Download as PDF 5312 Federal Register / Vol. 71, No. 21 / Wednesday, February 1, 2006 / Notices A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov under the ‘‘eFiling’’ link. Magalie R. Salas, Secretary. [FR Doc. E6–1242 Filed 1–31–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12608–000] Alternatives Unlimited, Inc.; Notice Soliciting Scoping Comments cchase on PROD1PC60 with NOTICES January 25, 2006. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Exemption from Licensing. b. Project No.: P–12608–000. c. Date filed: August 15, 2005. d. Applicant: Alternatives Unlimited, Inc. e. Name of Project: Alternatives Hydro Power Project. f. Location: On the Mumford River, in the Town of Northbridge, Worcester County, Massachusetts. The project would not use federal land. g. Filed Pursuant to: Public Utility Regulatory Policies Act of 1978, 16 U.S.C. sections 2705 and 2708. h. Applicant Contact: Kathleen D. Hervol. Beals and Thomas, Inc. Reservoir Corporate Center, 144 Turnpike Road (Route 9), Southborough, MA 01772–2104, (508) 366–0560. i. FERC Contact: Stefanie Harris, (202) 502–6653 or stefanie.harris@ferc.gov. j. Deadline for filing scoping comments: February 24, 2006. All documents (original and eight copies) should be filed with: Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the VerDate Aug<31>2005 17:49 Jan 31, 2006 Jkt 208001 official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. Scoping comments may be filed electronically via the Internet in lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https://www.ferc.gov) under the ‘‘eFiling’’ link. k. This application is not ready for environmental analysis at this time. l. Description of Project: The Alternatives Hydro Power Project would consist of: (1) The existing 127-foot-long by 15.5-foot-high Ring Shop Dam consisting of a concrete 9.5-foot-high spillway topped with 2.5-foot-high flashboards, a waste gate, and two inlet structures located at the north and south ends of the spillway, (2) an existing 1.3acre reservoir enlarged to 2 acres with a normal full pond elevation of 285.1 feet above mean sea level, (3) a restored 8-foot-wide head gated intake structure, (4) a new 23-foot by 6-foot metal service platform (to be enclosed for a future powerhouse) located at the south side of the dam containing three generating units with a total installed capacity of 45 kilowatts; and (5) appurtenant facilities. The restored project would have an average annual generation of 340 megawatt-hours. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. A copy is also available for inspection and reproduction at the address in item h above. n. You may also register online at https://www.ferc.gov.esubscribenow.htm to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. o. Scoping Process: The Commission staff intends to prepare a single Environmental Assessment (EA) for the Alternatives Hydro Power Project in accordance with the National Environmental Policy Act. The EA will consider both site-specific and cumulative environmental impacts and PO 00000 Frm 00081 Fmt 4703 Sfmt 4703 reasonable alternatives to the proposed action. Commission staff do not propose to conduct any on-site scoping meetings at this time. Instead, we are soliciting comments, recommendations, and information, on the Scoping Document (SD). Copies of the SD outlining the subject areas to be addressed in the EA were distributed to the parties on the Commission’s mailing list. Copies of the SD may be viewed on the Web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call 1–866– 208–3676 or for TTY, (202) 502–8659. Magalie R. Salas, Secretary. [FR Doc. E6–1249 Filed 1–31–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application Accepted for Filing and Soliciting Motions To Intervene, Protests, and Comments January 25, 2006. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Preliminary Permit. b. Project No.: 12626–000. c. Date filed: November 29, 2005. d. Applicant: Northern Illinois Hydropower Corporation. e. Name of Project: Dresden Island Hydroelectric Project. f. Location: On the Illinois River, in Grundy, County, Illinois. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)—825(r). h. Applicant Contact: Mr. Damon Zdunich, Northern Illinois Hydropower Corporation, 801 Oakland Avenue, Joliet, IL 60435, (312) 320–1610, dzdunich@gelbergroup.com. The Dresden Island Lock and Dam is owned by the U.S. Army Corps of Engineers. i. FERC Contact: Patricia W. Gillis at (202) 502–8735. j. Deadline for filing comments, protests, and motions to intervene: 60 days from the issuance date of this notice. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person in the official service list E:\FR\FM\01FEN1.SGM 01FEN1 cchase on PROD1PC60 with NOTICES Federal Register / Vol. 71, No. 21 / Wednesday, February 1, 2006 / Notices for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Project: The proposed project using the Dresden Island Lock and Dam would consist of: (1) A proposed powerhouse having a total installed capacity of 18-megawatts, (2) a proposed 3-phase 34-kilovolt 3⁄4 mile overhead transmission line, and (3) appurtenant facilities. The proposed project would have an average annual generation of 73,400,000 kilowatt-hours, which would be sold to a local utility. l. Locations of Applications: A copy of the application is available for inspection and reproduction at the Commission in the Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call toll-free 1–866–208–3676 or e-mail FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item h. above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Competing Preliminary Permit: Anyone desiring to file a competing application for preliminary permit for a proposed project must submit the competing application itself, or a notice of intent to file such an application, to the Commission on or before the specified comment date for the particular application (see 18 CFR 4.36). Submission of a timely notice of intent allows an interested person to file the competing preliminary permit application no later than 30 days after the specified comment date for the particular application. A competing preliminary permit application must conform with 18 CFR 4.30(b) and 4.36. o. Competing Development Application: Any qualified development applicant desiring to file a competing development application must submit to the Commission, on or before a specified comment date for the particular application, either a competing development application or a notice of intent to file such an application. Submission of a timely notice of intent to file a development VerDate Aug<31>2005 17:49 Jan 31, 2006 Jkt 208001 application allows an interested person to file the competing application no later than 120 days after the specified comment date for the particular application. A competing license application must conform with 18 CFR 4.30(b) and 4.36. p. Notice of Intent: A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit, if such an application may be filed, either a preliminary permit application or a development application (specify which type of application). A notice of intent must be served on the applicant(s) named in this public notice. q. Proposed Scope of Studies under Permit: A preliminary permit, if issued, does not authorize construction. The term of the proposed preliminary permit would be 36 months. The work proposed under the preliminary permit would include economic analysis, preparation of preliminary engineering plans, and a study of environmental impacts. Based on the results of these studies, the Applicant would decide whether to proceed with the preparation of a development application to construct and operate the project. r. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, 385.214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper; See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s web site under ‘‘efiling’’ link. The Commission strongly encourages electronic filing. s. Filing and Service of Responsive Documents: Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘RECOMMENDATIONS FOR TERMS AND CONDITIONS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers. Any of the above-named documents must be filed by providing the original and the number of copies provided by the Commission’s PO 00000 Frm 00082 Fmt 4703 Sfmt 4703 5313 regulations to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. t. Agency Comments: Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Magalie R. Salas, Secretary. [FR Doc. E6–1250 Filed 1–31–06; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application To Amend Recreation Plan and Soliciting Comments, Motions To Intervene, and Protests January 25, 2006. Take notice that the following application has been filed with the Commission and is available for public inspection: a. Application Type: Amendment of License. b. Project No: 2157–166. c. Date Filed: December 15, 2005. d. Applicant: Public Utility District No. 1 of Snohomish County, Washington and the City of Everett. e. Name of Project: Henry M. Jackson Project. f. Location: The project is located on Sulton River, in Snohomish County, Washington. This project occupies about 1,939 acres of federal lands administered by the U.S. Forest Service. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a) 825(r) and 799 and 801. h. Applicant Contact: Mr. Clare Olivers, Public Utility District No. 1 of Snohomish County, 2320 California Street, P.O. Box 1107, Everett, WA 98206, (425) 783–8606. i. FERC Contacts: Any questions on this notice should be addressed to Mr. Jon Cofrancesco at (202) 502–8951, or email address: jon.cofrancesco@ferc.gov. j. Deadline for filing comments and or motions: February 14, 2006. All documents (original and eight copies) should be filed with: Ms. E:\FR\FM\01FEN1.SGM 01FEN1

