Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power, 8004 [E6-2167]
Download as PDF
8004
Federal Register / Vol. 71, No. 31 / Wednesday, February 15, 2006 / Notices
authorities related to Museum and
Library Services. The Executive Session
of the Meeting from 2 p.m. to 3:15 p.m.
on Monday, March 6, 2006 will be
closed pursuant to subsections (c)(4)
and (c)(9) of section 552b of Title 5,
United States Code because the Board
will consider information that may
disclose: Trade secrets and commercial
or financial information obtained from a
person and privileged or confidential;
and information the premature
disclosure of which would be likely to
significantly frustrate implementation of
a proposed agency action. The meetings
from 3:30 p.m. until 5 p.m. Monday,
March 6, 2006 and the meeting from 9
a.m. to 1 p.m. on Tuesday, March 7,
2006 are open to the public. If you need
special accommodations due to a
disability, please contact: Institute of
Museum and Library Services, 1100
Pennsylvania Avenue, NW.,
Washington, DC 20506. Telephone:
(202) 653–4676; TDD (202) 653–4699 at
least seven (7) days prior to the meeting
date.
Dated: February 13, 2006.
Teresa LaHaie,
Director of Administration and Budget.
[FR Doc. 06–1456 Filed 2–13–06; 1:07 pm]
conditions to determine the operability
of offsite power systems under plant
technical specifications. (The TSO, ISO,
or RA/RC is responsible for preserving
the reliability of the local transmission
system. In this GL the term TSO is used
to denote these entities);
2. Use of NPP/TSO protocols and
analysis tools by TSOs to assist NPPs in
monitoring grid conditions for
consideration in maintenance risk
assessments;
3. Offsite power restoration
procedures in accordance with Section
2 of NRC Regulatory Guide (RG) 1.155,
‘‘Station Blackout’’;
4. Losses of offsite power caused by
grid failures at a frequency equal to or
greater than once in 20 site-years in
accordance with RG 1.155, and
5. Require addressees to provide a
written response to the NRC in
accordance with 10 CFR 50.54(f).
This Federal Register notice is
available through the NRC’s
Agencywide Documents Access and
Management System (ADAMS) under
accession number ML060380343.
The GL was issued on February
1, 2006.
DATES:
BILLING CODE 7036–01–M
ADDRESSES:
NUCLEAR REGULATORY
COMMISSION
Grid Reliability and the Impact on Plant
Risk and the Operability of Offsite
Power
Nuclear Regulatory
Commission.
ACTION: Notice of Issuance.
cprice-sewell on PROD1PC66 with NOTICES
AGENCY:
SUMMARY: The U.S. Nuclear Regulatory
Commission (NRC) has issued Generic
Letter (GL) 2006–02 to all holders of
operating licenses for nuclear power
reactors, except those who have
permanently ceased operation and have
certified that fuel has been removed
from the reactor vessel. The NRC is
issuing this generic letter to determine
if compliance is being maintained with
NRC regulatory requirements governing
electric power sources and associated
personnel training for your plant, the
NRC is issuing this GL to obtain
information from its licensees regarding:
1. Use of protocols between the
nuclear power plant (NPP) and the
transmission system operator (TSO),
independent system operator (ISO), or
reliability coordinator/authority (RC/
RA) and the use of transmission load
flow analysis tools (analysis tools) by
TSOs to assist NPPs in monitoring grid
VerDate Aug<31>2005
13:17 Feb 14, 2006
Jkt 208001
Not applicable.
FOR FURTHER INFORMATION, CONTACT:
Paul Gill at 301–415–3316 or by e-mail
asg@nrc.gov or Matthew W. McConnell
at 301–415–1597 or e-mail
mxm4@nrc.gov.
NRC GL
2006–02 may be examined, and/or
copied for a fee, at the NRC’s Public
Document Room (PDR) at One White
Flint North, 11555 Rockville Pike (first
floor), Rockville, Maryland. Publicly
available records will be accessible
electronically from the ADAMS Public
Electronic Reading Room on the Internet
at the NRC Web site, https://
www.nrc.gov/NRC/ADAMS/.
The ADAMS number for the GL is
ML060180352.
If you do not have access to ADAMS
or if you have problems in accessing the
documents in ADAMS, contact the NRC
PDR reference staff at 1–800–397–4209
or 301–415–4737 or by e-mail to
pdr@nrc.gov.
SUPPLEMENTARY INFORMATION:
Dated at Rockville, Maryland, this 9th day
of February 2006.
For the Nuclear Regulatory Commission.
Christopher I. Grimes,
Director, Division of Policy and Rulemaking,
Office of Nuclear Reactor Regulation.
[FR Doc. E6–2167 Filed 2–14–06; 8:45 am]
BILLING CODE 7590–01–P
PO 00000
Frm 00093
Fmt 4703
Sfmt 4703
PENSION BENEFIT GUARANTY
CORPORATION
Required Interest Rate Assumption for
Determining Variable-Rate Premium;
Interest Assumptions for
Multiemployer Plan Valuations
Following Mass Withdrawal
Pension Benefit Guaranty
Corporation.
ACTION: Notice of interest rates and
assumptions.
