Notice of Application To Amend Recreation Plan and Soliciting Comments, Motions To Intervene, and Protests, 5313-5314 [E6-1251]
Download as PDF
cchase on PROD1PC60 with NOTICES
Federal Register / Vol. 71, No. 21 / Wednesday, February 1, 2006 / Notices
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. Description of Project: The
proposed project using the Dresden
Island Lock and Dam would consist of:
(1) A proposed powerhouse having a
total installed capacity of 18-megawatts,
(2) a proposed 3-phase 34-kilovolt 3⁄4
mile overhead transmission line, and (3)
appurtenant facilities. The proposed
project would have an average annual
generation of 73,400,000 kilowatt-hours,
which would be sold to a local utility.
l. Locations of Applications: A copy of
the application is available for
inspection and reproduction at the
Commission in the Public Reference
Room, located at 888 First Street, NE.,
Room 2A, Washington, DC 20426, or by
calling (202) 502–8371. This filing may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item h.
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Competing Preliminary Permit:
Anyone desiring to file a competing
application for preliminary permit for a
proposed project must submit the
competing application itself, or a notice
of intent to file such an application, to
the Commission on or before the
specified comment date for the
particular application (see 18 CFR 4.36).
Submission of a timely notice of intent
allows an interested person to file the
competing preliminary permit
application no later than 30 days after
the specified comment date for the
particular application. A competing
preliminary permit application must
conform with 18 CFR 4.30(b) and 4.36.
o. Competing Development
Application: Any qualified development
applicant desiring to file a competing
development application must submit to
the Commission, on or before a
specified comment date for the
particular application, either a
competing development application or a
notice of intent to file such an
application. Submission of a timely
notice of intent to file a development
VerDate Aug<31>2005
17:49 Jan 31, 2006
Jkt 208001
application allows an interested person
to file the competing application no
later than 120 days after the specified
comment date for the particular
application. A competing license
application must conform with 18 CFR
4.30(b) and 4.36.
p. Notice of Intent: A notice of intent
must specify the exact name, business
address, and telephone number of the
prospective applicant, and must include
an unequivocal statement of intent to
submit, if such an application may be
filed, either a preliminary permit
application or a development
application (specify which type of
application). A notice of intent must be
served on the applicant(s) named in this
public notice.
q. Proposed Scope of Studies under
Permit: A preliminary permit, if issued,
does not authorize construction. The
term of the proposed preliminary permit
would be 36 months. The work
proposed under the preliminary permit
would include economic analysis,
preparation of preliminary engineering
plans, and a study of environmental
impacts. Based on the results of these
studies, the Applicant would decide
whether to proceed with the preparation
of a development application to
construct and operate the project.
r. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, 385.211,
385.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper; See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s web site under ‘‘efiling’’ link. The Commission strongly
encourages electronic filing.
s. Filing and Service of Responsive
Documents: Any filings must bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers. Any of the above-named
documents must be filed by providing
the original and the number of copies
provided by the Commission’s
PO 00000
Frm 00082
Fmt 4703
Sfmt 4703
5313
regulations to: The Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
A copy of any motion to intervene must
also be served upon each representative
of the Applicant specified in the
particular application.
t. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Magalie R. Salas,
Secretary.
[FR Doc. E6–1250 Filed 1–31–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application To Amend
Recreation Plan and Soliciting
Comments, Motions To Intervene, and
Protests
January 25, 2006.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Amendment of
License.
b. Project No: 2157–166.
c. Date Filed: December 15, 2005.
d. Applicant: Public Utility District
No. 1 of Snohomish County,
Washington and the City of Everett.
e. Name of Project: Henry M. Jackson
Project.
f. Location: The project is located on
Sulton River, in Snohomish County,
Washington. This project occupies
about 1,939 acres of federal lands
administered by the U.S. Forest Service.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a) 825(r) and 799 and
801.
h. Applicant Contact: Mr. Clare
Olivers, Public Utility District No. 1 of
Snohomish County, 2320 California
Street, P.O. Box 1107, Everett, WA
98206, (425) 783–8606.
i. FERC Contacts: Any questions on
this notice should be addressed to Mr.
Jon Cofrancesco at (202) 502–8951, or email address: jon.cofrancesco@ferc.gov.
j. Deadline for filing comments and or
motions: February 14, 2006.
All documents (original and eight
copies) should be filed with: Ms.
E:\FR\FM\01FEN1.SGM
01FEN1
cchase on PROD1PC60 with NOTICES
5314
Federal Register / Vol. 71, No. 21 / Wednesday, February 1, 2006 / Notices
Magalie R. Salas, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington DC 20426.
Please include the project number (P–
2157–166) on any comments or motions
filed. Comments, protests, and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages efilings.
k. Description of the Application: On
December 15, 2005, Public Utility
District No. 1 of Snohomish County and
the City of Everett (co-licensees) filed an
application to amend the project’s
recreation plan. The co-licensees have
implemented security measures to
protect project hydroelectric facilities,
including gate closures across Culmback
Dam Road, immediately north and south
of the dam. These closures prevent all
public access across the dam, including
access to project recreation area No. 6 (a
scenic overlook adjacent to the dam)
and access from the south to recreation
areas Nos. 7 and 8, located on the north
side of the project reservoir. Pedestrian
access to recreation areas Nos. 7 and 8
remains available via a road along
northwest side of the reservoir. The colicensees’ application reflects the
proposed public access restrictions to
the above recreation areas.
l. Location of the Application: The
filing is available for review at the
Commission in the Public Reference
Room, located at 888 First Street, NE.,
Room 2A, Washington, D.C. 20426, or
may be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, please contact
FERC Online support at
FERCOnLineSupport@ferc.gov or toll
free (866) 208 3676 or TTY, contact
(202) 502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, 385.211,
385.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
VerDate Aug<31>2005
17:49 Jan 31, 2006
Jkt 208001
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filings must bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers. A copy of any motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
p. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
q. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the ‘‘eFiling’’ link.
