction, delivery of feed materials, and distribution of products 
(e.g., power transmission lines, pipelines);
     Marketability of products and market access to feed 
stocks;
     Solid wastes: pollution prevention plans and waste 
management strategies, including the handling of ash, slag, water 
treatment sludge, and hazardous materials;
     Disproportionate impacts on minority and low-income 
populations;
     Connected actions: potential development of support 
facilities or supporting infrastructure;
     Ecological: potential on-site and off-site impacts to 
vegetation, terrestrial wildlife, aquatic wildlife, threatened or 
endangered species, and ecologically sensitive habitats;
     Geologic impacts: potential impacts from the sequestration 
of CO2 and other captured gases on underground resources 
such as potable water supplies, mineral resources, and fossil fuel 
resources;
     Ground surface impacts from CO2 sequestration: 
potential impacts from leakage of injected CO2, potential 
impacts from induced flows of native fluids to the ground surface or 
near the ground surface, and the potential for induced ground heave 
and/or microseisms;
     Fate and stability of sequestered CO2 and other 
captured gases;
     Health and safety issues associated with CO2 
capture and sequestration;
     Cumulative effects that result from the incremental 
impacts of the proposed project when added to the other past, present, 
and reasonably foreseeable future projects;
     Compliance with regulatory requirements and environmental 
permitting;
     Environmental monitoring plans associated with the power 
plant and with the CO2 sequestration site; and
     Ultimate closure plans for the CO2 
sequestration site and reservoirs.

Host Site Selection

    The Alliance will conduct a site competition to identify one or 
more candidate sites suitable for the FutureGen facility. The process 
will be an open competition in which States, tribes, private 
organizations and other interested parties can offer sites to the 
Alliance for consideration.
    The selection process will include the use of both qualification 
criteria and scoring criteria. Qualification criteria will be used to 
initially screen proposals and thereby identify qualified sites 
meriting further evaluation for the FutureGen Project. Scoring criteria 
will be used by the Alliance to distinguish among the initial set of 
qualified sites to identify the candidates (proposals and sites) that 
merit evaluation under the NEPA process. Categories of criteria that 
will be considered by the Alliance include: Suitability of the proposed 
site for construction of the power plant, suitability of the proposed 
sequestration reservoir for permanently sequestering CO2, 
availability of necessary infrastructure and resources (e.g. railroads, 
roads, natural gas lines, power transmission lines, and water), access, 
environmental factors, and costs.
    Following the development of a site selection plan and the site 
screening criteria and subsequent to DOE approval of these items, the 
Alliance is issuing a draft Request for Proposals (RFP) for a two-week 
comment period. Following the public comment period, the Alliance will 
issue the final RFP (proposed for March 2006) seeking proposals for a 
host site. The draft RFP and other information provided by the Alliance 
will be available at https://www.FutureGenAlliance.org.
    Site proponents will be required to submit information that the 
Alliance will use to determine how, and the extent to which, each of 
the screening criteria would be met at each site. Proponents of each 
site will be required to submit sufficient acceptable technical, 
environmental and economic information. The RFP will also state that, 
for those sites that will be analyzed in the EIS, additional 
information may be requested from site proponents. Such information may 
require some field work, but will not require drilling of exploratory 
wells or conducting seismic surveys, because the EIS will be based on 
readily available information.
    The Alliance will review the proposals received to identify those 
sites that are reasonable from a technical, environmental, and economic 
perspective. At the conclusion of the review of proposals, the Alliance 
will provide DOE with a report that describes the screening process and 
findings and identifies the sites that the Alliance concludes are 
candidates (i.e., those believed by the Alliance to be

[[Page 8287]]

reasonable alternatives). DOE will review the Alliance's selection 
process for fairness, openness and compliance with the established 
approach.
    Based on its review of the Alliance's identification of candidate 
sites and other relevant information, DOE will then preliminarily 
determine the reasonable alternatives to be addressed in the EIS. DOE's 
NOI to prepare an EIS for the FutureGen Project will identify the 
proposed reasonable alternative sites.
    The Alliance may assist the DOE and DOE contractors in gathering 
additional information to support completion of the EIS. However, the 
DOE and DOE contractors will develop the EIS. Following the completion 
of the EIS and the public involvement process, the DOE will announce in 
a Record of Decision (ROD) either the no-action alternative or those 
sites, if any, that are acceptable to the DOE for the project. If the 
action alternative is selected, the Alliance will subsequently select a 
host site from among those, if any, that are listed in the ROD as being 
acceptable to the DOE. Following the tentative selection of a host 
site, the Alliance will conduct extensive site characterization work on 
the chosen site. Information obtained from the characterization will be 
reviewed by the DOE and will support the completion of a supplement 
analysis by DOE to determine whether the newly gained information would 
have altered in a significant way the findings in the EIS. The 
supplement analysis will be used to determine whether a Supplemental 
EIS must be prepared.

Future Public Involvement

    This ANOI does not serve as a substitute for the Notice of Intent 
that will initiate the public scoping process for the FutureGen Project 
EIS. Following publication of the Notice of Intent, DOE will hold 
scoping meetings, prepare and distribute the Draft EIS for public 
review, hold public hearings to solicit public comment on the Draft 
EIS, and publish a Final EIS. Not less than 30 days after publication 
of the U.S. Environmental Protection Agency's Notice of Availability of 
the Final EIS, DOE may issue a Record of Decision documenting its 
decision concerning the proposed action.

Preliminary EIS Schedule

    DOE anticipates issuance of a NOI to prepare an EIS in July 2006. 
The NOI or subsequent notices published in the Federal Register will 
announce the dates for public scoping meetings and the target date for 
completion of a Draft EIS.
    A Notice of Availability of the Draft EIS will be published in the 
Federal Register upon completion of the Draft EIS and will announce the 
locations and dates for public hearings on the Draft EIS and the means 
for providing comments. DOE will hold public hearings at locations 
comparable to those for the scoping meetings. DOE will consider all 
comments received at public hearings or otherwise during preparation of 
the Final EIS.

    Issued in Washington, DC, on February 13, 2006.
John Spitaleri Shaw,
Assistant Secretary for Environment, Safety and Health.