Environmental Impact Statements And Regulations; Availability of EPA Comments, 5836-5837 [E6-1502]
Download as PDF
5836
Federal Register / Vol. 71, No. 23 / Friday, February 3, 2006 / Notices
corresponding one-time total cost to all
respondents will be $5210.00. Since this
information collection is voluntary and
does not involve any special equipment,
respondents will not incur any capital
or operation and maintenance (O&M)
costs.
What Is the Next Step in the Process for
This ICR?
EPA will consider the comments
received and amend the ICR as
appropriate. The final ICR package will
then be submitted to OMB for review
and approval pursuant to 5 CFR
1320.12. At that time, EPA will issue
another Federal Register notice
pursuant to 5 CFR 1320.5(a)(1)(iv) to
announce the submission of the ICR to
OMB and the opportunity to submit
additional comments to OMB. If you
have any questions about this ICR or the
approval process, please contact the
technical person listed under FOR
FURTHER INFORMATION CONTACT.
Dated: January 5, 2006.
Al McGartland,
Director, National Center for Environmental
Economics, Office of Policy Economics and
Innovation.
[FR Doc. E6–1503 Filed 2–2–06; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6671–9]
Environmental Impact Statements And
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7167. An explanation of the
ratings assigned to draft environmental
impact statements (EISs) was published
in FR dated April 1, 2005 (70 FR 16815).
hsrobinson on PROD1PC70 with NOTICES
Draft EISs
EIS No. 20050362, ERP No. D–NRC–
E05101–NC, Generic—Brunswick
Stream Electric Plant, Units 1 and 2
(TAC Nos. MC4641 and MC4642)
License Renewal of Nuclear Plants,
Supplement 25 to NUREG–1437,
Brunswick County, NC.
Summary: EPA expressed
environmental concerns about
radiological monitoring of all plant
effluents, and appropriate storage and
ultimate disposition of radioactive
VerDate Aug<31>2005
15:00 Feb 02, 2006
Jkt 208001
waste generated on-site during the
license renewal period, as well as
continuing measures to limit
bioentrainment and other impacts to
aquatic species from surface water
withdrawals and discharges. Rating
EC1.
EIS No. 20050396, ERP No. D–BIA–
K60036–CA, Elk Valley Rancheria
Martin Ranch 203.5-Acre Fee-to-Trust
Transfer and Casino/Resort Project,
Implementation, Federal Trust, Elk
Valley Rancheria Tribe, Crescent City,
Del Norte County, CA.
Summary: EPA expressed concerns
about impacts to wetlands and
uncertainties in the stormwater
management system. EPA recommended
the final EIS include an adaptive
management plan for the vegetated
swale system and clarify the need for a
Clean Water Act Section 404 permit for
road crossings. Rating EC2.
EIS No. 20050425, ERP No. D–BLM–
K65292–CA, Southern Diablo
Mountain Range and Central Coast of
California Resource Management
Plan, Several Counties, CA.
Summary: EPA expressed concerns
and recommended additional measures
be taken to reduce impacts to human
health, watershed and vegetation
resources in the planning area. Rating
EC2.
EIS No. 20050435, ERP No. D–NOA–
E86003–00, Snapper Grouper Fishery,
Amendment 13C to the Fishery
Management Plan, Phase Out
Overfishing of Snowy Grouper,
Golden Tilefish, Vermilion Snapper
and Sea Bass, Implementation, South
Atlantic Region.
Summary: While EPA had no
objection to the proposed action, EPA
did request clarification of EJ
demographics of fishermen. Rating LO.
EIS No. 20050438, ERP No. D–COE–
E11058–SC, Charleston Naval
Complex (CNC), Proposed
Construction of a Marine Container
Terminal, Cooper River in Charleston
Harbor, City of North Charleston,
Charleston County, SC.
Summary: EPA expressed
environmental concerns about impacts
to aquatic resources, water quality and
air quality. EPA also requested
additional information regarding the
potential impacts. Rating EC2.
EIS No. 20050450, ERP No. D–SFW–
F64006–IL, Crab Orchard National
Wildlife Refuge Comprehensive
Conservation Plan (CCP),
Implementation, Williamson, Jackson
and Unicon Counties, IL.
