Transcontinental Gas Pipe Line Corporation; Notice of Proposed Changes in FERC Gas Tariff, 7025-7026 [E6-1863]
Download as PDF
Federal Register / Vol. 71, No. 28 / Friday, February 10, 2006 / Notices
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–1858 Filed 2–9–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. eastern time on
February 10, 2006.
[Docket No. RP06–176–000]
Texas Gas Transmission, LLC; Notice
of Annual Cash-Out Report
Magalie R. Salas,
Secretary.
[FR Doc. E6–1859 Filed 2–9–06; 8:45 am]
BILLING CODE 6717–01–P
rmajette on PROD1PC67 with NOTICES1
February 3, 2006.
Take notice that on January 20, 2006,
Texas Gas Transmission, LLC (Texas
Gas) tendered for filing a report, which
compares its cash-out revenues with its
cash-out costs incurred for the annual
billing period November 1, 2004,
through October 31, 2005, in accordance
with its tariff. Texas Gas states that there
is no rate impact to customers as a result
of this filing.
Texas Gas states that copies of this
filing have been served upon Texas
Gas’s jurisdictional customers and
interested state commissions.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
date as indicated below. Anyone filing
an intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
VerDate Aug<31>2005
15:10 Feb 09, 2006
Jkt 208001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
7025
Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
[Docket No. RP06–191–000]
TransColorado Gas Transmission
Company; Notice of Tariff Filing
Magalie R. Salas,
Secretary.
[FR Doc. E6–1860 Filed 2–9–06; 8:45 am]
BILLING CODE 6717–01–P
February 3, 2006.
Take notice that on January 27, 2006,
TransColorado Gas Transmission
Company (TransColorado) tendered for
as part of its FERC Gas Tariff, First
Revised Volume No. 1, the following
tariff sheets, to be effective February 1,
2006:
First Revised Sheet No. 247B.02
Original Sheet No. 247B.03
TransColorado states that a copy of
this filing has been served upon
TransColorado’s customers and affected
state commissions.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of § 154.210 of the
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RP06–197–000]
Transcontinental Gas Pipe Line
Corporation; Notice of Proposed
Changes in FERC Gas Tariff
February 3, 2006.
Take notice that on January 31, 2006,
Transcontinental Gas Pipe Line
Corporation (Transco) tendered for
filing as part of its FERC Gas Tariff,
Third Revised Volume No. 1, the
following tariff sheets to become
effective March 1, 2006:
Forty-Second Revised Sheet No. 27
Fifty-Seventh Revised Sheet No. 28A
Thirty-Sixth Revised Sheet No. 28C
Transco states that copies of the filing
are being mailed to its affected
customers and interested state
commissions.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
E:\FR\FM\10FEN1.SGM
10FEN1
7026
Federal Register / Vol. 71, No. 28 / Friday, February 10, 2006 / Notices
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of § 154.210 of the
Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–1863 Filed 2–9–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Transco states that copies of the filing
are being mailed to affected customers
and interested state commissions.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed in accordance
with the provisions of § 154.210 of the
Commission’s regulations (18 CFR
154.210). Anyone filing an intervention
or protest must serve a copy of that
document on the Applicant. Anyone
filing an intervention or protest on or
before the intervention or protest date
need not serve motions to intervene or
protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–1865 Filed 2–9–06; 8:45 am]
[Docket No. RP06–199–000]
Transcontinental Gas Pipe Line
Corporation; Notice of Proposed
Changes in FERC Gas Tariff
BILLING CODE 6717–01–P
rmajette on PROD1PC67 with NOTICES1
February 3, 2006.
Take notice that on January 31, 2006,
Transcontinental Gas Pipe Line
Corporation (Transco) tendered for
filing as part of its FERC Gas Tariff,
Third Revised Volume No. 1, ThirtyThird Revised Sheet No. 28, to become
effective February 1, 2006.
VerDate Aug<31>2005
15:10 Feb 09, 2006
Jkt 208001
PO 00000
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER06–267–000; OA06–1–000;
TS06–4–000]
Wolverine Creek Goshen
Interconnection, LLC and Wolverine
Creek Energy, LLC; Notice of Issuance
of Order
February 3, 2006.
Wolverine Creek Goshen
Interconnection, LLC (WCGI) and
Wolverine Creek Energy, LLC
(Wolverine Creek) filed a Common
Facilities Agreement between WCGI and
its owners Wolverine Creek, Ridgeline
Airtricity Energy LLC and Goshen Phase
II LLC. WCGI also requested waiver of
various Commission regulations. In
particular, WCGI requested that the
Commission grant blanket approval
under 18 CFR Part 34 of all future
issuances of securities and assumptions
of liability by WCGI.
On January 13, 2006, as amended on
January 27, 2006, pursuant to delegated
authority, the Director, Division of
Tariffs and Market Development—
South, granted the request for blanket
approval under Part 34. The Director’s
order also stated that the Commission
would publish a separate notice in the
Federal Register establishing a period of
time for the filing of protests.
Accordingly, any person desiring to be
heard or to protest the blanket approval
of issuances of securities or assumptions
of liability by WCGI should file a
motion to intervene or protest with the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426, in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure. 18 CFR 385.211,
385.214 (2004).
Notice is hereby given that the
deadline for filing motions to intervene
or protest is February 13, 2006.
Absent a request to be heard in
opposition by the deadline above, WCGI
is authorized to issue securities and
assume obligations or liabilities as a
guarantor, indorser, surety, or otherwise
in respect of any security of another
person; provided that such issuance or
assumption is for some lawful object
within the corporate purposes of WCGI,
compatible with the public interest, and
is reasonably necessary or appropriate
for such purposes.
Docket Nos. ER06–267–000, OA06–1–
000 and TS06–4–000
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
Frm 00025
Fmt 4703
Sfmt 4703
E:\FR\FM\10FEN1.SGM
10FEN1
Agencies
[Federal Register Volume 71, Number 28 (Friday, February 10, 2006)]
[Notices]
[Pages 7025-7026]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-1863]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RP06-197-000]
Transcontinental Gas Pipe Line Corporation; Notice of Proposed
Changes in FERC Gas Tariff
February 3, 2006.
Take notice that on January 31, 2006, Transcontinental Gas Pipe
Line Corporation (Transco) tendered for filing as part of its FERC Gas
Tariff, Third Revised Volume No. 1, the following tariff sheets to
become effective March 1, 2006:
Forty-Second Revised Sheet No. 27
Fifty-Seventh Revised Sheet No. 28A
Thirty-Sixth Revised Sheet No. 28C
Transco states that copies of the filing are being mailed to its
affected customers and interested state commissions.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and
[[Page 7026]]
Procedure (18 CFR 385.211 and 385.214). Protests will be considered by
the Commission in determining the appropriate action to be taken, but
will not serve to make protestants parties to the proceeding. Any
person wishing to become a party must file a notice of intervention or
motion to intervene, as appropriate. Such notices, motions, or protests
must be filed in accordance with the provisions of Sec. 154.210 of the
Commission's regulations (18 CFR 154.210). Anyone filing an
intervention or protest must serve a copy of that document on the
Applicant. Anyone filing an intervention or protest on or before the
intervention or protest date need not serve motions to intervene or
protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6-1863 Filed 2-9-06; 8:45 am]
BILLING CODE 6717-01-P