Eastern Shore Natural Gas Company; Notice of Application, 6460-6461 [E6-1664]

Download as PDF 6460 Federal Register / Vol. 71, No. 26 / Wednesday, February 8, 2006 / Notices Comment Date: 5 p.m. Eastern Time on February 8, 2006. Magalie R. Salas, Secretary. [FR Doc. E6–1658 Filed 2–7–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E6–1705 Filed 2–7–06; 8:45 am] Federal Energy Regulatory Commission BILLING CODE 6717–01–P [Docket No. RP06–194–000] Columbia Gas Transmission Corporation; Notice of Proposed Changes in FERC Gas Tariff Federal Energy Regulatory Commission Take notice that on January 30, 2006, Columbia Gas Transmission Corporation (Columbia) tendered for filing as part of its FERC Gas Tariff, Second Revised Volume No. 1, the following revised tariff sheet with a proposed effective date of February 1, 2006: rmajette on PROD1PC67 with NOTICES1 Third Revised Sheet No. 167. Third Revised Sheet No. 168. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the VerDate Aug<31>2005 15:26 Feb 07, 2006 Jkt 208001 Magalie R. Salas, Secretary. [FR Doc. E6–1707 Filed 2–7–06; 8:45 am] DEPARTMENT OF ENERGY February 2, 2006. This filing is accessible online at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. BILLING CODE 6717–01–P [Docket No. RP96–383–074] Dominion Transmission, Inc.; Notice of Negotiated Rate February 2, 2006. Take notice that on January 31, 2006, Dominion Transmission, Inc. (DTI) tendered for filing as part of its FERC Gas Tariff, Third Revised Volume No. 1, Third Revised Sheet No. 1405, to become effective February 1, 2006. DTI states that the purpose of this filing is to amend the Appalachian Pool Operators negotiated rate customer and contract list. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of § 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP06–53–000] Eastern Shore Natural Gas Company; Notice of Application January 31, 2006. Take notice that on January 20, 2006, Eastern Shore Natural Gas Company (Eastern Shore), 417 Bank Lane, Dover, Delaware 19904, filed in Docket No. CP06–53–000, an application pursuant to section 7(c) of the Natural Gas Act (NGA), for a certificate of public convenience and necessity to construct and operate certain pipeline and measuring station facilities, with appurtenances, located in Pennsylvania and Delaware in order to expand the capacity of Eastern Shore’s system, all as more fully set forth in the request which is on file with the Commission and open to public inspection. Specifically, Eastern Shore proposes to construct and operate, in three phases, 55-miles of mainline extension and looping and construct and operate two new delivery points. The additional capacity created by the proposed facilities will be utilized to serve highpriority residential and commercial customer market growth in Eastern Shore’s market area. The construction and operation of the proposed facilities will provide additional peak day capacity on Eastern Shore’s system of 47,350 dekatherms per day at an estimated cost of $33,606,460. Any questions regarding this application should be directed to Elaine B. Bittner, Vice President, Eastern Shore Natural Gas Company, 417 Bank Lane, Dover, Delaware 19904, or call at (302) 734–6710 ext. 6016. E:\FR\FM\08FEN1.SGM 08FEN1 rmajette on PROD1PC67 with NOTICES1 Federal Register / Vol. 71, No. 26 / Wednesday, February 8, 2006 / Notices There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. Comments, protests and interventions may be filed electronically via the VerDate Aug<31>2005 15:26 Feb 07, 2006 Jkt 208001 Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. Comment Date: February 21, 2006. Magalie R. Salas, Secretary. [FR Doc. E6–1664 Filed 2–7–06; 8:45 am] 6461 (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on February 16, 2006. Magalie R. Salas, Secretary. [FR Doc. E6–1708 Filed 2–7–06; 8:45 am] BILLING CODE 6717–01–P BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Docket No. RP99–220–022] [Docket No. CP04–413–002] Entrega Gas Pipeline LLC; Notice of Compliance Filing Great Lakes Gas Transmission Limited Partnership; Notice of Negotiated Rate Agreement February 2, 2006. Take notice that on January 19, 2006, Entrega Gas Pipeline LLC (Entrega) tendered for filing as part of its FERC Gas Tariff, Original Volume No. 1, the following tariff sheets, with an effective date of December 17, 2005: February 2, 2006. Take notice that on January 27, 2006, Great Lakes Gas Transmission Limited Partnership (Great Lakes) filed for disclosure, a transportation service agreement pursuant to Great Lakes’ Rate Schedule FT entered into by Great Lakes and WPS Energy Services Inc. (WPS) (FT Service Agreement). Great Lakes states that the FT Service Agreement being filed reflects a negotiated rate arrangement between Great Lakes and WPS commencing February 1, 2006. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed in accordance with the provisions of Section 154.210 of the Commission’s regulations (18 CFR 154.210). Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Original Volume No. 1. First Revised Sheet No. 254. Original Sheet No. 254.01. Entrega states that a copy of this filing has been served upon all parties on the official service list for this proceeding. Any person desiring to protest this filing must file in accordance with Rule 211 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211). Protests to this filing will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Such protests must be filed on or before the date as indicated below. Anyone filing a protest must serve a copy of that document on all the parties to the proceeding. The Commission encourages electronic submission of protests in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible online at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 E:\FR\FM\08FEN1.SGM 08FEN1

Agencies

[Federal Register Volume 71, Number 26 (Wednesday, February 8, 2006)]
[Notices]
[Pages 6460-6461]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-1664]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP06-53-000]


Eastern Shore Natural Gas Company; Notice of Application

 January 31, 2006.
    Take notice that on January 20, 2006, Eastern Shore Natural Gas 
Company (Eastern Shore), 417 Bank Lane, Dover, Delaware 19904, filed in 
Docket No. CP06-53-000, an application pursuant to section 7(c) of the 
Natural Gas Act (NGA), for a certificate of public convenience and 
necessity to construct and operate certain pipeline and measuring 
station facilities, with appurtenances, located in Pennsylvania and 
Delaware in order to expand the capacity of Eastern Shore's system, all 
as more fully set forth in the request which is on file with the 
Commission and open to public inspection.
    Specifically, Eastern Shore proposes to construct and operate, in 
three phases, 55-miles of mainline extension and looping and construct 
and operate two new delivery points. The additional capacity created by 
the proposed facilities will be utilized to serve high-priority 
residential and commercial customer market growth in Eastern Shore's 
market area. The construction and operation of the proposed facilities 
will provide additional peak day capacity on Eastern Shore's system of 
47,350 dekatherms per day at an estimated cost of $33,606,460.
    Any questions regarding this application should be directed to 
Elaine B. Bittner, Vice President, Eastern Shore Natural Gas Company, 
417 Bank Lane, Dover, Delaware 19904, or call at (302) 734-6710 ext. 
6016.

[[Page 6461]]

    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 14 copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    Comments, protests and interventions may be filed electronically 
via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and 
the instructions on the Commission's Web site under the ``e-Filing'' 
link.
    Comment Date: February 21, 2006.

Magalie R. Salas,
Secretary.
[FR Doc. E6-1664 Filed 2-7-06; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.