Summary: While EPA had no
objections to the proposed action, EPA
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
did request clarification on partnerships
to reduce water pollution and additional
surveys covering area–sensitive forest
birds and grassland and shrubland
birds. Rating LO.
EIS No. 20050484, ERP No. D–COE–
K36143–CA, American River
Watershed, Lower American River
Common Features Mayhew Levee
Project, Reconstruction, Sacramento
County, CA.
Summary: EPA expressed concerns
that several alternatives would convert
the American River Parkway to levee
and maintenance roads and would
impact oak woodland habitat. EPA
recommended the selection of either
Alternative 4 or 5 to reduce impacts to
riparian vegetation and requested
additional information regarding
cumulative impacts to air and water
quality in the area. Rating EC2.
EIS No. 20050507, ERP No. D–BLM–
K65293–NV, Sheep Complex, Big
Springs and Owyhee Grazing
Allotments Sensitive Bird Species
Project, Determine Impacts of
Livestock Grazing, Elko County, NV.
Summary: EPA expressed
environmental concerns with the
potential for continued impacts to
vegetation, cultural resources, wildlife
habitat and sensitive species under the
proposed level of grazing. The Final EIS
should include additional information
on mitigation measures. Rating EC2.
EIS No. 20050539, ERP No. D–GSA–
K61163–CA, Andrade Port of Entry
(POE) Improvements Project,
Proposed Expansion, Renovation , or
Replacement of POE, Andrade, CA.
Summary: EPA had concerns about
cumulative impacts to air quality, water
quality, biological resources and
cultural resources. Rating EC2.
EIS No. 20050413, ERP No. DS–FHW–
E40339–NC, NC 12 Replacement of
Herbert C. Bonner Bridge (Bridge No.
11 ) New and Updated Information,
over Oregon Inlet Construction,
Funding, U.S. Coast Guard Permit,
Special-Use-Permit, Right-of-Way
Permit, US Army COE Section 10 and
404 Permit, Dare County, NC.
Summary: EPA has environmental
objections to proposed project
alternatives that would continue to
bisect the Pea Island National Wildlife
Refuge (PINWR) and likely result in
long-term impacts to water quality as
well as disturbances to essential habitat
for migratory water fowl and resident
wildlife. Pamlico Sound bridge
alternatives (PSBC), however, would
traverse open water and result in less
adverse environmental impacts by
E:\FR\FM\03FEN1.SGM
03FEN1
Federal Register / Vol. 71, No. 23 / Friday, February 3, 2006 / Notices
bypassing the PINWR and most
sensitive aquatic habitats. Rating EO2.
ENVIRONMENTAL PROTECTION
AGENCY
Final EISs
[ER–FRL–6671–8]
EIS No. 20050313, ERP No. F–DOE–
J39033–UT, Moab Uranium Mill
Trailings Remediation, Proposal to
Clean Up Surface Contamination and
Implement a Ground Water Strategy,
Grand and San Juan Counties, UT.
Environmental Impact Statements;
Notice of Availability
Summary: EPA’s earlier concerns
were addressed in the Final EIS;
therefore, EPA does not object to the
proposed action.
EIS No. 20050506, ERP No. F–NOA–
L91026–00, Pacific Coast Groundfish
Fishery Management Plan, To
Conserve and Enhance Essential Fish
Habitat (EFH) Designation and
Minimization of Advise Impacts,
Coast Exclusive Economic Zone, WA,
OR and CA.
Summary: EPA supports the preferred
alternatives for designating EFH,
minimizing fishing impacts to EFH and
research and monitoring. However, EPA
still has concerns that not all oil
production platforms are designated as
Habitat Areas of Particular Concern.
EIS No. 20050517, ERP No. F–FHW–
D40325–PA, US–219 Improvements
Project, Meyersdale to Somerset, SR
6219, Section 020, Funding, U.S.
Army COE Section 404 Permit,
Somerset County, PA.
Summary: EPA has no objections to
the proposed project.
EIS No. 20050509, ERP No. FB–COE–
E36167–FL, Central and Southern
Florida Project, Tamiami Trail
Modifications, Modified Water
Deliveries to Everglades National
Park, Authorized Flow of Water from
WCA–38 and the L–29 Canal North of
the Tamiami Trail, Dade County, FL.
hsrobinson on PROD1PC70 with NOTICES
Summary: While EPA has no
objections to the proposed action, EPA
did recommend an adaptive
management approach to take advantage
of information gained from concurrent/
future water quality monitoring and
wetland functions analysis.
