Crisp County Power Commission; Notice of Availability of Environmental Assessment, 4128-4129 [E6-841]
Download as PDF
wwhite on PROD1PC61 with NOTICES
4128
Federal Register / Vol. 71, No. 16 / Wednesday, January 25, 2006 / Notices
the Notice of Cancellation Filing of
Kentucky Utilities Co.
Filed Date: 01/05/2006.
Accession Number: 20060105–5031.
Comment Date: 5 p.m. eastern time on
Monday, January 30, 2006.
Docket Numbers: ER06–268–001.
Applicants: Los Esteros Critical
Energy Facility LLC.
Description: Los Esteros Critical
Energy Facility, LLC submits
Attachment A—corrections to Rate
Schedule No.130 of its Reliability MustRun Agreement with the California
Independent System Operator Corp.
Filed Date: 01/11/2006.
Accession Number: 20060113–0142.
Comment Date: 5 p.m. eastern time on
Wednesday, February 1, 2006.
Docket Numbers: ER06–332–001.
Applicants: ISO New England Inc.
Description: ISO New England Inc
submits a page providing the missing
text from its informational filing
submitted on 12/15/05.
Filed Date: 01/10/2006.
Accession Number: 20060117–0220.
Comment Date: 5 p.m. eastern time on
Tuesday, January 31, 2006.
Docket Numbers: ER06–472–000.
Applicants: LG&E Energy Marketing
Inc.
Description: LG&E Energy Marketing ,
Inc submits an Agreement for Electric
Service with Kenergy Corp.
Filed Date: 01/11/2006.
Accession Number: 20060113–0135.
Comment Date: 5 p.m. eastern time on
Wednesday, February 1, 2006.
Docket Numbers: ER06–473–000.
Applicants: Central Vermont Public
Service Corporation.
Description: Central Vermont Public
Service Corp submits a non-conforming
point-to-point service agreement under
ISO New England Inc Tariff Schedule
20A.
Filed Date: 01/11/2006.
Accession Number: 20060113–0134.
Comment Date: 5 p.m. eastern time on
Wednesday, February 1, 2006.
Docket Numbers: ER06–475–000.
Applicants: Colorado Power Partners.
Description: Colorado Power Partners
submits revised sheets to its market
based rate tariff, FERC Electric Tariff
Volume No. 1.
Filed Date: 01/11/2006.
Accession Number: 20060117–0213.
Comment Date: 5 p.m. eastern time on
Wednesday, February 1, 2006.
Docket Numbers: ER06–476–000.
Applicants: Westar Energy, Inc.
Description: Westar Energy, Inc
submits a Notice of Cancellation of
Supplement No.15, Service Schedule M
under their First Revised Rate Schedule
Federal Power Commission No. 93.
VerDate Aug<31>2005
18:26 Jan 24, 2006
Jkt 208001
Filed Date: 01/11/2006.
Accession Number: 20060117–0214.
Comment Date: 5 p.m. eastern time on
Wednesday, February 1, 2006.
Docket Numbers: ER88–478–001;
ER91–576–002.
Applicants: Ocean State Power; Ocean
State Power II.
Description: Ocean State Power and
Ocean State Power II report a change in
status to reflect certain departures from
the facts the Commission relied upon in
granting market-based rate authority.
Filed Date: 01/11/2006.
Accession Number: 20060113–0138.
Comment Date: 5 p.m. eastern time on
Wednesday, February 1, 2006.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other and the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St. NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the web site that
enables subscribers to receive e-mail
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–826 Filed 1–24–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 659–013]
Crisp County Power Commission;
Notice of Availability of Environmental
Assessment
January 18, 2006.
In accordance with the National
Environmental Policy Act of 1969, as
amended, and the Federal Energy
Regulatory Commission’s (Commission)
regulations (18 CFR Part 380),
Commission staff have prepared an
environmental assessment (EA) that
analyzes the environmental impacts of
allowing Crisp Country Power
Commission, licensee for the Lake
Blackshear Hydroelectric Project (FERC
No. 659), to amend the existing project
boundary. The licensee proposes to
amend the Lake Blackshear Project’s
boundary to include a 3.2 acre increase
in the lake surface area in association
with a proposed subdivision on
Lincolmpinch Cove. The proposed
subdivision would include 16 lots and
would extend the inlet to provide lake
frontage to the proposed lots. The
extension would be created by
excavating wetland areas bordering the
cove to a depth of approximately 4 feet
below the normal water surface
elevation of Lake Blackshear. The
licensee proposes to maintain the
project boundary at the 237-foot msl
contour, and extend the boundary along
this contour to encompass the
additional area that would be excavated
and inundated in association with the
construction of the subdivision. In
addition to excavating the cove area, the
developer would dredge a 4-foot-deep
by 40-foot-wide channel from Lake
Blackshear to the cove to allow water
from the lake to fill the cove.
A copy of the EA is attached to a
Commission order titled ‘‘Order
Approving Change in Project
Boundary,’’ which was issued on
January 13, 2006, and is available for
review and reproduction at the
Commission’s Public Reference Room,
E:\FR\FM\25JAN1.SGM
25JAN1
Federal Register / Vol. 71, No. 16 / Wednesday, January 25, 2006 / Notices
located at 888 First Street, NE., Room
2A, Washington, DC 20426. The EA may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘elibrary’’ link. Enter the docket
number (prefaced by P-) and excluding
the last three digits, in the docket
number field to access the document.
For assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY,
contact (202) 502–8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6–841 Filed 1–24–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application for Surrender of
License and Soliciting Comments,
Motions To Intervene, and Protests
wwhite on PROD1PC61 with NOTICES
January 18, 2006.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Surrender of
License (5 MW or Less).
b. Project No.: 11392–008.
c. Date Filed: August 17, 2005.
d. Applicant: J&T Hydro Company.
e. Name of Project: Ramseur Project.
f. Location: Located on the Deep
River, Randolph County, North
Carolina.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Ms. Joann Hill,
J&T Hydro Company, 7540 Burgess
Kivett Road, Ramseur, NC 27316.
i. FERC Contact: Christopher Yeakel,
(202) 502–8132.
j. Deadline for filing responsive
documents: February 21, 2006.
k. Description of Proposed Action:
The existing project consists of: (1) An
11-foot-high, 434-foot-long stone
masonry dam; (2) a reservoir with a
surface area of about 33 acres; (3) a
1,300 foot-long power canal; (4) an
existing two-story brick masonry
powerhouse that previously contained
two generators rated at 150 kW each for
a total installed capacity of 300 kW; (5)
a 226 foot-long tailrace; (6) a 112-footlong, 2.4-kilovolt overhead transmission
line; and (7) appurtenant equipment.
The licensee would like to surrender its
license. The generating equipment has
been removed and sold.
l. Locations of Application: A copy of
the information is available for
VerDate Aug<31>2005
18:26 Jan 24, 2006
Jkt 208001
inspection and reproduction at the
Commission in the Public Reference
Room, located at 888 First Street, NE.,
Room 2A, Washington, DC 20426, or by
calling (202) 502–8371. This filing may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number, here P–11392, in the docket
number field to access the document.
For assistance, call toll-free 1–866–208–
3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item h
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘REPLY COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers. Any of the above-named
documents must be filed by providing
the original and eight copies to: Magalie
R. Salas, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. An
additional copy must be sent to the
Director, Division of Hydropower
Administration and Compliance,
Federal Energy Regulatory Commission,
at the above-mentioned address. A copy
of any motion to intervene must also be
served upon each representative of the
Applicant specified in the particular
application.
p. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described
applications. A copy of the applications
may be obtained by agencies directly
from the Applicant. If any agency does
not file comments within the time
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
4129
specified for filing comments, it will be
presumed to have no comments. One
copy of an agency’s comments must also
be sent to the Applicant’s
representatives.
q. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the
‘‘e-Filing’’ link.
Magalie R. Salas,
Secretary.
[FR Doc. E6–839 Filed 1–24–06; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Application for Non-Project
Use of Project Lands and Waters
January 18, 2006.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Non-Project Use
of Project Lands and Waters.
b. Project No: 2413–073.
c. Date Filed: November 22, 2005.
d. Applicant: Georgia Power
Company.
e. Name of Project: Wallace Dam
Project.
f. Location: The proposed
development is located on Lake Oconee
in Putnam County, Georgia. This project
does not occupy any federal or tribal
lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r) and 799
and 801.
h. Applicant Contact: Mr. Lee B.
Glenn, Georgia Power Company, 125
Wallace Dam Road NE., Eatonton, GA
31024, (706) 485–8704.
i. FERC Contact: Any questions on
this notice should be addressed to
Shana High at (202) 502–8764.
j. Deadline for filing comments and or
motions: February 21, 2006.
All documents (original and eight
copies) should be filed with: Ms.
Magalie R. Salas, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington DC 20426.
Please include the project number (P–
2413–073) on any comments or motions
filed. Comments, protests, and
interventions may be filed electronically
via the internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
E:\FR\FM\25JAN1.SGM
25JAN1
Agencies
[Federal Register Volume 71, Number 16 (Wednesday, January 25, 2006)]
[Notices]
[Pages 4128-4129]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E6-841]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 659-013]
Crisp County Power Commission; Notice of Availability of
Environmental Assessment
January 18, 2006.
In accordance with the National Environmental Policy Act of 1969,
as amended, and the Federal Energy Regulatory Commission's (Commission)
regulations (18 CFR Part 380), Commission staff have prepared an
environmental assessment (EA) that analyzes the environmental impacts
of allowing Crisp Country Power Commission, licensee for the Lake
Blackshear Hydroelectric Project (FERC No. 659), to amend the existing
project boundary. The licensee proposes to amend the Lake Blackshear
Project's boundary to include a 3.2 acre increase in the lake surface
area in association with a proposed subdivision on Lincolmpinch Cove.
The proposed subdivision would include 16 lots and would extend the
inlet to provide lake frontage to the proposed lots. The extension
would be created by excavating wetland areas bordering the cove to a
depth of approximately 4 feet below the normal water surface elevation
of Lake Blackshear. The licensee proposes to maintain the project
boundary at the 237-foot msl contour, and extend the boundary along
this contour to encompass the additional area that would be excavated
and inundated in association with the construction of the subdivision.
In addition to excavating the cove area, the developer would dredge a
4-foot-deep by 40-foot-wide channel from Lake Blackshear to the cove to
allow water from the lake to fill the cove.
A copy of the EA is attached to a Commission order titled ``Order
Approving Change in Project Boundary,'' which was issued on January 13,
2006, and is available for review and reproduction at the Commission's
Public Reference Room,
[[Page 4129]]
located at 888 First Street, NE., Room 2A, Washington, DC 20426. The EA
may also be viewed on the Commission's Web site at https://www.ferc.gov
using the ``elibrary'' link. Enter the docket number (prefaced by P-)
and excluding the last three digits, in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll-free at (866) 208-3676, or for TTY,
contact (202) 502-8659.
Magalie R. Salas,
Secretary.
[FR Doc. E6-841 Filed 1-24-06; 8:45 am]
BILLING CODE 6717-01-P