Alternatives Unlimited, Inc.; Notice Soliciting Scoping Comments, 5312 [E6-1249]
Download as PDF
5312
Federal Register / Vol. 71, No. 21 / Wednesday, February 1, 2006 / Notices
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site at
https://www.ferc.gov under the ‘‘eFiling’’ link.
Magalie R. Salas,
Secretary.
[FR Doc. E6–1242 Filed 1–31–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12608–000]
Alternatives Unlimited, Inc.; Notice
Soliciting Scoping Comments
cchase on PROD1PC60 with NOTICES
January 25, 2006.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Exemption
from Licensing.
b. Project No.: P–12608–000.
c. Date filed: August 15, 2005.
d. Applicant: Alternatives Unlimited,
Inc.
e. Name of Project: Alternatives Hydro
Power Project.
f. Location: On the Mumford River, in
the Town of Northbridge, Worcester
County, Massachusetts. The project
would not use federal land.
g. Filed Pursuant to: Public Utility
Regulatory Policies Act of 1978, 16
U.S.C. sections 2705 and 2708.
h. Applicant Contact: Kathleen D.
Hervol. Beals and Thomas, Inc.
Reservoir Corporate Center, 144
Turnpike Road (Route 9), Southborough,
MA 01772–2104, (508) 366–0560.
i. FERC Contact: Stefanie Harris, (202)
502–6653 or stefanie.harris@ferc.gov.
j. Deadline for filing scoping
comments: February 24, 2006.
All documents (original and eight
copies) should be filed with: Magalie R.
Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
VerDate Aug<31>2005
17:49 Jan 31, 2006
Jkt 208001
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
Scoping comments may be filed
electronically via the Internet in lieu of
paper. The Commission strongly
encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov) under the
‘‘eFiling’’ link.
k. This application is not ready for
environmental analysis at this time.
l. Description of Project: The
Alternatives Hydro Power Project would
consist of: (1) The existing 127-foot-long
by 15.5-foot-high Ring Shop Dam
consisting of a concrete 9.5-foot-high
spillway topped with 2.5-foot-high
flashboards, a waste gate, and two inlet
structures located at the north and south
ends of the spillway, (2) an existing 1.3acre reservoir enlarged to 2 acres with
a normal full pond elevation of 285.1
feet above mean sea level, (3) a restored
8-foot-wide head gated intake structure,
(4) a new 23-foot by 6-foot metal service
platform (to be enclosed for a future
powerhouse) located at the south side of
the dam containing three generating
units with a total installed capacity of
45 kilowatts; and (5) appurtenant
facilities. The restored project would
have an average annual generation of
340 megawatt-hours.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item h above.
n. You may also register online at
https://www.ferc.gov.esubscribenow.htm
to be notified via email of new filings
and issuances related to this or other
pending projects. For assistance, contact
FERC Online Support.
o. Scoping Process: The Commission
staff intends to prepare a single
Environmental Assessment (EA) for the
Alternatives Hydro Power Project in
accordance with the National
Environmental Policy Act. The EA will
consider both site-specific and
cumulative environmental impacts and
PO 00000
Frm 00081
Fmt 4703
Sfmt 4703
reasonable alternatives to the proposed
action.
Commission staff do not propose to
conduct any on-site scoping meetings at
this time. Instead, we are soliciting
comments, recommendations, and
information, on the Scoping Document
(SD).
