New York Power Authority; Notice of Application Ready for Environmental Analysis, and Soliciting Comments, Terms and Conditions, Recommendations, and Prescriptions, 7761-7762 [E6-2037]
Download as PDF
rmajette on PROD1PC67 with NOTICES
Federal Register / Vol. 71, No. 30 / Tuesday, February 14, 2006 / Notices
conveys water to; (6) a second
powerhouse (Plant 2) containing a
single 600-kW turbine generating unit;
and (7) appurtenant facilities. The
applicant estimates that the total
average annual generation is 3,844
megawatt-hours. The dam and existing
project facilities are owned by Flambeau
Hydro, LLC.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item h. above.
All filings must: (1) Bear in all capital
letters the title ‘‘COMMENTS’’, ‘‘REPLY
COMMENTS’’,
‘‘RECOMMENDATIONS’’, ‘‘TERMS
AND CONDITIONS’’, or
‘‘PRESCRIPTIONS’’; (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person submitting the
filing; and (4) otherwise comply with
the requirements of 18 CFR 385.2001
through 385.2005. All comments,
recommendations, terms and
conditions, or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. Each filing must be
accompanied by proof of service on all
persons listed on the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b), and 385.2010.
You may also register online at
https://www.ferc.gov/esubscribenow.htm
to be notified via e-mail of new filings
and issuances related to this or other
pending projects. For assistance, contact
FERC Online Support.
n. Procedural schedule: The
Commission staff proposes to issue an
Environmental Assessment (EA) rather
than issuing a draft and final EA. Staff
intends to allow at least 30 days for
entities to comment on the EA, and will
take into consideration all comments
received on the EA before final action is
taken on the license application. The
application will be processed according
to the following schedule, but revisions
to the schedule may be made as
appropriate:
VerDate Aug<31>2005
14:46 Feb 13, 2006
Jkt 208001
Issue Notice of availability of the EA:
May 30, 2006.
Ready for Commission decision on the
application: July 31, 2006.
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Magalie R. Salas,
Secretary.
[FR Doc. E6–2035 Filed 2–13–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2216–066]
New York Power Authority; Notice of
Application Ready for Environmental
Analysis, and Soliciting Comments,
Terms and Conditions,
Recommendations, and Prescriptions
February 7, 2006.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: P–2216–066.
c. Date Filed: August 18, 2005.
d. Applicant: New York Power
Authority.
e. Name of Project: Niagara Power
Project, which consists of the Lewiston
Pump Generating Plant and the Robert
Moses Niagara Power Plant.
f. Location: The Niagara Power Project
is located on the Niagara River in the
City of Niagara Falls and the Towns of
Niagara and Lewiston, in Niagara
County, New York.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Frederick E.
Chase, Executive Director of
Hydropower Relicensing, Power
Authority of the State of New York, 30
South Pearl Street, Albany, NY 12207–
3425, (518) 433–6738 or
chase.f@nypa.gov.
i. FERC Contact: Steve Kartalia, (202)
502–6131 or Stephen.kartalia@ferc.gov.
j. Deadline for filing comments, terms
and conditions, recommendations, and
prescriptions: 60 days from the issuance
of this notice. All reply comments must
be filed with the Commission within
105 days from the issuance date of this
notice.
All documents (original and eight
copies) should be filed with: Magalie R.
Salas, Secretary, Federal Energy
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
7761
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
Comments, terms and conditions,
recommendations, and prescriptions
may be filed electronically via the
Internet in lieu of paper. The
Commission strongly encourages
electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site (https://
www.ferc.gov) under the ‘‘eFiling’’ link.
k. This application has been accepted
and is now ready for environmental
analysis.
l. Description of Project: The existing
project has a conventional development
and a pumped storage development for
a total current installed capacity of
2,538 megawatts (based on currently
completed upgrades). Existing project
facilities include: (a) Two 700-foot-long
intake structures located on the upper
Niagara River about 2.6 miles upstream
from the American Falls; (b) two 4.3mile-long concrete underground water
supply conduits, each measuring 46 feet
wide by 66.5 feet high; (c) a forebay; (d)
the Lewiston Pump-Generating Plant,
measuring 975 feet long by 240 feet
wide by 160 feet high; (e) the 1,900-acre
Lewiston Reservoir at a maximum water
surface elevation of 658 feet United
States Lake Survey Datum; (f) the Robert
Moses Niagara power plant, including
an intake structure, measuring 1,100 feet
long by 190 feet wide by 100 feet high;
(g) a switch yard; and (h) appurtenant
facilities.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item h above.