Dated: January 31, 2006.
Ken Mittelholtz,
Environmental Protection Specialist, Office
of Federal Activities.
[FR Doc. E6–1502 Filed 2–2–06; 8:45 am]
BILLING CODE 6560–50–P
VerDate Aug<31>2005
15:00 Feb 02, 2006
Jkt 208001
Responsible Agency: Office of Federal
Activities. General Information: (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements filed 01/23/2006 through
01/27/2006.
Pursuant to 40 CFR 1506.9.
EIS No. 20060030, Final Supplement,
COE, IL, Sugar Creek Municipal Water
Supply, Updated Information,
Proposed New 1172 Acre Water
Supply Reservoir, Construction, COE
Section 404 Permit Issuance, City of
Marion, Williamson and Johnson
Counties, IL. Wait Period Ends: 03/06/
2006. Contact: Greg McKay 502–315–
6685.
EIS No. 20060031, Final EIS, NPS, ME,
Schoodic General Management Plan
Amendment, Implementation, Acadia
National Park, ME. Wait Period Ends:
03/06/2006. Contact: John T. Kelly
207–288–8703.
EIS No. 20060032, Draft EIS, AFS, AK,
Kuiu Timber Sale Area, Proposes to
Harvest Timber and Build Associated
Temporary Roads, U.S. Army COE
Section 10 and 404 Permits, North
Kuiu Island, Petersburg Ranger
District, Tongass National Forest, AK.
Comment Period Ends: 03/20/2006.
Contact: Kris Rutledge 907–772–5905.
EIS No. 20060033, Final EIS, FRA, CA,
Los Angeles Union Station RunThrough Tracks Project, Pedestrian
Access Improvements, Connectivity
and Increase the Capacity, City of Los
Angeles, Los Angeles County, CA.
Wait Period Ends: 03/06/2006.
Contact: David Valenstein 202–493–
6368.
EIS No. 20060034, Draft EIS, NRC, MN,
Generic—License Renewal of Nuclear
Plants, Supplement 26 to NUREG
1437, Regarding Monticello Nuclear
Generating Plant (TAC NO. MC6441)
Renewal of Opeating License DRP–22
for Additional 20 Years of Operation,
Mississippi River, City of Monticello,
Wright County, MN. Comment Period
Ends: 05/04/2006. Contact: Jennifer A.
Davis 301–415–3835.
Amended Notices
EIS No. 20050382, Draft EIS, BIA, WI,
Menominee Casino-Hotel 223-Acre
Fee-to-Trust Transfer and Casino
Project, Implementation, Federal
Trust, Menominee Indian Tribe of
Wisconsin (Tribe), in City of Kenosha
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
5837
and County of Kenosha, WI. Comment
Period Ends: 03/06/2006. Contact:
Herb Nelson 612–725–4510. Revision
on FR Notice Published 09/23/2005.
Reopening Comment Period that
Ended on 11/21/2005 to 03/06/2006.
EIS No. 20050452, Draft EIS, BLM, NM,
Kasha-Katuwe Tent Rocks National
Monument Resource Management
Plan, Implementation, Rio Puerco
Field Office, Sandoval County, NM.
Comment Period Ends: 02/17/2006.
Contact: John Bristol 505–761–8755.
Revision of FR Notice Published 11/
04/2005: Comment Period Extended
from 02/02/2006 to 02/17/2006.
EIS No. 20050520, Draft EIS, BIA, OR,
Coyote Business Park, Confederated
Tribes of the Umatilla Indian
Reservation, Proposes to Develop,
Build and Manage a Light Industrial
Commercial Business Park, Umatilla
County, OR. Comment Period Ends:
02/17/2006. Contact: Jerry L. Lauer
541–278–3786 Revision on FR Notice
Published 12/16/2005: Comment
Period Extend from 01/30/2006 to 02/
17/2006.
EIS No. 20050548, Draft EIS, NPS, NC,
North Shore Road, Great Smoky
Mountains National Park, General
Management Plan, Implementation,
Fontana Dam, Swain County, NC.
Comment Period Ends: 03/20/2006.