Magalie R. Salas,
Secretary.
[FR Doc. E6–1251 Filed 1–31–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application for Non-Project
Use of Project Lands and Waters and
Soliciting Comments, Motions To
Intervene, and Protests
January 25, 2006.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Non-Project Use
of Project Lands and Waters.
b. Project No.: 516–417.
c. Date Filed: January 10, 2006.
d. Applicant: South Carolina Electric
& Gas Company.
e. Name of Project: Saluda Project.
f. Location: Lake Murray in Lexington
County, South Carolina. This project
does not occupy any federal or tribal
lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Randolph
R. Mahan, Manager, Environmental
PO 00000
Frm 00083
Fmt 4703
Sfmt 4703
Programs and Special Projects, SCANA
Services, Inc., Columbia, SC, 29218;
(803) 217–9538.
i. FERC Contacts: Any questions on
this notice should be addressed to Ms.
Shana High at (202) 502–8674.
j. Deadline for filing comments and or
motions: February 27, 2006.
All documents (original and eight
copies) should be filed with: Ms.
Magalie R. Salas, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington DC 20426.
Please include the project number (P–
516–417) on any comments or motions
filed. Comments, protests, and
interventions may be filed electronically
via the internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages efilings.
k. Description of Proposal: South
Carolina Electric & Gas Company is
requesting Commission authorization to
issue a permit to LAB Investors, L.L.C.
for the construction of a community
docking facility which includes a 100slip marina, a launching facility with
courtesy dock, and parking. The 100slip marina will require the excavation
of approximately 9,200 cubic yards
(c.y.) of material from 2.01 acres.
Construction of the launching facility
entails the placement of approximately
400 c.y. of topsoil, 300 c.y. of gravel,
and 35 c.y. of concrete covering 0.04
acre. The facility will not provide fuel
services or pump-out facilities as boats
with marine sanitary devices will not be
allowed to be berthed at the docks.
l. Location of the Applications: The
filings are available for review at the
Commission in the Public Reference
Room, located at 888 First Street, NE.,
Room 2A, Washington, DC 20426, or
may be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, please call
the Helpline at (866) 208–3676 or
contact FERCOnLineSupport@ferc.gov.
For TTY, contact (202) 502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, 385.211,
385.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
E:\FR\FM\01FEN1.SGM
01FEN1
Agencies
[Federal Register Volume 71, Number 21 (Wednesday, February 1, 2006)]
[Notices]
[Pages 5313-5314]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-1251]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application To Amend Recreation Plan and Soliciting
Comments, Motions To Intervene, and Protests
January 25, 2006.
Take notice that the following application has been filed with the
Commission and is available for public inspection:
a. Application Type: Amendment of License.
b. Project No: 2157-166.
c. Date Filed: December 15, 2005.
d. Applicant: Public Utility District No. 1 of Snohomish County,
Washington and the City of Everett.
e. Name of Project: Henry M. Jackson Project.
f. Location: The project is located on Sulton River, in Snohomish
County, Washington. This project occupies about 1,939 acres of federal
lands administered by the U.S. Forest Service.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a) 825(r)
and 799 and 801.
h. Applicant Contact: Mr. Clare Olivers, Public Utility District
No. 1 of Snohomish County, 2320 California Street, P.O. Box 1107,
Everett, WA 98206, (425) 783-8606.
i. FERC Contacts: Any questions on this notice should be addressed
to Mr. Jon Cofrancesco at (202) 502-8951, or e-mail address:
jon.cofrancesco@ferc.gov.
j. Deadline for filing comments and or motions: February 14, 2006.
All documents (original and eight copies) should be filed with: Ms.
[[Page 5314]]
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington DC 20426. Please include the project
number (P-2157-166) on any comments or motions filed. Comments,
protests, and interventions may be filed electronically via the
Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission's web site under the ``e-Filing'' link.
The Commission strongly encourages e-filings.
k. Description of the Application: On December 15, 2005, Public
Utility District No. 1 of Snohomish County and the City of Everett (co-
licensees) filed an application to amend the project's recreation plan.
The co-licensees have implemented security measures to protect project
hydroelectric facilities, including gate closures across Culmback Dam
Road, immediately north and south of the dam. These closures prevent
all public access across the dam, including access to project
recreation area No. 6 (a scenic overlook adjacent to the dam) and
access from the south to recreation areas Nos. 7 and 8, located on the
north side of the project reservoir. Pedestrian access to recreation
areas Nos. 7 and 8 remains available via a road along northwest side of
the reservoir. The co-licensees' application reflects the proposed
public access restrictions to the above recreation areas.
l. Location of the Application: The filing is available for review
at the Commission in the Public Reference Room, located at 888 First
Street, NE., Room 2A, Washington, D.C. 20426, or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, please
contact FERC Online support at FERCOnLineSupport@ferc.gov or toll free
(866) 208 3676 or TTY, contact (202) 502-8659.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210,
385.211, 385.214. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filings must
bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS
FOR TERMS AND CONDITIONS'', ``PROTEST'', or ``MOTION TO INTERVENE'', as
applicable, and the Project Number of the particular application to
which the filing refers. A copy of any motion to intervene must also be
served upon each representative of the Applicant specified in the
particular application.
p. Agency Comments: Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
q. Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site at https://www.ferc.gov
under the ``e-Filing'' link.
Magalie R. Salas,
Secretary.
[FR Doc. E6-1251 Filed 1-31-06; 8:45 am]
BILLING CODE 6717-01-P