AGENCY:
SUMMARY: This notice informs the public
of the interest rates and assumptions to
be used under certain Pension Benefit
Guaranty Corporation regulations. These
rates and assumptions are published
elsewhere (or can be derived from rates
published elsewhere), but are collected
and published in this notice for the
convenience of the public. Interest rates
are also published on the PBGC’s Web
site (https://www.pbgc.gov).
DATES: The required interest rate for
determining the variable-rate premium
under part 4006 applies to premium
payment years beginning in February
2006. The interest assumptions for
performing multiemployer plan
valuations following mass withdrawal
under part 4281 apply to valuation dates
occurring in March 2006.
FOR FURTHER INFORMATION CONTACT:
Catherine B. Klion, Attorney, Legislative
and Regulatory Department, Pension
Benefit Guaranty Corporation, 1200 K
Street, NW., Washington, DC 20005,
202–326–4024. (TTY/TDD users should
call the Federal relay service by dialing
711 and ask for 202–326–4024.)
SUPPLEMENTARY INFORMATION:
Variable-Rate Premiums
Section 4006(a)(3)(E)(iii)(II) of the
Employee Retirement Income Security
Act of 1974 (ERISA) and § 4006.4(b)(1)
of the PBGC’s regulation on Premium
Rates (29 CFR part 4006) prescribe use
of an assumed interest rate (the
‘‘required interest rate’’) in determining
a single-employer plan’s variable-rate
premium. The required interest rate is
the ‘‘applicable percentage’’ (currently
85 percent) of the annual yield on 30year Treasury securities for the month
preceding the beginning of the plan year
for which premiums are being paid (the
‘‘premium payment year’’). (Although
the Treasury Department has ceased
issuing 30-year securities, the Internal
Revenue Service announces a surrogate
yield figure each month—based on the
30-year Treasury bond maturing in
February 2031—which the PBGC uses to
determine the required interest rate.)
The required interest rate to be used in
determining variable-rate premiums for
E:\FR\FM\15FEN1.SGM
15FEN1
Agencies
[Federal Register Volume 71, Number 31 (Wednesday, February 15, 2006)]
[Notices]
[Page 8004]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-2167]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
Grid Reliability and the Impact on Plant Risk and the Operability
of Offsite Power
AGENCY: Nuclear Regulatory Commission.
ACTION: Notice of Issuance.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) has issued
Generic Letter (GL) 2006-02 to all holders of operating licenses for
nuclear power reactors, except those who have permanently ceased
operation and have certified that fuel has been removed from the
reactor vessel. The NRC is issuing this generic letter to determine if
compliance is being maintained with NRC regulatory requirements
governing electric power sources and associated personnel training for
your plant, the NRC is issuing this GL to obtain information from its
licensees regarding:
1. Use of protocols between the nuclear power plant (NPP) and the
transmission system operator (TSO), independent system operator (ISO),
or reliability coordinator/authority (RC/RA) and the use of
transmission load flow analysis tools (analysis tools) by TSOs to
assist NPPs in monitoring grid conditions to determine the operability
of offsite power systems under plant technical specifications. (The
TSO, ISO, or RA/RC is responsible for preserving the reliability of the
local transmission system. In this GL the term TSO is used to denote
these entities);
2. Use of NPP/TSO protocols and analysis tools by TSOs to assist
NPPs in monitoring grid conditions for consideration in maintenance
risk assessments;
3. Offsite power restoration procedures in accordance with Section
2 of NRC Regulatory Guide (RG) 1.155, ``Station Blackout'';
4. Losses of offsite power caused by grid failures at a frequency
equal to or greater than once in 20 site-years in accordance with RG
1.155, and
5. Require addressees to provide a written response to the NRC in
accordance with 10 CFR 50.54(f).
This Federal Register notice is available through the NRC's
Agencywide Documents Access and Management System (ADAMS) under
accession number ML060380343.
DATES: The GL was issued on February 1, 2006.
ADDRESSES: Not applicable.
FOR FURTHER INFORMATION, CONTACT: Paul Gill at 301-415-3316 or by e-
mail asg@nrc.gov or Matthew W. McConnell at 301-415-1597 or e-mail
mxm4@nrc.gov.
SUPPLEMENTARY INFORMATION: NRC GL 2006-02 may be examined, and/or
copied for a fee, at the NRC's Public Document Room (PDR) at One White
Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland.
Publicly available records will be accessible electronically from the
ADAMS Public Electronic Reading Room on the Internet at the NRC Web
site, https://www.nrc.gov/NRC/ADAMS/. The ADAMS number for the
GL is ML060180352.
If you do not have access to ADAMS or if you have problems in
accessing the documents in ADAMS, contact the NRC PDR reference staff
at 1-800-397-4209 or 301-415-4737 or by e-mail to pdr@nrc.gov.
Dated at Rockville, Maryland, this 9th day of February 2006.
For the Nuclear Regulatory Commission.
Christopher I. Grimes,
Director, Division of Policy and Rulemaking, Office of Nuclear Reactor
Regulation.
[FR Doc. E6-2167 Filed 2-14-06; 8:45 am]
BILLING CODE 7590-01-P