Contact: Imelda Wegwerth 865–436–
1302. Revision to FR Notice Published
01/06/2006: Comment Period has
been Extended from 02/21/2006 to 03/
20/2006.
EIS No. 20050555, Final EIS, APH, 00,
Adoption—Black-Tailed Prairie Dog
Conservation and Management on the
Nebraska National Forest and
Associated Units, Implementation,
Dawes, Sioux Blaine, Cherry, Thomas
Counties, NE and Custer, Fall River,
Jackson, Pennington, Jones, Lyman,
Stanley Counties, SD. Wait Period
Ends: 01/30/2006. Contact: Gary A.
Littauer 505–346–2632, Ext 232.
U.S. DOA/APH adopted the U.S.
DOA/AFS Final EIS #20050330, filed
08–04–2005. APH was a cooperating
agency on the project. Recirculation on
the document is not necessary under
1506.3(b) of the CEQ Regulations.
Revision of FR Notice Published 12/
02/2005: This Adoption should have
appeared in FR 12/02/2005.
EIS No. 20060004, Final EIS, FHW, MD,
Intercounty Connector (ICC) from I–
270 to US1, Funding and U.S. Army
COE Section 404 Permit, Montgomery
and Prince George’s Counties, MD.
Wait Period Ends: 02/27/2006.
Contact: Dan Johnson 410–779–7154.
E:\FR\FM\03FEN1.SGM
03FEN1
Agencies
[Federal Register Volume 71, Number 23 (Friday, February 3, 2006)]
[Notices]
[Pages 5836-5837]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-1502]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6671-9]
Environmental Impact Statements And Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
Section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at 202-564-7167. An explanation of the ratings
assigned to draft environmental impact statements (EISs) was published
in FR dated April 1, 2005 (70 FR 16815).
Draft EISs
EIS No. 20050362, ERP No. D-NRC-E05101-NC, Generic--Brunswick Stream
Electric Plant, Units 1 and 2 (TAC Nos. MC4641 and MC4642) License
Renewal of Nuclear Plants, Supplement 25 to NUREG-1437, Brunswick
County, NC.
Summary: EPA expressed environmental concerns about radiological
monitoring of all plant effluents, and appropriate storage and ultimate
disposition of radioactive waste generated on-site during the license
renewal period, as well as continuing measures to limit bioentrainment
and other impacts to aquatic species from surface water withdrawals and
discharges. Rating EC1.
EIS No. 20050396, ERP No. D-BIA-K60036-CA, Elk Valley Rancheria Martin
Ranch 203.5-Acre Fee-to-Trust Transfer and Casino/Resort Project,
Implementation, Federal Trust, Elk Valley Rancheria Tribe, Crescent
City, Del Norte County, CA.
Summary: EPA expressed concerns about impacts to wetlands and
uncertainties in the stormwater management system. EPA recommended the
final EIS include an adaptive management plan for the vegetated swale
system and clarify the need for a Clean Water Act Section 404 permit
for road crossings. Rating EC2.
EIS No. 20050425, ERP No. D-BLM-K65292-CA, Southern Diablo Mountain
Range and Central Coast of California Resource Management Plan, Several
Counties, CA.
Summary: EPA expressed concerns and recommended additional measures
be taken to reduce impacts to human health, watershed and vegetation
resources in the planning area. Rating EC2.
EIS No. 20050435, ERP No. D-NOA-E86003-00, Snapper Grouper Fishery,
Amendment 13C to the Fishery Management Plan, Phase Out Overfishing of
Snowy Grouper, Golden Tilefish, Vermilion Snapper and Sea Bass,
Implementation, South Atlantic Region.
Summary: While EPA had no objection to the proposed action, EPA did
request clarification of EJ demographics of fishermen. Rating LO.
EIS No. 20050438, ERP No. D-COE-E11058-SC, Charleston Naval Complex
(CNC), Proposed Construction of a Marine Container Terminal, Cooper
River in Charleston Harbor, City of North Charleston, Charleston
County, SC.
Summary: EPA expressed environmental concerns about impacts to
aquatic resources, water quality and air quality. EPA also requested
additional information regarding the potential impacts. Rating EC2.
EIS No. 20050450, ERP No. D-SFW-F64006-IL, Crab Orchard National
Wildlife Refuge Comprehensive Conservation Plan (CCP), Implementation,
Williamson, Jackson and Unicon Counties, IL.