Copies of the SD outlining the subject
areas to be addressed in the EA were
distributed to the parties on the
Commission’s mailing list. Copies of the
SD may be viewed on the Web at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, call 1–866–
208–3676 or for TTY, (202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–1249 Filed 1–31–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application Accepted for
Filing and Soliciting Motions To
Intervene, Protests, and Comments
January 25, 2006.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: 12626–000.
c. Date filed: November 29, 2005.
d. Applicant: Northern Illinois
Hydropower Corporation.
e. Name of Project: Dresden Island
Hydroelectric Project.
f. Location: On the Illinois River, in
Grundy, County, Illinois.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)—825(r).
h. Applicant Contact: Mr. Damon
Zdunich, Northern Illinois Hydropower
Corporation, 801 Oakland Avenue,
Joliet, IL 60435, (312) 320–1610,
dzdunich@gelbergroup.com. The
Dresden Island Lock and Dam is owned
by the U.S. Army Corps of Engineers.
i. FERC Contact: Patricia W. Gillis at
(202) 502–8735.
j. Deadline for filing comments,
protests, and motions to intervene: 60
days from the issuance date of this
notice.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
E:\FR\FM\01FEN1.SGM
01FEN1
Agencies
[Federal Register Volume 71, Number 21 (Wednesday, February 1, 2006)]
[Notices]
[Page 5312]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-1249]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12608-000]
Alternatives Unlimited, Inc.; Notice Soliciting Scoping Comments
January 25, 2006.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Exemption from Licensing.
b. Project No.: P-12608-000.
c. Date filed: August 15, 2005.
d. Applicant: Alternatives Unlimited, Inc.
e. Name of Project: Alternatives Hydro Power Project.
f. Location: On the Mumford River, in the Town of Northbridge,
Worcester County, Massachusetts. The project would not use federal
land.
g. Filed Pursuant to: Public Utility Regulatory Policies Act of
1978, 16 U.S.C. sections 2705 and 2708.
h. Applicant Contact: Kathleen D. Hervol. Beals and Thomas, Inc.
Reservoir Corporate Center, 144 Turnpike Road (Route 9), Southborough,
MA 01772-2104, (508) 366-0560.
i. FERC Contact: Stefanie Harris, (202) 502-6653 or
stefanie.harris@ferc.gov.
j. Deadline for filing scoping comments: February 24, 2006.
All documents (original and eight copies) should be filed with:
Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
Scoping comments may be filed electronically via the Internet in
lieu of paper. The Commission strongly encourages electronic filings.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site (https://www.ferc.gov) under the ``eFiling'' link.
k. This application is not ready for environmental analysis at this
time.
l. Description of Project: The Alternatives Hydro Power Project
would consist of: (1) The existing 127-foot-long by 15.5-foot-high Ring
Shop Dam consisting of a concrete 9.5-foot-high spillway topped with
2.5-foot-high flashboards, a waste gate, and two inlet structures
located at the north and south ends of the spillway, (2) an existing
1.3-acre reservoir enlarged to 2 acres with a normal full pond
elevation of 285.1 feet above mean sea level, (3) a restored 8-foot-
wide head gated intake structure, (4) a new 23-foot by 6-foot metal
service platform (to be enclosed for a future powerhouse) located at
the south side of the dam containing three generating units with a
total installed capacity of 45 kilowatts; and (5) appurtenant
facilities. The restored project would have an average annual
generation of 340 megawatt-hours.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659. A copy is also available for
inspection and reproduction at the address in item h above.
n. You may also register online at https://
www.ferc.gov.esubscribenow.htm to be notified via email of new filings
and issuances related to this or other pending projects. For
assistance, contact FERC Online Support.
o. Scoping Process: The Commission staff intends to prepare a
single Environmental Assessment (EA) for the Alternatives Hydro Power
Project in accordance with the National Environmental Policy Act. The
EA will consider both site-specific and cumulative environmental
impacts and reasonable alternatives to the proposed action.
Commission staff do not propose to conduct any on-site scoping
meetings at this time. Instead, we are soliciting comments,
recommendations, and information, on the Scoping Document (SD).
Copies of the SD outlining the subject areas to be addressed in the
EA were distributed to the parties on the Commission's mailing list.
Copies of the SD may be viewed on the Web at https://www.ferc.gov using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, call 1-866-208-3676 or for TTY, (202) 502-8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6-1249 Filed 1-31-06; 8:45 am]
BILLING CODE 6717-01-P