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
E:\FR\FM\14FEN1.SGM
14FEN1
7762
Federal Register / Vol. 71, No. 30 / Tuesday, February 14, 2006 / Notices
related to this or other pending projects.
For assistance, contact FERC Online
Support.
All filings must (1) Bear in all capital
letters the title ‘‘COMMENTS;’’ ‘‘REPLY
COMMENTS’’,
‘‘RECOMMENDATIONS’’, ‘‘TERMS
AND CONDITIONS’’, or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person submitting the
filing; and (4) otherwise comply with
the requirements of 18 CFR 385.2001
through 385.2005. All comments,
recommendations, terms and conditions
or prescriptions must set forth their
evidentiary basis and otherwise comply
with requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
Each filing must be accomplished by
proof of service on all persons listed on
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b), and
385.2010.
n. Procedural schedule and final
amendments: At this time we anticipate
preparing a draft environmental impact
statement (DEIS). Recipients will have
45 days to provide the Commission with
any written comments on the DEIS. All
comments filed with the Commission
will be considered in the final
environmental impact statement (FEIS).
The application will be processed
according to the following Hydro
Licensing Schedule. Revisions to the
schedule will be made as appropriate.
Notice of the Availability of the DEIS:
June 2006.
Notice of the Availability of the FEIS:
November 2006.
Ready for Commission’s decision on
the application: February 2007.
Final amendments to the application
must be filed with the Commission no
later than 60 days from the issuance
date of this notice.
Magalie R. Salas,
Secretary.
[FR Doc. E6–2037 Filed 2–13–06; 8:45 am]
rmajette on PROD1PC67 with NOTICES
BILLING CODE 6717–01–P
VerDate Aug<31>2005
14:46 Feb 13, 2006
Jkt 208001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application for Surrender of
Conduit Exemption and Soliciting
Comments, Motions To Intervene, and
Protests
February 7, 2006.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Surrender of
Conduit Exemption.
b. Project No: 6546–001.
c. Date Filed: November 16, 2005.
d. Applicant: Glenn-Colusa Irrigation
District.
e. Name of Project: Stovall #2 Project.
f. Location: The project is located on
the Glenn-Colusa Canals in Colusa
County, California.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. O.L.
Tenney, Glenn-Colusa Irrigation
District, P.O. Box 150, 344 East Laurel
Street, Willows, CA 95988, (530) 934–
8881.
i. FERC Contact: Robert Bell, (202)
502–6062.
j. Status of Environmental Analysis:
This application is ready for
environmental analysis at this time, and
the Commission is requesting
comments, reply comments,
recommendations, terms and
conditions, and prescriptions.
k. Deadline for filing comments and
or motions: March 7, 2006.
All documents (original and eight
copies) should be filed with: Ms.
Magalie R. Salas, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
Please include the project number (P–
6546–001) on any comments or motions
filed.
Comments, protests, and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the ‘‘eFiling’’ link. The Commission strongly
encourages electronic filings.
l. Description of Application: GlennColusa Irrigation District proposes to
surrender the exemption from licensing
for the Stovall #2 Project. As part of its
request, Glenn-Colusa Irrigation District
proposes to decommission the project.
The Glenn-Colusa Irrigation District will
remove the turbine form the concrete
penstock, the lids will be replaced and
secured and water deliveries will
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
continue through the same conduits that
have been historically used.
m. Location of the Application: This
filing is available for review and
reproduction at the Commission in the
Public Reference Room, Room 2A, 888
First Street, NE., Washington, DC 20426.
The filing may also be viewed on the
Web at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number, here P–6546, in the docket
number field to access the document.