Summary: While EPA had no objections to the proposed action, EPA
did request clarification on partnerships to reduce water pollution and
additional surveys covering area-sensitive forest birds and grassland
and shrubland birds. Rating LO.
EIS No. 20050484, ERP No. D-COE-K36143-CA, American River Watershed,
Lower American River Common Features Mayhew Levee Project,
Reconstruction, Sacramento County, CA.
Summary: EPA expressed concerns that several alternatives would
convert the American River Parkway to levee and maintenance roads and
would impact oak woodland habitat. EPA recommended the selection of
either Alternative 4 or 5 to reduce impacts to riparian vegetation and
requested additional information regarding cumulative impacts to air
and water quality in the area. Rating EC2.
EIS No. 20050507, ERP No. D-BLM-K65293-NV, Sheep Complex, Big Springs
and Owyhee Grazing Allotments Sensitive Bird Species Project, Determine
Impacts of Livestock Grazing, Elko County, NV.
Summary: EPA expressed environmental concerns with the potential
for continued impacts to vegetation, cultural resources, wildlife
habitat and sensitive species under the proposed level of grazing. The
Final EIS should include additional information on mitigation measures.
Rating EC2.
EIS No. 20050539, ERP No. D-GSA-K61163-CA, Andrade Port of Entry (POE)
Improvements Project, Proposed Expansion, Renovation , or Replacement
of POE, Andrade, CA.
Summary: EPA had concerns about cumulative impacts to air quality,
water quality, biological resources and cultural resources. Rating EC2.
EIS No. 20050413, ERP No. DS-FHW-E40339-NC, NC 12 Replacement of
Herbert C. Bonner Bridge (Bridge No. 11 ) New and Updated Information,
over Oregon Inlet Construction, Funding, U.S. Coast Guard Permit,
Special-Use-Permit, Right-of-Way Permit, US Army COE Section 10 and 404
Permit, Dare County, NC.
Summary: EPA has environmental objections to proposed project
alternatives that would continue to bisect the Pea Island National
Wildlife Refuge (PINWR) and likely result in long-term impacts to water
quality as well as disturbances to essential habitat for migratory
water fowl and resident wildlife. Pamlico Sound bridge alternatives
(PSBC), however, would traverse open water and result in less adverse
environmental impacts by
[[Page 5837]]
bypassing the PINWR and most sensitive aquatic habitats. Rating EO2.
Final EISs
EIS No. 20050313, ERP No. F-DOE-J39033-UT, Moab Uranium Mill Trailings
Remediation, Proposal to Clean Up Surface Contamination and Implement a
Ground Water Strategy, Grand and San Juan Counties, UT.
Summary: EPA's earlier concerns were addressed in the Final EIS;
therefore, EPA does not object to the proposed action.
EIS No. 20050506, ERP No. F-NOA-L91026-00, Pacific Coast Groundfish
Fishery Management Plan, To Conserve and Enhance Essential Fish Habitat
(EFH) Designation and Minimization of Advise Impacts, Coast Exclusive
Economic Zone, WA, OR and CA.
Summary: EPA supports the preferred alternatives for designating
EFH, minimizing fishing impacts to EFH and research and monitoring.
However, EPA still has concerns that not all oil production platforms
are designated as Habitat Areas of Particular Concern.
EIS No. 20050517, ERP No. F-FHW-D40325-PA, US-219 Improvements Project,
Meyersdale to Somerset, SR 6219, Section 020, Funding, U.S. Army COE
Section 404 Permit, Somerset County, PA.
Summary: EPA has no objections to the proposed project.
EIS No. 20050509, ERP No. FB-COE-E36167-FL, Central and Southern
Florida Project, Tamiami Trail Modifications, Modified Water Deliveries
to Everglades National Park, Authorized Flow of Water from WCA-38 and
the L-29 Canal North of the Tamiami Trail, Dade County, FL.
Summary: While EPA has no objections to the proposed action, EPA
did recommend an adaptive management approach to take advantage of
information gained from concurrent/future water quality monitoring and
wetland functions analysis.
Dated: January 31, 2006.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. E6-1502 Filed 2-2-06; 8:45 am]
BILLING CODE 6560-50-P