Agencies

[Federal Register Volume 71, Number 21 (Wednesday, February 1, 2006)]
[Notices]
[Pages 5312-5313]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-1250]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Application Accepted for Filing and Soliciting Motions 
To Intervene, Protests, and Comments

January 25, 2006.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Preliminary Permit.
    b. Project No.: 12626-000.
    c. Date filed: November 29, 2005.
    d. Applicant: Northern Illinois Hydropower Corporation.
    e. Name of Project: Dresden Island Hydroelectric Project.
    f. Location: On the Illinois River, in Grundy, County, Illinois.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)--825(r).
    h. Applicant Contact: Mr. Damon Zdunich, Northern Illinois 
Hydropower Corporation, 801 Oakland Avenue, Joliet, IL 60435, (312) 
320-1610, dzdunich@gelbergroup.com. The Dresden Island Lock and Dam is 
owned by the U.S. Army Corps of Engineers.
    i. FERC Contact: Patricia W. Gillis at (202) 502-8735.
    j. Deadline for filing comments, protests, and motions to 
intervene: 60 days from the issuance date of this notice.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person in the official service list

[[Page 5313]]

for the project. Further, if an intervenor files comments or documents 
with the Commission relating to the merits of an issue that may affect 
the responsibilities of a particular resource agency, they must also 
serve a copy of the document on that resource agency.
    k. Description of Project: The proposed project using the Dresden 
Island Lock and Dam would consist of: (1) A proposed powerhouse having 
a total installed capacity of 18-megawatts, (2) a proposed 3-phase 34-
kilovolt \3/4\ mile overhead transmission line, and (3) appurtenant 
facilities. The proposed project would have an average annual 
generation of 73,400,000 kilowatt-hours, which would be sold to a local 
utility.
    l. Locations of Applications: A copy of the application is 
available for inspection and reproduction at the Commission in the 
Public Reference Room, located at 888 First Street, NE., Room 2A, 
Washington, DC 20426, or by calling (202) 502-8371. This filing may 
also be viewed on the Commission's Web site at https://www.ferc.gov 
using the ``eLibrary'' link. Enter the docket number excluding the last 
three digits in the docket number field to access the document. For 
assistance, call toll-free 1-866-208-3676 or e-mail 
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
h. above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Competing Preliminary Permit: Anyone desiring to file a 
competing application for preliminary permit for a proposed project 
must submit the competing application itself, or a notice of intent to 
file such an application, to the Commission on or before the specified 
comment date for the particular application (see 18 CFR 4.36). 
Submission of a timely notice of intent allows an interested person to 
file the competing preliminary permit application no later than 30 days 
after the specified comment date for the particular application. A 
competing preliminary permit application must conform with 18 CFR 
4.30(b) and 4.36.
    o. Competing Development Application: Any qualified development 
applicant desiring to file a competing development application must 
submit to the Commission, on or before a specified comment date for the 
particular application, either a competing development application or a 
notice of intent to file such an application. Submission of a timely 
notice of intent to file a development application allows an interested 
person to file the competing application no later than 120 days after 
the specified comment date for the particular application. A competing 
license application must conform with 18 CFR 4.30(b) and 4.36.
    p. Notice of Intent: A notice of intent must specify the exact 
name, business address, and telephone number of the prospective 
applicant, and must include an unequivocal statement of intent to 
submit, if such an application may be filed, either a preliminary 
permit application or a development application (specify which type of 
application). A notice of intent must be served on the applicant(s) 
named in this public notice.
    q. Proposed Scope of Studies under Permit: A preliminary permit, if 
issued, does not authorize construction. The term of the proposed 
preliminary permit would be 36 months. The work proposed under the 
preliminary permit would include economic analysis, preparation of 
preliminary engineering plans, and a study of environmental impacts. 
Based on the results of these studies, the Applicant would decide 
whether to proceed with the preparation of a development application to 
construct and operate the project.
    r. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, 
385.211, 385.214. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    Comments, protests and interventions may be filed electronically 
via the Internet in lieu of paper; See 18 CFR 385.2001(a)(1)(iii) and 
the instructions on the Commission's web site under ``e-filing'' link. 
The Commission strongly encourages electronic filing.
    s. Filing and Service of Responsive Documents: Any filings must 
bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS 
FOR TERMS AND CONDITIONS'', ``PROTEST'', or ``MOTION TO INTERVENE'', as 
applicable, and the Project Number of the particular application to 
which the filing refers. Any of the above-named documents must be filed 
by providing the original and the number of copies provided by the 
Commission's regulations to: The Secretary, Federal Energy Regulatory 
Commission, 888 First Street, NE., Washington, DC 20426. A copy of any 
motion to intervene must also be served upon each representative of the 
Applicant specified in the particular application.
    t. Agency Comments: Federal, state, and local agencies are invited 
to file comments on the described application. A copy of the 
application may be obtained by agencies directly from the Applicant. If 
an agency does not file comments within the time specified for filing 
comments, it will be presumed to have no comments. One copy of an 
agency's comments must also be sent to the Applicant's representatives.

Magalie R. Salas,
Secretary.
[FR Doc. E6-1250 Filed 1-31-06; 8:45 am]