For assistance, call toll-free 1–866–208–
3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
n. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
o. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, 385.211,
385.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
p. Filing and Service of Responsive
Documents: Any filings must bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers. A copy of any motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
q. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E6–2039 Filed 2–13–06; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\14FEN1.SGM
14FEN1
Agencies
[Federal Register Volume 71, Number 30 (Tuesday, February 14, 2006)]
[Notices]
[Pages 7761-7762]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-2037]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2216-066]
New York Power Authority; Notice of Application Ready for
Environmental Analysis, and Soliciting Comments, Terms and Conditions,
Recommendations, and Prescriptions
February 7, 2006.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: P-2216-066.
c. Date Filed: August 18, 2005.
d. Applicant: New York Power Authority.
e. Name of Project: Niagara Power Project, which consists of the
Lewiston Pump Generating Plant and the Robert Moses Niagara Power
Plant.
f. Location: The Niagara Power Project is located on the Niagara
River in the City of Niagara Falls and the Towns of Niagara and
Lewiston, in Niagara County, New York.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Frederick E. Chase, Executive Director of
Hydropower Relicensing, Power Authority of the State of New York, 30
South Pearl Street, Albany, NY 12207-3425, (518) 433-6738 or
chase.f@nypa.gov.
i. FERC Contact: Steve Kartalia, (202) 502-6131 or
Stephen.kartalia@ferc.gov.
j. Deadline for filing comments, terms and conditions,
recommendations, and prescriptions: 60 days from the issuance of this
notice. All reply comments must be filed with the Commission within 105
days from the issuance date of this notice.
All documents (original and eight copies) should be filed with:
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
Comments, terms and conditions, recommendations, and prescriptions
may be filed electronically via the Internet in lieu of paper. The
Commission strongly encourages electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
(https://www.ferc.gov) under the ``eFiling'' link.
k. This application has been accepted and is now ready for
environmental analysis.
l. Description of Project: The existing project has a conventional
development and a pumped storage development for a total current
installed capacity of 2,538 megawatts (based on currently completed
upgrades). Existing project facilities include: (a) Two 700-foot-long
intake structures located on the upper Niagara River about 2.6 miles
upstream from the American Falls; (b) two 4.3-mile-long concrete
underground water supply conduits, each measuring 46 feet wide by 66.5
feet high; (c) a forebay; (d) the Lewiston Pump-Generating Plant,
measuring 975 feet long by 240 feet wide by 160 feet high; (e) the
1,900-acre Lewiston Reservoir at a maximum water surface elevation of
658 feet United States Lake Survey Datum; (f) the Robert Moses Niagara
power plant, including an intake structure, measuring 1,100 feet long
by 190 feet wide by 100 feet high; (g) a switch yard; and (h)
appurtenant facilities.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659. A copy is also available for
inspection and reproduction at the address in item h above.
Register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-mail of new filings and
issuances
[[Page 7762]]
related to this or other pending projects. For assistance, contact FERC
Online Support.
All filings must (1) Bear in all capital letters the title
``COMMENTS;'' ``REPLY COMMENTS'', ``RECOMMENDATIONS'', ``TERMS AND
CONDITIONS'', or ``PRESCRIPTIONS;'' (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person submitting the filing; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, terms and conditions or prescriptions must
set forth their evidentiary basis and otherwise comply with
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the
application directly from the applicant. Each filing must be
accomplished by proof of service on all persons listed on the service
list prepared by the Commission in this proceeding, in accordance with
18 CFR 4.34(b), and 385.2010.
n. Procedural schedule and final amendments: At this time we
anticipate preparing a draft environmental impact statement (DEIS).
Recipients will have 45 days to provide the Commission with any written
comments on the DEIS. All comments filed with the Commission will be
considered in the final environmental impact statement (FEIS). The
application will be processed according to the following Hydro
Licensing Schedule. Revisions to the schedule will be made as
appropriate.
Notice of the Availability of the DEIS: June 2006.
Notice of the Availability of the FEIS: November 2006.
Ready for Commission's decision on the application: February 2007.
Final amendments to the application must be filed with the
Commission no later than 60 days from the issuance date of this notice.
Magalie R. Salas,
Secretary.
[FR Doc. E6-2037 Filed 2-13-06; 8:45 am]
BILLING CODE 6717-01-P